    Importance of Elect System for Auxiliary

    Classification of Auxiliaries

    Choice of Voltage for Aux

    Aux. Power supply system

    Emergency AC Supply

    Presentation outline

  • 7/31/2019 AC Supply System_Std

    3/20

    24 May 2012 PMI Revision 00 3

    Auxiliary Power Supply System

    The purpose of an Electrical system is to generate andsupply electrical energy .

    The system should be designed and managed to deliverpower with Reliability and Economy.

    As these two requirements are quite opposed a balanceis required to have an optimum design of Auxiliary powersupply system

    The auxiliaries have Ratings range from a few watts to

    few Mega Watts & Located over a large areaWork under varied Operating Conditions

  • 7/31/2019 AC Supply System_Std

    4/20

    24 May 2012 PMI Revision 00 4

    Auxiliary Power Supply System

    Failure of Auxiliaries can cause Outage of Power Plant

    Auxiliaries need Reliable Power Supply

    System designed to cater to this need

    Loads segregated on the basis of

    Rating (to decide Voltage)

    Location (to decide the

    Feeding Point) Change-over schemes & Alternate Power Supply arrangement

    to ensure Reliability

  • 7/31/2019 AC Supply System_Std

    5/20

    24 May 2012 PMI Revision 00 5

    Elements of Aux. Power System

    More than 95% of the auxiliaries are driven by Motors

    Different Voltage levels are interconnected through

    Transformers

    Miscellaneous Elements

    Incomers

    Ties

    Diesel Generators

  • 7/31/2019 AC Supply System_Std

    6/20

    24 May 2012 PMI Revision 00 6

    Voltage Rating of Motors Decided based on kW

    Rating Rating 160kW 415V (LV), Contactor

    > 160kW & 200kW 415V (LV), Breaker > 200kW & 1500kW 3.3kV (MV), Breaker > 1500kW 11kV (MV), Breaker

    Frequent Start / Stop Operations (Coal Conveyor Motors) MV Vacuum Contactor

    List of Boards / Feeding Points arrived at based onLocation of Load Centers / Systems

    Quantity & Rating of Transformers calculated based on

    Load & Operational Requirements Rating of Board Calculated based onthe Operating Load &

    Transformer Rating

  • 7/31/2019 AC Supply System_Std

    7/20

    24 May 2012 PMI Revision 00 7

    Nominal System voltage 6.6kV 11kV 3.3kV

    Highest System voltage 7.2 kV 12kV 3.6kV

    Rated Frequency 50Hz 50Hz 50Hz

    Number of phases/ poles Three Three Three

    System Neutral Earthing Earthed through Resistance of 6.35 toLimit E/F Current to 300A

    One minute power frequencywithstand voltage

    20kV 28kV 10kV

    Impulse withstand voltage 60kV (peak) 75kV (peak) 40kV (peak)

    Maximum System Fault Level 40kA (rms)

    Short time rating of Eqpt. 40kA (rms) for 1 second

    Dynamic withstand rating 100kA (peak)

  • 7/31/2019 AC Supply System_Std

    8/20

    24 May 2012 PMI Revision 00 8

    Nominal System voltage 415V, 10%

    Rated Frequency 50Hz

    Number of phases Three

    System Neutral Earthing Solidly Earthed

    Maximum System Fault Level 45kA (rms)

    Short time rating of Eqpt. 45kA (rms) for 1 second

    Dynamic withstand rating 105kA (peak)

  • 7/31/2019 AC Supply System_Std

    9/20

    24 May 2012 PMI Revision 00 9

    Sizing of Unit & Station transformer

    Start up power

    Feeding offsite areas loads

    Rating of the Switchgear

    Loads

    Power Supply arrangement

    6.6& 0.415kV System

    11 & 3.3 & 0.415kV System

  • 7/31/2019 AC Supply System_Std

    10/20

    24 May 2012 PMI Revision 00 10

    Commonly used voltage level up to 200 MW unitsize- 6.6kV, 415V

    Initially same voltage level (6.6 kv, 415v) were adopted

    for 500 MW unit size as well.With 500 MW unit, quantitative and qualitative change

    in auxiliaries took place. (11 kv Switchgear)

  • 7/31/2019 AC Supply System_Std

    11/20

    24 May 2012 PMI Revision 00 11

    Grid Voltage- Normally 400kV for most of the200,500MW units in India except few deviations

    Any Intermediate Voltage Available-to providereliable start-up power source and to meet initialcommissioning activities as well as to supply bulk

    loads(CW system, make-up water etc.) away fromthe main plants.Generally used Intermediate voltagelevels are 220kV, 132kV, 33kV

    Nature of Auxiliaries i.e. ratings, basic

    characteristics and location

  • 7/31/2019 AC Supply System_Std

    12/20

    24 May 2012 PMI Revision 00 12

    G

    UAT-A Dyn1

    UAT-B16.5 KV

    6.6 KV Ynd11

    GT

    Ynyn0

    Station TRF-1

    UNIT SWGR--AUNIT SWGR--B

    Stn. SWGR-SA SB

    UST

    A

    ESP TRF-AS/Serv.Trf.-B

    UST-B ESP TRF-B

    USS-A USS-B 415 V Unit EMG SWGR

    X

    From DG SWGR

    XBlr MCC

    Turb MCC

    BFPID Fan

    Air Compr

    Trf

    X X

    X

    Stn Serv

    Trf-ADMP Serv

    Trf

    1)SWYServ

    Trf-1

    2)Ash

    Handl T/

    1600KV

    6.6 KV

    B.C.

    N.O.

    TMCC

    Fdr to

    Clarif

    Water

    SWGR

  • 7/31/2019 AC Supply System_Std

    13/20

    24 May 2012 PMI Revision 00 13

    Transformer feeder Details

    To PMCC

    MCC/PCCMediumVoltage

    MagneticContactor

    SFUCB

    To ACDB

    Motor Feeder

    Unit ServiceTransformer

    To PMCC

    MagneticContactor

    SFU

    To ACDB

    Motor Feeder

    Dyn11

    C.B.

    415 V

    6.6 KV

  • 7/31/2019 AC Supply System_Std

    14/20

    24 May 2012 PMI Revision 00 14

    X X

    X X

    X XX X

    DG-1DG-3

    DG-2

    DG SWGR-1 DG SWGR-2

    UNIT EMER

    SWGR-1 UNIT EMER

    SWGR-2

    UNIT EMER

    SWGR-3

    UNIT EMER

    SWGR-4

  • 7/31/2019 AC Supply System_Std

    15/20

    24 May 2012 PMI Revision 00 15

    (1) AOP-1 (2) Em. Lighting Trf.

    (3) TVDC Reserve Supply (4) UPS Ch.

    (5) Scanner Air Fan (6) BVDC Reserve Supply

    (7) AC Seal Oil Pump (8) Air Heater Lub Oil Panel

    (9) Jacking Oil Pump (10) Stator Water Pump-B

    (11) Barring Gear (12) +26 v DC ATRS Ch. B(13) -26V DC ATRS Ch.B(14) 26V DC FSSS Ch. B

    (15) 26V DC DDC Ch. A

  • 7/31/2019 AC Supply System_Std

    16/20

    24 May 2012 PMI Revision 00 16

    (1) BFP-1C (2) BFP-1A

    (3) PA Fan-1A (4) ID Fan -1A

    (5) UST-1A (6) ESP T/F -1A

    (7) FD Fan -1A (8) Coal Mill- 1A, C, E

    (9) CEP-1A,C (10) ACW Booster Pump-1A

    (11) Bus V.T.

  • 7/31/2019 AC Supply System_Std

    17/20

    24 May 2012 PMI Revision 00 17

    (1) Unit Em. SWGR (2) Boiler MCC

    (3) BVDC A (4) Turb. MCC A

    (5) 220V Dc Ch. A (6) +24 DC ATRS Ch. A

    (7) -24V DC ATRS Ch.A (8) Turb ACDB A

    (9) +24 V DDCMIS Ch. B (10) Gen Control Panel

    (11) Boiler ACDB A a) Grav. Feeder A,B, C,D,E,Fb) S/B MCC Feeder-1

    c) INC From USS B

    (12) MOT Centrifuge

  • 7/31/2019 AC Supply System_Std

    18/20

    24 May 2012 PMI Revision 00 18

    (1) UPS Ch. (2) +24V FSSS Ch.

    (3) TVDC (4) Boiler MCC B

    (5) Turb MCC B (6) Turb ACDS B

    (7) Boiler ACDB B

  • 7/31/2019 AC Supply System_Std

    19/20

    24 May 2012 PMI Revision 00 19

  • 7/31/2019 AC Supply System_Std

    20/20

    24 May 2012 PMI Revision 00 20


Recommended