Academy for the Gifted and Talented School 28 Green Infrastructure Information Sheet Location: 200 Presidential Boulevard Paterson, NJ 07522 Site Use: School Watershed Name: Lower Passaic River Ward: 1 Targeted Pollutants: total nitrogen (TN), total phosphorus (TP), and total suspended solids (TSS) in surface runoff Green Infrastructure Description: Bioretention system and enhanced tree pits Estimated Stormwater Captured and/or Treated Per Year: 491,700 gallons Implementation Date: 10/10/2017 Green Infrastructure System: 3,310 sq. ft. rain garden and nine 16 sq. ft. enhanced tree pits Drainage Area: 22,135 sq. ft. (blacktop playground runoff) Funding Sources: New Jersey Department of Environmental Protection 319(h) Partners/Stakeholders: Rutgers Cooperative Extension Water Resources Program, New Jersey Department of Environmental Protection, Great Swamp Watershed Association, Paterson Public Schools Board of Education and Facilities, School 4 Staff and Students, and Passaic County Appendix A: Site Photograph – Previous Condition Appendix B: Site Concept Plan Appendix C: Site Design Plan Appendix D: Site Photograph – Current Condition
Transcript
Page 1: Academy for the Gifted and Talented School 28 Green ...water.rutgers.edu/Projects/Paterson/GIInfoSheet... · Academy for the Gifted and Talented School 28 Green Infrastructure Information

Academy for the Gifted and Talented School 28 Green Infrastructure Information Sheet

Location:

200 Presidential Boulevard Paterson, NJ 07522

Site Use: School Watershed Name: Lower Passaic River

Ward: 1

Targeted Pollutants:

total nitrogen (TN), total phosphorus (TP), and total suspended solids (TSS) in surface runoff

Green Infrastructure Description:

Bioretention system and enhanced tree pits

Estimated Stormwater Captured and/or

Treated Per Year:

491,700 gallons

Implementation Date: 10/10/2017 Green Infrastructure System: 3,310 sq. ft. rain garden and nine 16 sq. ft. enhanced tree pits Drainage Area: 22,135 sq. ft. (blacktop playground runoff) Funding Sources:

New Jersey Department of Environmental Protection 319(h) Partners/Stakeholders:

Rutgers Cooperative Extension Water Resources Program, New Jersey Department of Environmental Protection, Great Swamp Watershed Association, Paterson Public Schools Board of Education and Facilities, School 4 Staff and Students, and Passaic County Appendix A: Site Photograph – Previous Condition Appendix B: Site Concept Plan Appendix C: Site Design Plan

Appendix D: Site Photograph – Current Condition

Page 2: Academy for the Gifted and Talented School 28 Green ...water.rutgers.edu/Projects/Paterson/GIInfoSheet... · Academy for the Gifted and Talented School 28 Green Infrastructure Information

Academy for the Gifted and Talented School 28 Green Infrastructure Information Sheet

APPENDIX A:

Site Photograph – Previous Condition

August 28, 2015

Page 3: Academy for the Gifted and Talented School 28 Green ...water.rutgers.edu/Projects/Paterson/GIInfoSheet... · Academy for the Gifted and Talented School 28 Green Infrastructure Information
Page 4: Academy for the Gifted and Talented School 28 Green ...water.rutgers.edu/Projects/Paterson/GIInfoSheet... · Academy for the Gifted and Talented School 28 Green Infrastructure Information

Academy for the Gifted and Talented School 28 Green Infrastructure Information Sheet

APPENDIX B:

Site Concept Plan

Page 5: Academy for the Gifted and Talented School 28 Green ...water.rutgers.edu/Projects/Paterson/GIInfoSheet... · Academy for the Gifted and Talented School 28 Green Infrastructure Information
Page 6: Academy for the Gifted and Talented School 28 Green ...water.rutgers.edu/Projects/Paterson/GIInfoSheet... · Academy for the Gifted and Talented School 28 Green Infrastructure Information

Academy for the Gifted and Talented School 28 Green Infrastructure Information Sheet

APPENDIX C:

Site Design Plan

Page 7: Academy for the Gifted and Talented School 28 Green ...water.rutgers.edu/Projects/Paterson/GIInfoSheet... · Academy for the Gifted and Talented School 28 Green Infrastructure Information

EXISTING CONTOURS SURVEYED

EDGE OF PAVEMENT

EXISTING SPOT ELEVATIONS

1

0

0

SPOT ELEVATION CODES:

EP - EDGE OF PAVEMENT

GS - GROUND SHOT

UP - UTILITY POLE

MH- MANHOLE

100.00

CODE

EXISTING BUILDING

EXISTING CENTERLINE

PROPOSED GREEN INFRASTRUCTURE

EXISTING FENCE

EXISTING DRAINAGE AREA

EXISTING TREELINE

EXISTING TREE

EXISTING UTILITY POLE

EXISTING CATCH BASIN

EXISTING CONTOURS1

0

0

PU

BL

IC

S

CH

OO

L 28

PA

TE

RS

ON

G

RE

EN

IN

FR

AS

TR

UC

TU

RE

319(h

)

200 P

RE

SID

EN

TIA

L B

LV

D, P

AT

ER

SO

N

PA

SS

AIC

C

OU

NT

Y, N

J

CO

VE

R S

HE

ET

RE

VIS

IO

NS

No.

DA

TE

DE

SC

RIP

TIO

N

AP

PR

OV

ED

CC

O

CH

EC

KE

D

MA

L

DR

AW

N

EA

J

CH

RIS

TO

PH

ER

C

. O

BR

OP

TA

, P

h.D

., P

.E

.

PR

OF

ES

SIO

NA

L E

NG

IN

EE

R - N

J L

IC

EN

SE

#

3

75

32

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

D

AT

E _

__

__

__

__

__

__

__

__

SHEET NAME

COVER

PUBLIC SCHOOL 28PATERSON GREEN INFRASTRUCTURE200 PRESIDENTIAL BLVD, PATERSON

PASSAIC COUNTY, NEW JERSEY

LIST OF DRAWINGS:

LOCATION MAP: LEGEND:PROJECT DESCRIPTION:

A BIORETENTION SYSTEM (RAIN GARDEN) WILL BE

IMPLEMENTED TO CAPTURE, TREAT, AND INFILTRATE THE

STORMWATER RUNOFF FROM THE IMPERVIOUS AREA

LOCATED BEHIND THE MAIN SCHOOL BUILDING. A TOTAL OF

NINE TREE PITS WILL ALSO BE PLACED ALONG THE

PERIMETER OF THE AREA. ALONG THE SIDEWALK TO THE

SOUTHEAST OF THE SCHOOL, THIRTEEN ADDITIONAL TREE

PITS WILL BE INSTALLED.

DA

TE

02

.2

0.1

7

RE

V

04

.1

7.1

7

04/17/17

Page 8: Academy for the Gifted and Talented School 28 Green ...water.rutgers.edu/Projects/Paterson/GIInfoSheet... · Academy for the Gifted and Talented School 28 Green Infrastructure Information

OCC

100.83

F

101.96

GATE

102.57

GATE

103.95

F

101.39

F

100.86

F

101.60

F

102.73

GATE

103.10

GATE

103.29

F

102.37

GATE

102.55

GATE

100.66

GS

101.04

GS

101.41

GS

101.52

GS

101.92

GS

102.44

GS

102.18

GS

101.58

GS

101.01

GS

100.75

GS

100.50

GS

100.52

GS

100.87

GS

101.33

GS

101.75

GS

102.35

GS

102.80

GS

103.01

BL

103.91

GS

103.52

GS

103.98

GS

103.01

GS

102.75

GS

102.31

GS

103.68

BL

103.87

BL

104.51

BL

105.46

BL

105.41

BL

104.40

GS

103.57

GS

103.14

GS

102.98

GS

102.68

GS

102.59

GS

102.10

GS

102.11

GS

102.25

GS

102.45

GS

102.81

GS

103.34

GS

104.38

GS

105.46

GS

105.54

GS

104.12

GS

102.85

GS

101.99

GS

101.88

GS

101.59

GS

101.38

GS

101.39

GS

101.13

GS

101.18

GS

101.38

GS

101.81

GS

102.86

GS

104.16

GS

105.48

GS

105.36

GS

104.04

GS

102.75

GS

101.99

GS

101.17

GS

100.79

GS

101.02

GS

100.94

GS

101.03

GS

100.96

GS

101.22

GS

101.85

GS

102.80

GS

104.18

GS

105.34

GS

105.39

GS

103.94

GS

102.61

GS

101.50

GS

100.86

GS

102.06

CB

102.00

CB

101.34

UP

99.90

CB

100.48

UP

100.34

GS

100.65

GS

GS

100.78

GS

102.27

GS

101.41

GS

100.42

MH

104.93

MH

102.47

MH

101.81

DG

101.63

MH

1

0

5

1

0

1

1

0

2

1

0

3

1

0

4

1

0

1

102

1

0

3

1

0

4

DRAINAGE AREA 1

(18,600 SF)

LIMIT OF WORK (9,650 SF)

SEE P-2 (SITE PLAN 1)

C

L

I

N

T

O

N

S

T

R

E

E

T

EXISTING

MANHOLE

EXISTING GATE

T

E

M

P

L

E

S

T

R

E

E

T

AREA TO BE DEPAVED

(232 SF)

EXISTING CATCH BASINS

DRAINAGE AREA 7

(530 SF)

DRAINAGE AREA 2

(540 SF)

AREA TO BE DEPAVED

(3,310 SF)

AREA TO BE DEPAVED

(16 SF (x3),48 SF)

AREA TO BE DEPAVED

(16 SF (x2),32 SF)

AREA TO BE DEPAVED

(16 SF (x4), 64 SF)

DRAINAGE AREA 3

(740 SF)

DRAINAGE AREA 4

(720 SF)

DRAINAGE AREA 5

(670 SF)

DRAINAGE AREA 6

(335 SF)

DRAINAGE AREA 8

(145 SF)

DRAINAGE AREA 9

(200 SF)

DRAINAGE AREA 10

(235 SF)

DRAINAGE AREA 11

(285 SF)

DRAINAGE AREA 12

(260 SF)

DRAINAGE AREA 13

(325 SF)

DRAINAGE AREA 14

(335 SF)

DRAINAGE AREA 16

(455 SF)

DRAINAGE AREA 20

(490 SF)

AREA TO BE DEPAVED

(16 SF (X2),32 SF)

LIMIT OF WORK (7,000 SF)

SEE P-3 (SITE PLAN 2&3)

P

U

B

L

I

C

S

C

H

O

O

L

2

8

P

R

E

S

I

D

E

N

T

I

A

L

B

O

U

L

E

V

A

R

D

DRAINAGE AREA 15

(400 SF)

1

0

4

1

0

0

9

8

1

0

6

1

0

6

104

104

1

0

2

1

0

6

DRAINAGE AREA 19

(560 SF)

DRAINAGE AREA 17

(480 SF)

DRAINAGE AREA 18

(560 SF)

EXISTING

MANHOLE

OVERHANGING WIRE

RE

VIS

IO

NS

No.

DA

TE

DE

SC

RIP

TIO

N

AP

PR

OV

ED

CC

O

CH

EC

KE

D

MA

L

DR

AW

N

EA

J

CH

RIS

TO

PH

ER

C

. O

BR

OP

TA

, P

h.D

., P

.E

.

PR

OF

ES

SIO

NA

L E

NG

IN

EE

R - N

J L

IC

EN

SE

#

3

75

32

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

D

AT

E _

__

__

__

__

__

__

__

__

PU

BL

IC

S

CH

OO

L 28

PA

TE

RS

ON

G

RE

EN

IN

FR

AS

TR

UC

TU

RE

319(h

)

200 P

RE

SID

EN

TIA

L B

LV

D, P

AT

ER

SO

N

PA

SS

AIC

C

OU

NT

Y, N

J

EX

IS

TIN

G C

ON

DIT

IO

NS

A

ND

D

EM

OL

IT

IO

N P

LA

N

PLAN NOTES:1. CONTRACTOR SHALL SCHEDULE MEETING WITH ENGINEER AND PROPERTY OWNER PRIOR TO MOBILIZATION.

2. CONTRACTOR SHALL VERIFY ALL INFORMATION INCLUDING ELEVATIONS AND UTILITIES PRIOR TO MOBILIZATION.

3. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING REQUIRED APPROVALS FROM AUTHORITIES WITH JURISDICTION OVER PROPOSED WORK.

4. CONTRACTOR SHALL COORDINATE AND CONFIRM PROJECT SCHEDULE AND WORKING HOURS WITH ENGINEER AND PROPERTY OWNER AND PROCEED IN

ACCORDANCE WITH LOCAL REQUIREMENTS.

5. CONTRACTOR SHALL COORDINATE UTILITY MARK OUT PRIOR TO MOBILIZATION.

6. CONTRACTOR SHALL DEMO AND REMOVE ALL EXISTING ASPHALT PAVING AS SHOWN ON PLAN.

7. CONTRACTOR SHALL HAUL REMOVED DEBRIS OFF SITE UNLESS OTHERWISE NOTED BY PROPERTY OWNER.

N0 20' 40'

SCALE 1" = 20'-0"

EXISTING PLANSHEET NAME

P-1

No.

04.17.2017

DR

AIN

AG

E A

RE

AS

A

DJU

ST

ED

DA

TE

02

.2

0.1

7

RE

V

04

.1

7.1

7

04/17/17

Page 9: Academy for the Gifted and Talented School 28 Green ...water.rutgers.edu/Projects/Paterson/GIInfoSheet... · Academy for the Gifted and Talented School 28 Green Infrastructure Information

100.00

OCC

100.17

GATE

100.83

F

101.96

GATE

102.57

GATE

103.95

F

101.39

F

100.86

F

101.60

F

102.73

GATE

103.10

GATE

103.29

F

GS

100.66

GS

101.04

GS

101.41

GS

101.52

GS

102.44

GS

102.18

GS

101.58

GS

101.01

GS

100.75

GS

100.50

GS

100.52

GS

100.87

GS

101.33

GS

101.75

GS

102.35

GS

102.80

GS

103.01

BL

103.01

GS

102.75

103.68

BL

103.87

BL

103.57

GS

103.14

GS

102.98

GS

102.68

GS

102.59

GS

102.10

GS

102.11

GS

102.25

GS

102.45

GS

102.81

GS

103.34

GS

104.38

GS

105.46

GS

105.54

GS

104.12

GS

102.85

GS

101.99

GS

101.88

GS

101.59

GS

101.38

GS

101.39

GS

101.13

GS

101.18

GS

101.38

GS

101.81

GS

102.86

GS

104.16

GS

105.48

GS

105.36

GS

104.04

GS

102.75

GS

101.99

GS

101.17

GS

100.79

GS

101.02

GS

100.94

GS

101.03

GS

100.96

GS

101.22

GS

101.85

GS

102.80

GS

104.18

GS

105.34

GS

105.39

GS

103.94

GS

102.61

GS

101.50

GS

100.86

GS

102.06

CB

102.00

CB

101.34

UP

100.41

UP

99.90

CB

100.48

UP

100.34

GS

100.65

GS

100.06

GS

100.03

GS

100.78

GS

102.27

GS

101.41

GS

100.42

MH

102.47

MH

101.63

MH

100

1

0

5

1

0

1

1

0

2

1

0

3

1

0

4

1

0

1

102

1

0

3

1

0

4

64 LF 4" DIA. HDPE PIPE

(0.5% MIN. SLOPE)

DRAINTECH OVERFLOW

RIM ELEV=101.18'

INV. 4" OUT=99.50'

(NOTE 2)

69.00'

78.00'

29.00'

25.00'

MIN BERM OF RAIN GARDEN

ELEV=101.25'

BASE OF RAIN GARDEN

ELEV=100.75'

PROPOSED RAIN GARDEN

(3,310 SF, 2,750 SF BASE)

INV. 4" OUT=99.08'

2

DT-1

3

DT-1

1

DT-1

4

DT-1

R14.00'

2.00'

INLET PROTECTION

(NOTE 1)

CLEAN OUT

INV. =101.00

5

DT-1

20 LF 4" DIA. PERFORATED

HDPE PIPE (0.5% MIN. SLOPE)

4.00'

4.00'

3.00'

4.00'

4.00'

5.00'

14.00'

PROPOSED ENHANCED TREE PITS

(x4)

1

DT-3

PROPOSED ENHANCED TREE PITS

(x3)

1

DT-2

PROPOSED ENHANCED TREE PITS

(x2)

1

DT-2

14.00'

4.00'

4.00'

14.00'

14.00'

5.00'

5.00'

5.00'

10.00'

14.00'

14.00'

P

U

B

L

I

C

S

C

H

O

O

L

2

8

ROCK-LINED OVERFLOW

CREST ELEV=101.25'

(NOTE 1)

4

DT-1

3.00'

3.00'

3.00'

3.00'

RE

VIS

IO

NS

No.

DA

TE

DE

SC

RIP

TIO

N

AP

PR

OV

ED

CC

O

CH

EC

KE

D

MA

L

DR

AW

N

EA

J

CH

RIS

TO

PH

ER

C

. O

BR

OP

TA

, P

h.D

., P

.E

.

PR

OF

ES

SIO

NA

L E

NG

IN

EE

R - N

J L

IC

EN

SE

#

3

75

32

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

D

AT

E _

__

__

__

__

__

__

__

__

PU

BL

IC

S

CH

OO

L 28

PA

TE

RS

ON

G

RE

EN

IN

FR

AS

TR

UC

TU

RE

319(h

)

200 P

RE

SID

EN

TIA

L B

LV

D, P

AT

ER

SO

N

PA

SS

AIC

C

OU

NT

Y, N

J

PR

OP

OS

ED

S

IT

E P

LA

N

N0 10' 20'

SCALE 1" = 10'-0"

SITE PLAN 1

PLAN NOTES:1. CONTRACTOR SHALL SCHEDULE MEETING WITH ENGINEER AND PROPERTY OWNER PRIOR TO MOBILIZATION AND CONSTRUCTION.

2. CONTRACTOR SHALL VERIFY ALL INFORMATION INCLUDING ELEVATIONS AND UTILITIES PRIOR TO CONSTRUCTION.

3. CONTRACTOR SHALL VERIFY ALL PROPOSED MATERIALS WITH PROPERTY OWNER AND ENGINEER PRIOR TO CONSTRUCTION.

4. CONTRACTOR SHALL STAKE OUT LOCATIONS OF PROPOSED RAIN GARDENS, STONE CHANNELS, AND TRENCH DRAIN AND OBTAIN APPROVAL FROM ENGINEER

PRIOR TO INSTALLATION.

5. CONTRACTOR SHALL INSTALL CONVENTIONAL ASPHALT AS SHOWN ON PLAN. THE ASPHALT AND CONCRETE MIXING PLANT, HAULING AND PLACING EQUIPMENT,

AND INSTALLATION SHALL BE IN CONFORMANCE WITH NAPA IS 131 AND THE NJDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, 2007 OR

LATEST VERSION.

6. CONTRACTOR SHALL GRADE SITE AS SHOWN ON PLAN. CUT SOIL SHALL BE REUSED ON SITE FOR FILL LOCATIONS.

7. CONTRACTOR SHALL HAUL EXCESS SOIL OFF SITE UNLESS OTHERWISE NOTED BY PROPERTY OWNER.

8. ALL FINISHED ELEVATIONS SHALL MATCH ADJOINING PAVEMENT ENSURING SMOOTH TRANSITIONS AND NO TRIPPING HAZARDS

.

9. CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ALL AREAS DISTURBED DURING CONSTRUCTION TO ORIGINAL CONDITIONS.

NOTE 1: STONE SHALL BE COMPRISED OF 3"-5" DIAMETER CLEAN, WASHED RIVER STONE. ALL AREAS OF EROSION PROTECTION STONE SHALL BE UNDERLAIN WITH

GEOTEXTILE FABRIC (GEOTEX 801 BY PROPEX OR APPROVED EQUIVALENT).

NOTE 2: UNDERDRAIN ONLY TO BE IMPLEMENTED IF INFILTRATION RATE IS INADEQUATE AT THE SITE.

SHEET NAME

P-2

DA

TE

02

.2

0.1

7

RE

V

04

.1

7.1

7

04/17/17

104.17.2017

RA

IN

G

AR

DE

N E

LE

VA

TIO

NS

A

DJU

ST

ED

Page 10: Academy for the Gifted and Talented School 28 Green ...water.rutgers.edu/Projects/Paterson/GIInfoSheet... · Academy for the Gifted and Talented School 28 Green Infrastructure Information

1

DT-2

PROPOSED ENHANCED TREE PITS

(x9)

21.00'

25.00'

16.0'

25.00'

25.00'

25.00'

25' SPACING BETWEEN

TREES UNLESS SPECIFIED

MATCH LINE

SITE PLAN 3

P

U

B

L

I

C

S

C

H

O

O

L

2

8

4.00'

4.00'

1

0

6

104

1

0

4

16.0'

1

DT-2

PROPOSED ENHANCED TREE PITS

(x4)

104

1

0

2

RE

VIS

IO

NS

No.

DA

TE

DE

SC

RIP

TIO

N

AP

PR

OV

ED

CC

O

CH

EC

KE

D

MA

L

DR

AW

N

EA

J

CH

RIS

TO

PH

ER

C

. O

BR

OP

TA

, P

h.D

., P

.E

.

PR

OF

ES

SIO

NA

L E

NG

IN

EE

R - N

J L

IC

EN

SE

#

3

75

32

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

D

AT

E _

__

__

__

__

__

__

__

__

PU

BL

IC

S

CH

OO

L 28

PA

TE

RS

ON

G

RE

EN

IN

FR

AS

TR

UC

TU

RE

319(h

)

200 P

RE

SID

EN

TIA

L B

LV

D, P

AT

ER

SO

N

PA

SS

AIC

C

OU

NT

Y, N

J

PR

OP

OS

ED

S

IT

E P

LA

N

N0 10' 20'

SCALE 1" = 10'-0"

SITE PLAN 3

PLAN NOTES:1. CONTRACTOR SHALL SCHEDULE MEETING WITH ENGINEER AND PROPERTY OWNER PRIOR TO MOBILIZATION AND CONSTRUCTION.

2. CONTRACTOR SHALL VERIFY ALL INFORMATION INCLUDING ELEVATIONS AND UTILITIES PRIOR TO CONSTRUCTION.

3. CONTRACTOR SHALL VERIFY ALL PROPOSED MATERIALS WITH PROPERTY OWNER AND ENGINEER PRIOR TO CONSTRUCTION.

4. CONTRACTOR SHALL STAKE OUT LOCATIONS OF PROPOSED RAIN GARDENS, STONE CHANNELS, AND TRENCH DRAIN AND OBTAIN APPROVAL FROM ENGINEER

PRIOR TO INSTALLATION.

5. CONTRACTOR SHALL INSTALL CONVENTIONAL ASPHALT AS SHOWN ON PLAN. THE ASPHALT AND CONCRETE MIXING PLANT, HAULING AND PLACING EQUIPMENT,

AND INSTALLATION SHALL BE IN CONFORMANCE WITH NAPA IS 131 AND THE NJDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, 2007 OR

LATEST VERSION.

6. CONTRACTOR SHALL GRADE SITE AS SHOWN ON PLAN. CUT SOIL SHALL BE REUSED ON SITE FOR FILL LOCATIONS.

7. CONTRACTOR SHALL HAUL EXCESS SOIL OFF SITE UNLESS OTHERWISE NOTED BY PROPERTY OWNER.

8. ALL FINISHED ELEVATIONS SHALL MATCH ADJOINING PAVEMENT ENSURING SMOOTH TRANSITIONS AND NO TRIPPING HAZARDS

.

9. CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ALL AREAS DISTURBED DURING CONSTRUCTION TO ORIGINAL CONDITIONS.

NOTE 1: STONE SHALL BE COMPRISED OF 3"-5" DIAMETER CLEAN, WASHED RIVER STONE. ALL AREAS OF EROSION PROTECTION STONE SHALL BE UNDERLAIN WITH

GEOTEXTILE FABRIC (GEOTEX 801 BY PROPEX OR APPROVED EQUIVALENT).

SHEET NAME

P-3

N0 10' 20'

SCALE 1" = 10'-0"

SITE PLAN 2

DA

TE

02

.2

0.1

7

RE

V

04

.1

7.1

7

04/17/17

Page 11: Academy for the Gifted and Talented School 28 Green ...water.rutgers.edu/Projects/Paterson/GIInfoSheet... · Academy for the Gifted and Talented School 28 Green Infrastructure Information

IG

IG

IG

IG

IG

IG

IG

IG

IG

IG

IG

IG

PV

PV

PS

PA

MV

MV

HERBACEOUS PLUG PLANTING DETAIL

TREE PLANTING DETAIL

SHRUB PLANTING DETAIL

2

DT-3

1

DT-3

3

DT-3

TREE PLANTING DETAIL

2

DT-3

NS

(x13 TREE PITS,

ALONG STREET)

TREE PLANTING DETAIL

2

DT-3

AG

(x9 TREE PITS,

IN PLAYGROUND)

PLANT SPECIES LIST

BOTANICAL NAME COMMON NAME

PV Panicum virgatum SWITCHGRASS

PA Pennisetun alopecuroides FOUNTAIN GRASS

PS Phlox subulata CREEPING PHLOX

QUANTITY

270

155

355

MV Magnolia virginia SWEET BAY MAGNOLIA

NS Nyssa sylvatica MARSHALL BLACKGUM

AG Amelanchier x grandiflora AUTUMN BRILLIANCE

SERVICEBERRY (SINGLE-STEM)

PLANT LIST

IG Ilex Glabra INKBERRY HOLLY (SHAMROCK)12

SIZE

1 QUART

1 QUART

1 QUART

TREES

SHRUBS

#2 CONT.

2

13

9

2-3" CAL. B&B

2-3" CAL. B&B

2-3" CAL. B&B

RE

VIS

IO

NS

No.

DA

TE

DE

SC

RIP

TIO

N

AP

PR

OV

ED

CC

O

CH

EC

KE

D

MA

L

DR

AW

N

EA

J

CH

RIS

TO

PH

ER

C

. O

BR

OP

TA

, P

h.D

., P

.E

.

PR

OF

ES

SIO

NA

L E

NG

IN

EE

R - N

J L

IC

EN

SE

#

3

75

32

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

D

AT

E _

__

__

__

__

__

__

__

__

PU

BL

IC

S

CH

OO

L 28

PA

TE

RS

ON

G

RE

EN

IN

FR

AS

TR

UC

TU

RE

319(h

)

200 P

RE

SID

EN

TIA

L B

LV

D, P

AT

ER

SO

N

PA

SS

AIC

C

OU

NT

Y, N

J

PL

AN

TIN

G P

LA

N

N0 5' 10'

SCALE 1" = 5'-0"

PLANTING PLANSHEET NAME

P-4

DA

TE

02

.2

0.1

7

RE

V

04

.1

7.1

7

04/17/17

104.17.2017

PLA

NT

IN

G P

LA

N R

EV

IS

ED

Page 12: Academy for the Gifted and Talented School 28 Green ...water.rutgers.edu/Projects/Paterson/GIInfoSheet... · Academy for the Gifted and Talented School 28 Green Infrastructure Information

SHEET NAME

DT-1

PU

BL

IC

S

CH

OO

L 28

PA

TE

RS

ON

G

RE

EN

IN

FR

AS

TR

UC

TU

RE

319(h

)

200 P

RE

SID

EN

TIA

L B

LV

D, P

AT

ER

SO

N

PA

SS

AIC

C

OU

NT

Y, N

J

RA

IN

G

AR

DE

N D

ET

AIL

S

RE

VIS

IO

NS

No.

DA

TE

DE

SC

RIP

TIO

N

AP

PR

OV

ED

CC

O

CH

EC

KE

D

MA

L

DR

AW

N

EA

J

CH

RIS

TO

PH

ER

C

. O

BR

OP

TA

, P

h.D

., P

.E

.

PR

OF

ES

SIO

NA

L E

NG

IN

EE

R - N

J L

IC

EN

SE

#

3

75

32

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

D

AT

E _

__

__

__

__

__

__

__

__

DA

TE

02

.2

0.1

7

RE

V

04

.1

7.1

7

04/17/17

104.17.2017

SO

IL P

ER

ME

AB

ILIT

Y T

ES

TIN

G N

OT

E A

DD

ED

AutoCAD SHX Text
BERM (SEE SITE PLAN FOR ELEV.)
AutoCAD SHX Text
3:1 MAX. SLOPE
AutoCAD SHX Text
STONE SHALL NOT RESTRICT FLOW
AutoCAD SHX Text
RAIN GARDEN BASE
AutoCAD SHX Text
GEOTEXTILE FABRIC
AutoCAD SHX Text
3"-5" DIA. RIVER STONE; APPROX. 6" LAYER
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
BERM ELEVATION (SEE SITE PLAN)
AutoCAD SHX Text
BASE ELEVATION (SEE SITE PLAN)
AutoCAD SHX Text
3" MULCH LAYER
AutoCAD SHX Text
PONDING DEPTH
AutoCAD SHX Text
4" DIA. PERFORATED HDPE PIPE @ 0.5% MIN. SLOPE SURROUNDED WITH 4" NJDOT #57 STONE (IF NOTED ON SITE PLAN)
AutoCAD SHX Text
NON-DEGRADING FILTER MATERIAL TO SURROUND AGGREGATE
AutoCAD SHX Text
TILL, BACKFILL WITH 2" TOPSOIL
AutoCAD SHX Text
TILL, BACKFILL WITH 2" TOPSOIL
AutoCAD SHX Text
RIM ELEV. (SEE SITE PLAN)
AutoCAD SHX Text
6" SEWER & DRAIN RISER
AutoCAD SHX Text
DRAINTECH 6" ATRIUM POLYOLEFIN GRATE, OR EQUIV.
AutoCAD SHX Text
3" MULCH LAYER
AutoCAD SHX Text
FINISHED GRADE
AutoCAD SHX Text
4" HDPE PIPE @ 0.5% MIN. SLOPE
AutoCAD SHX Text
CRUSHED AGGREGATE BASE ( " CLEAN STONE)34" CLEAN STONE)
AutoCAD SHX Text
OUTLET, DRAINTECH, OR EQUIV.
AutoCAD SHX Text
TILLED SUBSOIL
AutoCAD SHX Text
6"-12" THICK SOIL BED (70% SAND, 30% COMPOST) BLEND WITH TILLER PRIOR TO SPREADING HARDWOOD MULCH & PLANTING
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
PROPOSED
AutoCAD SHX Text
EXTENT OF EXCAVATION
AutoCAD SHX Text
3:1 MAX. SLOPE
AutoCAD SHX Text
3:1 MAX. SLOPE
AutoCAD SHX Text
4" DIA. CLEAN-OUT TEE
AutoCAD SHX Text
4" DIA. HDPE PIPING
AutoCAD SHX Text
4" PVC THREADED PLUG (RECESSES) WITH INVERTED KEY PLUG
AutoCAD SHX Text
4" PVC CLEAN-OUT HUB ADAPATER
AutoCAD SHX Text
MULCH LAYER
AutoCAD SHX Text
BIORETENTION LAYER
AutoCAD SHX Text
SURROUND PIPE WITH 4" OF NJDOT #57 STONE
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
BERM (SEE SITE PLAN FOR ELEV.)
AutoCAD SHX Text
APPROX. 6" LAYER OF RIVER STONE
AutoCAD SHX Text
RAIN GARDEN BASE (SEE SITE PLAN FOR ELEV.)
AutoCAD SHX Text
OVERFLOW INV. (SEE SITE PLAN)
AutoCAD SHX Text
GEOTEXTILE FABRIC
AutoCAD SHX Text
0.5% MIN. SLOPE
AutoCAD SHX Text
EXISTING LAWN
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
1
AutoCAD SHX Text
DT-1
AutoCAD SHX Text
RAIN GARDEN EXCAVATION SECTION
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
2
AutoCAD SHX Text
DT-1
AutoCAD SHX Text
RAIN GARDEN CROSS-SECTION
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
5
AutoCAD SHX Text
DT-1
AutoCAD SHX Text
DRAINTECH OUTLET DETAIL
AutoCAD SHX Text
CONSTRUCTION NOTES: 1.THE CONTRACTOR SHALL VERIFY ALL INFORMATION PRIOR TO EXCAVATION INCLUDING ELEVATIONS AND LOCATIONS OF EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY ALL INFORMATION PRIOR TO EXCAVATION INCLUDING ELEVATIONS AND LOCATIONS OF EXISTING UTILITIES. 2.THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF ANY FIELD CONDITIONS DIFFER MATERIALLY FROM THOSE REPRESENTED ON THESE DRAWINGS AND THE THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF ANY FIELD CONDITIONS DIFFER MATERIALLY FROM THOSE REPRESENTED ON THESE DRAWINGS AND THE SPECIFICATIONS OR IF, IN THE CONTRACTOR'S OPINION, SAID CONDITIONS CONFLICT WITH THE DESIGNS SHOWN HEREON. 3.THE ENGINEER SHALL INSPECT ALL PLANTING BED AREAS BEFORE MULCHING TO INSURE THAT ADEQUATE DRAINAGE EXISTS. IF ANY AREAS TO BE MULCHED SHOW THE ENGINEER SHALL INSPECT ALL PLANTING BED AREAS BEFORE MULCHING TO INSURE THAT ADEQUATE DRAINAGE EXISTS. IF ANY AREAS TO BE MULCHED SHOW EVIDENCE OF POOR DRAINAGE, THE CONTRACTOR SHALL TAKE CORRECTIVE ACTION. 4.THE CONTRACTOR SHALL AVOID DISTURBING ALL EXISTING TREES. ANY DISTURBANCE TO TREES OR TREE ROOTS MUST BE COORDINATED WITH THE PROPERTY OWNER. THE CONTRACTOR SHALL AVOID DISTURBING ALL EXISTING TREES. ANY DISTURBANCE TO TREES OR TREE ROOTS MUST BE COORDINATED WITH THE PROPERTY OWNER. 5.DIMENSIONS AND SHAPE WILL VARY, REFER TO SITE PLAN. DIMENSIONS AND SHAPE WILL VARY, REFER TO SITE PLAN. 6.RIVER STONE PROTECTION DIMENSIONS ARE TYPICAL AND MAY VARY PER SITE. CONSULT THE ENGINEER AND SITE PLAN FOR DIMENSIONS ON A PER SITE BASIS. RIVER STONE PROTECTION DIMENSIONS ARE TYPICAL AND MAY VARY PER SITE. CONSULT THE ENGINEER AND SITE PLAN FOR DIMENSIONS ON A PER SITE BASIS. 7.RIVER STONE PROTECTION SHALL SLOPE TO RAIN GARDEN BASE. RIVER STONE PROTECTION SHALL SLOPE TO RAIN GARDEN BASE. 8.REFER TO SITE PLAN TO DETERMINE OUTLET TYPE (ROCK-LINED OVERFLOW OR DRAINTECH RISER). REFER TO SITE PLAN TO DETERMINE OUTLET TYPE (ROCK-LINED OVERFLOW OR DRAINTECH RISER). 9.REFER TO SITE PLAN FOR ALL ELEVATIONS AND INVERTS. REFER TO SITE PLAN FOR ALL ELEVATIONS AND INVERTS. 10.THE CONTRACTOR SHALL EXCAVATE 12" LOWER THAN THE BASE ELEVATION SHOWN ON THE SITE PLANS. THE SLOPES OF THE RAIN GARDEN SHALL BE AT A 3:1 THE CONTRACTOR SHALL EXCAVATE 12" LOWER THAN THE BASE ELEVATION SHOWN ON THE SITE PLANS. THE SLOPES OF THE RAIN GARDEN SHALL BE AT A 3:1 MINIMUM. 11.THE SUBGRADE OF THE RAIN GARDEN SHALL BE LEVEL TO ENSURE PROPER DRAINAGE. CONTRACTOR SHALL OBTAIN ENGINEER APPROVAL PRIOR TO BACKFILLING WITH THE SUBGRADE OF THE RAIN GARDEN SHALL BE LEVEL TO ENSURE PROPER DRAINAGE. CONTRACTOR SHALL OBTAIN ENGINEER APPROVAL PRIOR TO BACKFILLING WITH 12" OF BIORETENTION MEDIA. 12.THE CONTRACTOR SHALL INSTALL OVERFLOW IF SPECIFIED IN SITE PLANS PRIOR TO BACKFILLING WITH BIORETENTION MEDIA. THE CONTRACTOR SHALL INSTALL OVERFLOW IF SPECIFIED IN SITE PLANS PRIOR TO BACKFILLING WITH BIORETENTION MEDIA. 13.THE BIORETENTION LAYER SHALL BE LEVEL TO ENSURE PROPER DRAINAGE. CONTRACTOR SHALL OBTAIN ENGINEER APPROVAL PRIOR TO SPREADING MULCH AND THE BIORETENTION LAYER SHALL BE LEVEL TO ENSURE PROPER DRAINAGE. CONTRACTOR SHALL OBTAIN ENGINEER APPROVAL PRIOR TO SPREADING MULCH AND PLANTING. 14.INLET AND OUTLET PROTECTION SHALL BE UNDERLAIN WITH GEOTEXTILE FABRIC. INLET AND OUTLET PROTECTION SHALL BE UNDERLAIN WITH GEOTEXTILE FABRIC. 15.INLETS AND OUTLETS SHALL NOT INHIBIT THE FLOW OF WATER FROM THE STREET. THE RIVER STONE SHALL BE PLACED BELOW THE BOTTOM OF THE PIPE. INLETS AND OUTLETS SHALL NOT INHIBIT THE FLOW OF WATER FROM THE STREET. THE RIVER STONE SHALL BE PLACED BELOW THE BOTTOM OF THE PIPE. 16.THE CONTRACTOR SHALL TILL THE BERM SECTION AND BACKFILL WITH TOPSOIL. THE CONTRACTOR SHALL TILL THE BERM SECTION AND BACKFILL WITH TOPSOIL. 17.ALL DISTURBED AREAS EXCLUSIVE OF RAIN GARDEN AND SLOPED BERM SHALL BE RESTORED TO ORIGINAL CONDITIONS BY CONTRACTOR. ALL DISTURBED AREAS EXCLUSIVE OF RAIN GARDEN AND SLOPED BERM SHALL BE RESTORED TO ORIGINAL CONDITIONS BY CONTRACTOR. 18.THE CONTRACTOR SHALL HAVE A PRE-CONSTRUCTION MEETING WITH THE PROJECT ENGINEER PRIOR TO ANY WORK ON SITE. THE CONTRACTOR SHALL HAVE A PRE-CONSTRUCTION MEETING WITH THE PROJECT ENGINEER PRIOR TO ANY WORK ON SITE. 19.CONTRACTOR SHALL PERFORM REQUIRED TESTING TO DETERMINE SOIL PERMEABILITY AND SEASONAL HIGH WATER TABLE ELEVATION AT THE SITE. TESTING SHALL BE CONTRACTOR SHALL PERFORM REQUIRED TESTING TO DETERMINE SOIL PERMEABILITY AND SEASONAL HIGH WATER TABLE ELEVATION AT THE SITE. TESTING SHALL BE DONE PRIOR TO EXCAVATION AND INSTALLATION OF POROUS ASPHALT, BIOSWALES, AND RAIN GARDENS. PROJECT ENGINEER SHALL BE PRESENT DURING TESTING AND SHALL BE INFORMED OF THE RESULTS. SPECIFICATIONS: 1.MAX COVER OVER TOP OF PIPE IS 4 FT. CONTACT ADS IF OTHERWISE GREATER. MAX COVER OVER TOP OF PIPE IS 4 FT. CONTACT ADS IF OTHERWISE GREATER. 2.THE APPROVAL OF MATERIALS AND MIXING OF SAND, COMPOST, AND SOIL SHALL BE DONE UNDER THE SUPERVISION OF THE PROJECT ENGINEER/LANDSCAPE ARCHITECT. THE APPROVAL OF MATERIALS AND MIXING OF SAND, COMPOST, AND SOIL SHALL BE DONE UNDER THE SUPERVISION OF THE PROJECT ENGINEER/LANDSCAPE ARCHITECT. BIORETENTION MEDIA SHALL CONSIST OF 70% SAND AND 30% COMPOST MIXTURE. 3.SAND SHALL AT THE MINIMUM CONFORM TO THE SIEVE ANALYSIS FOR CONCRETE AGGREGATE SAND (ASTM C-33). USGA TEE/GREEN SIEVE GRADATION MIX IS SAND SHALL AT THE MINIMUM CONFORM TO THE SIEVE ANALYSIS FOR CONCRETE AGGREGATE SAND (ASTM C-33). USGA TEE/GREEN SIEVE GRADATION MIX IS PREFERABLE WHERE AVAILABLE. 4.UNDERLYING SOILS SHALL BE TILLED/SCARIFIED PRIOR TO SPREADING/MIXING OF BIORETENTION MEDIA. UNDERLYING SOILS SHALL BE TILLED/SCARIFIED PRIOR TO SPREADING/MIXING OF BIORETENTION MEDIA. 5.ALL BIORETENTION MEDIA SHALL BE PLACED FROM THE SIDES OF THE FACILITIES, AND IN NO EVENT SHALL ANY TRACKED OR WHEELED EQUIPMENT BE PERMITTED TO ALL BIORETENTION MEDIA SHALL BE PLACED FROM THE SIDES OF THE FACILITIES, AND IN NO EVENT SHALL ANY TRACKED OR WHEELED EQUIPMENT BE PERMITTED TO CROSS THE RAIN GARDEN. 6.RAIN GARDEN SHALL BE CONSTRUCTED TO DIMENSIONS INDICATED ON THE SITE PLAN. RAIN GARDEN SHALL BE CONSTRUCTED TO DIMENSIONS INDICATED ON THE SITE PLAN. 7.3-5 INCH DELAWARE RIVER STONE SHALL BE USED FOR STONE CHANNEL AND INLET/OUTLET PROTECTION. 3-5 INCH DELAWARE RIVER STONE SHALL BE USED FOR STONE CHANNEL AND INLET/OUTLET PROTECTION. 8.NON-DYED, TRIPLE-SHREDDED HARDWOOD MULCH SHALL BE USED. NON-DYED, TRIPLE-SHREDDED HARDWOOD MULCH SHALL BE USED. 9.PLANTING OF RAIN GARDEN AND SLOPED BERM SHALL BE COMPLETED AS INDICATED ON THE SITE PLAN. PLANTING OF RAIN GARDEN AND SLOPED BERM SHALL BE COMPLETED AS INDICATED ON THE SITE PLAN. 10.THE CONTRACTOR SHALL PERFORM ALL WORK IN CONFORMANCE WITH THE NJDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, 2007 OR LATEST THE CONTRACTOR SHALL PERFORM ALL WORK IN CONFORMANCE WITH THE NJDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, 2007 OR LATEST VERSION.
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
3
AutoCAD SHX Text
DT-1
AutoCAD SHX Text
INLET PROTECTION CROSS SECTION DETAIL
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
6
AutoCAD SHX Text
DT-1
AutoCAD SHX Text
CLEAN OUT DETAIL
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
4
AutoCAD SHX Text
DT-1
AutoCAD SHX Text
ROCK-LINED OVERFLOW
Page 13: Academy for the Gifted and Talented School 28 Green ...water.rutgers.edu/Projects/Paterson/GIInfoSheet... · Academy for the Gifted and Talented School 28 Green Infrastructure Information

RE

VIS

IO

NS

No.

DA

TE

DE

SC

RIP

TIO

N

AP

PR

OV

ED

CC

O

CH

RIS

TO

PH

ER

C

. O

BR

OP

TA

, P

h.D

., P

.E

.

PR

OF

ES

SIO

NA

L E

NG

IN

EE

R - N

J L

IC

EN

SE

#

3

75

32

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

D

AT

E _

__

__

__

__

__

__

__

__

SHEET NAME

DT-2

CH

EC

KE

D

MA

L

DR

AW

N

EA

J

PU

BL

IC

S

CH

OO

L 28

PA

TE

RS

ON

G

RE

EN

IN

FR

AS

TR

UC

TU

RE

319(h

)

200 P

RE

SID

EN

TIA

L B

LV

D, P

AT

ER

SO

N

PA

SS

AIC

C

OU

NT

Y, N

J

TR

EE

P

IT

D

ET

AIL

S

DA

TE

02

.2

0.1

7

RE

V

04

.1

7.1

7

04/17/17

104.17.2017

FR

EE

BO

AR

D A

DD

ED

T

O T

RE

E P

IT

D

ET

AIL

AutoCAD SHX Text
48"X48" TREE GRATE (TYP.)
AutoCAD SHX Text
PERMEABLE SOIL SEPARATION FABRIC
AutoCAD SHX Text
CONSTRUCTION NOTES: 1.THE CONTRACTOR SHALL VERIFY ALL INFORMATION PRIOR TO EXCAVATION INCLUDING ELEVATIONS AND LOCATIONS OF EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY ALL INFORMATION PRIOR TO EXCAVATION INCLUDING ELEVATIONS AND LOCATIONS OF EXISTING UTILITIES. 2.THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF ANY FIELD CONDITIONS DIFFER MATERIALLY FROM THOSE REPRESENTED ON THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF ANY FIELD CONDITIONS DIFFER MATERIALLY FROM THOSE REPRESENTED ON THESE DRAWINGS AND THE SPECIFICATIONS OR IF, IN THE CONTRACTOR'S OPINION, SAID CONDITIONS CONFLICT WITH THE DESIGNS SHOWN HEREON. 3.THE ENGINEER SHALL INSPECT ALL PLANTING BED AREAS BEFORE PLANTING TO INSURE THAT ADEQUATE DRAINAGE EXISTS. IF ANY AREAS TO THE ENGINEER SHALL INSPECT ALL PLANTING BED AREAS BEFORE PLANTING TO INSURE THAT ADEQUATE DRAINAGE EXISTS. IF ANY AREAS TO BE PLANTED SHOW EVIDENCE OF POOR DRAINAGE, THE CONTRACTOR SHALL TAKE CORRECTIVE ACTION. 4.THE CONTRACTOR SHALL HAVE ALL UTILITIES MARKED BEFORE ANY EXCAVATION. IF ANY UTILITIES INTERFERE WITH THE PROJECT, THE THE CONTRACTOR SHALL HAVE ALL UTILITIES MARKED BEFORE ANY EXCAVATION. IF ANY UTILITIES INTERFERE WITH THE PROJECT, THE CONTRACTOR SHALL NOTIFY THE ENGINEER. 5.THE ENTIRE CONTINUOUS TREE PIT AND/OR ENHANCED TREE PIT SHALL BE EXCAVATED, THE CONTRACTOR SHALL DISPOSE OF ANY EXCESS THE ENTIRE CONTINUOUS TREE PIT AND/OR ENHANCED TREE PIT SHALL BE EXCAVATED, THE CONTRACTOR SHALL DISPOSE OF ANY EXCESS MATERIALS. 4.THE CONTRACTOR SHALL AVOID OVER COMPACTING THE EXISTING MATERIALS IN ORDER TO AVOID POOR INFILTRATION OR SHORT LIFETIME OF THE CONTRACTOR SHALL AVOID OVER COMPACTING THE EXISTING MATERIALS IN ORDER TO AVOID POOR INFILTRATION OR SHORT LIFETIME OF PAVEMENT. 5.THE CONTRACTOR SHALL ESTABLISH ALL ELEVATIONS AND LINES AS SHOWN IN THE SITE PLAN FOR REVIEW BY THE ENGINEER BEFORE ANY THE CONTRACTOR SHALL ESTABLISH ALL ELEVATIONS AND LINES AS SHOWN IN THE SITE PLAN FOR REVIEW BY THE ENGINEER BEFORE ANY CONSTRUCTION BEGINS. 6.THE CONTRACTOR SHALL VERIFY THAT THE SUBGRADE IS CONSISTENT WITH LINE, GRADE, AND ELEVATIONS AS INDICATED IN THE SITE PLAN. ANY THE CONTRACTOR SHALL VERIFY THAT THE SUBGRADE IS CONSISTENT WITH LINE, GRADE, AND ELEVATIONS AS INDICATED IN THE SITE PLAN. ANY AREAS SHOWING EROSION OR POTENTIAL PONDING SHALL BE REGRADED BEFORE SUBBASE INSTALLATION. 7.IMMEDIATELY AFTER THE SUBGRADE IS APPROVED BY THE ENGINEER, THE CONTRACTOR SHALL BEGIN SUBBASE CONSTRUCTION WHICH INCLUDES IMMEDIATELY AFTER THE SUBGRADE IS APPROVED BY THE ENGINEER, THE CONTRACTOR SHALL BEGIN SUBBASE CONSTRUCTION WHICH INCLUDES ALL MATERIALS BELOW THE PAVEMENT AND ABOVE THE EXISTING SUBGRADE. 8.THE CONTRACTOR SHALL PLACE GEOTEXTILE FABRIC IN CONFORMANCE WITH MANUFACTURER'S STANDARDS. ALL ADJACENT FABRIC SHALL BE THE CONTRACTOR SHALL PLACE GEOTEXTILE FABRIC IN CONFORMANCE WITH MANUFACTURER'S STANDARDS. ALL ADJACENT FABRIC SHALL BE OVERLAPPED BY AT LEAST 16 INCHES. THE FABRIC SHALL BE SECURED AT LEAST FOUR FEET OUTSIDE OF THE EXCAVATED BASE. THE ENTIRE PIT PERIMETER SHALL BE LINED WITH GEOTEXTILE FABRIC. 10.THE STORAGE LAYER (NJDOT #2) SHALL BE INSTALLED EVENLY OVER THE EXISTING SUBBGRADE AND PERMEABLE FABRIC. STORAGE LAYER THE STORAGE LAYER (NJDOT #2) SHALL BE INSTALLED EVENLY OVER THE EXISTING SUBBGRADE AND PERMEABLE FABRIC. STORAGE LAYER AGGREGATE SHALL BE INSTALLED TO A MAXIMUM OF 95% STANDARD PROCTOR COMPACTION. PERMEABLE SOIL SEPARATION FABRIC SHALL BE INSTALLED ON TOP OF STORAGE LAYER PRIOR TO INSTALLING BIORETENTION MEDIA. 11.THE BIORETENTION MEDIA LAYER SHALL BE INSTALLED EVENLY OVER THE STORAGE LAYER AND FABRIC. THE BIORETENTION MEDIA LAYER SHALL BE INSTALLED EVENLY OVER THE STORAGE LAYER AND FABRIC. 12.THE INFILTRATION RATE SHALL BE AT LEAST 5-30 FT/DAY OR 50 % OF THE HYDRAULIC CONDUCTIVITY (D2434). THE INFILTRATION RATE SHALL BE AT LEAST 5-30 FT/DAY OR 50 % OF THE HYDRAULIC CONDUCTIVITY (D2434). 14.AFTER SUBBASE AGGREGATE INSTALLATION THE GEOTEXTILE FABRIC SHALL BE FOLDED BACK ALONG ALL BED EDGES. THE FABRIC SHALL REMAIN AFTER SUBBASE AGGREGATE INSTALLATION THE GEOTEXTILE FABRIC SHALL BE FOLDED BACK ALONG ALL BED EDGES. THE FABRIC SHALL REMAIN SECURE UNTIL ADJACENT SOILS ESTABLISH VEGETATION. ANY NECESSARY MEASURES SHALL BE TAKEN TO PREVENT SEDIMENT FROM WASHING INTO BEDS. 15.CONCRETE SHALL BE INSTALLED IN CONFORMANCE WITH NJDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, 2007 OR CONCRETE SHALL BE INSTALLED IN CONFORMANCE WITH NJDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, 2007 OR LATEST VERSION. REFER TO SHEET DT-3 FOR PERVIOUS CONCRETE. SPECIFICATIONS: 1.THE TREE GATES SHALL BE THE RETROFIT COLLECTION GRATES (R-9002) FROM NEENAH FOUNDRY. GRATES SHALL BE 48" ON EACH SIDE WITH THE TREE GATES SHALL BE THE RETROFIT COLLECTION GRATES (R-9002) FROM NEENAH FOUNDRY. GRATES SHALL BE 48" ON EACH SIDE WITH A 16" DIAMETER EXPANDABLE TREE OPENING OR APPROVED ALTERNATIVE FOR CONTINUOUS TREE PIT. FOR ENHANCED TREE PIT THE GRATE SHALL BE 48" - 72" ON EACH SIDE WITH A 16" DIAMETER EXPANDABLE TREE OPENING OR APPROVED ALTERNATIVE. SEE SITE PLAN FOR GRATE DIMENSIONS FOR ENHANCED TREE PITS. 2.THE BIORETENTION LAYER SHALL BE COMPRISED OF 70% SAND AND 30% COMPOST MIXTURE. THE BIORETENTION LAYER SHALL BE COMPRISED OF 70% SAND AND 30% COMPOST MIXTURE. 3.THE COURSE STORAGE LAYER IN DETAIL 1 SHALL BE COMPRISED OF NJDOT #2 WASHED STONE. THE LAYER SHALL BE COMPACTED MULTIPLE THE COURSE STORAGE LAYER IN DETAIL 1 SHALL BE COMPRISED OF NJDOT #2 WASHED STONE. THE LAYER SHALL BE COMPACTED MULTIPLE TIMES. ALL OTHER STORAGE LAYERS SHALL BE COMPRISED OF NJDOT #57 WASHED STONE. 4.REFER TO DT-3 FOR PERVIOUS CONCRETE DETAILS.REFER TO DT-3 FOR PERVIOUS CONCRETE DETAILS.
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
1
AutoCAD SHX Text
DT-2
AutoCAD SHX Text
ENHANCED TREE PIT
Page 14: Academy for the Gifted and Talented School 28 Green ...water.rutgers.edu/Projects/Paterson/GIInfoSheet... · Academy for the Gifted and Talented School 28 Green Infrastructure Information

RE

VIS

IO

NS

No.

DA

TE

DE

SC

RIP

TIO

N

AP

PR

OV

ED

CC

O

CH

EC

KE

D

MA

L

DR

AW

N

EA

J

CH

RIS

TO

PH

ER

C

. O

BR

OP

TA

, P

h.D

., P

.E

.

PR

OF

ES

SIO

NA

L E

NG

IN

EE

R - N

J L

IC

EN

SE

#

3

75

32

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

D

AT

E _

__

__

__

__

__

__

__

__

SHEET NAME

DT-3

PU

BL

IC

S

CH

OO

L 28

PA

TE

RS

ON

G

RE

EN

IN

FR

AS

TR

UC

TU

RE

319(h

)

200 P

RE

SID

EN

TIA

L B

LV

D, P

AT

ER

SO

N

PA

SS

AIC

C

OU

NT

Y, N

J

PL

AN

TIN

G A

ND

L

AN

DS

CA

PE

D

ET

AIL

S

DA

TE

02

.2

0.1

7

RE

V

04

.1

7.1

7

04/17/17

104.17.2017

PLA

NT

IN

G S

CH

ED

ULE

R

EV

IS

ED

AutoCAD SHX Text
SHRUB SHALL BEAR SAME RELATION TO FINISHED GRADE AS IT BORE TO PREVIOUS EXISTING GRADE.
AutoCAD SHX Text
THIN BRANCHES AND FOLIAGE (NOT ALL END TIPS) BY 13RETAINING NORMAL PLANT SHAPE.
AutoCAD SHX Text
CUT & REMOVE BURLAP FROM TOP OF BALL AS SHOWN13 OF BALL AS SHOWN
AutoCAD SHX Text
SHREDDED BARK MULCH
AutoCAD SHX Text
SAUCER AROUND SHRUB
AutoCAD SHX Text
LIMIT OF BARE ROOT SPREAD
AutoCAD SHX Text
TOPSOIL
AutoCAD SHX Text
SCARIFY SUBSOIL TO MIN. 4" DEPTH
AutoCAD SHX Text
NOTES: 1.DEER PROTECTION REQUIRED AROUND SHRUB PLANTINGS.DEER PROTECTION REQUIRED AROUND SHRUB PLANTINGS.
AutoCAD SHX Text
DO NOT PRUNE TREE EXCEPT AS DIRECTED BY OWNERS REPRESENTATIVE
AutoCAD SHX Text
3 - (2"X2"X8') WOOD STAKES
AutoCAD SHX Text
CROWN OF ROOT BALL TO BE SET EVEN WITH FINISH GRADE 3" MAX. MULCH OVER ENTIRE PLANTING HOLE
AutoCAD SHX Text
KEEP AWAY FROM TRUNK
AutoCAD SHX Text
CREATE RAISED SAUCER AROUND EDGE OF ROOT BALL, REMOVE AFTER FIRST YEAR
AutoCAD SHX Text
BACKFILL WITH TOPSOIL MIXED WITH 50% HUMUS
AutoCAD SHX Text
FINISHED GRADE
AutoCAD SHX Text
CUT & REMOVE TOP OF BURLAP, 12 OF BURLAP, TWINE AND WIRE BASKET FROM ROOT BALL
AutoCAD SHX Text
B&B ROOT BALL
AutoCAD SHX Text
EXISTING SUB GRADE, TO AVOID SETTLING DO NOT EXCAVATE BENEATH ROOT BALL
AutoCAD SHX Text
NOTES: 1.DO NOT DAMAGE MAIN ROOTS OR ROOT BALL WHEN INSTALLING TREE STAKE. DO NOT DAMAGE MAIN ROOTS OR ROOT BALL WHEN INSTALLING TREE STAKE. 2.WATER THOROUGHLY AFTER INSTALLATION. WATER THOROUGHLY AFTER INSTALLATION. 3.REMOVE SAUCER AND STAKES TWO YEARS OR LESS AFTER INSTALLATION. REMOVE SAUCER AND STAKES TWO YEARS OR LESS AFTER INSTALLATION. 4.CONTRACTOR IS NOT TO USE TREE WRAP. CONTRACTOR IS NOT TO USE TREE WRAP.
AutoCAD SHX Text
1 QUART OR PLUG (TYP.)
AutoCAD SHX Text
TRIPLE-SHREDDED HARDWOOD MULCH (3" DEPTH)
AutoCAD SHX Text
BIORETENTION MEDIA
AutoCAD SHX Text
QTY.
AutoCAD SHX Text
KEY
AutoCAD SHX Text
BOTANICAL NAME
AutoCAD SHX Text
COMMON NAME
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
270
AutoCAD SHX Text
PV
AutoCAD SHX Text
Panicum Virgatum
AutoCAD SHX Text
SWITCHGRASS
AutoCAD SHX Text
QUART
AutoCAD SHX Text
155
AutoCAD SHX Text
PA
AutoCAD SHX Text
Pennisetun Alopecuroides
AutoCAD SHX Text
FOUNTAIN GRASS
AutoCAD SHX Text
QUART
AutoCAD SHX Text
355
AutoCAD SHX Text
PS
AutoCAD SHX Text
Phlox Subulata
AutoCAD SHX Text
CREEPING PHLOX
AutoCAD SHX Text
QUART
AutoCAD SHX Text
QTY.
AutoCAD SHX Text
KEY
AutoCAD SHX Text
BOTANICAL NAME
AutoCAD SHX Text
COMMON NAME
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
12
AutoCAD SHX Text
IG
AutoCAD SHX Text
Ilex Glabra
AutoCAD SHX Text
SHAMROCK
AutoCAD SHX Text
3 GAL.
AutoCAD SHX Text
QTY.
AutoCAD SHX Text
KEY
AutoCAD SHX Text
BOTANICAL NAME
AutoCAD SHX Text
COMMON NAME
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
2
AutoCAD SHX Text
MV
AutoCAD SHX Text
Magnolia virginiana
AutoCAD SHX Text
SWEET BAY MAGNOLIA
AutoCAD SHX Text
2-3" CAL. BAGGED & BURLAPPED
AutoCAD SHX Text
13
AutoCAD SHX Text
NS
AutoCAD SHX Text
Nyssa sylvatica
AutoCAD SHX Text
MARSHALL BLACKGUM
AutoCAD SHX Text
2-3" CAL. BAGGED & BURLAPPED
AutoCAD SHX Text
9
AutoCAD SHX Text
AG
AutoCAD SHX Text
Amelanchier x grandiflora
AutoCAD SHX Text
AUTUMN BRILIANCE SERVICEBERRY (SINGLE-STEM)
AutoCAD SHX Text
2-3" CAL. BAGGED & BURLAPPED
AutoCAD SHX Text
PERENNIALS & GRASSES PLANT LIST
AutoCAD SHX Text
SHRUB PLANT LIST
AutoCAD SHX Text
TREES PLANT LIST
AutoCAD SHX Text
PLANTING SCHEDULE
AutoCAD SHX Text
OPEN LAWN AND TURF AREAS 1.SEED ALL REMAINING PARK AREAS WITH TURF TYPE FALL FESCUE AND PERENNIAL RYEGRASS BLEND (LOFTS - SUMMER STRESS MIX II OR APPROVED EQUIVALENT). INSTALL AT A RATE OF 350 LBS. PER ACRE PER MANUFACTURERS SPECIFICATIONS. SEED ALL REMAINING PARK AREAS WITH TURF TYPE FALL FESCUE AND PERENNIAL RYEGRASS BLEND (LOFTS - SUMMER STRESS MIX II OR APPROVED EQUIVALENT). INSTALL AT A RATE OF 350 LBS. PER ACRE PER MANUFACTURERS SPECIFICATIONS. TOPSOILING, SEEDING AND MULCHING NOTES 1. ANY UNDISTURBED AREA ON WHICH ACTIVITY HAS CEASED AND WHICH WILL REMAIN EXPOSED FOR MORE THAN 10 DAYS MUST BE SEEDED AND MULCHED IMMEDIATELY. DURING NON-GERMINATING PERIODS, MULCH MUST BE APPLIED AT THE REQUIRED ANY UNDISTURBED AREA ON WHICH ACTIVITY HAS CEASED AND WHICH WILL REMAIN EXPOSED FOR MORE THAN 10 DAYS MUST BE SEEDED AND MULCHED IMMEDIATELY. DURING NON-GERMINATING PERIODS, MULCH MUST BE APPLIED AT THE REQUIRED RATES. DISTURBED AREAS WHICH ARE NOT AT FINISHED GRADE AND WHICH WILL BE REDISTURBED WITHIN 1 YEAR SHALL BE SEEDED AND MULCHED WITH A QUICK GROWING TEMPORARY SEEDING MIXTURE AND MULCH. DISTURBED AREAS WHICH ARE EITHER AT FINISHED GRADE OR WILL NOT BE REDISTURBED WITHIN 1 YEAR MUST BE SEEDED AND MULCHED WITH A PERMANENT SEED MIXTURE AND MULCH. 2. DIVERSIONS, CHANNELS, SEDIMENTATION BASINS, SEDIMENT TRAPS, AND STOCKPILES MUST BE SEEDED AND MULCHED IMMEDIATELY. DIVERSIONS, CHANNELS, SEDIMENTATION BASINS, SEDIMENT TRAPS, AND STOCKPILES MUST BE SEEDED AND MULCHED IMMEDIATELY. 3. GRADED AREAS SHALL BE TEMPORARILY SEEDED AND MULCHED IMMEDIATELY FOLLOWING EARTH MOVING PROCEDURES. TEMPORARY SEED SHALL BE ANNUAL RYE GRASS APPLIED AT A RATE OF 3 LBS. PER 1OOO SQ. FT. GRADED AREAS SHALL BE TEMPORARILY SEEDED AND MULCHED IMMEDIATELY FOLLOWING EARTH MOVING PROCEDURES. TEMPORARY SEED SHALL BE ANNUAL RYE GRASS APPLIED AT A RATE OF 3 LBS. PER 1OOO SQ. FT. 4. AFTER SEEDING, HAY OR STRAW MULCH MUST BE APPLIED AT A RATE OF AT LEAST 3.0 TONS PER ACRE. MULCH SHALL BE ANCHORED BY EITHER CRIMPING WITH A COULTER IMPLEMENT, OR BY STAPLING BIODEGRADABLE NETTING TO THE SURFACE. AFTER SEEDING, HAY OR STRAW MULCH MUST BE APPLIED AT A RATE OF AT LEAST 3.0 TONS PER ACRE. MULCH SHALL BE ANCHORED BY EITHER CRIMPING WITH A COULTER IMPLEMENT, OR BY STAPLING BIODEGRADABLE NETTING TO THE SURFACE. 5. SITE PREPARATION TO UPLAND AREAS: APPLY 1 TON OF AGRICULTURAL-GRADE LIMESTONE PER ACRE PLUS 10-20-10 FERTILIZER AT THE RATE OF 500 LB. PER ACRE. WORK IN WHERE POSSIBLE. SEEDING OF DISTURBED UPLAND AREAS (BEYOND SITE PREPARATION TO UPLAND AREAS: APPLY 1 TON OF AGRICULTURAL-GRADE LIMESTONE PER ACRE PLUS 10-20-10 FERTILIZER AT THE RATE OF 500 LB. PER ACRE. WORK IN WHERE POSSIBLE. SEEDING OF DISTURBED UPLAND AREAS (BEYOND LIMITS OF RIPARIAN ENHANCEMENT AREA) TO BE DONE USING MIX OF FINE FESCUE AT 35 LBS/ACRE (PURE LIVE SEED) PLUS PERENNIAL RYEGRASS AT 15 LBS/ACRE (PURE LIVE SEED). 6. TOPSOIL SHALL BE A CLEAN FRIABLE LOAM WITH SUFFICIENT ORGANIC CONTENT (2.75%) TO PROMOTE PLANT VIGOR. AMENDMENTS SHALL BE ADDED AS NEEDED TO IMPROVE DEFICIENT SOILS. TOPSOIL SHALL BE RETURNED AT A LOOSE DEPTH OF FIVE TOPSOIL SHALL BE A CLEAN FRIABLE LOAM WITH SUFFICIENT ORGANIC CONTENT (2.75%) TO PROMOTE PLANT VIGOR. AMENDMENTS SHALL BE ADDED AS NEEDED TO IMPROVE DEFICIENT SOILS. TOPSOIL SHALL BE RETURNED AT A LOOSE DEPTH OF FIVE INCHES TO ALLOW FOR SETTLEMENT. 7. ESTABLISH PERMANENT SEEDING AS SOON AS POSSIBLE AFTER FINAL GRADING IS COMPLETE. UNLESS OTHERWISE INDICATED, PERMANENT SEEDING SHALL BE SEED MIXTURE SPECIFIED IN TABLE. ESTABLISH PERMANENT SEEDING AS SOON AS POSSIBLE AFTER FINAL GRADING IS COMPLETE. UNLESS OTHERWISE INDICATED, PERMANENT SEEDING SHALL BE SEED MIXTURE SPECIFIED IN TABLE. 8. SEE TABLES FOR SEED SPECIES MIXTURE AND APPLICATION RATES. SEE TABLES FOR SEED SPECIES MIXTURE AND APPLICATION RATES. 9. SEED MIXES ARE AVAILABLE AT ERNST CONSERVATION SEEDS IN MEADVILLE, PA. WEBSITE: WWW.ERNSTSEED.COM OR PHONE: 1-800-873-3321. SEED MIXES ARE AVAILABLE AT ERNST CONSERVATION SEEDS IN MEADVILLE, PA. WEBSITE: WWW.ERNSTSEED.COM OR PHONE: 1-800-873-3321. 10. NATIVE SHRUBS AND HERBACEOUS PLUGS ARE AVAILABLE AT PINELANDS NURSERY AND SUPPLY, COLUMBUS NJ. NATIVE SHRUBS AND HERBACEOUS PLUGS ARE AVAILABLE AT PINELANDS NURSERY AND SUPPLY, COLUMBUS NJ. WEBSITE: WWW.PINELANDSNURSERY.COM OR PHONE 1-800-667-2729 GENERAL LANDSCAPING NOTES 1.ALL PLANT MATERIALS SHALL CONFIRM TO THE AMERICAN ASSOCIATION OF NURSERYMEN'S AMERICAN STANDARD FOR NURSERY STOCK (LATEST EDITION) ALL PLANT MATERIALS SHALL CONFIRM TO THE AMERICAN ASSOCIATION OF NURSERYMEN'S AMERICAN STANDARD FOR NURSERY STOCK (LATEST EDITION) 2.INSPECTION OF PLANTING BEDS - THE LANDSCAPE ARCHITECT SHALL INSPECT ALL PLANTING AREAS BEFORE ANY TOPSOILING OR PLANTING IS BEGUN TO INSURE THAT ADEQUATE DRAINAGE EXISTS. IF ANY AREAS TO BE LANDSCAPED SHOW EVIDENCE OF INSPECTION OF PLANTING BEDS - THE LANDSCAPE ARCHITECT SHALL INSPECT ALL PLANTING AREAS BEFORE ANY TOPSOILING OR PLANTING IS BEGUN TO INSURE THAT ADEQUATE DRAINAGE EXISTS. IF ANY AREAS TO BE LANDSCAPED SHOW EVIDENCE OF POOR DRAINAGE, THE LANDSCAPE ARCHITECT SHALL NOTIFY THE OWNER IMMEDIATELY FOR CORRECTIVE ACTION 3.THE LANDSCAPE ARCHITECT SHALL APPROVE ALL PLANT MATERIAL AND STAKED PLANT LOCATIONS PRIOR TO INSTALLATION. ALL HERBACEOUS PLUG PLANTINGS SHALL BE A MINIMUM 3 INCH DEPTH. PLUGS SHALL BE PLANTED 1 FOOT O.C. AS INDICATED ON THE LANDSCAPE ARCHITECT SHALL APPROVE ALL PLANT MATERIAL AND STAKED PLANT LOCATIONS PRIOR TO INSTALLATION. ALL HERBACEOUS PLUG PLANTINGS SHALL BE A MINIMUM 3 INCH DEPTH. PLUGS SHALL BE PLANTED 1 FOOT O.C. AS INDICATED ON PLAN. 4.ALL TREES, SHRUBS, AND GROUNDCOVER SHALL BE PLACED IN CONTINUOUS MULCHED BEDS 4" IN DEPTH. MUCH SHALL BE TRIPLE SHREDDED HARDWOOD. ALL TREES, SHRUBS, AND GROUNDCOVER SHALL BE PLACED IN CONTINUOUS MULCHED BEDS 4" IN DEPTH. MUCH SHALL BE TRIPLE SHREDDED HARDWOOD. 5.ALL TREES, SHRUBS, AND GROUNDCOVER SHALL BE AS SPECIFIED AND SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS AND COMMENTS NOTED ON THE DRAWINGS. ALL TREES, SHRUBS, AND GROUNDCOVER SHALL BE AS SPECIFIED AND SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS AND COMMENTS NOTED ON THE DRAWINGS. 6. TOPSOIL SHALL BE PROVIDED BY THE LANDSCAPE CONTRACTOR FOR PLANTING ACCORDING TO THE PLANS AND DETAILS. 7.PREPARED TOPSOIL FOR BACKFILLING AROUND TREE BALLS SHALL BE A MIXTURE OF VOLUME OF THE FOLLOWING MATERIALS IN QUANTITIES SPECIFIED: COMPOST, TOPSOIL PREPARED TOPSOIL FOR BACKFILLING AROUND TREE BALLS SHALL BE A MIXTURE OF VOLUME OF THE FOLLOWING MATERIALS IN QUANTITIES SPECIFIED: COMPOST, TOPSOIL 13 COMPOST, TOPSOIL 23 TOPSOIL 8.ALL HERBACEOUS PLUG PLANTINGS SHALL BE MINIMUM 3 INCH DEPTH. PLUGS SHALL BE PLANTED 1 FOOT O.C. AS INDICATED ON PLAN.ALL HERBACEOUS PLUG PLANTINGS SHALL BE MINIMUM 3 INCH DEPTH. PLUGS SHALL BE PLANTED 1 FOOT O.C. AS INDICATED ON PLAN.
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
1
AutoCAD SHX Text
DT-3
AutoCAD SHX Text
SHRUB PLANTING DETAIL
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
2
AutoCAD SHX Text
DT-3
AutoCAD SHX Text
TREE PLANTING DETAIL
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
3
AutoCAD SHX Text
DT-3
AutoCAD SHX Text
HERBACEOUS PLUG PLANTING DETAIL
Page 15: Academy for the Gifted and Talented School 28 Green ...water.rutgers.edu/Projects/Paterson/GIInfoSheet... · Academy for the Gifted and Talented School 28 Green Infrastructure Information

SOIL EROSION AND SEDIMENT CONTROL NOTES

PU

BL

IC

S

CH

OO

L 28

PA

TE

RS

ON

G

RE

EN

IN

FR

AS

TR

UC

TU

RE

319(h

)

200 P

RE

SID

EN

TIA

L B

LV

D, P

AT

ER

SO

N

PA

SS

AIC

C

OU

NT

Y, N

J

SO

IL

E

RO

SIO

N A

ND

S

ED

IM

EN

T C

ON

TR

OL

D

ET

AIL

S

RE

VIS

IO

NS

No.

DA

TE

DE

SC

RIP

TIO

N

AP

PR

OV

ED

CC

O

CH

RIS

TO

PH

ER

C

. O

BR

OP

TA

, P

h.D

., P

.E

.

PR

OF

ES

SIO

NA

L E

NG

IN

EE

R - N

J L

IC

EN

SE

#

3

75

32

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

D

AT

E _

__

__

__

__

__

__

__

__

SHEET NAME

DT-4

Hudson Essex Passaic Soil Conservation District

http://hepsoilnj.org

HEPSCD251SESCNOTESrev2014

CH

EC

KE

D

MA

L

DR

AW

N

EA

J

DA

TE

02

.2

0.1

7

RE

V

04

.1

7.1

7

04/17/17

AutoCAD SHX Text
1"-2.5" DIA. CRUSHED STONE
AutoCAD SHX Text
EXIST. GROUND
AutoCAD SHX Text
PROVIDE APPROPRIATE TRANSITION BETWEEN STABILIZED CONST. ENTRANCE AND PUBLIC R.O.W.
AutoCAD SHX Text
EXIST. GROUND
AutoCAD SHX Text
1" - 2.5" CRUSHED STONE
AutoCAD SHX Text
METALS FASTENERS AND REINFORCEMENT BETWEEN FASTENER AND FABRIC (GEOTEXTILE)
AutoCAD SHX Text
HARDWOOD FENCE POST (MIN. 1.5' DIA.) FABRIC SECURED TO POST WITH METAL
AutoCAD SHX Text
DRAWSTRING RUNNING THROUGH FABRIC ALONG TOP OF FENCE
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
WOOD POST 30" HIGH MIN.
AutoCAD SHX Text
6"X6" TRENCH WITH COMPACTED BACKFILL
AutoCAD SHX Text
TRENCH DETAIL
AutoCAD SHX Text
NOTES: 1.SILT FENCE SHALL BE PLACED ALONG SLOPE CONTOURS TO SILT FENCE SHALL BE PLACED ALONG SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY. 2.INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN NECESSARY. (9" MAX. RECOMMENDED STORAGE HEIGHT. 3.REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT OFF-SITE AND CAN BE PERMANENTLY STABILIZED. 4.PLACE SILTE FENCE AT LOCATIONS SHOWN ON THE SOIL EROSION PLACE SILTE FENCE AT LOCATIONS SHOWN ON THE SOIL EROSION PLAN. 5.THE SLOPE OF THE LAND FOR AT LEAST 30 FEET ADJACENT TO THE SLOPE OF THE LAND FOR AT LEAST 30 FEET ADJACENT TO ANY SILT FENCE SHALL NOT EXCEED 5%. 6.SILT FENCE SHALL REMAIN IN PLACE FOR THE DURATION OF THE SILT FENCE SHALL REMAIN IN PLACE FOR THE DURATION OF THE PROJECT UNLESS OTHERWISE DIRECTED BY ENGINEER.
AutoCAD SHX Text
4' HIGH PLASTIC FENCE WITH 4" OPENINGS
AutoCAD SHX Text
5' METAL STAKES SPACED AT 7'
AutoCAD SHX Text
DRIP LINE
AutoCAD SHX Text
DRIP LINE
AutoCAD SHX Text
BRANCH BARK RIDGE
AutoCAD SHX Text
SECOND CUT
AutoCAD SHX Text
FIRST CUT
AutoCAD SHX Text
FINAL CUT
AutoCAD SHX Text
BRANCH COLLAR
AutoCAD SHX Text
NOTES: 1.TREE PROTECTION SHALL BE PROVIDED FOR ANY AND ALL TREES TO BE PROTECTED TREE PROTECTION SHALL BE PROVIDED FOR ANY AND ALL TREES TO BE PROTECTED DURING AND AFTER CONSTRUCTION. 2.4 FOOT HIGH SNOW FENCE SHALL BE PLACED AT THE DRIP LINE OF THE TREE AND 4 FOOT HIGH SNOW FENCE SHALL BE PLACED AT THE DRIP LINE OF THE TREE AND ENCIRCLE THE ENTIRE TREE. 3.ROOTS SHALL NOT BE CUT IN ANY AREA INSIDE THE DRIP LINE OF THE BRANCHES. ROOTS SHALL NOT BE CUT IN ANY AREA INSIDE THE DRIP LINE OF THE BRANCHES. 4.TREE LIMB REMOVAL, WHERE NECESSARY, WILL BE DONE FLUSH WITH TRUNK OR MAIN TREE LIMB REMOVAL, WHERE NECESSARY, WILL BE DONE FLUSH WITH TRUNK OR MAIN LIMB, GOOD GRADE OF TREE PAINT AND BE PERFORMED UNDER THE SUPERVISION OF A LICENSED NURSERYMAN.
AutoCAD SHX Text
1 " TO 2 " CLEAN STONE 12" TO 2 " CLEAN STONE 12" CLEAN STONE AROUND ENTIRE PERIMTER
AutoCAD SHX Text
INLET FRAME
AutoCAD SHX Text
1" DIA. PERFORATIONS
AutoCAD SHX Text
2"X6" LUMBER OR " 34" EXTERIOR PLYWOOD
AutoCAD SHX Text
EXCAVATION AREA
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
SEDIMENT CONTROL BAG/TANK
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
FILTERED WATER FLOW TO CATCH BASIN
AutoCAD SHX Text
PUMP DISCHARGE TO SEDIMENT FILTER SYSTEM
AutoCAD SHX Text
NOTES: 1.BAG MUST BE LOCATED AWAY FROM RECEIVING BAG MUST BE LOCATED AWAY FROM RECEIVING WATERS, OTHER ENVIRONMENTALLY SENSITIVE AREAS, AND/OR CONSTRUCTION ACTIVITIES. 2.BAGS MUST BE INSTALLED PER MANUFACTURER'S BAGS MUST BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. 3.BAGS MAY NOT BE REUSED. BAGS MAY NOT BE REUSED. 4.BAGS MUST BE DISPOSED OF ACCORDING TO BAGS MUST BE DISPOSED OF ACCORDING TO MANUFACTURER'S INSTRUCTIONS.
AutoCAD SHX Text
PUMP DISCHARGE
AutoCAD SHX Text
SEDIMENT CONTROL BAG
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
1
AutoCAD SHX Text
DT-4
AutoCAD SHX Text
TREE PROTECTION AND LIMB REMOVAL
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
2
AutoCAD SHX Text
DT-4
AutoCAD SHX Text
ORANGE BARRIER FENCE
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
3
AutoCAD SHX Text
DT-4
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
4
AutoCAD SHX Text
DT-4
AutoCAD SHX Text
CONSTRUCTION ENTRANCE
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
5
AutoCAD SHX Text
DT-4
AutoCAD SHX Text
INLET PROTECTION
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
6
AutoCAD SHX Text
DT-4
AutoCAD SHX Text
DEWATERING ELEVATION DETAIL
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
7
AutoCAD SHX Text
DT-4
AutoCAD SHX Text
DEWATERING PLAN DETAIL
AutoCAD SHX Text
1.ALL SOIL EROSION AND SEDIMENT CONTROL PRACTICES ON THIS PLAN WILL BE ALL SOIL EROSION AND SEDIMENT CONTROL PRACTICES ON THIS PLAN WILL BE CONSTRUCTED IN ACCORDANCE WITH THE "NEW JERSEY STANDARDS FOR SOIL EROSION AND SEDIMENT CONTROL" 7TH EDITION LAST REVISED JANUARY 2014. THESE MEASURES WILL BE INSTALLED PRIOR TO ANY MAJOR SOIL DISTURBANCE OR IN THEIR PROPER SEQUENCE AND MAINTAINED UNTIL PERMANENT PROTECTION IS ESTABLISHED. 2.ALL SOIL TO BE EXPOSED OR STOCKPILED FOR A PERIOD OF GREATER THAN ALL SOIL TO BE EXPOSED OR STOCKPILED FOR A PERIOD OF GREATER THAN 14 DAYS, AND NOT UNDER ACTIVE CONSTRUCTION, WILL BE TEMPORARILY SEEDED AND HAY MULCHED OR OTHERWISE PROVIDED WITH VEGETATIVE COVER. THIS TEMPORARY COVER SHALL BE MAINTAINED UNTIL SUCH TIME WHEREBY PERMANENT DESTABILIZATION IS ESTABLISHED. 3.SEEDING DATES: THE FOLLOWING SEEDING DATES ARE BEST RECOMMENDED TO SEEDING DATES: THE FOLLOWING SEEDING DATES ARE BEST RECOMMENDED TO ESTABLISH PERMANENT VEGETATIVE COVER WITHIN MOST LOCATIONS IN THE HEPSCD: SPRING - 3/1-5/15 AND FALL - 8/15-10/1 4.SEDIMENT FENCES ARE TO BE PROPERLY TRENCHED AND MAINTAINED UNTIL SEDIMENT FENCES ARE TO BE PROPERLY TRENCHED AND MAINTAINED UNTIL PERMANENT VEGETATIVE COVER IS ESTABLISHED. 5.ALL STORM DRAINAGE INLETS SHALL BE PROTECTED BY ONE OF THE PRACTICES ALL STORM DRAINAGE INLETS SHALL BE PROTECTED BY ONE OF THE PRACTICES ACCEPTED IN THE STANDARDS, AND PROTECTION SHALL REMAIN UNTIL PERMANENT STABILIZATION HAS BEEN ESTABLISHED. STORM DRAINAGE OUTLET POINTS SHALL BE PROTECTED AS REQUIRED BEFORE THEY BECOME FUNCTIONAL. 6.MULCH MATERIALS SHALL BE UN-ROTTED SMALL GRAIN STRAW APPLIED AT THE MULCH MATERIALS SHALL BE UN-ROTTED SMALL GRAIN STRAW APPLIED AT THE RATE OF 70 TO 90 POUNDS PER 1,000 SQUARE FEET AND ANCHORED WITH A MULCH ANCHORING TOOL, LIQUID MULCH BINDERS, OR NETTING TIE DOWN. OTHER SUITABLE MATERIALS MAY BE USED IF APPROVED BY THE SOIL CONSERVATION DISTRICT. 7.ALL EROSION CONTROL DEVICES SHALL BE PERIODICALLY INSPECTED, MAINTAINED ALL EROSION CONTROL DEVICES SHALL BE PERIODICALLY INSPECTED, MAINTAINED AND CORRECTED BY THE CONTRACTOR. ANY DAMAGE INCURRED BY EROSION SHALL BE RECTIFIED IMMEDIATELY. 8.THE HUDSON-ESSEX-PASSAIC SOIL CONSERVATION DISTRICT WILL BE NOTIFIED THE HUDSON-ESSEX-PASSAIC SOIL CONSERVATION DISTRICT WILL BE NOTIFIED IN WRITING AT LEAST 48 HOURS PRIOR TO ANY SOIL DISTURBING ACTIVITIES. FAX - (862) 333-4507 OR EMAIL - [email protected] 9.THE APPLICANT MUST OBTAIN A DISTRICT ISSUED REPORT-OF-COMPLIANCE THE APPLICANT MUST OBTAIN A DISTRICT ISSUED REPORT-OF-COMPLIANCE PRIOR TO APPLYING FOR THE CERTIFICATE OF OCCUPANCY OR TEMPORARY CERTIFICATE OF OCCUPANCY FROM THE RESPECTIVE MUNICIPALITY, NJ - DCA OR ANY OTHER CONTROLLING AGENCY. CONTACT THE DISTRICT AT CONTACT THE DISTRICT AT 862-333-4505 TO REQUEST A FINAL INSPECTION, GIVING ADVANCED NOTICE UPON COMPLETION OF THE RESTABILIZATION MEASURES. A PERFORMANCE DEPOSIT MAY BE POSTED WITH THE DISTRICT WHEN WINTER WEATHER OR SNOW COVER PROHIBITS THE PROPER APPLICATION OF SEED, MULCH, FERTILIZER OR HYDRO-SEED. 10.PAVED ROADWAYS MUST BE KEPT CLEAN AT ALL TIMES. DO NOT UTILIZE A FIRE PAVED ROADWAYS MUST BE KEPT CLEAN AT ALL TIMES. DO NOT UTILIZE A FIRE OR GARDEN HOSE TO CLEAN ROADS UNLESS THE RUNOFF IS DIRECTED TO A PROPERLY DESIGNED AND FUNCTIONING SEDIMENT BASIN. WATER PUMPED OUT OF THE EXCAVATED AREAS CONTAINS SEDIMENTS THAT MUST BE REMOVED PRIOR TO DISCHARGING TO RECEIVING BODIES OF WATER USING REMOVABLE PUMPING STATIONS, SUMP PITS, PORTABLE SEDIMENTATION TANKS AND/OR SILT CONTROL BAGS. 11.ALL SURFACES HAVING LAWNS OR LANDSCAPING AS FINAL COVER ARE TO BE ALL SURFACES HAVING LAWNS OR LANDSCAPING AS FINAL COVER ARE TO BE PROVIDED TOPSOIL PRIOR TO RE-SEEDING, SODDING OR PLANTING. A DEPTH OF 5 INCHES (UNSETTLED) IS RECOMMENDED. 12.ALL PLAN REVISIONS MUST BE SUBMITTED TO THE DISTRICT FOR PROPER ALL PLAN REVISIONS MUST BE SUBMITTED TO THE DISTRICT FOR PROPER REVIEW AND APPROVAL. 13.A CRUSHED STONE WHEEL CLEANING TRACKING-PAD IS TO BE INSTALLED AT A CRUSHED STONE WHEEL CLEANING TRACKING-PAD IS TO BE INSTALLED AT ALL SITE EXITS USING 2 -1" CRUSHED ANGULAR STONE (ASTM 2 OR 3) TO 12 -1" CRUSHED ANGULAR STONE (ASTM 2 OR 3) TO A MINIMUM LENGTH OF 50 FEET AND MINIMUM DEPTH OF 6". ALL DRIVEWAYS MUST BE PROVIDED WITH CRUSHED STONE UNTIL PAVING IS COMPLETE. 14.STEEP SLOPES INCURRING DISTURBANCE MAY REQUIRE ADDITIONAL STABILIZATION STEEP SLOPES INCURRING DISTURBANCE MAY REQUIRE ADDITIONAL STABILIZATION MEASURES. THESE "SPECIAL" MEASURES SHALL BE DESIGNED BY THE APPLICANT'S ENGINEER AND BE APPROVED BY THE SOIL CONSERVATION DISTRICT. 15.THE HUDSON-ESSEX-PASSAIC SOIL CONSERVATION DISTRICT SHALL BE NOTIFIED, THE HUDSON-ESSEX-PASSAIC SOIL CONSERVATION DISTRICT SHALL BE NOTIFIED, IN WRITING, FOR THE SALE OF ANY PORTION OF THE PROJECT OR FOR THE SALE OF INDIVIDUAL LOTS. NEW OWNER'S INFORMATION SHALL BE PROVIDED. ADDITIONAL MEASURES DEEMED NECESSARY BY DISTRICT OFFICIALS SHALL BE IMPLEMENTED AS CONDITIONS WARRANT.
Page 16: Academy for the Gifted and Talented School 28 Green ...water.rutgers.edu/Projects/Paterson/GIInfoSheet... · Academy for the Gifted and Talented School 28 Green Infrastructure Information

Academy for the Gifted and Talented School 28 Green Infrastructure Information Sheet

APPENDIX D:

Site Photograph – Current Condition

October 10, 2017

Page 17: Academy for the Gifted and Talented School 28 Green ...water.rutgers.edu/Projects/Paterson/GIInfoSheet... · Academy for the Gifted and Talented School 28 Green Infrastructure Information

Recommended