+ All Categories
Home > Documents > ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY...

ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY...

Date post: 21-Jan-2021
Category:
Upload: others
View: 7 times
Download: 0 times
Share this document with a friend
21
Industry’s Needs of Aviation Infrastructures ACARE AirTN Meeting, 26 th February 2013 February 2013 ACARE AirTN Infrastructure Needs Presented by Axel Flaig, SVP Airbus Flight Physics Event / Department (optional)
Transcript
Page 1: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

Industry’s Needs of Aviation InfrastructuresACARE AirTN Meeting, 26th February 2013

February 2013ACARE AirTN Infrastructure Needs

Presented byAxel Flaig, SVP Airbus Flight Physics

Event / Department (optional)

Page 2: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

Aviation ChallengesFebruary 2013ACARE AirTN Infrastructure Needs

Page 3: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

Socio-economics & environment

February 2013ACARE AirTN Infrastructure Needs

Industry ChallengesEurope has set ambitious targets in terms of environmental impact reduction , increased innovation and competitiveness

-Emissions:-75% less CO2, 90%less NOx and 65% less noise

World Traffic Growth

-Seamless air transport system including air traffic management

Page 4: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

Product Asymptote & Future TechnologiesFebruary 2013ACARE AirTN Infrastructure Needs

Page 5: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

Product evolution: Step Change Needed

February 2013ACARE AirTN Infrastructure Needs

2015 2030 2050

Future aircraft require radical technologies & configurations

Page 6: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

Infrastructure in the Aviation ContextFebruary 2013ACARE AirTN Infrastructure Needs

Page 7: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

Key Enablers

February 2013ACARE AirTN Infrastructure Needs

Complementary means: Wind tunnel testing, numerical simulation & Flight Tests

Wind Tunnel Testing for configuration and design verification, technology validation in non-linear flight regimes

Numerical Simulation for specific studies, detailed flow physics and data production in linear flight regimes

Flight Tests for design validation

Page 8: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

Wind Tunnel Testing: Projected Testing Effort

February 2013ACARE AirTN Infrastructure Needs

Unconventional configurations with novel technologies will require significant wind tunnel test effort in concept validation

0

500

1000

1500

2000

2500

2000 2007 2020+ 2025+

Con

vent

iona

l

A35

0-XW

B

A38

0

Unc

onve

ntio

nal

Aircraft developments over time

Win

d Tu

nnel

Tes

t Effo

rt (D

ays)

Page 9: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

Requirements on Wind Tunnel FacilitiesFebruary 2013ACARE AirTN Infrastructure Needs

Page 10: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

Aerodynamics technology barrier

February 2013ACARE AirTN Infrastructure Needs

Validation of advanced aerodynamics technologies require advanced testing at high Reynolds numbers

Low Drag Aircraft through Natural Laminar Flow concept and Flow Control

Page 11: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

Engine simulation & Configuration

February 2013ACARE AirTN Infrastructure Needs

Counter Rotating Open Rotors (CROR): Engine Simulation

Configuration testing

The development of these concept simulators is only been possible through significant wind tunnel testing efforts

Page 12: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

Advanced Measurements: Beyond the conventional

February 2013ACARE AirTN Infrastructure Needs

Icing Tests

Landing Gear TestsAeroacoustics

Non-intrusive advanced measurements and visualisation

Significant effort needed to ensure that capabilities are available for industrial exploitation, ready for the next generation of aircraft developments

Page 13: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

Outlook on Future Infrastructure DevelopmentsFebruary 2013ACARE AirTN Infrastructure Needs

Page 14: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

Maintenance and upgrade needs

February 2013ACARE AirTN Infrastructure Needs

Maintaining & Developing core facilities is key for securing aircraft developments

Due to the demanding drive for technology and configuration validation, there is huge pressure on facility owners to upgrade their capabilities

Page 15: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

The current aircraft product panorama

February 2013ACARE AirTN Infrastructure Needs

Max Range (nautical miles)1000 2000 3000 4000 5000 6000 7000 8000 9000 10000

50

100

150

200

250

300

350

400

450

500

550

600

650

Seat

ing

Cap

acity

A318A319

A320A321 NEO derivatives

A330-300

A330-200

A350-1000A350-900

A350-800

Modern and comprehensive Product Range with enhanced capabilities

Open demand of over 28000 aircraft for the existing types with incremental improvements for the next 20 years

Page 16: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

Risks

February 2013ACARE AirTN Infrastructure Needs

“2015+”

« Continuous improvements within constrained architecture and schedule»

No foreseen new aircraft developments in the near future = decreasing workload to key facilities

“2020+”

« Technology validation and de-risking»

“2030+”

« Game Changing aircraft concept»

Next major development not foreseen until 2030: Potential financial risks on key facilities due to lack of revenues from testing volume

Page 17: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

ATRSAAB

EUROCOPTER

AIRBUS MILITARY

AIRBUS

BAE SYSTEMS

CASSIDIAN

MBDA

DASSAULT

Airframers’ view of the European Landscape

February 2013ACARE AirTN Infrastructure Needs

In 2011, Airbus took the initiative to set up a working group of the major European airframers to review and provide a recommendation on the future wind tunnel infrastructure needs

European Wind Tunnel Infrastructure Landscape

Engine manufacturers and research view not

reflected

Page 18: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

The current strategic infrastructures

February 2013ACARE AirTN Infrastructure Needs

ONERA-F1

ETW

DNW-LLF

ONERA-S1

ARA-TWT

ONERA-B02

DNW-KRG

CIRA

CEPRA-19Need for many facilities each with specific capabilities

Airframers’ perspective

Page 19: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

ConclusionsFebruary 2013ACARE AirTN Infrastructure Needs

Page 20: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

Conclusions

February 2013ACARE AirTN Infrastructure Needs

Industrial Wind Tunnels are vital to support the European Aeronautics industry in future aircraft developments; they fulfil societal needs as expressed in the ACARE Vision 2020 and Flightpath 2050 ambitions

No major developments are planned over the next decade; this creates a survival risk for the existing infrastructures due to reduced income from industry

A joint European effort is required to set up a funding mechanism through research programmes to ensure the long term availability of such facilities with state-of-the-art capabilities

Page 21: ACARE AirTN Infrastructure Needs February 2013 · 2016. 4. 15. · SAAB EUROCOPTER AIRBUS MILITARY AIRBUS BAE SYSTEMS CASSIDIAN MBDA DASSAULT . Airframers’ view of the European

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

February 2013ACARE AirTN Infrastructure Needs

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. This document and all information contained herein is the sole property of AIRBUS Operations S.A.S. No intellectual propertyrights are granted by the delivery of this document or the disclosure of its content. This document shall not be reproduced or disclosed to a third party without the express written consent of AIRBUS Operations S.A.S. Thisdocument and its content shall not be used for any purpose other than that for which it is supplied. The statements made herein do not constitute an offer. They are based on the mentioned assumptions and are expressedin good faith. Where the supporting grounds for these statements are not shown, AIRBUS Operations S.A.S. will be pleased to explain the basis thereof.AIRBUS, its logo, A300, A310, A318, A319, A320, A321, A330, A340, A350, A380, A400M are registered trademarks.


Recommended