ACEH INVESTMENT PROFILE
Transcript
  • ACEH INVESTMENTPROFILE

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD2014

    DETAILED PLAN OF

  • Aceh is your investment destination. There are four key strengths that make Aceh very promising: friendly investment laws, geographical position, abundant natural resources, and human capital. Friendly investment laws are related to our status as a special autonomy province in Indonesia. We have a wider authority to govern ourselves than other regions in Indonesia. We also have privilleges to make direct cooperation with foreign institutions. Another important investment measure is the free port and free trade zone in Sabang. The zone provides attractive incentives for investors, such as import duty and tax exemption. For simplification, all licensings for investment in the zone are issued by the Sabang Management and Development Board (BPKS).Another reason that makes Aceh one of the best place to invest is its location proximity. Located in one of the busiest international shipping lane, on the entrance of Malacca Strait, Aceh is geographically close to potential markets, such as East Africa, Middle East, South Asia, Southeast Asia, East Asia, along with Australia and New Zealand. This relative position is a beneficial networking for long term investment activities. Aceh also has abundant natural resources. Coffee, cocoa, rubber, and palm oil are just a short list. Mineral resources, located inland and offshore also await further investment Potential investors can get the most of the commodities, utilizing the large number of productive and hardworking labor force in Aceh. To highlight, the Government of Aceh provides 20% of its annual budget for human capital so they can be your partners in the business.To accelerate investment in the region, we work on some important issues to be resolve, such as de-regulation, licensing acceleration, security and business comfort improvement. Hence, the brand-new Aceh is just perfect for your future investment.Last but not least, we welcome you to visit Aceh and invest in amazing Aceh.

    dr. Zaini Abdullah GOVERNOR OF ACEH

    FOREWORD

    dr. Zaini Abdullah GOVERNOR OF ACEH

  • We thank God that Aceh regains trust from investors and being in the top seven of investment realization in Indonesia in 2013. 42 new businesses, domestic and overseas, acquired investment licenses to operate in Aceh, and are committed to invest in 10 priority sectors, with the total investment value was up to IDR 6.1 trillions. Meanwhile, 139 existing companies/projects have been operating in Aceh, with the total amount of investment, up to December 2013, was about IDR 5 (five) trillions, and employed about 21.866 local manpower.As our vision is to be one of the leading investment destination in Indonesia, we will continue to work hard and to make sure that investor and potential investors get the best services and full assisstance where necessary. We will also make effective and efficient coordination with related sectors and institutions to simplify all procedures. All the efforts are for one reason, to provide business comfort to investors. We thank you all for your continuous support to Aceh and to trust Aceh as your investment destination.

    Ir. Iskandar, M.ScChairman of Aceh InvestmentCoordinating Board

    PREFACE

    Ir. Iskandar, M.ScChairman of

    Aceh InvestmentCoordinating Board

  • Content

    I INTRODUCTION

    II DETAILED PLAN OF AGRO INDUSTRIES PROJECT

    1.1 VISION ~ 11

    1.2 GEOGRAPHY~ 12

    1.3 DEMOGRAPHY ~ 14

    1.4 SPATIAL PLANNING ~ 16

    1.5 ECONOMIC PERFORMANCE ~ 18

    1.6 INFRASTRUCTURE SUPPORT ~ 20

    1.7 DOING BUSINESS IN ACEH ~ 30

    1.8 FACT AND FIGURE ~ 32

    2.1 DETAILED PLAN OF FOOD CROPS AND HORTICULTURE ~ 38

    2.2 DETAILED PLAN OF PLANTATION ~ 52

    2.3 DETAILED PLAN OF ACEH BEEF INDUSTRY DEVELOPMENT PROJECT ~ 76

    2.4 DETAILED PLAN OF FISHERIES ~ 88

  • III DETAILED PLAN OF INFRASTRUCTURE AND ENERGY

    IV DETAILED PLAN OF TOURISM DEVELOPMENT PROJECT IN BANDA ACEH

    V SABANG FREE PORT AND FREE TRADE ZONE PROJECT

    VI DETAILED PLAN OF INDUSTRIAL AND TRADING ESTATES

    3.1 DETAILED PLAN OF INSFRASTRUCTURE ~ 98

    3.2 DETAILED PLAN OF ENERGY ~ 102

    4.1 KRUENG ACEH RIVER WALK ~ 112

    4.2 ULEE LHEU BEACH ~ 116

    6.1 ACEH INDUSTRIAL AREA ~ 144

    5.1 INTERNATIONAL SHIPPING LINE ~ 124

    5.2 SABANG INTERNATIONAL WATER FRONT RESORT AND CONVENTION CENTRE ~ 126

    5.3 PASSANGER CRUISE TERMINAL ~ 128

    5.4 YACHT MARINA & SUPPORTING FACILITIES ~ 130

    5.6 DIVING CENTER ~ 132

    5.7 SEA PORT ~ 134

  • Introduction

    I

  • INTRODUCTION

    | WWW.ACEHINVESTMENT.COM

    10

  • Aceh becomes one of the leading Investment Destination in 2017

    VISION

    ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    11

  • 1.2 GEOGRAPHY

    ACEH, THE WEST GATE OF INDONESIA

    INTRODUCTION

    | WWW.ACEHINVESTMENT.COM

    12

  • ACEH

    ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    13

  • 1.3 DEMOGRAPHY

    INTRODUCTION

    | WWW.ACEHINVESTMENT.COM

    14

  • 7,478,801.95 H

    aTotal area of

    the territorial sea w

    hose breadth

    extends to tw

    o hundred nautical m

    iles m

    easured from

    the baselines.

    56,770.81 Km

    2Total area

    according to Basem

    ap of Indonesia.

    1,978,491

    Labors Force

    Inhabited by

    people (2013)

    5,015,23448 %

    of the

    population

    work in the

    agriculture

    sector.

    Topographically hilly with mountains, valleys, rivers,

    waterfalls, and narrow floodplain

    18 5 289 778 6.493 district cities subdistrict mukim villages

    ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    15

  • Cultivated AreaThose areas for production forest, community forest; agriculture; fisheries; mining; industry; tourism; housing and other functions.

    Strategic Area: The Center of National Stragic Activities (PKSN) : Sabang, free port and free trade

    areav National Activity Center : Lhokseumawe and greater area (PKN) Capital City : Banda Aceh

    2,934,602 Ha Protected Area and Conservation AreaThose areas ruled for the protection for following areas Local protected area; preserve region and areas and cultural heritage; national disaster-prone; geology protection; and other preservation areas.

    2,708,550 Ha

    1.4 SPATIAL PLANNING

    Photo: Banda Aceh From Sky

    INTRODUCTION

    | WWW.ACEHINVESTMENT.COM

    16

  • Cultivated Area

    Protected Area

    Conservation Area

    Sabang

    Banda Aceh

    Lhokseumawe

    Langsa

    Takengon

    Meulaboh

    ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    17

  • 1.5 ECONOMIC PERFORMANCE

    Min

    imum

    Wag

    e (US

    D)

    5,08

    5,05

    28,56

    5,72

    8

    40,7

    83,2

    26 111

    ,183

    ,310

    382,

    330,

    821

    26,133,215

    13,127,198

    4,407,581

    165,101,527

    102,857,143

    411,

    428,

    571

    Domestic Investment (USD)

    Foreign Investment (USD)

    INTRODUCTION

    | WWW.ACEHINVESTMENT.COM

    18

  • Inflation Economic Growth Export (ton) Import (ton)

    Photo: Illustration

    ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    19

  • National Road1.803,36 Km

    Regencial Road13.841,07 Km

    Provincial Road1.813,33 Km

    ROAD

    Photo: Highway Road, Lhok Seudu, Aceh Besar

    1.6 INFRASTRUCTURE SUPPORT

    INTRODUCTION

    | WWW.ACEHINVESTMENT.COM

    20

  • Lhokseumawe

    Banda Aceh

    Sabang

    Takengon

    Langsa

    Meulaboh

    ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    21

  • SEAPORT

    Photo: Malahayati Seaport, Aceh Besar

    INTRODUCTION

    | WWW.ACEHINVESTMENT.COM

    22

  • Malahayati-Aceh Besar

    Krueng Geukueh-Lhokseumawe

    Kuala Langsa

    Sinabang

    Balohan-Sabang

    Meulaboh

    Tapak Tuan

    Susoh

    Singkil

    Calang

    ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    23

  • AIRPORT

    Photo: Iskandar Muda International Airtport, Aceh Besar

    INTRODUCTION

    | WWW.ACEHINVESTMENT.COM

    24

  • Sultan Iskandar Muda-Aceh Besar

    Malikussaleh-Lhokseumawe

    Rembele-Central Aceh

    Maimun Saleh-Sabang

    Point A-North Aceh

    Kuala Batee-Southwest Aceh

    Lasikin-Simeulu

    Hamzah Fansuri-Aceh Singkil

    Cut Nyak Dhien-Nagan Raya Alas Lauser-Southeast Aceh

    T. Cut Ali-South Aceh

    Blang Keujeuren-Gayo Luwes

    ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    25

  • ENERGY

    CapacityTariff/KWH

    IDR USD450 VA 485 0.05

    900 VA 600 0.06

    1300 VA 930 0.09

    2.200 VA 960 0.1

    3.500 VA -14 KVA 1112 0.11

    14 KVA-200 KVA 972 0.1

    200 KVA-30.000 KVA 803 0.08

    More Than 30.000 KVA 723 0.07

    Aceh-North Sumatra Interconnection

    343 MW

    PLTG Arun Lhokseumawe

    200 MW

    Nagan Raya Steam Power Plant

    2x110 MW

    Peusangan Hydro Power Plant

    88MW

    Photo: Steam Power Plant, Nagan Raya

    INTRODUCTION

    | WWW.ACEHINVESTMENT.COM

    26

  • Aceh North SumateraInterconnection

    PLTG Arun LhokseumaweFinishing: 2014

    Peusangan Hydro Electric Power PlantFinishing: 2016

    Nagan Raya SteamPower Plant

    ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    27

  • WATER

    DISTRICT/CITY WATER SUPPLY COMPANY

    Banda Aceh PDAM Tirta Daroy

    Sabang PDAM Tirta Aneuk Laot

    Aceh Besar PDAM Tirta Mon Tala

    Pidie PDAM Tirta Mon Krueng Baro

    Pidie Jaya PDAM Tirta Krueng Meureudu

    Bireun PDAM Tirta Krueng Peusangan

    North Aceh PDAM Tirta Mon Pase

    East Aceh PDAM Tirta Peusada

    Lansa PDAM Tirta Keumeuneng

    Central Aceh PDAM Tirta Tawar

    Gayo Luwes PDAM Tirta Sejuk

    Bener Meriah PDAM Tirta Beungi

    Aceh Jaya PDAM Tirta Mon Trata

    West Aceh PDAM Tirta Meulaboh

    Southeast Aceh PDAM Tirta Agara Kutacane

    Singkil PDAM Tirta Singkil

    South Aceh PDAM Tirta Naga Tapaktuan

    Photo: Ilustration

    INTRODUCTION

    | WWW.ACEHINVESTMENT.COM

    28

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    29

  • Law No 11 of 2006 on Aceh Governance. The law gives the Government of Aceh privileges to govern the province including in economic development to improve health, safety, and public welfare.

    Law No. 37 of 2000 on Sabang Free Port and Free Trade Zone. It concludes a wide range of facilities for doing business in Sabang, such as import duty and tax exemption. The Sabang Management and Development Agency (BPKS) operates the zone and has an authorization to issue all licensings for investment in this area.

    Presidential Regulation No. 11 of 2010 on Cooperation between the Government of Aceh and Foreign Institutions. The regulation allows a wide authority for the Government of Aceh to establish cooperation with foreign institutions, especially in economic development.

    REGULATIONS

    Photo: Palm Oil Industry, PT. Megalopolis, Aceh Jaya

    1.7 DOING BUSINESS IN ACEH

    INTRODUCTION

    | WWW.ACEHINVESTMENT.COM

    30

  • INCENTIVES

    POTENTIAL INVESTORS

    LICENSING

    CONSTRUCTION

    OPERATION ANDBUSINESS EXPANSION

    PRINCIPLE LICENSE: BKPM/BPKSWORKING LICENCE: BKPM/BPKSLOC AL LICENCE: BP2T

    One Stop Service for Local Licenses

    INVESTMENT ACCELERATION TASK FORCE TEAM

    INFORMATION, FACILITATION AND ASSISTANCE> Security, convenience and law certainty> Land availability, labor, wages & incentive> Licensing administration> Policy, Regulation> Field Visit, etc

    INVESTMENT EVALUATION ANDCONTROLLING TASK FORCE TEAM

    FACILITATION AND ASSISTANCE> Security, convenience and low certainty> Land dispute, labor dispute, etc> Regulation and licensing for business

    NOTE: BKPM > Indonesian Investment Coordinating Board BPKS > Sabang Free Port and Free Trade Management Board BP2T > One Stop Service Office

    Ease of Doing Business in Aceh

    a. Reduction of Sectoral levy permits; Shall not exceed 50 % (fifty percent) of the levy payable amount.

    b. Stimulus funding, for selected sectors; Stimulus funds awarded in the form of interest subsidy shall not exceed 2 % (two percent) of the rate of interest paid for the purchase of machinery or equipment.

    c. Capital relief; in the form of equity capital and assets in accordance with the ability of the Government of Aceh .

    Providing incentives to investors in the form of:

    ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    31

  • The Big 5 of Foreign Direct Investment by Country of Origin

    UK

    USA

    1.83.8

    1.8 FACT AND FIGURE

    INTRODUCTION

    | WWW.ACEHINVESTMENT.COM

    32

  • OUR PROGRESS IN 2013

    India

    Malaysia

    South Korea

    Billion USD

    1 USD = 9,300 IDRMarch, 2013 Kurs

    8.70.2 4.7

    We got 42 new projects (IDR 6.1 trillion) and more than IDR 5.09 trillion of 139 projects (21.866 workers) already have boost our economy. Now, its your turn !

    ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    33

  • Detailed Plan of Agro Industries Project

    II

  • Photo: Lineung Buleun Potato Farm

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    2.1 FOOD CROPS AND HORTICULTURE

    with the area of 438,855 Ha,

    and the annual production of about 1,788,783 tonnes in 2012

    The overall demand of rice in Indonesia is currently reaches 33 million tons, while Aceh domestic consumption is about 658,340 tonnes (2013). There are huge potential to develop rice farming and processing to meet domestic market share.

    PADDY

    Agriculture is the key sector in Aceh,

    Supported by about 359,478 farmers in Aceh.

    36

  • Photo: Ilustration

    ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    37

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    AREA AND PRODUCTION OF PADDY BY REGENCY/CITY, 2012

    Regency/City Planted Area (Ha) Production (Ton)

    Simeulue 6,907 26,005

    Aceh Singkil 2,220 6,611

    South Aceh 19,367 64,309

    Southeast Aceh 12,320 62,462

    East Aceh 46,442 213,033

    Central Aceh 7,092 25,816

    West Aceh 15,039 44,342

    Aceh Besar 47,124 203,516

    Pidie 43,904 204,052

    Bireuen 36,285 141,440

    North Aceh 68,189 341,951

    Southwest Aceh 29,019 96,426

    Gayo Lues 6,654 31,776

    Aceh Tamiang 27,193 102,082

    Nagan Raya 33,903 75,899

    Aceh Jaya 13,081 41,211

    Bener Meriah 2,944 13,903

    Pidie Jaya 13,606 62,014

    Banda Aceh 121 285

    Langsa 3,493 13,295

    Lhokseumawe 2,239 11,645

    Subulussalam 1,713 6,665

    T O T A L 438,855 1,788,738

    38

  • Photo: Rice Milling Unit , Pidie

    ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    Establishing the modern rice milling plant, capacity 8 ton/hour.

    PROJECT PURPOSE INVESTMENT ESTIMATION

    USD 8,000,000

    SOUTHEAST ACEH12,320 Ha

    62,462 Tons

    EAST ACEH46,442 Ha

    213,033 Tons

    NORTH ACEH68,189 Ha

    341,951 Tons

    BIREUEN36,285 Ha

    141,440 Tons

    ACEH BESAR47,124 Ha

    203,516 Tons

    PIDIE43,904 Ha

    204,052 Tons

    39

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    There is a reason why corn [Zea mays] is the most-produced grain worldwide; it is involved in just about every aspect of our lives. Corn provides about 21 percent of human nutrition across the globe. Corn is usually fed to animals.There are many other non-culinary uses for the grain as well; it is a key ingredient in ethanol, cosmetics, ink, glue, laundry starch, medicines and fabrics, just to name a few. It also can be the raw material for baskets and toys. In short, corn is an essential ingredient in our diets and also in our world (source: en.wikipedia.org/wiki/Maize).

    As one of the major producers of corn, we offers opportunities for potential investors to set up a poultry feed industry in Aceh.

    ... it is a key ingredient in ethanol, cosmetics, ink, glue, laundry starch, medicines and fabrics, just to name a few.

    CORN

    40

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    41

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    AREA AND PRODUCTION OF CORN BY REGENCY/CITY, 2012

    Regency/City Planted Area (Ha) Production (Ton) Farmer

    Simeulue 1 28

    Aceh Singkil 201 464

    South Aceh 12,330 49,377 6,000

    Southeast Aceh 26,602 89,301 6,000

    East Aceh 2,480 8,214 7,800

    Central Aceh 138 434 4,500

    West Aceh 209 485

    Aceh Besar 452 216

    Pidie 751 679 4,500

    Bireuen 894 1,729 3,300

    North Aceh 1,619 1,406 5,750

    Southwest Aceh 33 22

    Gayo Lues 1,333 5,174 3,000

    Aceh Tamiang 2,020 4,464 1,500

    Nagan Raya 318 598

    Aceh Jaya 126 397 5,750

    Bener Meriah 728 1,193 6,000

    Pidie Jaya 239 93 7,000

    Banda Aceh 2 -

    Sabang 34 -

    Langsa 12 7

    Lhokseumawe 58 -

    Subulussalam 1,208 3,005

    T O T A L 51,788 167,286 61,100

    42

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    Establishing poultry feed factory (maize bran, maize germ, cattle feed, corn grits) which has drying machine (capacity 40 tons/hour) and warehouse (capacity 9000 tons)

    PROJECT PURPOSE INVESTMENT ESTIMATION

    USD 12,367,320

    SOUTHEAST ACEH26,602Ha

    89,301 Tons

    SOUTH ACEH12,330 Ha

    49,377 Tons

    43

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    Soybean is a main source for worlds vegetable protein and vegetable oil

    Nationwide, soybean production in 2012 was 851,647 tons with the area of the land 554,132 Ha. In Aceh, the soybean plantation in 2012 was approximately 44,638 Ha, and its production was 51.440 tons.

    Supported by about 90,305 farmers in Aceh

    SOYBEAN

    90,305 farmers in Aceh

    44

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    45

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    AREA AND PRODUCTION OF SOYBEANS BY REGENCY/CITY, 2012

    Regency/City Planted Area (Ha) Production (Ton) Farmer

    Simeulue - -

    Aceh Singkil 43 30

    South Aceh 105 140

    Southeast Aceh 4 7

    East Aceh 1,922 2,404 39,305

    Central Aceh 690 818

    West Aceh 30 32

    Aceh Besar 757 634

    Pidie 5,333 6,138 9,000

    Bireuen 21,847 27,127 12,000

    North Aceh 3,532 2,744 13,500

    Southwest Aceh 3,866 3,896

    Gayo Lues 28 52

    Aceh Tamiang 2,182 1,756 7,500

    Nagan Raya 202 155

    Aceh Jaya 98 15

    Bener Meriah 60 381

    Pidie Jaya 3,899 5,078 9,000

    Banda Aceh - -

    Sabang 7 3

    Langsa - -

    Lhokseumawe 18 -

    Subulussalam 15 29

    T O T A L 44,638 51,439 90,305

    46

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    Establishing poultry feed factory (cattle feed) which has drying machine (capacity 40 tons/hour) and warehouse (capacity 9000 tons)

    PROJECT PURPOSE INVESTMENT ESTIMATION

    USD 12,367,320

    PIDIE JAYA3,899 Ha

    5,078 Tons

    PIDIE 5,333 Ha

    6,138 Tons

    WEST ACEH30 Ha

    32 Tons

    NORTH ACEH3,532 Ha

    2,744 Tons

    ACEH TAMIANG2,182 Ha

    1,756 Tons

    SOUTHEAST ACEH4 Ha

    7 Tons

    47

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    FRUITS AND VEGETABLEHorticulture area is a geographic area that has similarity ecosystems and united by a common infrastructure facilitiesthus forming region filled with various business activities including the provision of facilities based horticultural production, cultivation, post-harvest handling and processing, marketing, and various supporting activities (Indonesia Directorate General of Horticulture). Its main purpose is to develop well-being of society through the utilization of resources in a sustainable manner by integrating communal relations, the economy, and the environment in harmony.

    Linueng Buleun in Bener Meriah is very potential for horticultural farm, as it is close to the new hydro power plant and has direct access to seaports in the east coast. The local government provides 25.300 ha of land for potential investors to set up organic horticultural farms in this area. The target is to supply fruits and vegetables for international markets. The very supportive and welcome local community ensures that investment in this area is very promising.

    48

  • Photo: Harvesting Potatos in Lineung Buleun, Bener Meriah

    ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    49

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    Horticulture Planted Area (Ha) Produksi (Ton)

    Vegetable:

    Potato 835 18

    Cabbage 654 30

    Tomato 99 20

    Carrot 397 8.5

    String Beans 92 4.5

    Red Chilies 1048 8

    Cayenne Pepper 875 5

    Red Onion 220 4.2

    Scallion 230 4.3

    Fruit:

    Avocado 1022 2

    Orange 418 3

    Terong Belanda 166 0.6

    Markisah 73 0.3

    Kasmak 72 0.2

    POTENTIALS(tons)

    AVOCADO 74,624 MANGGO 270,544 RAMBUTAN 280,994 ORANGE 85,522 JACK FRUIT 81,154 DURIAN 270,449 PAPAYA 148,298 BANANA 689,892 WATERMELON 165,397

    STRING BEAN 170,188 CHILI 300,188 CAYENNE PEPPER 195,052 TOMATO 173,573 EGG PLANT 147,778 CUCUMBER 198,629 RED UNION 26,004 GARLIC 772 POTATO 86,154

    50

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    Establishing organic farm base on a production system that sustains the health of soils, ecosystems and people.

    Selling the products in international markets.

    PROJECT PURPOSE INVESTMENT ESTIMATION

    USD 1,025,850

    LINEUNG BULEUN25.300 HA

    51

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    2.2 DETAILED PLAN OF PLANTATION

    Palm oil constitutes the largest plantation crop in Aceh in volume and economic value, and the palm oil sector has significant growth potential as a major source of revenue for food and bio fuel products.

    The Government of Aceh has been initiating several strategic plans in this commodity:

    1. Create operational and policy support for sustainable palm oil among government, private sector, NGOs, and smallholders.

    2. Support palm oil public-private investment partnerships.

    3. Reduce threats to high conservation value forests and peat swamp ecosystems.

    4. Create a provincial seed certification and distribution program.

    5. Improve supply chains and pricing transparency for palm oil production and processing.

    PALM OIL

    In 2010, it consisted of smallholders production: 185,265 Tons, Government plantation production: 69,634 Tons, and private plantation production: 238,927 Tons and the status is still temporary.

    52

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    Annual Production(tons)

    2006 2007 2008 2009 2010

    493.826

    482.895

    326.665

    769.010

    765.416

    53

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    Although many districts in Aceh have palm oil plantations, only Aceh Tamiang, Aceh Singkil, and Nagan Raya have higher number of crude palm oil (CPO) production that suitable for a big processing industry. The following table shows total production for each district.

    PALM PLANTED AREA AND PRODUCTION OF SMALL HOLDER & ESTATE ENTERPRISES BY REGENCY/CITY 2012

    Regency/City Planted Area (Ha) Production (Ton)

    Aceh Singkil 54,560 397,729

    South Aceh 9,765 32,004

    Southeast Aceh 7,666 19,942

    East Aceh 70,565 35,0797

    Central Aceh 0 0

    West Aceh 25,485 33,618

    Aceh Besar 1,180 397

    Pidie 77 16

    Bireuen 4,644 2,2161

    North Aceh 24,595 115,664

    Southwest Aceh 20,612 13,093

    Gayo Lues 0 0

    Aceh Tamiang 54,417 3,849,265

    Nagan Raya 50,401 168,767

    Aceh Jaya 15,953 15,357

    Bener Meriah 1,300 144

    Pidie Jaya 2,087 990

    Banda Aceh 0 0

    Sabang 0 0

    Langsa 419 947

    Lhokseumawe 208 243

    Subulussalam 21,514 49,135

    T O T A L 368650 5070555

    54

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    Establishing palm oil processing industries (Biodiesel, Fatty Alcohol, Edible Oil, Shortening, SBE, Soap Noodles Plant, Dove Plant, Fatty Acid Plant, NPK Fetilizer Plant, Refinery Plant, Biomass Pellet Production Plant).

    PROJECT PURPOSE INVESTMENT ESTIMATION

    USD 26,449,321Net Present Value : 8,411,663.48 USD

    Internal Rate of Return : 23,1%

    PAYBACK PERIOD : 6 YEARS AND 8 MONTHS

    NAGAN RAYA76,439 Ha

    90,241 Tons

    ACEH TAMIANG50,755 Ha

    121,916 Tons

    ACEH SINGKIL47,111 Ha

    110,004 Tons

    Lhokseumawe

    Banda Aceh

    Meulaboh

    Photo: Palm Oil Processing Industry, PT. Megalopolis, Aceh Jaya

    55

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    Natural rubber consists of suitable polymers of the organic compound isoprene with minor impurities of other organic compounds plus water. The rubber plant can grow up to 15-25 meters, has an upright big stem and big high branching.

    Currently, rubber is harvested mainly in the form of the latex from a rubber tree (Hevea brasiliiensis) which was tapped from the cut bark of the plant. It can be used to produce another form of rubber, such as crumb rubber and rubber timber.

    Natural rubber is used extensively in many applications and products, either alone or in combination with other materials such as firewood, charcoal, wood or lumber for household apliance (furniture), door and window profiles, hoses, belts, matting, flooring and dampeners (antivibration mounts) for the automotive industry, aircraft industry, textile, gloves (medical, household and industrial) and toys.

    RUBBER

    56

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    Photo: Rubber plant, Illustration

    57

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    There are five districts in Aceh that have higher number of rubber production that suitable for a big processing industry: West Aceh, East Aceh, Aceh Tamiang. The following table shows total production for each district.

    District/City Planted Area (Ha) Production (ton)Simeulue 1,201 141

    Aceh Singkil 3,698 2,376

    South Aceh 1,099 252

    Southeast Aceh 10,183 9,802

    East Aceh 35,277 21,333

    Central Aceh - -

    West Aceh 27,381 18,649

    Great Aceh 16 -

    Pidie 20 -

    Bireuen 2,506 1,387

    North Aceh 10,485 6,601

    Southwest Aceh 851 134

    Gayo Lues 7 1

    Aceh Tamiang 22,238 14,736

    Nagan Raya 10,870 3,322

    Aceh Jaya 12,416 5,025

    Bener Meriah - -

    Pidie Jaya 3 1

    Banda Aceh - -

    Sabang - -

    Langsa 1,642 1,430

    Lhokseumawe 20 25

    Subulussalam 4,379 2,192

    T O T A L 144,292 87,407

    PLANTED AREA AND PRODUCTION OF RUBBER IN ACEH

    58

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    Establishing rubber processing industries.

    EXISTING COMPANY PT. Aceh Rubber Industry

    (Aceh Tamiang)

    PROJECT PURPOSE INVESTMENT ESTIMATION

    USD 21,161,739Net Present Value : 234,618,007 USD

    Internal Rate of Return : 53,81 %Benefit Cost Ratio : 1,26

    Net Benefit Cost Ratio : 3,739

    PAYBACK PERIOD : 6 YEARS AND 8 MONTHS

    ACEH TAMIANG22,238 Ha

    22,238 Tons

    EAST ACEH35,277 Ha

    21,333 Tons

    WEST ACEH27,381 Ha

    18,649 Tons

    Lhokseumawe

    Banda Aceh

    Photo: Rubber Processing Industry, PT. Aceh Rubber Industry, Aceh Tamiang

    59

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    Indonesia is the third largest producer of cocoa beans in the world after the Ivory Coast and Ghana.

    In Aceh, cocoa is a leading commodities other than coffee, palm oil, rubber, organic horticulture, corn and patchouli.

    Cocoa plantations spread almost in all districts in Aceh, from Aceh Tamiang in the eastern part of Aceh, to Simeulue Island in the outer edge of Aceh Province.

    Aceh cocoa has been exported to many countries in the world. The statistics indicate that in 2010, Aceh export volumes of cocoa beans reached 420,978.40 kgs or equals to USD 1,166,080.30 (Aceh Industry and Trade Agency, 2012).

    The development strategy is to gear sustainable cocoa industries. The upstream industries are strengthened, however the focus is to boost value added in the downstream sector.

    COCOA

    60

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    Photo: Cacoa Farm in Pidie Jaya

    61

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    There are five districts in Aceh as the major cocoa producers that are suitable for a big processing industry: Pidie Jaya, Bireuen, Aceh Tamiang, Southeast Aceh, and Soutwest Aceh. The following table shows total production for each district.

    CACOA PLANTED AREA AND PRODUCTION OF SMALL HOLDER & ESTATE ENTERPRISES BY REGENCY/CITY 2012

    Regency/City Planted Area (Ha) Production (ton)

    Simeulue 1,806 200

    Aceh Singkil 636 147

    South Aceh 1,332 153

    Southeast Aceh 19,454 8,843

    East Aceh 12,416 6,536

    Central Aceh 2,322 546

    West Aceh 722 235

    Aceh Besar 3,136 426

    Pidie 9,609 4,499

    Bireuen 6,023 3,801

    North Aceh 9,503 3,163

    Southwest Aceh 4,356 874

    Gayo Lues 4,443 888

    Aceh Tamiang 2,280 941

    Nagan Raya 5,372 1,335

    Aceh Jaya 1,267 206

    Bener Meriah 1,190 185

    Pidie Jaya 12,734 3,645

    Banda Aceh 0 0

    Sabang 637 172

    Langsa 303 132

    Lhokseumawe 135 64

    Subulussalam 816 130

    T O T A L 100492 37121

    62

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    Establishing cocoa processing industries (paste, butter, powderander).

    Establishing packaging industry.

    PROJECT PURPOSE INVESTMENT ESTIMATION

    USD 97,095,995Net Present Value : 5,730,808.44 USD

    Internal Rate of Return : 22,4% Benefit Cost Ratio : 1,69

    PAYBACK PERIOD : 6 YEARS AND 9 MONTHS

    ACEH TAMIANG2,675 Ha

    1,127 Tons

    SOUTHEAST ACEH11,970 Ha

    7,622 TonsSOUTHWEST ACEH4,356 Ha

    2,746 Tons

    BIREUEN5,436 Ha

    4,039 Tons

    PIDIE JAYA10,513 Ha

    3,073 TonsBanda Aceh

    Meulaboh

    Photo: Illustration

    63

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    Gayo coffee is a typical coffee from the Gayo highlands, an area that covers Bener Meriah, Central Aceh and Gayo Lues Districts in Aceh Province.

    Gayo is the name of the tribe who inhabits this region. The majority of people in this area are coffee growers. The plantation has began as early as 1908 which main product is arabica coffee. In fact, arabica coffee production resulting from the Gayo land is the largest in Asia.

    Gayo coffee has been exported to many countries in the world. The statistics indicate that in 2012, Aceh export volumes of coffee beans to 18 countries were up to 9,703,260.00 kgs or equals to USD 64,358,771.31 (Aceh Industry and Trade Agency, 2012).

    Gayo coffee also has gained some international certifications as a recognition to its excellence in quality, such as organic and fair trade certified as well as Geographical Indication (GI). Particularly, black gayo arabica coffee obtained the highest score in the Indonesian Specialty Coffee Auction 2010 in Bali, which guarantees that it is the best coffee in the world.

    COFFEE

    64

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    Aceh export volumes of coffee beans to 18 countries were up to

    9,703,260 kgs

    Photo: Coffee plant in Bener Meriah

    65

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    Three major producers of coffee in Aceh are, Bener Meriah, Central Aceh, and Gayo Lues. These areas are suitable for a big coffee processing industry. The following table shows total production for each district.

    COFFEE PLANTED AREA AND PRODUCTION OF SMALL HOLDER BY REGENCY/CITY 2012

    RegencyRobusta Arabika Total Robusta & Arabika (Ton)

    FarmerPlanted

    Area (Ha)Production

    (Ton)Planted

    Area (Ha)Production

    (Ton)Planted

    Area (Ha)Production

    (Ton)

    Central Aceh 2,315 793 48,300 25,370 50,615 26,163 33,000

    Bener Meriah 1,360 660 48,101 22,414 49,461 23,074 29,000

    Gayo Lues 4,652 1,118 4,652 1,118 40,000

    Pidie 9,540 1,569 - - 9,540 1,569 11,846

    T O T A L 13,215 3,022 101,053 48,902 114,268 51,924 113,846

    66

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    Establishing coffee processing industries.

    Establishing packaging industry.

    PROJECT PURPOSE INVESTMENT ESTIMATION

    USD 30,864,300

    PAYBACK PERIOD : 6 YEARS AND 9 MONTHS

    CENTRAL ACEHRobusta: 2,315 Ha / 874 Tons

    Arabica: 48,000 Ha/ 24,328 Tons

    BENER MERIAHRobusta: 1,250 Ha / 660 Tons

    Arabica: 48,101 Ha /22,414 Tons

    GAYO LUES4,588 Ha

    1,036 Tons

    Banda Aceh

    Photo: Coffee bean sorting, Central Aceh

    67

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    Coconut industry can be developed by either farmer group level or larger scaled industry, for domestic and internaional market, such as young coconut products, coconut coctail, coconut jam, baby food supplements, soft drinks, nata de coco, coconut water sauce, coconut flour, virgin coconut oil, coconut shell charcoal, briquet charcoal, liquid smoke of coconut shell, coconut wood, and organic fertilizer. While the exporting goods are such as copra, white copra, raw coconut oil, coconut cake, desiccated coconut, and active charcoal.

    COCONUT

    68

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    69

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    COCONUT PLANTED AREA AND PRODUCTION OF SMALL HOLDER BY REGENCY/CITY 2012

    Regency/City Planted Area (Ha) Production (Ton)

    Simeulue 7,472 2,611

    Aceh Singkil 5,224 2,235

    South Aceh 7,023 2,948

    Southeast Aceh 851 488

    East Aceh 6,797 6,015

    Central Aceh 103 11

    West Aceh 2,832 1,202

    Aceh Besar 14,351 7,971

    Pidie 8,633 5,967

    Bireuen 14,341 11,760

    North Aceh 19,389 10,310

    Southwest Aceh 2,155 1,244

    Gayo Lues 440 85

    Aceh Tamiang 575 185

    Nagan Raya 1,350 659

    Aceh Jaya 6,333 1,643

    Bener Meriah 43 12

    Pidie Jaya 3,336 1,091

    Banda Aceh - -

    Sabang 4,045 2,386

    Langsa 473 283

    Lhokseumawe 774 391

    Subulussalam 855 269

    T O T A L 107,395 59,766

    70

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    Establish Virgin Coconut Oil Processing Industry

    PROJECT PURPOSE INVESTMENT ESTIMATION

    USD 87,286Net Present Value : 15.5%

    Internal Rate of Return : 57.39%Benefit Cost Ratio : 2.19

    Lhokseumawe

    Banda Aceh

    Meulaboh

    NORTH ACEH19,389 Ha

    10,310Tons

    BIREUEN14,341 Ha

    11,760Tons

    ACEH BESAR14,351 Ha 9,971Tons

    Photo: Illustration

    71

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    Contains the Patchouli Alcohol of 2.5% to 3.3% (the average PA of patchouli in the world is 2.5%).

    Patchouli is a species of plant from the genus Pogostemon. It is a bushy herb of the mint family, with erect stems, reaching two or three feet (about 0.75 metre) in height and bearing small, pale pink-white flowers. The plant is native to tropical regions of Asia, and is extensively cultivated in Aceh, Indonesia (wikipedia.org, 05/29/2013).

    Patchouli oils is used as raw material for a number of finished products, such as parfume and modern scented industrial products such as paper towels, laundry detergents, and air fresheners. Patcholi also can be used in antiseptic, pesticide, and as a fixative to bind other essential oils.

    The Geographical Indication Expert of the Indonesian Ministry of Agriculture, Dr. Riyaldi, affirmed that Aceh is very potential for the development of large-scale patchouli businesses, because of its supporting condition of land and its quality. According to a research, Aceh patchouli oil contains patchouli alcohol (yield) 2.5% to 3.3% which makes it the best patchouli in the world (patchouli-aceh.com, 03/18/2012).

    As one of the major producers of patchouli, Aceh offers opportunities for potential investors to set up patchouli processing industries in the region.

    PATCHOULI

    72

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    According to a research, Aceh patchouli oil contains patchouli alcohol (yield) 2.5% to 3.3%

    which makes it the best patchouli in the world.

    Photo: Patchouli Plant, Illustration

    73

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    Aceh produces the best patchouli in the world. The main production areas are Aceh Jaya, South Aceh, Southwest Aceh and Gayo Lues Districts, which are suitable for large-scale processing industries. The following table shows the total production for each district.

    PATCHOULI AREA AND PRODUCTION OF SMALL HOLDER BY REGENCY/CITY, 2012

    Regency/City Planted Area (Ha) Production (Ton)

    Simeulue - -

    Aceh Singkil 40 21

    South Aceh 408 212

    Southeast Aceh 1,418 612

    East Aceh - -

    Central Aceh 23 20

    West Aceh - -

    Aceh Besar 118 53

    Pidie 8 5

    Bireuen 43 33

    North Aceh 132 124

    Southwest Aceh 78 61

    Gayo Lues 853 774

    Aceh Tamiang 40 35

    Nagan Raya 15 13

    Aceh Jaya 650 308

    Bener Meriah - -

    Pidie Jaya 3 3

    Banda Aceh - -

    Sabang - -

    Langsa - -

    Lhokseumawe - -

    Subulussalam 19 9

    T O T A L 3,848 2,283

    74

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    Establishing patchouli processing industries.

    Increasing production volume and quality of patchouli.

    PROJECT PURPOSE INVESTMENT ESTIMATION

    USD 1,025,960

    WEST ACEH114 Ha6 Tons

    SOUTH ACEH334 Ha21 Tons

    GAYO LUES149 Ha33 TonsACEH JAYA

    107 Ha20 Tons

    Lhokseumawe

    Banda Aceh

    Photo: Patchouli Processing Industry, Illustration

    75

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    2.3 DETAILED PLAN OF ACEH BEEF INDUSTRY DEVELOPMENT PROJECT

    Livestock farm area in Aceh is 1.525.578 Ha. The huge area is significantly feasible for forage-livestock system, integrated with crop plantation. The project involves rearing of both breeding and fattening. The main activities of the project would be procurement of irrigation and hay making equipment, construction of back-up livestock farm infrastructure, construction of animal feeds plant, breeding and fattening. Strategy for Aceh beef Development project includes : develop a neucleus-plasma structure for the developing a beef herd in Aceh, establish system for ; management of mature breeding cows (grazing systems or feedlot), establish a beef finishing unit (feedlot) plan for each regency and halal beef processing and meet distribution. Targeted for initial development; Aceh Besar, Pidie, Bener Meriah, Central Aceh and Nagan Raya Regency.

    76

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    Photo: Governor of Aceh visiting Livestock Improvement Company farm in Victoria, Australia (11/2013)

    77

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    Aceh Besar Beef Industry Development Project

    Land Area : 6,434 HaLocation : Krueng Aceh Kuta Malaka Blang Ubo-ubo

    Land Status : Goverment Ownership

    Photo: Tradisional Fattening in Krueng Aceh, Aceh Besar

    78

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    SCHEME Nucleus : 605 Ha Plasma : 5,829 Ha

    INFRASTRUCTURE SUPPORT Airport : Sultan Iskandar Muda Seaport : Malahayati Road by Condition : Moderate Road by Surface : Gravel and Land Water : River, Spring Electicity : Supported

    Breeding : 5,500 cows Fattening : 15,000 cows

    ROI : 29.64 % B/C : 1.23

    INVESTMENT ESTIMATION

    PAYBACK PERIOD : 3 YEARS AND 5 MONTHS

    USD 33,147,500

    SUITABLE FOR: Kuta Malaka - Major Feedlot for Nucleus Herd Krueng Aceh- Traditional Fattening Cot Sirebee, Jantho- Bull Depot Blang Ubo-Ubo- Large Scale Breeding for Nucleus Herd

    Blang Ubo-ubo

    Cot Sirebee

    Kuta Malaka

    Krueng Aceh

    ACEH BESAR

    79

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    Pidie Beef Industry Development Project

    Land Area : 500 HaLocation : Biheu Village, Muara Tiga District

    Land Status : Private Ownership

    Photo: Breeding Farm, Pidie

    80

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    SCHEME Plasma System

    INFRASTRUCTURE SUPPORT Airport : Sultan Iskandar Muda Seaport : Malahayati Road by Condition : Moderate Road by Surface : Gravel and Land Water : River, Spring Electricity : Supported

    Breeding : 3,080 cows Fattening : 10,000 cows

    ROI : 32 % B/C : 1.23

    INVESTMENT ESTIMATION

    PAYBACK PERIOD : 3 YEARS AND 2 MONTHS

    USD 21,325,600

    Biheu Village

    PIDIE

    SUITABLE FOR: Breeding

    81

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    Bener Meriah Beef Industry Development Project

    Land Area : 4,155 HaLocation : Perumpakan Benjadi

    Land Status : Goverment Ownership

    Photo: Breeding Farm, Bener Meriah

    82

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    Breeding : 3,080 cows Fattening : 10,000 cows

    ROI : 32 % B/C : 1.23

    INVESTMENT ESTIMATION

    PAYBACK PERIOD : 3 YEARS AND 2 MONTHS

    USD 21,628,500

    SCHEME Nucleus dan Plasma System

    INFRASTRUCTURE SUPPORT Airport : Rembele & Malikussaleh Seaport : Krueng Geukueh Road by Condition : Moderate Road by Surface : Gravel and Land Water : River, Spring Electicity: Supported

    Perumpakan Benjadi

    BENER MERIAH

    SUITABLE FOR: Breeding Central Feedlot

    83

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    Central Aceh Beef Industry Development Project

    Land Area : 2,280 HaLocation : Jagong Jeget Karang Ampar Land Status : Private and Goverment Ownership

    Photo: Fattening Farm, Central Aceh

    84

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    Breeding : 3,080 cows Fattening : 10,000 cows

    ROI : 32 % B/C : 1.23

    INVESTMENT ESTIMATION

    PAYBACK PERIOD : 3 YEARS AND 2 MONTHS

    USD 21,628,500

    SCHEME Nucleus : 780 Ha Plasma : 1,500 Ha

    INFRASTRUCTURE SUPPORT Airport : Rembele & Malikussaleh Seaport : Krueng Geukueh Road by Condition : Moderate Road by Surface : Gravel and Land Water : River, Spring Electicity: Supported

    Jagong Jeget

    Karang Ampar

    CENTRAL ACEH

    SUITABLE FOR: Fattening

    85

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    Nagan Raya Beef Industry Development Project

    Land Area : 5,000 HaLocation : Blang Baroe Rambong

    Land Status : Aneuk Nanggroe Cooperatives

    Photo: Research Station and Feedlot, Nagan Raya

    86

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    Breeding : 3,080 cows Fattening : 10,000 cows

    ROI : 32 % B/C : 1.23

    INVESTMENT ESTIMATION

    PAYBACK PERIOD : 3 YEARS AND 2 MONTHS

    USD 21,325,600

    SCHEME Nucleus dan Plasma System

    INFRASTRUCTURE SUPPORT Airport : Cut Nyak Dhien Seaport : PT. MDB Suak Patong and Kuala Tripa

    Road by Condition : Moderate Road by Surface : Gravel and Land Water : River Electicity : Supported

    Blang Baroe Rambong

    NAGAN RAYA

    SUITABLE FOR: Research Station Feedlot Breeding

    87

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    2.4 DETAILED PLAN OF FISHERIES

    ACEH INTERNATIONAL FISHING PORT AT LAMPULO

    88

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    696,117 Tons of Fish is Aceh Potencial

    from Fisheries

    Photo: Lampulo Fishing Port

    89

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    LAMPULO FISHING PORT PRODUCTION 2006 - 2012 (Kg)

    90

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD | Meulaboh

    Establishing fishery industries (taking, culturing, processing, preserving, storing, transporting, marketing or selling fish or fish products).

    PROJECT PURPOSE INVESTMENT ESTIMATION

    USD 200,000,000

    BANDA ACEHLampulo Fishing Port

    51,8 Ha

    Photo: Lampulo Fishing Port

    91

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    IDI FISHING PORT

    92

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    Photo: Idi Fishing Port

    93

  • Detailed Plan of Agro Industries Project

    | WWW.ACEHINVESTMENT.COM

    NO INVESTMENT OPPORTUNITY CAPACITY EXPLAIN

    1 Block Ice Factory 80 tons/day

    2 Modern fishery processing industry 50 ton Pelagic

    3 Shipyard (Wood & fiber) 4 unit Repairs & Shipyard

    4 Fish transportation service (domestic and foreign) 2 unit

    THE POTENTIALS IN IDITotal catch of fishermen reached 48.67 tons dailyThe number of fishermen as much as 8246 people (Year 2012)Total fleet of 447 fishing fleets units (Year 2012)Various Fishing gear reaching 571 pieces (Year 2012).

    Photo: Idi Fishing Port

    94

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    Establishing fishery industries (taking, culturing, processing, preserving, storing, transporting, marketing or selling fish or fish products).

    PROJECT PURPOSE INVESTMENT ESTIMATION

    USD 10,000,000

    EAST ACEHIdi Fishing Port

    62.5 HALhokseumawe

    Banda Aceh

    Meulaboh

    95

  • Detailed Plan of Infrastructure and Energy

    | WWW.ACEHINVESTMENT.COM

    96

    Detailed Plan of Infrastructure and Energy

    III

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    97

  • Detailed Plan of Infrastructure and Energy

    | WWW.ACEHINVESTMENT.COM

    98

    3.1 DETAILED PLAN OF INFRASTRUCTURE

    ROLL-ON/ROLL-OFFCARGO FERRY SERVICE

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    99

    Photo: Illustration

  • Detailed Plan of Infrastructure and Energy

    | WWW.ACEHINVESTMENT.COM

    100

    Frequent Route of PT. Pelayaran Alkan Abadi

    Loading Port Destination Port Ship Name

    Tg. Priok, Jakarta Malahayati, Aceh Hirondex V.9

    Malahayati, Aceh Tg. Priok, Jakarta Hirondex V.10

    Photo: Krueng Gekuh Seaport

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    101

    Establishing Ro-Ro Freight Ferry Shipping

    EXISTING COMPANY Langsa: Kenangan Passanger Ferry PT. Pelayaran Alkan Abadi

    PROJECT PURPOSE INVESTMENT ESTIMATION

    USD 1,025,960

    NORTH ACEHKrueng Geukuh

    Sea Port

    LANGSAKuala Langsa

    Sea Port

  • Detailed Plan of Infrastructure and Energy

    | WWW.ACEHINVESTMENT.COM

    102

    3.2 DETAILED PLAN OF ENERGY

    GEOTHERMAL POWER PLANT

    Photo: Illustration

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    103

    The power for the district of Bener Meriah is supplied from the 150kV transmission Aceh - Sumatra interconnection system from North Sumatra.The power supply is only able to serve 207 villages (89.22%) of the total 232 villages. A total of 25 village have not been served yet.

    INVESTMENT FEASIBILITY INVESTMENT ESTIMATION

    USD 288,080,000

    BENER MERIAH

  • Detailed Plan of Infrastructure and Energy

    | WWW.ACEHINVESTMENT.COM

    104

    GEOTHERMAL POWER PLANT PROJECT 2013-2026

    No Objects Regency/City Coordinate

    Energy Potential (Mwe)

    NoteResource (Mwe)Reserve (Mwe)

    Spec Hipo Expec

    1 Iboih Sabang LU 0437 ; BT 9645 25 - -

    2 Lho Pria Laot Sabang LU 0347 ; BT 9741 50 - -

    3 Jaboi Keuneukai Sabang LU 0553 ; BT 9514 - - 50 Bukaka Group/ PT. Sabang Energi

    4 Ie Seum-Krueng Raya Aceh Besar LU 0529 ; BT 9539 - 63 -

    5 Seulawah Agam Aceh Besar LU 0550 ; BT 9518 - - 165 Pertamina

    6 Alur Canang Pidie LU 0501 ; BT 9555 25 - -

    7 Alue Long-Bangga Pidie LU 0448 ; BT 9648 100 - -

    8 Tangse Pidie LU 0456 ; BT 9644 25 - - Hitay Energi Holding

    9 Rimba Raya Bener Meriah LU 0328 ; BT 9751 100 - -

    10 Simpang Balik Bener Meriah LU 0419 ; BT 9753 100

    11 G. Geureudong Central Aceh LU 0548 ; BT 9519 - 120 - Chevron/PT.Jasa Ayah

    12 Silih Nara Central Aceh LU 0437 ; BT 9742 100 - -

    13 Meranti East Aceh LU 0505 ; BT 9554 25 - -

    14 Brawang Buaya Aceh Tamiang LU 0508 ; BT 9618 25 - -

    15 Kafi Gayo Luwes 25 - -

    16 Gunung Kembar Gayo Luwes LU 0533 ; BT 9533 - 92 - Hitay Energi Holding

    17 Dolok Perkirapan Gayo Luwes LU 0442 BT 9649 25 - -

    TOTAL POTENTIALS = 1.115 Mwe 625 275 215

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    105

    BENER MERIAH

    EAST ACEH

    ACEH TAMIANG

    GAYO LUES

    CENTRAL ACEH

    SABANG

    ACEH BESAR

    PIDIE

  • Detailed Plan of Infrastructure and Energy

    | WWW.ACEHINVESTMENT.COM

    106

    HYDROPOWER PLANT

    Photo: Illustration

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    107

    Establishing Irrigation 19.50 HA and Hydropower Plant 160 MW/580 MWH

    INVESTMENT FEASIBILITY INVESTMENT ESTIMATION

    USD 539,280,000

    NORTH ACEH

  • Detailed Plan of Infrastructure and Energy

    | WWW.ACEHINVESTMENT.COM

    108

    No. District/City Project Name Location Capacity (MW)

    Invesment Estimation

    (Million USD)

    1 North Aceh

    Jambuaye-3 Wh Jambu Air 37.2 111.6

    Jambuaye-5 Kr. Jambuaye 181.8 545.4

    Bidin/Jambuaye Kr. Jambuaye 246 738

    2 Gayo Lues Ramasan-1 Kr. Ramasan 171.6 514.8

    3 East Aceh Peureulak Kr. Peureulak 34.8 104.4

    4 Aceh Tamiang Tampur W. Tampur 428 1284

    5 South Aceh

    Jambo Papeun-2 Kr. Jambo Papeun 95.2 285.6

    Kluet Kr. Kluet 141 423

    Sibubung-2 Kr. Sibubung 121.1 363.3

    6 Nagan RayaTeripa-3 Kr. Teripa 172.6 517.8

    Teripa-4 Kr. Teripa 306.4 919.2

    7 West AcehMeureubo-1 Kr. Meulaboh 82.1 246.3

    Woyla-2 Kr. Woyla 274 822

    8 Central AcehPameu Kr. Pameu 160.6 481.8

    Peusangan Kr. Peusangan 90 270

    9 Southeast Aceh Dolok-1 Kr. Dolok 32.2 96.6

    10 Aceh Jaya Teunom-2 Kr. Teunom 288.2 864.6

    Total 2862.8 8,588.40

    HYDRO POWER PLANT PROJECT 2013-2026

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    109

    NORTH ACEH

    CENTRAL ACEH

    EAST ACEH

    ACEH TAMIANG

    GAYO LUES

    SOUTHEAST ACEH

    WEST ACEH

    NAGAN RAYA

    SOUTH ACEH

    ACEH JAYA

  • Detailed Plan of Tourism Development Project in Banda Aceh

    | WWW.ACEHINVESTMENT.COM

    110

    Detailed Plan of Tourism Development Project in Banda Aceh

    IV

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    111

  • Detailed Plan of Tourism Development Project in Banda Aceh

    | WWW.ACEHINVESTMENT.COM

    112

    KRUENG ACEH RIVER WALK

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    113

  • Detailed Plan of Tourism Development Project in Banda Aceh

    | WWW.ACEHINVESTMENT.COM

    114

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    115

    Food Court Restaurant Playground Jogging Track Mini Port Amphitheater Park

    FASILITIES INVESTMENT ESTIMATION

    USD 10,000,000

    BANDA ACEH

  • Detailed Plan of Tourism Development Project in Banda Aceh

    | WWW.ACEHINVESTMENT.COM

    116

    ULE LHEUBEACH

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    117

  • Detailed Plan of Tourism Development Project in Banda Aceh

    | WWW.ACEHINVESTMENT.COM

    118

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    119

    Food Court Restaurant Playground Jogging Track Mini Port Amphitheater Park Fishing Spot

    FASILITIES INVESTMENT ESTIMATION

    USD 10,000,000

    BANDA ACEH

  • Sabang Management and Development Agency (BPKS) Project

    | WWW.ACEHINVESTMENT.COM

    120

    Sabang Free Port and Free Trade Zone Project

    V

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    121

  • Sabang Management and Development Agency (BPKS) Project

    | WWW.ACEHINVESTMENT.COM

    122

    VIEW OF THE SABANG BAY

    FRESH WATER LAKE BUILT BY THE DUTCH

    Sabang has been designated as one of national and international tourist destinations, especially with the enactment of Sabang port as a cruise ship destination in 2011. The Govermant of Aceh has targeted 1 million visitor in 2007.

    Sabang is located at the Malaca Strait gate, directly adjacent to Malaysia and Thailand, and is part of Andaman Cluster, a very advanced and developed tourism destination. Its next to Phuket and Langkawi.

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    123

    ENTRANCE TO THE PORT OF SABANG

    Ecotourism, Adventure, Beach and Sport Heritage and Education

    THE POTENTIALS

  • Sabang Management and Development Agency (BPKS) Project

    | WWW.ACEHINVESTMENT.COM

    124

    INTERNATIONAL SHIPPING LINE

    The Law No.37 year 2000 about Free Trade and Free Port Zone of Sabang

    Descision of Governor of Aceh Province as Chief Council of Sabang, Number: 193/034, year 2001 about Forming of Management Board of Sabang Free Port and Free Trade Zone (BPKS)

    The Law No.11 year 2006 regarding Aceh Goverment; article 167 to 170

    Goverment Regulation No.83/2011 concering Delegation of Authority from Central Goverment to Sabang Zone Council or DKS.

    FRIENDLY TO INVESTMENT REGULATION

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    125

    SUEZ - SABANG - KRA - TOKYO : 8,353 MILESSUEZ - SABANG - SINGAPURE - TOKYO : 8,793 MILESSUEZ - SUNDA STRAIT - TOKYO : 9,427 MILESSUEZ - LOMBOK - TOKYO : 10,216 MILES

  • Sabang Management and Development Agency (BPKS) Project

    | WWW.ACEHINVESTMENT.COM

    126

    SABANG INTERNATIONAL WATER FRONTRESORT AND CONVENTION CENTRE

    Land Area : 0.5 HaLocation : Paradiso BeachLand Status : Goverment OwnershipSupporting Land : 1 Ha Sabang Fair Areal

    Road by Condition : GoodRoad by Surface : AsphaltedWater : Like and SpringElecticity : Supported

    INFRASTRUCTURE SUPPORTAirport : Maimun SalehSeaport : Balohan (passanger port) and Sabang International Hubport

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    127

    USD 35,000,000Payback : 8 Years

    B/C Ratio : 1.21

    INVESTMENT ESTIMATION

    Photo: Illustration

  • Sabang Management and Development Agency (BPKS) Project

    | WWW.ACEHINVESTMENT.COM

    128

    Land Area : 117 HaLocation : Sabang BayLand Status : Goverment OwnershipDepth : 22 mCT 1 Length : 180 m2 x 25 m2CT 3 Length : 423 m2 x 50 m2

    Road by Condition : GoodRoad by Surface : AsphaltedWater : Like and SpringElecticity : Supported

    INFRASTRUCTURE SUPPORTAirport : Maimun SalehSeaport : Balohan (passanger port) and Sabang International Hubport

    PASSANGER CRUISE TERMINAL

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    129

    USD 120,000,000Payback : 8 Years

    B/C Ratio : 1.23

    INVESTMENT ESTIMATION

    Photo: Sabang bay

  • Sabang Management and Development Agency (BPKS) Project

    | WWW.ACEHINVESTMENT.COM

    130

    YACHT MARINA & SUPPORTING FACILITIES

    Batchmetri Area : 26.5 HaLand Area : 13 HaLocation : Lhok Wieng LandLand Status : Goverment Ownership

    Road by Condition : GoodRoad by Surface : AsphaltedWater : Like and SpringElecticity : Supported

    INFRASTRUCTURE SUPPORTAirport : Maimun SalehSeaport : Balohan (passanger port) and Sabang International Hubport

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    131

    USD 6,000,000Payback : 5 Years

    B/C Ratio : 1.3

    INVESTMENT ESTIMATION

    Photo: Sabang

  • Sabang Management and Development Agency (BPKS) Project

    | WWW.ACEHINVESTMENT.COM

    132

    Location : Gapang and Iboih BeachLand Status : Goverment Ownership

    Road by Condition : GoodRoad by Surface : AsphaltedWater : Like and SpringElecticity : Supported

    INFRASTRUCTURE SUPPORTAirport : Maimun SalehSeaport : Balohan (passanger port) and Sabang International Hubport

    DIVING CENTER

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    133

    USD 1,100,000Payback : 4 Years

    B/C Ratio : 1.3

    INVESTMENT ESTIMATION

    Photo: Sabang Sea Garden

  • Sabang Management and Development Agency (BPKS) Project

    | WWW.ACEHINVESTMENT.COM

    134

    SEA PORT

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    135

    Commerce, Export-Import Transshipment port Cruise line Docking yard

    Fuel Bunkering Service Storage Water Supply Other

    INVESTMENT OPPORTUNITIES

    Photo: Sabang Port

  • Sabang Management and Development Agency (BPKS) Project

    | WWW.ACEHINVESTMENT.COM

    136

    PLAN OF SABANG PORT

    Banda Aceh

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    137

    CT1 : Multi Purpose TerminalCT2 : Cargo TerminalCT3 : Transhipment Terminal

  • Sabang Management and Development Agency (BPKS) Project

    | WWW.ACEHINVESTMENT.COM

    138

    INDUSTRY AND TRADING SECTOR

    Service of export or import trade Fuel Bunker, Transit & Supply Down Stream for Agro Industry (CPO, Cacao, Rubber, etc) Shipping Industry/ Ship Docking Fishery Industry

    BUSINEESS OPPORTUNITIES

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    139

    INDUSTRIAL PARK AT BALOHAN

    We will offer the greatest advantages in todays challenging manufacturing environtment. We will offer the most advanced Industrial Free Zone in Indonesia-minutes from the Container Seaport. We will offer competitive labor rates, on-site property management and 24-hours security. We will layout the Parks to best utilize the land area and provide for only High Tech Industries that create jobs beneficial to the people of Pulau Weh and Indonesia.

  • Sabang Management and Development Agency (BPKS) Project

    | WWW.ACEHINVESTMENT.COM

    140

    FISHERY SECTOR

    It is surrounded by Hindia Ocean, Benggala Bay and Malacca Strait.

    Sabang Zone has a big potential for marine fish related industies

    Part of Sub Regional Indonesia-Malaysia-Thailand Growth Triangle (IMT-GT)/ Cluster Andaman

    Some location along the coast of Weh Island and Pulo Aceh Island are potentials for marine culture

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    141

    Export Processing Zone (EPZ) Fresh Fish Export Terminal (sea and air cargo) Marine Culture, such as sea weed, lobsters. Cold Storage Docking Yard

    BUSINEESS OPPORTUNITIES

    Sabang Zone has free: Custom Clearance Custom (Export-Import) duties Luxury good tax Value Added Tax (VAT)

    Free Trade and Free Port determined for 70 years. Management Board of Free Trade and Free

    Port Sabang (BPKS) has an authority to publish business license and others licensings, hence, the procedures are faster and easier

    INCENTIVESBPKS has an authority to provide incentives for the business in Sabang Zone:

  • Detailed Plan of Infrastructure and Energy

    | WWW.ACEHINVESTMENT.COM

    142

    Detailed Plan of Industrial and Trading Estates

    VI

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    143

  • Detailed Plan of Infrastructure and Energy

    | WWW.ACEHINVESTMENT.COM

    144

    6.1 ACEH INDUSTRIAL AREA PLAN AT LADONG

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    145

  • Detailed Plan of Infrastructure and Energy

    | WWW.ACEHINVESTMENT.COM

    146

    Reserved LandArea : 552.663 sqm

    LOCATION:Ladong, Great Aceh (about 18 Km to Banda Aceh and 9 Km to Port of Malahayati).

    CONSISTED OF: 19 lots for small scale industries (0.10 Ha 0.30 Ha). 23 lots for medium scale industries (0.30 Ha 0,50 Ha). 10 lots for large scale industries (0.50 Ha 1 Ha).

  • ACEH INVESTMENT PROFILE

    ACEH INVESTMENT COORDINATING BOARD |

    147

    ACEH BESAR

    LADONG556.663 sqm (55 Ha)

    BEEF PROCESSING FOCUSED

    INVESTMENT AREA

    COCONUT FOCUSEDINVESTMENT AREA

    MALAHAYATI SEAPORT

    PIDIE

  • Detailed Plan of Infrastructure and Energy

    | WWW.ACEHINVESTMENT.COM

    148

    Chief of Editor IskandarNetty Muharni

    Editor Arif ArhamCut Eliza Mutia

    Design and LayoutEka SaputraZulfahmi

    Copyrigth 2014 | Aceh Investment Coordinating Board

  • INTRODUCTION

    | WWW.ACEHINVESTMENT.COM

    150

    Jl. Ahmad Yani No. 39, Banda Aceh, IndonesiaP : +62 651 23170 | F : +62 651 23171E : [email protected] | [email protected] : investasi.acehprov.go.id | acehinvestment.com

    Aceh InvestmentCoordinating Board

    Download E-Book


Recommended