Accessing the City of Bryan Storm Water Master Plan
April 29, 2011Katie Hogan, EIT, FNIMike Wayts, PE, FNIBrett McCully, PE, City of Bryan
Purpose • Create a sustainable
database and CIP plan• Consolidate Information
from multiple sources into a consistent format
• Based on current databases• Assist in budgeting for
drainage utility fee dollars
Overview• Data Collection• Data Assessment and
Ranking• Final Database and Report
Data Collection• Data Sources• Completed Studies &
Masterplans• GIS Data• Drainage Work Orders• Existing H&H models• City Input
Site Visit
SC11: Old Hearne Road Flooding
Site Visit• Flooding at end of subdivision
Site Visit
• Erosion along Burton Creek
Data Assessment• 126 Projects Total from Various Sources
Database
Ranking
Ranking
Ranking
GIS Color Coded Map
One Page Summary Report
Implementation• FNI Report and
sustainable Database to guide in developing Drainage Utility Fee budget
• Develop larger CIP projects that compete for bond funds
• Update database annually with projects and work orders
ImplementationApple Creek Drainage:
Temporary fix for undermined concrete flume