Absentism Project

Date post: 03-Apr-2018
Category:
Upload: indu-randhawa-gill
View: 216 times
Download: 0 times
Share this document with a friend

of 50

Transcript
  • 7/28/2019 Absentism Project

    1/50

    1 |P a g e

    ACKNOWLEDGEMENT

    I gratefully acknowledge the help and co-operation of the entire

    Manpower of LANCO Budhil Hydro Electric Project (70 MW) at Bharmour. At

    the outset, I would like to thank Mr. Anil Gautam, General Manager (HR) for

    giving me an opportunity to learn at LANCO Budhil Hydro Electric Project (70

    MW) at Bharmour; My guide Mr. Nasir Khan, Officer (HR), whose versatile

    guidance provided me with an insight into the field of Human Resource

    Development, particularly deserves my thanks.

    A similar vote of thanks goes to Mr. Umed Singh and Mr. Sartaj Singh o

    LANCO BHEP, Bharmour whose expertise in the field proved to be of great

    value to me during my training.

    I would like to thank Mr. Rajesh Kumar, Assistant Professor, SOBMS,

    CUHP Dharamshala for his valuable guidance in making my project successful.

    I also wish to thank my Mom and Dad for their financial and moralsupport. Above all I want to thank God Almighty for always being with me.

    With all their encouragement and well wishes, my project proved to be

    fruitful

    (DEEPAK KUMAR)

  • 7/28/2019 Absentism Project

    2/50

    2 |P a g e

    DECLARATION

    I, Deepak Kumar, student of Central University of Himachal Pradesh, pursuing

    MBA (ED) under Roll no. CUHP 10 MBA(ED) 5, hereby declares that, I have

    completed my 8 weeks Summer Training in LANCO Budhil Hydro Electric

    Project at Bharmour, Distt. Chamba of H.P. and, therefore, submitting this

    Summer Training Project Report in original. I further declare that all the

    contents of this report are authentic and based upon the research conducted

    by me during the period of Summer Training. This Report is exclusively

    submitted in the Central University of Himachal Pradesh for the partial

    fulfillment of the degree of MBA.

    (DEEPAK KUMAR)

  • 7/28/2019 Absentism Project

    3/50

    3 |P a g e

    TABLE OF CONTENTS

    Acknowledgement 1

    Declaration 2

    Table of Contents 3

    PART 1: THE ORGANIZATION DIAGNOSIS AND UNDERSTANDING

    I. Origin and Growth of Company 4

    II. Managerial Practices adopted by the Mgmt. of the Company 10

    III. Organizational Structure 19

    IV. Performance in terms of Financial and Non Financial aspects 20

    V. SWOT Analysis of LANCO BHEP 28

    PART II: PROJECT WORK

    VI. Introduction to the Topic Chosen for Study 29VI. Problem Identification and Problem Formulation 34

    VIII. Research Methodology 36

    IX. Results and Recommendations 39

    Table and Pie Charts 38

    APPENDICES

    Annexure I: Industry Supervisor Report

    Annexure II: Questionnaire 49

  • 7/28/2019 Absentism Project

    4/50

    4 |P a g e

    PART I: ORGANIZATIONAL DIAGNOSIS AND UNDERSTANDING:

    I. THE ORIGIN AND GROWTH OF COMPANY:

    ORGANIZATIONS PROFILE:

    LANCO Infratech Limited is one of Indias rapidly emerging business

    entities. For the last two and a half decades it has been driving growth in the

    domains of Engineering, Procurement and Construction (EPC), Power, Solar,

    Natural Resources, Infrastructure and Property Development. Its continuous

    focus on innovation and expansion together with its commitment to quality

    and excellence has contributed significantly to the progress that the company

    has made over a short span of time. The 25-year-old group is, today, uniquely

    poised to attain leadership position in its areas of operation.

    The key positions in the company are held by:

    L Rajagopal is the Founder Chairman of LANCO Group of Companies.

    L Madhusudhan Rao is the Executive Chairman of LANCO Infratech Ltd. G Bhaskara Rao is the Executive Vice Chiarman of LANCO Infratech Ltd.

    ORGANIZATIONS HISTORY:

    1960-76:The Seeds of Enterprise:

    In 1960, brothers Amarappa Naidu, Venkata Rama Naidu and Venkata

    Ratnam Naidu laid the foundation of LANCO by starting a transport business

    with one truck (a converted bus) inherited from their father L.V. Subba Naidu.

    Amarappa Naidu's business acumen and the brothers' commitment soon led to

    orders pouring in from construction companies that needed material to be

    transported to and from construction sites. By 1976, the thriving business

    boasted of a fleet of 100 trucks that serviced the construction industry in

    Andhra Pradesh.

  • 7/28/2019 Absentism Project

    5/50

    5 |P a g e

    1977-85: Building the Foundation:

    Having succeeded beyond imagination, the Naidu brothers planned to

    enter the construction business themselves. In 1980, Uma Maheshwar Rao and

    Company was established and soon made a name for itself in the construction

    industry by delivering several prestigious turnkey projects in Andhra Pradesh

    and Karnataka. By 1980, the company's assets included 150 trucks, eight

    excavators, 10 bulldozers and 15 drilling machines. In 1985, L.V. Rama Naidu's

    son, L. Rajagopal, a mechanical engineer, was inducted into the company.

    1986-90: Overcoming Adversity:

    In 1986, when the company went through some tough circumstances, L.

    Rajgopal's resolve to succeed even got firmer. He acquired a new construction

    firm, S.V. Contractors, in partnership with his brother-in-law, G. Bhaskara Rao,

    also an engineer. The first year of operation saw a profit of Rs. 1crore; by 1990

    the company's annual turnover was Rs. 25 crore.

    1991-94: Seizing Opportunities:Taking advantage of the new opportunities offered by the liberalization

    of the Indian economy, L. Rajagopal diversified from construction business to

    manufacturing by setting up a pig iron plant of 90,000 tpa. He took inspiration

    from his uncle Lagadapati Amarappa Naidu and named this new business as

    LANCO Ferro. LANCO is an acronym for Lagadapati Amarappa Naidu and

    Company and is tribute to his vision and ideals. In 1991, L. Rajagopal inducted

    his younger brother, L. Madhusudhan Rao, to manage the business at LANCO

    Ferro, which was renamed as LANCO Industries in 1993. L. Madhusudhan Rao

    launched several ambitious initiatives and expanded LANCO Ferro into a fully-

    integrated plant producing cement, ductile iron pipes and pig iron.

    1995-1999: Diversifying to Grow:

  • 7/28/2019 Absentism Project

    6/50

    6 |P a g e

    Diversification through joint venture partnerships became the key word

    at LANCO as the organization embarked on an aggressive growth path. In 1995,

    the Andhra Pradesh government opened the power sector to private players.

    LANCO entered the power sector against a power purchase agreement with

    the state government with a 368 MW gas power plant in Kondapalli,

    commissioned in 2000. Kondapalli Power Ltd. (LKPL), a joint venture between

    LANCO and the Genting Group of Malaysia marked a major milestone in the

    organizations growth as an independent power producer.

    2000-05: A New Century, a New Vision:

    In 2002, L. Rajagopal retired from the business to pursue public life, and

    L. Madhusudhan Rao took over as the Chairman of the organization. This was a

    period of change and reorganization, as LANCO prepared itself to meet the

    challenges of a new century. LANCO also consolidated its position in the power

    sector by commissioning several large projects, winning bids for several others,

    and winning a range of business and industry awards and prestigiousrecognition forums.

    2005-10: Poised for Industry Leadership:

    LANCO Infratech Limited, a new holding corporate entity, was created in

    2006 to consolidate diverse operations under a single brand. LANCO decided to

    focus on its core business: energy and construction and enter the

    infrastructure and property development sectors. Simultaneously, LANCO

    embarked on Vision 2020, an ambitious growth plan primarily in the sectors of

    power, solar energy, EPC and natural resources. By 2015, it plans to achieve a

    capacity of 15,000 MW in the power sector and also become one of the

    country's major developers in solar energy.

  • 7/28/2019 Absentism Project

    7/50

    7 |P a g e

    LANCO BUDHIL HYDRO ELECTRIC PRJECT (70 MW) AT BHARMOUR:

    AN INTRODUCTION:

    LANCO Budhil Hydro Electric Power Project is under construction on

    Budhil River, which is one of the main tributary of river Ravi. The Project

    catchment is between: In tehsil Bharmour, District Chamba of Himachal

    Pradesh. It has two sites:

    1. Dam and Office Site (In Village Thala)2. Powerhouse site (In Kharamukh)

    The Diversion Dam is located near the village Thalla on Chamba- Chobia

    road (near about 9 Km from Bharmour) and the underground Powerhouse is

    located on the upstream of Budhil confluence point with the river Ravi at

    Kharamukh.

    Capacity: 70 MW (2 x 35 MW): It has two turbines with a capacity of producing35 MW of electricity each per day

    River: It is built upon river Budhil (a Major tributary of river Ravi, confluence atKharamukh)

    Budget: Rs. 550 Crores is the amount invested on the project BOT Basis: 40 years: Project is on the Built Operate and Transfer basis i.e. it will

    be constructed by LANCO and on its completion time which is 5 years from the

    date of Contract (since 2005), it will be further harnessed by the company for

    the next 40 years and then handed over to the HP government.

    Components:1. Office Site2. Dam Site3. Tunnel4. Powerhouse5. Transmission Line

  • 7/28/2019 Absentism Project

    8/50

    8 |P a g e

    OFFICE SITE:

    Office Site is located village Thala of Tehsil Bharmour of Disrict Chamba

    HP. It has Administration, HR & Liaison Department, Finance and Accounts

    Department, Billing, Planning and Store Department etc.

    DAM SITE:

    Dam Site is located village Thala of Tehsil Bharmour of Disrict Chamba

    HP. The height of the dam is 61 m and its length is 64 m. It has 3 gates each of

    dimension 6.5 m X 10.5 m. Dam feeds two Feeder Canals which supply the

    water to De Silting Chamber where Silt is settled (as these are deeper than the

    feeder canals). Later it leads to HRT i.e. Head Race Tunnel.

    The Dam is built upon Budhil nullah which is one of the major tributary

    of River Ravi. This is a newly built dam, though is functional now but still as the

    Powerhouse is under construction so water is not stored upto required level till

    now. It will store the water of the Budhil nullah and feed two feeder canals

    with it which will send the water through Head Race Tunnel (HRT) to thepowerhouse so as to rotate turbine for Power generation.

    TUNNEL:

    Tunnel connects Dam with the Powerhouse. It consists of 2 Feeder

    Canals, 2 De Silting Chambers, 1 Pressure Shaft through which water fell 80 m

    deep to produce enough pressure to rotate the turbines. Feeder Canals are fed

    with the water of the Dam. They carry the water to the to the De- silting

    chambers. In de-silting chamber, as the name suggests, the silt is settled down

    to purify the water. As this silt can cause the harm to the turbine so it is

    essential to purify the water before it reaches the turbines. This de- silting

    chamber is actually a tunnel more deeper than the feeder canal so that water

    when enter into these de- silting chamber make silt settle down and the pure

    which is above flow freely to the Head race Tunnel, which is again having the

  • 7/28/2019 Absentism Project

    9/50

    9 |P a g e

    diameter equal to that of feeders canal. This Head Race Tunnel further carries

    water to the rest of the distance and ends in the Pressure Shaft. This Pressure

    Shaft is a few meters away from the Powerhouse where Turbines are located.

    It is 80m deep so the water flow with a great pressure in it enough to rotate

    the Turbines and generate target electricity which is set upto minimum 70 MW

    in a day.

    POWERHOUSE SITE:

    Powerhouse is actually Underground and having Dimensions of 14.5 m X

    43 m. Its location is at the right bank of river Ravi at Kharamukh. It has two

    Vertical shaft Turbines driven to generate per day units of 35 MW each (2 X 35

    = 70 MW). Its Access Tunnel is 305 m long and 7 m high. It is D shaped. It

    houses Transformer and Control Room also. Its construction adit is at the top

    of the Powerhouse and it serves as Ventilation Tunnel also.

    TRANSMISSION LINE:

    The Transmission Line is 18 Km long and it is fed into Chamera- III GridSub- station of NHPC Ltd. It has 60 Towers at the gap of 300 m each. LANCO

    Budhil Hydro Electric project Transmission line stretches only upto this. After

    this the Generated power of LANCO Budhil Hydro Electric Project is carried on

    by the Transmission lines of Chamera- III Transmission lines which is situated in

    Dharwala, Distt. Chamba. It further propagates power to the Power Grid India

    Ltd. Sub station at Chamba from where Power Grid India Ltd. distributes the

    energy to various areas according to its demand. It is noteworthy here that the

    calculation of units produced by LANCO Budhil Hydro Electric Project is done

    by the Power Grid India Ltd. only. It note down the Power provided to it by

    LANCO Budhil Hydro Electric Power Project with the help of a meter installed

    for the calculation of Power provided by the above said.

  • 7/28/2019 Absentism Project

    10/50

    10 |P a g e

    II. MANAGERIAL PRACTICES ADOPTED BY THE COMPANY:

    ORGANIZATIONS VISION, MISSION AND VALUES:

    VISION:

    Most Admired Integrated Infrastructure Enterprise.

    MISSION:

    Development of Society through Leadership, Entrepreneurship and

    Ownership.

    VALUES:

    Integrity:

    LANCO group choose to be honest in all their Business Interactions and

    Transactions and remain steadfast even when challenged. They strive for

    consistency between what they Think, what they Say and what they Do.

    Humility & Respect:

    They are consistently humble in their approach to and interactions with

    people. They treat every person with respect at all times, unconditionally.Organization Before Self:

    They recognize that organization interest is supreme, above individual

    preferences and goals. In all their decisions, actions and dealings they put the

    Organization before self.

    Achievement Drive:

    They have an urge that drives them to intensely focus on performance

    and act decisively with high energy to achieve the desired results.

    Positive Attitude:

    They always demonstrate a 'can-do' mind-set and engage to deliver

    organizational goals. They look upon challenging circumstances as

    opportunities to enhance their capabilities and find ways of achieving.

    Accountability:

  • 7/28/2019 Absentism Project

    11/50

    11 |P a g e

    They own up to their words, actions and outcome. When they commit to

    do something, they own it and they do it- decisively and responsibly.

    Teamwork:

    They work harmoniously with a shared vision, energized by their

    collective talent. They Trust, Listen to, Share with and Empower team

    members and take collective responsibility for the results.

    Continuous learning:

    They strive to continuously learn and consistently set higher standards

    of performance. They learn together on a day to day basis from each of their

    stakeholders, both internal and external. They change to learn, and learn to

    change at a fast pace in order to excel; ultimately creating an edge in

    everything that they do.

    PEOPLE (Human Resource) at LANCO:

    At LANCO, they believe that the organization's largest and most valuableasset is its people (Human Resource). Their knowledge, expertise and skills

    combined with their energy and commitment are the engines that drive

    business growth and success. The adage an organization is only as good as its

    people truly applies to LANCO, an organization that is committed to being

    Always Inspiring for its people.

    They inspire their people to bring their talents and ideas to work to help

    LANCO achieve the goals outlined in their Vision 2015. They also strive to

    create an environment that inspires people to give their best, to be productive

    and deliver exceptional results. They aim to ensure that each person working

    at LANCO is happy, healthy, professionally fulfilled and treated fairly, and that

    he or she regards LANCO as an employer of choice.

  • 7/28/2019 Absentism Project

    12/50

    12 |P a g e

    Employee engagement finds a place of high priority at LANCO. They

    strive to keep people engaged through frequent communication to raise

    awareness, increases participation, and boost performance. Rewards and

    recognition for achievement and exception performance are other ways to

    retain people's engagement as are their fast track career growth opportunities

    and their leadership and development programme.

    They seek to create an environment where people enjoy coming to work

    every day, where there is a feeling of camaraderie and good fellowship, where

    people get to work with alacrity and confidence, where they like the people

    they work with, and where they think of themselves as partners instead of

    employees.

    LANCO EDGE:

    Their ability to generate greater value for the organization and its

    shareholders constitutes a distinct, sustainable edge over competition. TheLANCO edge is an amalgamation of the values and ethics, human resources

    policies, business practices, systems and beliefs: their core business

    philosophy: that they have put into place over the years, which allows them to

    gain and retain an incisive advantage in todays competitive market place. They

    seek to remain always inspiring and attain the LANCO edge in every business

    vertical and domain that they operate in.

    The LANCO edge comprises:

    An aspiration to innovate continuously and foster a corporate culture thatenables innovation.

    An emphasis on constant learning, to build competencies at the individual,team and organizational levels, through the LANCO Learning Academy.

  • 7/28/2019 Absentism Project

    13/50

    13 |P a g e

    A unique Leadership, Entrepreneurship and Ownership (LEO) framework thataims at identifying, creating and nurturing Growth Leaders who excel in

    multiple competencies, through a competency matrix to measure and match

    talent and create quality people.

    A 'concept to commissioning' EPC execution model that addresses time, costand quality in every project.

    An unwavering focus on creating customer delight by delivering qualityconstruction projects on time, every time.

    A fully integrated solar value chain: the first in India, with a presence in sectorsfrom poly-silicon to wafer to module manufacturing coupled with project

    development, turnkey EPC and operations and maintenance services.

    The experience and expertise of successful project implementation within costand time schedules as well as the ability to make quick decisions and capitalize

    on market opportunities, as the largest independent power producer in India

    today.

    Expertise in providing cost-effective customized solutions for hydro projects,irrespective of the project's size or complexity.

    Optimizing resources and utilizing strategic locations to set benchmarks in thepower sector as the most cost-effective thermal power producer in the

    country.

    Acquisition of resources that focus on provision of fuel security to support theorganization's participation in the burgeoning coal trading market.

    Achievement of a 15 percent share of the power trading market with intent tobecome an integrated energy trader and service provider.

  • 7/28/2019 Absentism Project

    14/50

    14 |P a g e

    The ability to conceptualize and create upscale, environment - friendly andlifestyle oriented urban infrastructure that compares with the best in the

    world.

    UNITY AND DIVERSITY:

    At LANCO they strive to create a work environment that provides all

    their people: regardless of gender, race, age, culture, nation and ethnic

    identity, equal access to information, development and opportunity. By

    building an inclusive work environment, they seek to leverage their diverse

    people's unique talent, understanding, experience and ideas. For them,

    diversity is more than mere policies and practices. They see it as a lever that

    can unlock the power of difference to their competitive advantage.

    As they venture into global arena, they believe that their ability to

    understand, embrace and operate in a multicultural environment is critical to

    their long term sustainability and success, and to bringing agility and resilienceinto their business practices.

    They also understand the importance of unifying diversity to work

    towards their shared ideals, goals and vision as an organization. They believe in

    ensuring that their corporate policies are empathetic to diversity and that

    effective communication will contribute significantly to guaranteeing that their

    diverse people are unified towards energizing the organization to greater

    success.

    LANCO 's ventures in China, Indonesia, Australia, Germany, Spain, France

    and the United Kingdom are perfect examples of businesses that are thriving in

    the global marketplace. As they continue to realize their aspirations to become

    a truly global organization, they will also continue to advance their ability to

  • 7/28/2019 Absentism Project

    15/50

    15 |P a g e

    understand and embrace workplace diversity, and build a global workforce

    that can operate successfully in a multicultural world.

    LEO (Leadership, Entrepreneurship and Ownership):

    LEO, LANCOs unique Leadership, Entrepreneurship and Ownership

    framework, is aimed at creating high quality and sustainable human capital of

    global standards to drive the organization's dynamic, achievement oriented

    mindset. They believe LANCO is a product of their quality people who excel in

    three dimensions:

    Human Dimension which is a about Leadership Business Dimension which is about Entrepreneurship Personal Dimension which is about Ownership

    They encourage every employee at LANCO to develop these three

    dimensions of Leadership, Entrepreneurship and Ownership. The three

    dimensions are interrelated and interdependent, and it is the synergy between

    these three that is the key to success and to owning the spirit of LANCO.

    Leadership at LANCO is an interpersonal influence process of setting

    direction and inspiring people to achieve challenging goals. Leaders inspire and

    influence through their behaviour of embracing the idea of being a role model

    by setting an example and motivating people by involving them in problem

    solving and decision making processes.

    Entrepreneurship is being accountable for the profitability and growth

    of the business. Their people develop a compelling vision of the future. They

    search out challenging opportunities to grow, innovate and improve. They

    experiment, take risks and learn from their mistakes. They have a strategic

    mindset and always work towards the next goal.

  • 7/28/2019 Absentism Project

    16/50

    16 |P a g e

    Ownership in LANCO is to recognize the organization's interest as

    supreme, above individual preferences and goals. Owners put the organization

    before self in all decisions, actions and dealings. Ownership is dependent on

    personal traits and starts with having faith in one self. It is demonstrated

    through a passion for work, and the ability to turn every day adversity into an

    opportunity. It also means working towards a purpose, taking pride in the

    purpose, having patience, and perseverance never giving up till the purpose is

    accomplished.

    LEO is a scientific approach that places the right people in the right roles

    by measuring and matching talent as well as a transparent mechanism to grow

    people within the organization. The framework is instrumental in identifying

    learning and development needs of our people, and in inspiring and motivating

    them to learn and develop. At LANCO, the LEO framework is integrated with all

    the people processes such as recruitment, learning and development,

    performance management, succession planning, career planning, and creatinghigh potential growth leaders. It is the core of all human resource processes

    that enables alignment of individual goals and the organization's vision for the

    future.

    HR FUNCTIONS (ACTIVITIES) AT LANCO BHEP:

    Attendance: Record of attendance of all the employees of the organization isan important function of HR department. In LANCO Budhil Hydro Electric

    Project, the officers of various working sites viz. Office site, Dam site, HRT etc.

    keep the record of the presence and absence of the employees and then it is

    provided to the HR officer in the end of the day. The HR officer then sends this

    to the HR department of the head office in the organization at Gurgaon

    through internet. The head office then prepares the salary of the employees on

  • 7/28/2019 Absentism Project

    17/50

    17 |P a g e

    the basis of it and thus employees are provided with the salary accordingly by

    the HR department of the LANCO Budhil Hydro Electric Project, Bharmour.

    Recruitment: Recruitment is chiefly done by the HR department of the Headoffice. For this HR department of LANCO Budhil Hydro Electric Project,

    Bharmour send specifications of Job requirements at this place. They also call

    the tenders for various works from Large and Small scale contractors. E.g. they

    are outsourcing 70% of the construction work through Coastal Project Ltd.

    Training: HR department of LANCO Budhil Hydro Electric Project also impart onthe job trainings to various trainees like students from Engineering and

    Management background, they also provide training to their employees or

    otherwise recommend them for the required training

    Promotions: In LANCO Budhil Hydro Electric Project Performance Appraisalsare conducted annually according to the rules and regulations of the company.

    Motivation: Employees are motivated either through Money or appreciatione.g. Gold Coins are given to the employees who completes 10 years in the

    organization, Bonus is also given annually.

    Transportation: In Hydro Electric Power Plants transportation is very essentialto manage as LANCO Budhil Hydro Electric Project is split in the two sites, so to

    make employees and workers reach at work in right time is very important. For

    this Transportation is managed by HR department.

    Accommodation: In faraway place like Bharmour which is a Tribal areaarrangement of accommodation of the employees is again a big challenge, so

    the HR Department take care of the Guest House Lease deeds etc.

    Safety and Security at working sites: Hydro Electric Power Plants are veryaccidental prone sites so safety and security of the employees is again a big

    issue. For this Safety Officers are appointed by the LANCO Budhil Hydro Electric

  • 7/28/2019 Absentism Project

    18/50

    18 |P a g e

    Plant who checks on the workers whether they are taking precautions at the

    work sites or not e.g. like wearing helmets is compulsory and they can fine the

    worker not wearing helmet at the work site, they can also fine worker who has

    taken liquor and working at the project site, Medical facility like First Aid is

    available with an appointed Doctor, for some serious accident Ambulance is

    also available for speedy transportation.

    Accidents & Casualty: Every employee working at LANCO Budhil Hydro ElectricProject is ensured with Aviva MetLife Insurance. In case of casualty next of the

    kin of the employee are provided claim etc.

    Grievances handling: Other problems regarding pay and strikes etc. are alsohandled by the HR department.

    Environmental Issues: These are very important and have to be taken care ofas they are according to the laws and cannot be denied. The issues like where

    to dispose muck cutting of trees, construction of roads etc. are carried out only

    with the consent of the state authorities and HR department have to take care

    of it.

  • 7/28/2019 Absentism Project

    19/50

    19 |P a g e

    III. ORGANIZATION STRUCTURE (HIERARCHY) OF LANCO BHEP:

    Project Director (Executive Director)

    General Manager

    Office Site Dam HRT Powerhouse Transmission Line

    Admn. HR Finance

    AGM HR Sr. Fin. AGM AGM AGM AGM

    Officer Officer

    DM Accountant DM DM DM DM

    SE SE SE SE

    En. En. En. En.

    AE AE AE AE

    JE JE JE JE

    PA PA PA

    Abbreviations: HRT= Head Race Tunnel, HR= Human Resource, AGM= Assistant General Manager,

    DM= Deputy Manager, SE= Senior Engineer, En.= Engineer, AE= Assistant Engineer, JE= Junior

    Engineer, PA= Project Assistant.

  • 7/28/2019 Absentism Project

    20/50

    20 |P a g e

    IV. PERFORMANCE IN TERM OF FINANCIAL AND NON FINANCIAL ASPECTS:

    FINANCIAL PERFORMANCE OF THE COMPANY:

    The organizations dynamic advancement is propelled with its unique

    strategic plan: LANCO's Vision 2015. It is aimed at building LANCO as an

    achievement oriented and customer centric organization; an organization that

    is committed to attain industry leadership with aggressive growth plans for the

    business verticals in which it operates.

    LANCO Infratech Limited became a listed entity in November 2006

    following the Initial Public Offering (IPOs) of shares. Presently, the market

    capitalization of the company is approximately US$ 2.28 billion. Of the total

    240.78 million shares outstanding 67.95 percent is held by the founder

    promoters of the company. LANCOs gross revenue before elimination as on

    March 2011 was over Rs. 11,265 crores (USD 2.56 billion).

    Engineering, Procurement and Construction (EPC) is core business

    competence and strength of this organization and its Seamless integration withother domains such as infrastructure, construction and power, has borne rich

    dividends for LANCO. The organizations expertise in building large civic and

    urban infrastructure projects has been deployed in constructing thermal, gas

    and hydro power projects across the country. In a bid to find cost effective,

    sustainable and green solutions to the county's energy requirements, LANCO

    has made its presence felt in the area of solar power as well. is fast emerging

    as one of the top three private sector power developers in India with 2,092

    megawatt (MW) under operation, 7,153 MW under construction, and 11,070

    MW of projects under development.

    In a strategic move that provides increased fuel security for its current

    power generating assets and its future power portfolio expansions, LANCO

    through its Australian subsidiary, LANCO Resources Australia, has acquired

  • 7/28/2019 Absentism Project

    21/50

    21 |P a g e

    Griffin Coal Mining Company and Carpenter Mine Management. Griffin Coal

    owns the largest operational thermal coal mines in Western Australia,

    producing over 4 million tonnes per annum (mtpa) of coal which can be

    ramped up to over 15 mtpa in the near term, post development of evacuation

    infrastructure. LANCO also has strategic global partnerships with leading power

    companies including Genting, Harbin, GE, Dongfang, Doosan, etc.

    With team strength of about around 7,000 people, , headquartered in

    Gurgaon close to New Delhi, has a pan India presence in strategic locations in

    20 states in India and an expanding footprint in the emerging global markets.

    Currently, its international operations are located in Australia, China,

    Indonesia, Nepal, Singapore, Europe and the United States.

    LANCO is a privileged member of the World Economic Forum and has

    been acknowledged as an elite member of the top 200 "Global Growth

    Companies".

    NON FINANCIAL PERFORMANCE:

    ORGANIZATIONS DOMAINS:

    ENGINEERING, PROCUREMENT AND CONSTRUCTION:

    With its unique concept to commissioning execution model that

    considers time, cost and quality parameters, LANCO is an established industry

    leader in executing large projects. The organizations ISO 9001 certified EPC

    division has over 25 years experience in civil construction projects and seven

    years in implementing power projects through the EPC route. Strong

    capabilities in strategic management and speedy development, over 4,000

    highly experienced professionals, and resilient relationships with critical

    national and international equipment manufacturers and agencies make

    LANCO's EPC team a formidable force.

  • 7/28/2019 Absentism Project

    22/50

    22 |P a g e

    With its wide range of project execution experience in subcritical

    (300/600 MW), supercritical (660 MW), gas based and combine cycle projects,

    LANCO aims to become a global EPC (Engineering, Procurement and

    Construction) organization in the near future.

    Areas of Operation

    LANCO offers Engineering, Procurement and Construction services in

    two business segments:

    Power Others

    Power: Thermal Power Projects, Hydro Power Projects, Chimneys,

    Cooling Towers & Balance of Plant, Transmission & Distribution:

    Kondapalli gas based Power Project at Andhra Pradesh 120 MW Gas based Tanjore Power Project at Tamil Nadu Udupi Power Project, an imported coal based thermal power project at

    Karnataka

    Power Amarkantak Power Project in Chhattisgarh, a coal fired thermal basedproject

    Clarion Power Corporation Ltd (12 MW) Rithwik Energy Systems Ltd (6 MW) Barrage & Tunnel Construction at Teesta VI Hydro Electric Power Project,

    Sikkim

    275m Double Flue Can Chimney for ANPARA-C Kondapalli- Nuna Transmission Line 275m Twin flue/ Brick-lined chimnies for BHEL at Bellary, UKAI & North

    Chennai Projects

    Cooling Water Circulation System for NTPC at Ramagundam

    http://www.lancogroup.com/DynTestform.aspx?pageid=10/http://www.lancogroup.com/DynTestform.aspx?pageid=12/http://www.lancogroup.com/DynTestform.aspx?pageid=20/http://www.lancogroup.com/DynTestform.aspx?pageid=20/http://www.lancogroup.com/DynTestform.aspx?pageid=34http://www.lancogroup.com/DynTestform.aspx?pageid=34/http://www.lancogroup.com/DynTestform.aspx?pageid=27/http://www.lancogroup.com/DynTestform.aspx?pageid=27/http://www.lancogroup.com/DynTestform.aspx?pageid=21/http://www.lancogroup.com/DynTestform.aspx?pageid=21/http://www.lancogroup.com/DynTestform.aspx?pageid=27/http://www.lancogroup.com/DynTestform.aspx?pageid=27/http://www.lancogroup.com/DynTestform.aspx?pageid=34/http://www.lancogroup.com/DynTestform.aspx?pageid=34http://www.lancogroup.com/DynTestform.aspx?pageid=20/http://www.lancogroup.com/DynTestform.aspx?pageid=20/http://www.lancogroup.com/DynTestform.aspx?pageid=12/http://www.lancogroup.com/DynTestform.aspx?pageid=10/
  • 7/28/2019 Absentism Project

    23/50

    23 |P a g e

    Others: Roads, Highways & Bridges, Metros & Railways, Buildings & Airports,

    Sea Ports &

    Marine Structures, Water & Pipeline:

    Dalkhola- Islampore sub section II of NH 31 in the state of West Bengal Construction of 81 KM of NH 4 from KR Puram- Hoskote Construction of 81 KM of NH 48 from Bangalore- Devihalli EPC Contract for Construction of WTP, RWR and 100Km Pipeline for IL & FS at

    Paradip, Orissa

    Veeranam Project, 1875MM DIA, 114 KM Pipeline Chennai Metropolitan, TamilNadu

    Terminal Building of Varanasi Airport Koparkhairane Railway Station for CIDCO on Thane Belapur Road, Navi

    Mumbai

    Shastri Park Railway Station for Delhi Metro Railway has bagged the order for Construction of New Airport Terminal Building for

    Biju Patnaik Airport (BBI), Bhubaneswar, Orissa

    Construction of Hills Residential, IT Tower, Podium & Other Infrastructure Ashwini Hospital for Navy, Mumbai LANCOs Construction Division has bagged its first Metro Project on EPC basis

    from Chennai Metro Rail Limited, For Design & Construction of an Elevated

    station at Meenambakam and Viaduct, Ramps, Cut & Cover Tunnel between

    OTA station and Chennai Airport Station. The Project has to be completed in 36

    Months.

    LANCOs Construction Division bagged its first 765kv transmission line (fromRaigarh to Champa in Chhatisgarh state) from M/S. Power Grid Corporation of

    India Limited (PGCIL).

  • 7/28/2019 Absentism Project

    24/50

    24 |P a g e

    SOLAR POWER:

    To realize its vision of providing sustainable, innovative and cost-

    effective solutions to India's ever increasing energy needs, is focused on

    commercializing alternate technologies for green and efficient energy

    generation systems such as solar thermal and solar photovoltaic (PV). The

    group is working towards realizing its goal of indigenizing these technologies

    with the aim to reduce costs and achieve grid parity.

    LANCOs integrated Sand to Power strategy is best positioned to turn

    India's solar dream into a reality. LANCO is the first Indian organization to

    effectively integrate the entire solar value chain, with a presence in sectors

    such as Polysilicon to Wafer to Module Manufacturing as well as project

    development, turnkey EPC and O&M services. With its strong focus on a

    synergetic strategy and high end technology, LANCO targets to make solar

    energy affordable by every person in the country in the near future.

    Solar currently has one of the largest solar power project pipelines inthe country and a project pipeline of more than 300 MW of power globally. It

    has aggressive plans to execute 500 MW of EPC projects, 400 MW of its own

    projects and 250 MW of manufacturing a year by 2013, and to emerge as a

    leading developer and turnkey EPC service provider in the country and globally.

    To facilitate its aggressive growth strategy, the company operates from 10

    states in India and seven countries globally.

    SOLAR INTERNATIONAL:

    Project development activities in the international arena have been

    initiated through LANCO Solar's London based office and a diversified team of

    experts based in six European countries, the US, and Canada. Currently, two

    projects in the US and two projects in Italy and Spain are under installation,

    and a development pipeline of about 100 MW.

  • 7/28/2019 Absentism Project

    25/50

    25 |P a g e

    NATURAL RESOURCES:

    With the acquisition of the Australian Griffin mines and the successful

    bid to develop the Mahatamil coal block in Chhattisgarh, LANCO has added

    over 2 billion tonnes of coal resources to its business portfolio. This strategic

    move will allow the organization to provide fuel security (India will have a gap

    of over 200 million tonnes by 2015) and to participate in the burgeoning coal

    trading market. The Griffin mines alone are expected to produce over 20

    million tonnes per annum (mtpa) by 2015, helping LANCO to import 15 mtpa of

    thermal coal.

    LANCO has thus joined the exclusive league of mine operators in India

    and is looking to capitalize on this advantage by monetizing opportunities

    arising in other natural resources in the country.

    The LANCO Resources division comprises the following verticals:

    Coal Mining:

    Griffin Coal Mine, Australia (100 percent acquisition by )

    Rampia and dip side of Rampia, India (coal block jointly allotted to six partiesunder the Government of India captive scheme)

    Trading (imports into and exports from India):

    Coal (coking and non-coking thermal coal) Long and short term, Spot and IndexPrices

    Iron ore Limestone Bauxite Other minerals

    New Initiatives:

    Coal washeries

  • 7/28/2019 Absentism Project

    26/50

    26 |P a g e

    Limestone mines Bauxite mines Coal exports out of Griffin Coal Mine, Western Australia

    Resources in Global Outlets:

    Infratech Ltd., Corporate Office, Gurgaon (India) Resources International Pte. Ltd., Singapore Resources Australia Pty. Ltd., Perth, (West Australia) Griffin Coal Mining Company Pty Ltd., Perth ( West Australia)

    Carpenter Mine Management Pty. Ltd., Perth (West Australia) Energy Africa (Proprietary) Ltd., Johannesburg ( South Africa)

    INFRASTRUCTURE:

    LANCOs Infrastructure development business is focused on executing

    large civil and urban projects such as roads, highways, ports, airports, railway

    lines etc. The division envisions a pan India Build, Operate and Transfer (BOT)

    project portfolio worth Rs. 10,000 Crores by 2015, with a strong focus on the

    highways sector.

    The projects currently under execution include two major National

    Highway (NH) projects, on a BOT basis, to construct 163 km of roads at an

    estimated cost of Rs. 1,348. Another major project under development is the

    238 km toll road between Kanpur and Aligarh (NH 91) on a Design, Build,

    Finance, Operation and Transfer (DBFOT) basis.

    WHY LANCO?

    At LANCO, they value people. They have confidence in their experience,

    skill, expertise, commitment and drive. That is why they strive to provide an

  • 7/28/2019 Absentism Project

    27/50

    27 |P a g e

    environment where they can grow, as part of their core belief in Always

    Inspiring!

    As one of India's fastest growing business entities, over the last 25 years,

    LANCO has been driving growth in domains such as Engineering, Procurement

    & Construction, Power, Solar, Resources and Infrastructure. The company is a

    member of the UN Global Compact, and is recognized for its good corporate

    governance and social responsibility initiatives led by the LANCO Foundation.

    As part of the LANCO team, one can contribute to world class projects

    that help shape the nation, while building their own skills and expertise.

    LANCO employs around 7,000 committed, talented and ambitious

    professionals. If one is motivated and ones values match theirs, as a national

    player propelled by the desire to excel, they offer some of the most rewarding

    career development opportunities in the industry.

    Ones professional development is vital to them. Their business is built

    around a dedicated and motivated team, and they make long terminvestments in their people. They empower their people to stay ahead of

    competition by providing regular exposure to world class training programmes

    in some of the most reputed institutes in the country.

    They are proud of their high performance standards and seek

    improvement constantly. There are no limits to what they can achieve

    together or on the legacy one can leave while working for LANCO.

  • 7/28/2019 Absentism Project

    28/50

    28 |P a g e

    V. SWOT ANALYSIS OF LANCO BUDHIL HYDRO ELECTRIC PROJECT:

    STRENGTHS:

    Providing employment to the locals help gaining their trust. Providing employees with better transportation to make them comfortably

    reach at work site.

    CSR (Corporate Social Responsibility): making roads, providing trainings etc. Being a construction company is itself an added advantage for LANCO.

    WEAKNEESES:

    Not having a strong recognition yet. Salary is less as compare to others (e.g. Costal Project and NHPC, Chamba) Long distance between Dam and Powerhouse site (17 Km). HR practices are not very strong, Employee absenteeism is there. Not a big infrastructure like NHPC.

    OPPRTUNITIES:

    Stable enough to take the bid of other projects at this area. Will sale energy generated by the project for next 40 years (under BOT basis). Once the construction work will be over very few employees would be

    required (cut CTC).

    THREATS:

    Climatic conditions could affect power generation to a great level. Problems related to environmental code violation. Site is in the Seismic Zone V (Earthquakes are often, high risk area). Labour Unions supported by CITU (politics and strikes affects the work).

  • 7/28/2019 Absentism Project

    29/50

    29 |P a g e

    PART II: PROJECT WORK:

    VI. INTRODUCTION TO THE TOPIC CHOSEN FOR STUDY:

    Absenteeism refers to unauthorized absence of the worker from his job.

    Absenteeism can be defined as failure of employees to report for work when

    they are scheduled to work.

    In India, the problem of absenteeism is greater than other countries.

    When the employee takes time off, on a scheduled working day with

    permission, it is authorized absence. When he remains absent without

    permission or informing, it is wilful absence without leave. In these days, when

    the needs of the country require greater emphasis upon increase of

    productivity and the economic and rational utilization of time and materials at

    our disposal, it is necessary to minimize absenteeism to the maximum possible

    extent.

    Recent surveys indicate the following trends in absenteeism:1. The higher the rate of pay and the greater the length of service of the

    employee, the fewer the absences.

    2. As an organization grows, there is a tendency towards higher rates of

    absenteeism.

    3. Single employees are absent more frequently than married employees.

    4. Younger employees are absent more frequently than older employees but

    the latter are absent for longer periods of time.

    5. Unionized organizations have higher absenteeism rates than non-union

    organizations.

    The rate of absenteeism can be calculated by considering the number of

    persons scheduled to work and the number actually present. Thus, the rate of

    absenteeism can be estimated in the following way:

  • 7/28/2019 Absentism Project

    30/50

    30 |P a g e

    Rate of Absenteeism = No. of Total Manshifts Lost X 100

    No. of Total Manshifts scheduled to work

    CAUSES:

    Important factors leading to absenteeism can be summarized as follows:

    1. Long hours of work.

    2. Bad working conditions.

    3. Boredom.

    4. Lack of co-operation and understanding between management and workers.

    5. Sickness.

    6. Accidents.

    7. Occupational disease.

    8. Problem of transport facilities.

    9. Low wages.

    10. Lack of proper medical aid and health programmes.11. Lack of canteen services, rest rooms, etc.

    12. Bad housing conditions.

    13. Evil of drinking.

    14. Lack of marketing facilities.

    15. Social or religious festivals.

    16. Harvest seasons.

    17. Marriages.

    18. Education of children.

    19. Domestic problems and consequent worries, etc.

    Among these causes, in the existing Indian conditions, wage level in

    industries, has a direct bearing on absenteeism. Sickness on account of bad

    housing conditions contributes highest to industrial absenteeism. Social and

  • 7/28/2019 Absentism Project

    31/50

    31 |P a g e

    religious causes can be accounted as the second important contributing factor

    forabsenteeism. Absenteeism in industry varies from place to place, depending

    on thefestival, marriage, harvest season and other factors.

    EFFECTS :

    Absenteeism is one of the root causes of labour unrest. It affects the

    workers earnings as well as the company in the following manner:

    1.Decrease in Productivity:

    Employees may be carrying an extra workload or supporting new or

    replacement staff. Employees may be required to train and orient new or

    replacement workers. Staff morale and employee service may suffer.

    2. Financial Costs Payment of overtime may result:

    Cost of self-insured income protection plans must be borne plus the

    wage costs of replacement employees. Premium costs may rise for insured

    plans.3. Administrative Costs :

    Staff time is required to secure replacement employees or to reassign

    the remaining employees. Staff time is required to maintain and control

    absenteeism.

    The definition of absenteeism, its causes, its affects on productivity, and

    its costs in terms of finances and administrative effectiveness are quite clear.

    What is not as clear is how to take affirmative action to control absenteeism in

    such a way as not to create mistrust, costly administration and systems

    avoidance.

    Traditional methods of absenteeism control based only on disciplinary

    procedures have proven to be ineffective. It is almost impossible to create a

    fair disciplinary procedure because even well run disciplinary systems, which

  • 7/28/2019 Absentism Project

    32/50

    32 |P a g e

    treat similar actions in consistently similar ways, are usually seen as unfair. The

    reason for this is discipline alone usually does not identify or address the root

    causes of absenteeism. Every employee who takes time off in defiance of

    company regulations has reasons, right or wrong, which justify to themselves

    the legitimacy of their actions.

    Unless a management attendance program identifies and addresses the

    causes of employee absenteeism it will be ineffective and unfair. Traditional

    disciplinary programs alone can, at best, give the illusion of control. It is no

    secret that there are ways to beat even the best systems. The fear of discipline

    often only increases the desire to avoid management systems.

    If absenteeism is to be controlled, the physical and emotional needs of

    employees must be addressed. Incentives can be introduced to discourage

    absenteeism. Attendance bonus is awarded in certain establishments, merit

    increases and promotions are linked to minimum attendance. Good leave

    record of the employee is an important factor in considering him for moreresponsible positions. These incentives, no doubt, will be effective

    inducements for regular attendance and work which, in turn, will ensure

    efficient service. Habitual absenteeism must be treated as a misconduct and it

    must be stated that habitual absentees are liable for disciplinary action.

    India, and in particular Himachal Pradesh has a great potential for Hydro

    Electric Power generation. Hydro Electric Power is the energy generated by

    water through a proper procedure of making water fall on the Turbines with a

    great pressure to rotate them in order to produce high energy. The laws of

    physics are applicable to these procedures as the water falling with a great

    pressure on the turbines to make them rotate and change Potential energy

    into Electrical energy. The electrical energy thus produced is commercially

    used as Electric Power and which is an essential part of the human life in

  • 7/28/2019 Absentism Project

    33/50

    33 |P a g e

    todays world. It is evident from a Power failure that what is the importance of

    electricity in our lives. But, the biggest problem here is that this electrical

    energy is non renewable. It once consumed changes into other form of

    energies and cannot be recovered. So there is continuous demand to generate

    this energy.

    Himachal Pradesh government is keen on this situation and it has known

    the potential of this land of Gods of harnessing its water resources to generate

    Hydro Electric power. Also these Power generation projects are one of the

    biggest resources of revenue for the state government. It also helps the State

    government to provide many employment opportunities to the people of the

    state in their own home land. But, working at Hydro Electric Power Projects is

    not an easy task. It is a challenge of its own kind in itself. These sites are

    generally away from town and working conditions are generally not according

    to the wishes of the employees. It often results in absenteeism of employees,

    increases dissatisfaction regarding job among them which leads to the higherattrition rate. So it was important to conduct a survey regarding Absenteeism

    of employees, to find their reasons and suggest remedial measures to ensure

    maximum attendance.

  • 7/28/2019 Absentism Project

    34/50

    34 |P a g e

    VII. PROBLEM IDENTIFICATION AND PROBLEM FORMULATION:

    PROBLEM IDENTIFICATION:

    As per discussed in the previous chapter that working in the hydro

    power projects is itself a challenge of its own kind, and there are certain

    problems which the employee faces and these problems should be thus of

    utmost care to be taken of and the onus of it lies on the shoulders of HR

    department. One of such problem is the growing absenteeism among

    employees in the working sites and offices of the hydro electric plants. For this

    an effort is being made to know the reasons regarding absenteeism among

    employees of LANCO Bhudil Hydro Electric Plant and to provide some

    suggestions to the management so as to help them to take some remedial

    decisions and ensure maximum of attendance at the workplace.

    PROBLEM FORMULATION:

    The title of the problem is: Absenteeism: Cause, Effect and Control in LANCOBudhil Hydro Electric Project (70MW) at Bharmour

    OBLECTIVES OF THE STUDY:

    The objectives of the project are:

    To understand and analyze:

    1. What are the main causes of absenteeism in LANCO BHEP, Bharmour?

    2. What are the effects of the unauthorized absenteeism by the employees in

    the company?

    3. What are the current disciplinary actions taken by the HR department for

    reducing absenteeism?

    4. What is the attitude of employees towards these disciplinary actions?

    5. What factors are to be considered in order to reduce absenteeism?

  • 7/28/2019 Absentism Project

    35/50

    35 |P a g e

    6. What suggestions can be given to the management to improve the regular

    attendance of the employees in the company?

    Thus, the above objectives have been observed and analyzed in a

    detailed manner in this project report. I have made an attempt to go into root

    causes of the subject by using the various techniques of Research

    Methodology.

  • 7/28/2019 Absentism Project

    36/50

    36 |P a g e

    VIII. RESEARCH METHODOLOGY:

    A project is like a journey and it is always better to have atleast the

    faintest of ideas of the probable direction of our destination. Initially we have

    to decide upon the general area of interest or the aspect of the subject to

    inquire into. This decision is rather broad and not very precise. It is crude

    indication of the purpose of the study and is of little help for further planning

    and organization of the study.

    Research Methodology is defined as a more systematic activity directed

    towards discovery and the development of an organized body of knowledge.

    An efficient research contributes to the evaluation of a proper decision, which

    ultimately affects the path the organization will choose. The data collected is of

    paramount importance and hence the research process has to be effective and

    an efficient one.

    Research Methodology involves adopting various techniques which are

    best suited for the research and study of the problem, for investigation andanalysis of the problem. It starts with data collection from various sources i.e.,

    primary and secondary sources, data analysis and interpretation and finally the

    findings or conclusion from the analysis.

    In this project, Primary data was collected by Questionnaire Survey. The

    workmen selected for the interview purpose were the employees of LANCO

    BHEP, Bharmour. A random selection of samples from the workmen segment

    was done in the company. There are 190 employees in the company. From

    them respondents were selected randomly as sample to avoid any bias. Thus,

    25 workmen were selected for survey through the questionnaires prepared.

    This helped to be fair to all by not keeping in view the past record of

    absenteeism of individuals.

    The secondary data was collected from:

  • 7/28/2019 Absentism Project

    37/50

    37 |P a g e

    Monthly absenteeism data.

    Yearly absenteeism report.

    Leave records of employees.

    After the collection of data, the response of the 25 individuals were

    arranged in a chronological pattern and then evaluated. Many inferences could

    be drawn from both the primary as well as secondary data available which are

    put forth in the analysis section.

    It is often beneficial to undertake an intensive study of a few well

    selected instances of the phenomenon of interest. The method demands for

    great sensitivity and receptivity on our part. As new information pours in, the

    study is reformulated and redirected. Hence, to be on the safer side, it would

    always be wise to work keeping a particular method in mind.

    RESEARCH AREA:

    Research setting was to be chosen according to the relevance ofresearch topic. So, the two main sites of the LANCO Budhil Hydro Electric

    Project, 70 MW (i.e. - Office site including Dam site and Powerhouse site at

    village Thala and Kharamukh of Tehsil Bharmour, Distt. Chamba of H.P.

    respectively) were chosen to collect the data for the research project.

  • 7/28/2019 Absentism Project

    38/50

    38 |P a g e

    ANALYSIS AND INTERPRETATION OF DATA:

    Analysis of Data:

    TABLES & PIE- CHARTS:

    Tables 1: Employees Interest in their Jobs:

    Questions Not at all To some

    extent

    Average To Great

    Extent

    Highly

    Is Job

    Interesting?

    5 5 15 5 -

    Chart 1:Employees Interest in their Jobs:

    16%

    17%

    50%

    17%0%

    Is Job Interesting?

    Not at all

    To Some Extent

    Average

    To Great Extent

    Highly

  • 7/28/2019 Absentism Project

    39/50

    39 |P a g e

    Tables 2: Employees awareness about company rules:

    Questions Not at all To some

    extent

    Average To Great

    Extent

    Highly

    Awareness

    about Co.

    Rules?

    3 3 18 6 -

    Chart 2: Employees awareness about company rules:

    10%

    10%

    60%

    20%0%

    Awareness of Co. Rules

    Not At All

    To Some Extent

    Average

    To Great Extent

    Highly

  • 7/28/2019 Absentism Project

    40/50

    40 |P a g e

    Tables 3: Employees support from co- workers:

    Questions Not at all To some

    extent

    Average To Great

    Extent

    Highly

    Support of

    Co- workers

    5 10 12 3 -

    Chart 3: Employees support from co- workers:

    17%

    33%40%

    10%

    Support from Co- workers

    Not At All

    To Some Extent

    Average

    To Great Extent

    Highly

  • 7/28/2019 Absentism Project

    41/50

    41 |P a g e

    Tables 4: Leaves availed by an employee in a year:

    Questions 1-5 6-10 11-15 16-20 More

    Leaves in ayear

    - 12 5 5 8

    Chart 4: Leaves availed by an employee in a year:

    0%

    40%

    16%

    17%

    27%

    Leaves in a Year

    1 to 5

    6 to 10

    11 to 15

    16 to 20More

  • 7/28/2019 Absentism Project

    42/50

    42 |P a g e

    Tables 5: Reason behind availing leaves:

    Questions Personal Family

    Problem

    Working

    Conditions

    Social

    Problems

    Addiction

    Reason for

    Leaves

    - 12 5 5 8

    Chart 5: Reason behind availing leaves:

    0%

    40%

    16%

    17%

    27%

    Reason Behind Availing Leaves

    Personal

    Family Problem

    Working ConditionsSocial Problem

    Addiction

  • 7/28/2019 Absentism Project

    43/50

    43 |P a g e

    Tables 6: Salary structure of employee:

    Questions Satisfactory Average Unsatisfactory

    Reason for Leaves 5 10 15

    Chart 6: Salary structure of employee:

    17%

    33%

    50%

    Salary Structure of Employee

    Satisfactory

    Average

    Unsatisfactory

  • 7/28/2019 Absentism Project

    44/50

    44 |P a g e

    Tables 7: Family Conditions and family atmosphere of employee:

    Questions Satisfactory Average Unsatisfactory

    Family Conditions 3 9 18

    Chart 7: Family Conditions and family atmosphere of employee:

    10%

    30%

    60%

    Family Conditions of Employee

    Satisfactory

    Average

    Unsatisfactory

  • 7/28/2019 Absentism Project

    45/50

    45 |P a g e

    Tables 8: Is cause of absenteeism alcohol:

    Questions Not at all To some

    extent

    To great

    extent

    Highly True

    Is Cause Alcohol 12 15 3 2

    Chart 8: Is cause of absenteeism alcohol:

    38%

    47%

    9%6%

    Is Cause Alcohol

    Not At All

    To Some Extent

    To Great Extent

    Highly True

  • 7/28/2019 Absentism Project

    46/50

    46 |P a g e

    Table 9: Is cause of absenteeism Drug Intake:

    Questions Not at all To some

    extent

    To great

    extent

    Highly True

    Is Cause Drugs

    intake

    15 13 2 -

    Chart 9: Is cause of absenteeism Drug Intake:

    48%

    42%

    6% 4%

    Is Cause Drugs Intake

    Not At All

    To Some Extent

    To Great Extent

    Highly True

  • 7/28/2019 Absentism Project

    47/50

    47 |P a g e

    Table 10: Is cause of absenteeism Regular Health Problems:

    Questions Not at all To some

    extent

    To great

    extent

    Highly True

    Is Cause Regular

    Health Problems

    3 6 18 3

    Chart 10: Is cause of absenteeism Regular Health Problems:

    11%

    21%

    64%

    4%

    Is Cause Regular Health Problems

    Not At All

    To Some Extent

    To Great Extent

    Highly True

  • 7/28/2019 Absentism Project

    48/50

    48 |P a g e

    IX. RESULTS AND RECOMMENDATIONS:

    RESULTS:

    17% of workers takes 16 to 20 leaves in a year; among these 64% takeleaves due to regular health problems of their family or of themselves.

    Reasons for Absenteeism are:1. 17% of workers do not find their jobs interesting and resort to

    absenteeism

    2. 10% workers are not aware about rules and regulations of the companyand other 60% only knows them casually

    3. Most of the absenteeism is due to Family Problems as family conditionsof 60% workers is not satisfactory; 27% is due to addiction also and 6%

    of these are due to alcohol consumptions whereas 4% is due to High

    Drug Intake.

    4. 16% workers do not find working conditions satisfactory whereas 50%workers are not happy with their salary.

    RECCOMMENDATIONS:

    1. There should be better salary structure2. HR People should also counsel workers the ill- effects of the substance

    abuse

    3. The working conditions should be satisfactory4. The workers should aware about the rules and regulations of the

    company

  • 7/28/2019 Absentism Project

    49/50

    49 |P a g e

    ANNEXURE II:

    QUESTIONNAIRE

    Questionnaire Regarding Job Satisfaction

    Dear Respondent,

    I am getting training in LANCO Budhil Hydro Electric Project as a Management

    Trainee in HR and thus studying about various aspects of it. Absenteeism is one

    of the issues of importance in any organization and thus I want to study it

    regarding this organization. I humbly request you to spare few minutes from

    your busy schedule to help me in my research work. Please tick one of the

    following options. I shall be highly thankful.

    Name:

    Age: .

    Gender:

    Working in this organization from last..years.

    1. How many leaves availed by you per annum?1-5/ 6-10/ 11- 15/ 16-20/ More

    2. My job in company is very interesting:Not at all/ To some Extent/ Average/ To great Extent/ Highly

    3. My colleagues are highly supportive:Not at all/ To some Extent/ Average/ To great Extent/ Highly

    4. Are you aware of the leave rules of the company?Not at all/ To some Extent/ Average/ To great Extent/ Highly

    5. Main reason behind high leave consumption:Personal/ Family related/ Work related/ Social/ Addiction

    6. How is your family condition and family atmosphere?Satisfactory/ Average/ Unsatisfactory

  • 7/28/2019 Absentism Project

    50/50

    7. Is your salary structure adequate?Satisfactory/ Average/ Unsatisfactory

    8. The cause of my absenteeism is taking alcohol:Not at all/ To some Extent/ To great Extent/ Highly True

    9. The cause of my absenteeism is taking drugs:Not at all/ To some Extent/ To great Extent/ Highly True

    10.The cause of my absenteeism is regular health problems:Not at all/ To some Extent/ To great Extent/ Highly True

    11.Any other problem/ Suggestions.