ACEH INVESTMENTPROFILE
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD2014
DETAILED PLAN OF
Aceh is your investment destination. There are four key strengths that make Aceh very promising: friendly investment laws, geographical position, abundant natural resources, and human capital. Friendly investment laws are related to our status as a special autonomy province in Indonesia. We have a wider authority to govern ourselves than other regions in Indonesia. We also have privilleges to make direct cooperation with foreign institutions. Another important investment measure is the free port and free trade zone in Sabang. The zone provides attractive incentives for investors, such as import duty and tax exemption. For simplification, all licensings for investment in the zone are issued by the Sabang Management and Development Board (BPKS).Another reason that makes Aceh one of the best place to invest is its location proximity. Located in one of the busiest international shipping lane, on the entrance of Malacca Strait, Aceh is geographically close to potential markets, such as East Africa, Middle East, South Asia, Southeast Asia, East Asia, along with Australia and New Zealand. This relative position is a beneficial networking for long term investment activities. Aceh also has abundant natural resources. Coffee, cocoa, rubber, and palm oil are just a short list. Mineral resources, located inland and offshore also await further investment Potential investors can get the most of the commodities, utilizing the large number of productive and hardworking labor force in Aceh. To highlight, the Government of Aceh provides 20% of its annual budget for human capital so they can be your partners in the business.To accelerate investment in the region, we work on some important issues to be resolve, such as de-regulation, licensing acceleration, security and business comfort improvement. Hence, the brand-new Aceh is just perfect for your future investment.Last but not least, we welcome you to visit Aceh and invest in amazing Aceh.
dr. Zaini Abdullah GOVERNOR OF ACEH
FOREWORD
dr. Zaini Abdullah GOVERNOR OF ACEH
We thank God that Aceh regains trust from investors and being in the top seven of investment realization in Indonesia in 2013. 42 new businesses, domestic and overseas, acquired investment licenses to operate in Aceh, and are committed to invest in 10 priority sectors, with the total investment value was up to IDR 6.1 trillions. Meanwhile, 139 existing companies/projects have been operating in Aceh, with the total amount of investment, up to December 2013, was about IDR 5 (five) trillions, and employed about 21.866 local manpower.As our vision is to be one of the leading investment destination in Indonesia, we will continue to work hard and to make sure that investor and potential investors get the best services and full assisstance where necessary. We will also make effective and efficient coordination with related sectors and institutions to simplify all procedures. All the efforts are for one reason, to provide business comfort to investors. We thank you all for your continuous support to Aceh and to trust Aceh as your investment destination.
Ir. Iskandar, M.ScChairman of Aceh InvestmentCoordinating Board
PREFACE
Ir. Iskandar, M.ScChairman of
Aceh InvestmentCoordinating Board
Content
I INTRODUCTION
II DETAILED PLAN OF AGRO INDUSTRIES PROJECT
1.1 VISION ~ 11
1.2 GEOGRAPHY~ 12
1.3 DEMOGRAPHY ~ 14
1.4 SPATIAL PLANNING ~ 16
1.5 ECONOMIC PERFORMANCE ~ 18
1.6 INFRASTRUCTURE SUPPORT ~ 20
1.7 DOING BUSINESS IN ACEH ~ 30
1.8 FACT AND FIGURE ~ 32
2.1 DETAILED PLAN OF FOOD CROPS AND HORTICULTURE ~ 38
2.2 DETAILED PLAN OF PLANTATION ~ 52
2.3 DETAILED PLAN OF ACEH BEEF INDUSTRY DEVELOPMENT PROJECT ~ 76
2.4 DETAILED PLAN OF FISHERIES ~ 88
III DETAILED PLAN OF INFRASTRUCTURE AND ENERGY
IV DETAILED PLAN OF TOURISM DEVELOPMENT PROJECT IN BANDA ACEH
V SABANG FREE PORT AND FREE TRADE ZONE PROJECT
VI DETAILED PLAN OF INDUSTRIAL AND TRADING ESTATES
3.1 DETAILED PLAN OF INSFRASTRUCTURE ~ 98
3.2 DETAILED PLAN OF ENERGY ~ 102
4.1 KRUENG ACEH RIVER WALK ~ 112
4.2 ULEE LHEU BEACH ~ 116
6.1 ACEH INDUSTRIAL AREA ~ 144
5.1 INTERNATIONAL SHIPPING LINE ~ 124
5.2 SABANG INTERNATIONAL WATER FRONT RESORT AND CONVENTION CENTRE ~ 126
5.3 PASSANGER CRUISE TERMINAL ~ 128
5.4 YACHT MARINA & SUPPORTING FACILITIES ~ 130
5.6 DIVING CENTER ~ 132
5.7 SEA PORT ~ 134
Introduction
I
INTRODUCTION
| WWW.ACEHINVESTMENT.COM
10
Aceh becomes one of the leading Investment Destination in 2017
VISION
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
11
1.2 GEOGRAPHY
ACEH, THE WEST GATE OF INDONESIA
INTRODUCTION
| WWW.ACEHINVESTMENT.COM
12
ACEH
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
13
1.3 DEMOGRAPHY
INTRODUCTION
| WWW.ACEHINVESTMENT.COM
14
7,478,801.95 H
aTotal area of
the territorial sea w
hose breadth
extends to tw
o hundred nautical m
iles m
easured from
the baselines.
56,770.81 Km
2Total area
according to Basem
ap of Indonesia.
1,978,491
Labors Force
Inhabited by
people (2013)
5,015,23448 %
of the
population
work in the
agriculture
sector.
Topographically hilly with mountains, valleys, rivers,
waterfalls, and narrow floodplain
18 5 289 778 6.493 district cities subdistrict mukim villages
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
15
Cultivated AreaThose areas for production forest, community forest; agriculture; fisheries; mining; industry; tourism; housing and other functions.
Strategic Area: The Center of National Stragic Activities (PKSN) : Sabang, free port and free trade
areav National Activity Center : Lhokseumawe and greater area (PKN) Capital City : Banda Aceh
2,934,602 Ha Protected Area and Conservation AreaThose areas ruled for the protection for following areas Local protected area; preserve region and areas and cultural heritage; national disaster-prone; geology protection; and other preservation areas.
2,708,550 Ha
1.4 SPATIAL PLANNING
Photo: Banda Aceh From Sky
INTRODUCTION
| WWW.ACEHINVESTMENT.COM
16
Cultivated Area
Protected Area
Conservation Area
Sabang
Banda Aceh
Lhokseumawe
Langsa
Takengon
Meulaboh
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
17
1.5 ECONOMIC PERFORMANCE
Min
imum
Wag
e (US
D)
5,08
5,05
28,56
5,72
8
40,7
83,2
26 111
,183
,310
382,
330,
821
26,133,215
13,127,198
4,407,581
165,101,527
102,857,143
411,
428,
571
Domestic Investment (USD)
Foreign Investment (USD)
INTRODUCTION
| WWW.ACEHINVESTMENT.COM
18
Inflation Economic Growth Export (ton) Import (ton)
Photo: Illustration
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
19
National Road1.803,36 Km
Regencial Road13.841,07 Km
Provincial Road1.813,33 Km
ROAD
Photo: Highway Road, Lhok Seudu, Aceh Besar
1.6 INFRASTRUCTURE SUPPORT
INTRODUCTION
| WWW.ACEHINVESTMENT.COM
20
Lhokseumawe
Banda Aceh
Sabang
Takengon
Langsa
Meulaboh
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
21
SEAPORT
Photo: Malahayati Seaport, Aceh Besar
INTRODUCTION
| WWW.ACEHINVESTMENT.COM
22
Malahayati-Aceh Besar
Krueng Geukueh-Lhokseumawe
Kuala Langsa
Sinabang
Balohan-Sabang
Meulaboh
Tapak Tuan
Susoh
Singkil
Calang
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
23
AIRPORT
Photo: Iskandar Muda International Airtport, Aceh Besar
INTRODUCTION
| WWW.ACEHINVESTMENT.COM
24
Sultan Iskandar Muda-Aceh Besar
Malikussaleh-Lhokseumawe
Rembele-Central Aceh
Maimun Saleh-Sabang
Point A-North Aceh
Kuala Batee-Southwest Aceh
Lasikin-Simeulu
Hamzah Fansuri-Aceh Singkil
Cut Nyak Dhien-Nagan Raya Alas Lauser-Southeast Aceh
T. Cut Ali-South Aceh
Blang Keujeuren-Gayo Luwes
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
25
ENERGY
CapacityTariff/KWH
IDR USD450 VA 485 0.05
900 VA 600 0.06
1300 VA 930 0.09
2.200 VA 960 0.1
3.500 VA -14 KVA 1112 0.11
14 KVA-200 KVA 972 0.1
200 KVA-30.000 KVA 803 0.08
More Than 30.000 KVA 723 0.07
Aceh-North Sumatra Interconnection
343 MW
PLTG Arun Lhokseumawe
200 MW
Nagan Raya Steam Power Plant
2x110 MW
Peusangan Hydro Power Plant
88MW
Photo: Steam Power Plant, Nagan Raya
INTRODUCTION
| WWW.ACEHINVESTMENT.COM
26
Aceh North SumateraInterconnection
PLTG Arun LhokseumaweFinishing: 2014
Peusangan Hydro Electric Power PlantFinishing: 2016
Nagan Raya SteamPower Plant
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
27
WATER
DISTRICT/CITY WATER SUPPLY COMPANY
Banda Aceh PDAM Tirta Daroy
Sabang PDAM Tirta Aneuk Laot
Aceh Besar PDAM Tirta Mon Tala
Pidie PDAM Tirta Mon Krueng Baro
Pidie Jaya PDAM Tirta Krueng Meureudu
Bireun PDAM Tirta Krueng Peusangan
North Aceh PDAM Tirta Mon Pase
East Aceh PDAM Tirta Peusada
Lansa PDAM Tirta Keumeuneng
Central Aceh PDAM Tirta Tawar
Gayo Luwes PDAM Tirta Sejuk
Bener Meriah PDAM Tirta Beungi
Aceh Jaya PDAM Tirta Mon Trata
West Aceh PDAM Tirta Meulaboh
Southeast Aceh PDAM Tirta Agara Kutacane
Singkil PDAM Tirta Singkil
South Aceh PDAM Tirta Naga Tapaktuan
Photo: Ilustration
INTRODUCTION
| WWW.ACEHINVESTMENT.COM
28
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
29
Law No 11 of 2006 on Aceh Governance. The law gives the Government of Aceh privileges to govern the province including in economic development to improve health, safety, and public welfare.
Law No. 37 of 2000 on Sabang Free Port and Free Trade Zone. It concludes a wide range of facilities for doing business in Sabang, such as import duty and tax exemption. The Sabang Management and Development Agency (BPKS) operates the zone and has an authorization to issue all licensings for investment in this area.
Presidential Regulation No. 11 of 2010 on Cooperation between the Government of Aceh and Foreign Institutions. The regulation allows a wide authority for the Government of Aceh to establish cooperation with foreign institutions, especially in economic development.
REGULATIONS
Photo: Palm Oil Industry, PT. Megalopolis, Aceh Jaya
1.7 DOING BUSINESS IN ACEH
INTRODUCTION
| WWW.ACEHINVESTMENT.COM
30
INCENTIVES
POTENTIAL INVESTORS
LICENSING
CONSTRUCTION
OPERATION ANDBUSINESS EXPANSION
PRINCIPLE LICENSE: BKPM/BPKSWORKING LICENCE: BKPM/BPKSLOC AL LICENCE: BP2T
One Stop Service for Local Licenses
INVESTMENT ACCELERATION TASK FORCE TEAM
INFORMATION, FACILITATION AND ASSISTANCE> Security, convenience and law certainty> Land availability, labor, wages & incentive> Licensing administration> Policy, Regulation> Field Visit, etc
INVESTMENT EVALUATION ANDCONTROLLING TASK FORCE TEAM
FACILITATION AND ASSISTANCE> Security, convenience and low certainty> Land dispute, labor dispute, etc> Regulation and licensing for business
NOTE: BKPM > Indonesian Investment Coordinating Board BPKS > Sabang Free Port and Free Trade Management Board BP2T > One Stop Service Office
Ease of Doing Business in Aceh
a. Reduction of Sectoral levy permits; Shall not exceed 50 % (fifty percent) of the levy payable amount.
b. Stimulus funding, for selected sectors; Stimulus funds awarded in the form of interest subsidy shall not exceed 2 % (two percent) of the rate of interest paid for the purchase of machinery or equipment.
c. Capital relief; in the form of equity capital and assets in accordance with the ability of the Government of Aceh .
Providing incentives to investors in the form of:
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
31
The Big 5 of Foreign Direct Investment by Country of Origin
UK
USA
1.83.8
1.8 FACT AND FIGURE
INTRODUCTION
| WWW.ACEHINVESTMENT.COM
32
OUR PROGRESS IN 2013
India
Malaysia
South Korea
Billion USD
1 USD = 9,300 IDRMarch, 2013 Kurs
8.70.2 4.7
We got 42 new projects (IDR 6.1 trillion) and more than IDR 5.09 trillion of 139 projects (21.866 workers) already have boost our economy. Now, its your turn !
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
33
Detailed Plan of Agro Industries Project
II
Photo: Lineung Buleun Potato Farm
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
2.1 FOOD CROPS AND HORTICULTURE
with the area of 438,855 Ha,
and the annual production of about 1,788,783 tonnes in 2012
The overall demand of rice in Indonesia is currently reaches 33 million tons, while Aceh domestic consumption is about 658,340 tonnes (2013). There are huge potential to develop rice farming and processing to meet domestic market share.
PADDY
Agriculture is the key sector in Aceh,
Supported by about 359,478 farmers in Aceh.
36
Photo: Ilustration
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
37
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
AREA AND PRODUCTION OF PADDY BY REGENCY/CITY, 2012
Regency/City Planted Area (Ha) Production (Ton)
Simeulue 6,907 26,005
Aceh Singkil 2,220 6,611
South Aceh 19,367 64,309
Southeast Aceh 12,320 62,462
East Aceh 46,442 213,033
Central Aceh 7,092 25,816
West Aceh 15,039 44,342
Aceh Besar 47,124 203,516
Pidie 43,904 204,052
Bireuen 36,285 141,440
North Aceh 68,189 341,951
Southwest Aceh 29,019 96,426
Gayo Lues 6,654 31,776
Aceh Tamiang 27,193 102,082
Nagan Raya 33,903 75,899
Aceh Jaya 13,081 41,211
Bener Meriah 2,944 13,903
Pidie Jaya 13,606 62,014
Banda Aceh 121 285
Langsa 3,493 13,295
Lhokseumawe 2,239 11,645
Subulussalam 1,713 6,665
T O T A L 438,855 1,788,738
38
Photo: Rice Milling Unit , Pidie
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
Establishing the modern rice milling plant, capacity 8 ton/hour.
PROJECT PURPOSE INVESTMENT ESTIMATION
USD 8,000,000
SOUTHEAST ACEH12,320 Ha
62,462 Tons
EAST ACEH46,442 Ha
213,033 Tons
NORTH ACEH68,189 Ha
341,951 Tons
BIREUEN36,285 Ha
141,440 Tons
ACEH BESAR47,124 Ha
203,516 Tons
PIDIE43,904 Ha
204,052 Tons
39
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
There is a reason why corn [Zea mays] is the most-produced grain worldwide; it is involved in just about every aspect of our lives. Corn provides about 21 percent of human nutrition across the globe. Corn is usually fed to animals.There are many other non-culinary uses for the grain as well; it is a key ingredient in ethanol, cosmetics, ink, glue, laundry starch, medicines and fabrics, just to name a few. It also can be the raw material for baskets and toys. In short, corn is an essential ingredient in our diets and also in our world (source: en.wikipedia.org/wiki/Maize).
As one of the major producers of corn, we offers opportunities for potential investors to set up a poultry feed industry in Aceh.
... it is a key ingredient in ethanol, cosmetics, ink, glue, laundry starch, medicines and fabrics, just to name a few.
CORN
40
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
41
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
AREA AND PRODUCTION OF CORN BY REGENCY/CITY, 2012
Regency/City Planted Area (Ha) Production (Ton) Farmer
Simeulue 1 28
Aceh Singkil 201 464
South Aceh 12,330 49,377 6,000
Southeast Aceh 26,602 89,301 6,000
East Aceh 2,480 8,214 7,800
Central Aceh 138 434 4,500
West Aceh 209 485
Aceh Besar 452 216
Pidie 751 679 4,500
Bireuen 894 1,729 3,300
North Aceh 1,619 1,406 5,750
Southwest Aceh 33 22
Gayo Lues 1,333 5,174 3,000
Aceh Tamiang 2,020 4,464 1,500
Nagan Raya 318 598
Aceh Jaya 126 397 5,750
Bener Meriah 728 1,193 6,000
Pidie Jaya 239 93 7,000
Banda Aceh 2 -
Sabang 34 -
Langsa 12 7
Lhokseumawe 58 -
Subulussalam 1,208 3,005
T O T A L 51,788 167,286 61,100
42
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
Establishing poultry feed factory (maize bran, maize germ, cattle feed, corn grits) which has drying machine (capacity 40 tons/hour) and warehouse (capacity 9000 tons)
PROJECT PURPOSE INVESTMENT ESTIMATION
USD 12,367,320
SOUTHEAST ACEH26,602Ha
89,301 Tons
SOUTH ACEH12,330 Ha
49,377 Tons
43
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
Soybean is a main source for worlds vegetable protein and vegetable oil
Nationwide, soybean production in 2012 was 851,647 tons with the area of the land 554,132 Ha. In Aceh, the soybean plantation in 2012 was approximately 44,638 Ha, and its production was 51.440 tons.
Supported by about 90,305 farmers in Aceh
SOYBEAN
90,305 farmers in Aceh
44
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
45
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
AREA AND PRODUCTION OF SOYBEANS BY REGENCY/CITY, 2012
Regency/City Planted Area (Ha) Production (Ton) Farmer
Simeulue - -
Aceh Singkil 43 30
South Aceh 105 140
Southeast Aceh 4 7
East Aceh 1,922 2,404 39,305
Central Aceh 690 818
West Aceh 30 32
Aceh Besar 757 634
Pidie 5,333 6,138 9,000
Bireuen 21,847 27,127 12,000
North Aceh 3,532 2,744 13,500
Southwest Aceh 3,866 3,896
Gayo Lues 28 52
Aceh Tamiang 2,182 1,756 7,500
Nagan Raya 202 155
Aceh Jaya 98 15
Bener Meriah 60 381
Pidie Jaya 3,899 5,078 9,000
Banda Aceh - -
Sabang 7 3
Langsa - -
Lhokseumawe 18 -
Subulussalam 15 29
T O T A L 44,638 51,439 90,305
46
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
Establishing poultry feed factory (cattle feed) which has drying machine (capacity 40 tons/hour) and warehouse (capacity 9000 tons)
PROJECT PURPOSE INVESTMENT ESTIMATION
USD 12,367,320
PIDIE JAYA3,899 Ha
5,078 Tons
PIDIE 5,333 Ha
6,138 Tons
WEST ACEH30 Ha
32 Tons
NORTH ACEH3,532 Ha
2,744 Tons
ACEH TAMIANG2,182 Ha
1,756 Tons
SOUTHEAST ACEH4 Ha
7 Tons
47
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
FRUITS AND VEGETABLEHorticulture area is a geographic area that has similarity ecosystems and united by a common infrastructure facilitiesthus forming region filled with various business activities including the provision of facilities based horticultural production, cultivation, post-harvest handling and processing, marketing, and various supporting activities (Indonesia Directorate General of Horticulture). Its main purpose is to develop well-being of society through the utilization of resources in a sustainable manner by integrating communal relations, the economy, and the environment in harmony.
Linueng Buleun in Bener Meriah is very potential for horticultural farm, as it is close to the new hydro power plant and has direct access to seaports in the east coast. The local government provides 25.300 ha of land for potential investors to set up organic horticultural farms in this area. The target is to supply fruits and vegetables for international markets. The very supportive and welcome local community ensures that investment in this area is very promising.
48
Photo: Harvesting Potatos in Lineung Buleun, Bener Meriah
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
49
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
Horticulture Planted Area (Ha) Produksi (Ton)
Vegetable:
Potato 835 18
Cabbage 654 30
Tomato 99 20
Carrot 397 8.5
String Beans 92 4.5
Red Chilies 1048 8
Cayenne Pepper 875 5
Red Onion 220 4.2
Scallion 230 4.3
Fruit:
Avocado 1022 2
Orange 418 3
Terong Belanda 166 0.6
Markisah 73 0.3
Kasmak 72 0.2
POTENTIALS(tons)
AVOCADO 74,624 MANGGO 270,544 RAMBUTAN 280,994 ORANGE 85,522 JACK FRUIT 81,154 DURIAN 270,449 PAPAYA 148,298 BANANA 689,892 WATERMELON 165,397
STRING BEAN 170,188 CHILI 300,188 CAYENNE PEPPER 195,052 TOMATO 173,573 EGG PLANT 147,778 CUCUMBER 198,629 RED UNION 26,004 GARLIC 772 POTATO 86,154
50
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
Establishing organic farm base on a production system that sustains the health of soils, ecosystems and people.
Selling the products in international markets.
PROJECT PURPOSE INVESTMENT ESTIMATION
USD 1,025,850
LINEUNG BULEUN25.300 HA
51
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
2.2 DETAILED PLAN OF PLANTATION
Palm oil constitutes the largest plantation crop in Aceh in volume and economic value, and the palm oil sector has significant growth potential as a major source of revenue for food and bio fuel products.
The Government of Aceh has been initiating several strategic plans in this commodity:
1. Create operational and policy support for sustainable palm oil among government, private sector, NGOs, and smallholders.
2. Support palm oil public-private investment partnerships.
3. Reduce threats to high conservation value forests and peat swamp ecosystems.
4. Create a provincial seed certification and distribution program.
5. Improve supply chains and pricing transparency for palm oil production and processing.
PALM OIL
In 2010, it consisted of smallholders production: 185,265 Tons, Government plantation production: 69,634 Tons, and private plantation production: 238,927 Tons and the status is still temporary.
52
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
Annual Production(tons)
2006 2007 2008 2009 2010
493.826
482.895
326.665
769.010
765.416
53
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
Although many districts in Aceh have palm oil plantations, only Aceh Tamiang, Aceh Singkil, and Nagan Raya have higher number of crude palm oil (CPO) production that suitable for a big processing industry. The following table shows total production for each district.
PALM PLANTED AREA AND PRODUCTION OF SMALL HOLDER & ESTATE ENTERPRISES BY REGENCY/CITY 2012
Regency/City Planted Area (Ha) Production (Ton)
Aceh Singkil 54,560 397,729
South Aceh 9,765 32,004
Southeast Aceh 7,666 19,942
East Aceh 70,565 35,0797
Central Aceh 0 0
West Aceh 25,485 33,618
Aceh Besar 1,180 397
Pidie 77 16
Bireuen 4,644 2,2161
North Aceh 24,595 115,664
Southwest Aceh 20,612 13,093
Gayo Lues 0 0
Aceh Tamiang 54,417 3,849,265
Nagan Raya 50,401 168,767
Aceh Jaya 15,953 15,357
Bener Meriah 1,300 144
Pidie Jaya 2,087 990
Banda Aceh 0 0
Sabang 0 0
Langsa 419 947
Lhokseumawe 208 243
Subulussalam 21,514 49,135
T O T A L 368650 5070555
54
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
Establishing palm oil processing industries (Biodiesel, Fatty Alcohol, Edible Oil, Shortening, SBE, Soap Noodles Plant, Dove Plant, Fatty Acid Plant, NPK Fetilizer Plant, Refinery Plant, Biomass Pellet Production Plant).
PROJECT PURPOSE INVESTMENT ESTIMATION
USD 26,449,321Net Present Value : 8,411,663.48 USD
Internal Rate of Return : 23,1%
PAYBACK PERIOD : 6 YEARS AND 8 MONTHS
NAGAN RAYA76,439 Ha
90,241 Tons
ACEH TAMIANG50,755 Ha
121,916 Tons
ACEH SINGKIL47,111 Ha
110,004 Tons
Lhokseumawe
Banda Aceh
Meulaboh
Photo: Palm Oil Processing Industry, PT. Megalopolis, Aceh Jaya
55
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
Natural rubber consists of suitable polymers of the organic compound isoprene with minor impurities of other organic compounds plus water. The rubber plant can grow up to 15-25 meters, has an upright big stem and big high branching.
Currently, rubber is harvested mainly in the form of the latex from a rubber tree (Hevea brasiliiensis) which was tapped from the cut bark of the plant. It can be used to produce another form of rubber, such as crumb rubber and rubber timber.
Natural rubber is used extensively in many applications and products, either alone or in combination with other materials such as firewood, charcoal, wood or lumber for household apliance (furniture), door and window profiles, hoses, belts, matting, flooring and dampeners (antivibration mounts) for the automotive industry, aircraft industry, textile, gloves (medical, household and industrial) and toys.
RUBBER
56
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
Photo: Rubber plant, Illustration
57
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
There are five districts in Aceh that have higher number of rubber production that suitable for a big processing industry: West Aceh, East Aceh, Aceh Tamiang. The following table shows total production for each district.
District/City Planted Area (Ha) Production (ton)Simeulue 1,201 141
Aceh Singkil 3,698 2,376
South Aceh 1,099 252
Southeast Aceh 10,183 9,802
East Aceh 35,277 21,333
Central Aceh - -
West Aceh 27,381 18,649
Great Aceh 16 -
Pidie 20 -
Bireuen 2,506 1,387
North Aceh 10,485 6,601
Southwest Aceh 851 134
Gayo Lues 7 1
Aceh Tamiang 22,238 14,736
Nagan Raya 10,870 3,322
Aceh Jaya 12,416 5,025
Bener Meriah - -
Pidie Jaya 3 1
Banda Aceh - -
Sabang - -
Langsa 1,642 1,430
Lhokseumawe 20 25
Subulussalam 4,379 2,192
T O T A L 144,292 87,407
PLANTED AREA AND PRODUCTION OF RUBBER IN ACEH
58
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
Establishing rubber processing industries.
EXISTING COMPANY PT. Aceh Rubber Industry
(Aceh Tamiang)
PROJECT PURPOSE INVESTMENT ESTIMATION
USD 21,161,739Net Present Value : 234,618,007 USD
Internal Rate of Return : 53,81 %Benefit Cost Ratio : 1,26
Net Benefit Cost Ratio : 3,739
PAYBACK PERIOD : 6 YEARS AND 8 MONTHS
ACEH TAMIANG22,238 Ha
22,238 Tons
EAST ACEH35,277 Ha
21,333 Tons
WEST ACEH27,381 Ha
18,649 Tons
Lhokseumawe
Banda Aceh
Photo: Rubber Processing Industry, PT. Aceh Rubber Industry, Aceh Tamiang
59
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
Indonesia is the third largest producer of cocoa beans in the world after the Ivory Coast and Ghana.
In Aceh, cocoa is a leading commodities other than coffee, palm oil, rubber, organic horticulture, corn and patchouli.
Cocoa plantations spread almost in all districts in Aceh, from Aceh Tamiang in the eastern part of Aceh, to Simeulue Island in the outer edge of Aceh Province.
Aceh cocoa has been exported to many countries in the world. The statistics indicate that in 2010, Aceh export volumes of cocoa beans reached 420,978.40 kgs or equals to USD 1,166,080.30 (Aceh Industry and Trade Agency, 2012).
The development strategy is to gear sustainable cocoa industries. The upstream industries are strengthened, however the focus is to boost value added in the downstream sector.
COCOA
60
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
Photo: Cacoa Farm in Pidie Jaya
61
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
There are five districts in Aceh as the major cocoa producers that are suitable for a big processing industry: Pidie Jaya, Bireuen, Aceh Tamiang, Southeast Aceh, and Soutwest Aceh. The following table shows total production for each district.
CACOA PLANTED AREA AND PRODUCTION OF SMALL HOLDER & ESTATE ENTERPRISES BY REGENCY/CITY 2012
Regency/City Planted Area (Ha) Production (ton)
Simeulue 1,806 200
Aceh Singkil 636 147
South Aceh 1,332 153
Southeast Aceh 19,454 8,843
East Aceh 12,416 6,536
Central Aceh 2,322 546
West Aceh 722 235
Aceh Besar 3,136 426
Pidie 9,609 4,499
Bireuen 6,023 3,801
North Aceh 9,503 3,163
Southwest Aceh 4,356 874
Gayo Lues 4,443 888
Aceh Tamiang 2,280 941
Nagan Raya 5,372 1,335
Aceh Jaya 1,267 206
Bener Meriah 1,190 185
Pidie Jaya 12,734 3,645
Banda Aceh 0 0
Sabang 637 172
Langsa 303 132
Lhokseumawe 135 64
Subulussalam 816 130
T O T A L 100492 37121
62
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
Establishing cocoa processing industries (paste, butter, powderander).
Establishing packaging industry.
PROJECT PURPOSE INVESTMENT ESTIMATION
USD 97,095,995Net Present Value : 5,730,808.44 USD
Internal Rate of Return : 22,4% Benefit Cost Ratio : 1,69
PAYBACK PERIOD : 6 YEARS AND 9 MONTHS
ACEH TAMIANG2,675 Ha
1,127 Tons
SOUTHEAST ACEH11,970 Ha
7,622 TonsSOUTHWEST ACEH4,356 Ha
2,746 Tons
BIREUEN5,436 Ha
4,039 Tons
PIDIE JAYA10,513 Ha
3,073 TonsBanda Aceh
Meulaboh
Photo: Illustration
63
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
Gayo coffee is a typical coffee from the Gayo highlands, an area that covers Bener Meriah, Central Aceh and Gayo Lues Districts in Aceh Province.
Gayo is the name of the tribe who inhabits this region. The majority of people in this area are coffee growers. The plantation has began as early as 1908 which main product is arabica coffee. In fact, arabica coffee production resulting from the Gayo land is the largest in Asia.
Gayo coffee has been exported to many countries in the world. The statistics indicate that in 2012, Aceh export volumes of coffee beans to 18 countries were up to 9,703,260.00 kgs or equals to USD 64,358,771.31 (Aceh Industry and Trade Agency, 2012).
Gayo coffee also has gained some international certifications as a recognition to its excellence in quality, such as organic and fair trade certified as well as Geographical Indication (GI). Particularly, black gayo arabica coffee obtained the highest score in the Indonesian Specialty Coffee Auction 2010 in Bali, which guarantees that it is the best coffee in the world.
COFFEE
64
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
Aceh export volumes of coffee beans to 18 countries were up to
9,703,260 kgs
Photo: Coffee plant in Bener Meriah
65
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
Three major producers of coffee in Aceh are, Bener Meriah, Central Aceh, and Gayo Lues. These areas are suitable for a big coffee processing industry. The following table shows total production for each district.
COFFEE PLANTED AREA AND PRODUCTION OF SMALL HOLDER BY REGENCY/CITY 2012
RegencyRobusta Arabika Total Robusta & Arabika (Ton)
FarmerPlanted
Area (Ha)Production
(Ton)Planted
Area (Ha)Production
(Ton)Planted
Area (Ha)Production
(Ton)
Central Aceh 2,315 793 48,300 25,370 50,615 26,163 33,000
Bener Meriah 1,360 660 48,101 22,414 49,461 23,074 29,000
Gayo Lues 4,652 1,118 4,652 1,118 40,000
Pidie 9,540 1,569 - - 9,540 1,569 11,846
T O T A L 13,215 3,022 101,053 48,902 114,268 51,924 113,846
66
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
Establishing coffee processing industries.
Establishing packaging industry.
PROJECT PURPOSE INVESTMENT ESTIMATION
USD 30,864,300
PAYBACK PERIOD : 6 YEARS AND 9 MONTHS
CENTRAL ACEHRobusta: 2,315 Ha / 874 Tons
Arabica: 48,000 Ha/ 24,328 Tons
BENER MERIAHRobusta: 1,250 Ha / 660 Tons
Arabica: 48,101 Ha /22,414 Tons
GAYO LUES4,588 Ha
1,036 Tons
Banda Aceh
Photo: Coffee bean sorting, Central Aceh
67
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
Coconut industry can be developed by either farmer group level or larger scaled industry, for domestic and internaional market, such as young coconut products, coconut coctail, coconut jam, baby food supplements, soft drinks, nata de coco, coconut water sauce, coconut flour, virgin coconut oil, coconut shell charcoal, briquet charcoal, liquid smoke of coconut shell, coconut wood, and organic fertilizer. While the exporting goods are such as copra, white copra, raw coconut oil, coconut cake, desiccated coconut, and active charcoal.
COCONUT
68
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
69
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
COCONUT PLANTED AREA AND PRODUCTION OF SMALL HOLDER BY REGENCY/CITY 2012
Regency/City Planted Area (Ha) Production (Ton)
Simeulue 7,472 2,611
Aceh Singkil 5,224 2,235
South Aceh 7,023 2,948
Southeast Aceh 851 488
East Aceh 6,797 6,015
Central Aceh 103 11
West Aceh 2,832 1,202
Aceh Besar 14,351 7,971
Pidie 8,633 5,967
Bireuen 14,341 11,760
North Aceh 19,389 10,310
Southwest Aceh 2,155 1,244
Gayo Lues 440 85
Aceh Tamiang 575 185
Nagan Raya 1,350 659
Aceh Jaya 6,333 1,643
Bener Meriah 43 12
Pidie Jaya 3,336 1,091
Banda Aceh - -
Sabang 4,045 2,386
Langsa 473 283
Lhokseumawe 774 391
Subulussalam 855 269
T O T A L 107,395 59,766
70
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
Establish Virgin Coconut Oil Processing Industry
PROJECT PURPOSE INVESTMENT ESTIMATION
USD 87,286Net Present Value : 15.5%
Internal Rate of Return : 57.39%Benefit Cost Ratio : 2.19
Lhokseumawe
Banda Aceh
Meulaboh
NORTH ACEH19,389 Ha
10,310Tons
BIREUEN14,341 Ha
11,760Tons
ACEH BESAR14,351 Ha 9,971Tons
Photo: Illustration
71
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
Contains the Patchouli Alcohol of 2.5% to 3.3% (the average PA of patchouli in the world is 2.5%).
Patchouli is a species of plant from the genus Pogostemon. It is a bushy herb of the mint family, with erect stems, reaching two or three feet (about 0.75 metre) in height and bearing small, pale pink-white flowers. The plant is native to tropical regions of Asia, and is extensively cultivated in Aceh, Indonesia (wikipedia.org, 05/29/2013).
Patchouli oils is used as raw material for a number of finished products, such as parfume and modern scented industrial products such as paper towels, laundry detergents, and air fresheners. Patcholi also can be used in antiseptic, pesticide, and as a fixative to bind other essential oils.
The Geographical Indication Expert of the Indonesian Ministry of Agriculture, Dr. Riyaldi, affirmed that Aceh is very potential for the development of large-scale patchouli businesses, because of its supporting condition of land and its quality. According to a research, Aceh patchouli oil contains patchouli alcohol (yield) 2.5% to 3.3% which makes it the best patchouli in the world (patchouli-aceh.com, 03/18/2012).
As one of the major producers of patchouli, Aceh offers opportunities for potential investors to set up patchouli processing industries in the region.
PATCHOULI
72
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
According to a research, Aceh patchouli oil contains patchouli alcohol (yield) 2.5% to 3.3%
which makes it the best patchouli in the world.
Photo: Patchouli Plant, Illustration
73
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
Aceh produces the best patchouli in the world. The main production areas are Aceh Jaya, South Aceh, Southwest Aceh and Gayo Lues Districts, which are suitable for large-scale processing industries. The following table shows the total production for each district.
PATCHOULI AREA AND PRODUCTION OF SMALL HOLDER BY REGENCY/CITY, 2012
Regency/City Planted Area (Ha) Production (Ton)
Simeulue - -
Aceh Singkil 40 21
South Aceh 408 212
Southeast Aceh 1,418 612
East Aceh - -
Central Aceh 23 20
West Aceh - -
Aceh Besar 118 53
Pidie 8 5
Bireuen 43 33
North Aceh 132 124
Southwest Aceh 78 61
Gayo Lues 853 774
Aceh Tamiang 40 35
Nagan Raya 15 13
Aceh Jaya 650 308
Bener Meriah - -
Pidie Jaya 3 3
Banda Aceh - -
Sabang - -
Langsa - -
Lhokseumawe - -
Subulussalam 19 9
T O T A L 3,848 2,283
74
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
Establishing patchouli processing industries.
Increasing production volume and quality of patchouli.
PROJECT PURPOSE INVESTMENT ESTIMATION
USD 1,025,960
WEST ACEH114 Ha6 Tons
SOUTH ACEH334 Ha21 Tons
GAYO LUES149 Ha33 TonsACEH JAYA
107 Ha20 Tons
Lhokseumawe
Banda Aceh
Photo: Patchouli Processing Industry, Illustration
75
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
2.3 DETAILED PLAN OF ACEH BEEF INDUSTRY DEVELOPMENT PROJECT
Livestock farm area in Aceh is 1.525.578 Ha. The huge area is significantly feasible for forage-livestock system, integrated with crop plantation. The project involves rearing of both breeding and fattening. The main activities of the project would be procurement of irrigation and hay making equipment, construction of back-up livestock farm infrastructure, construction of animal feeds plant, breeding and fattening. Strategy for Aceh beef Development project includes : develop a neucleus-plasma structure for the developing a beef herd in Aceh, establish system for ; management of mature breeding cows (grazing systems or feedlot), establish a beef finishing unit (feedlot) plan for each regency and halal beef processing and meet distribution. Targeted for initial development; Aceh Besar, Pidie, Bener Meriah, Central Aceh and Nagan Raya Regency.
76
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
Photo: Governor of Aceh visiting Livestock Improvement Company farm in Victoria, Australia (11/2013)
77
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
Aceh Besar Beef Industry Development Project
Land Area : 6,434 HaLocation : Krueng Aceh Kuta Malaka Blang Ubo-ubo
Land Status : Goverment Ownership
Photo: Tradisional Fattening in Krueng Aceh, Aceh Besar
78
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
SCHEME Nucleus : 605 Ha Plasma : 5,829 Ha
INFRASTRUCTURE SUPPORT Airport : Sultan Iskandar Muda Seaport : Malahayati Road by Condition : Moderate Road by Surface : Gravel and Land Water : River, Spring Electicity : Supported
Breeding : 5,500 cows Fattening : 15,000 cows
ROI : 29.64 % B/C : 1.23
INVESTMENT ESTIMATION
PAYBACK PERIOD : 3 YEARS AND 5 MONTHS
USD 33,147,500
SUITABLE FOR: Kuta Malaka - Major Feedlot for Nucleus Herd Krueng Aceh- Traditional Fattening Cot Sirebee, Jantho- Bull Depot Blang Ubo-Ubo- Large Scale Breeding for Nucleus Herd
Blang Ubo-ubo
Cot Sirebee
Kuta Malaka
Krueng Aceh
ACEH BESAR
79
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
Pidie Beef Industry Development Project
Land Area : 500 HaLocation : Biheu Village, Muara Tiga District
Land Status : Private Ownership
Photo: Breeding Farm, Pidie
80
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
SCHEME Plasma System
INFRASTRUCTURE SUPPORT Airport : Sultan Iskandar Muda Seaport : Malahayati Road by Condition : Moderate Road by Surface : Gravel and Land Water : River, Spring Electricity : Supported
Breeding : 3,080 cows Fattening : 10,000 cows
ROI : 32 % B/C : 1.23
INVESTMENT ESTIMATION
PAYBACK PERIOD : 3 YEARS AND 2 MONTHS
USD 21,325,600
Biheu Village
PIDIE
SUITABLE FOR: Breeding
81
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
Bener Meriah Beef Industry Development Project
Land Area : 4,155 HaLocation : Perumpakan Benjadi
Land Status : Goverment Ownership
Photo: Breeding Farm, Bener Meriah
82
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
Breeding : 3,080 cows Fattening : 10,000 cows
ROI : 32 % B/C : 1.23
INVESTMENT ESTIMATION
PAYBACK PERIOD : 3 YEARS AND 2 MONTHS
USD 21,628,500
SCHEME Nucleus dan Plasma System
INFRASTRUCTURE SUPPORT Airport : Rembele & Malikussaleh Seaport : Krueng Geukueh Road by Condition : Moderate Road by Surface : Gravel and Land Water : River, Spring Electicity: Supported
Perumpakan Benjadi
BENER MERIAH
SUITABLE FOR: Breeding Central Feedlot
83
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
Central Aceh Beef Industry Development Project
Land Area : 2,280 HaLocation : Jagong Jeget Karang Ampar Land Status : Private and Goverment Ownership
Photo: Fattening Farm, Central Aceh
84
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
Breeding : 3,080 cows Fattening : 10,000 cows
ROI : 32 % B/C : 1.23
INVESTMENT ESTIMATION
PAYBACK PERIOD : 3 YEARS AND 2 MONTHS
USD 21,628,500
SCHEME Nucleus : 780 Ha Plasma : 1,500 Ha
INFRASTRUCTURE SUPPORT Airport : Rembele & Malikussaleh Seaport : Krueng Geukueh Road by Condition : Moderate Road by Surface : Gravel and Land Water : River, Spring Electicity: Supported
Jagong Jeget
Karang Ampar
CENTRAL ACEH
SUITABLE FOR: Fattening
85
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
Nagan Raya Beef Industry Development Project
Land Area : 5,000 HaLocation : Blang Baroe Rambong
Land Status : Aneuk Nanggroe Cooperatives
Photo: Research Station and Feedlot, Nagan Raya
86
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
Breeding : 3,080 cows Fattening : 10,000 cows
ROI : 32 % B/C : 1.23
INVESTMENT ESTIMATION
PAYBACK PERIOD : 3 YEARS AND 2 MONTHS
USD 21,325,600
SCHEME Nucleus dan Plasma System
INFRASTRUCTURE SUPPORT Airport : Cut Nyak Dhien Seaport : PT. MDB Suak Patong and Kuala Tripa
Road by Condition : Moderate Road by Surface : Gravel and Land Water : River Electicity : Supported
Blang Baroe Rambong
NAGAN RAYA
SUITABLE FOR: Research Station Feedlot Breeding
87
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
2.4 DETAILED PLAN OF FISHERIES
ACEH INTERNATIONAL FISHING PORT AT LAMPULO
88
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
696,117 Tons of Fish is Aceh Potencial
from Fisheries
Photo: Lampulo Fishing Port
89
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
LAMPULO FISHING PORT PRODUCTION 2006 - 2012 (Kg)
90
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD | Meulaboh
Establishing fishery industries (taking, culturing, processing, preserving, storing, transporting, marketing or selling fish or fish products).
PROJECT PURPOSE INVESTMENT ESTIMATION
USD 200,000,000
BANDA ACEHLampulo Fishing Port
51,8 Ha
Photo: Lampulo Fishing Port
91
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
IDI FISHING PORT
92
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
Photo: Idi Fishing Port
93
Detailed Plan of Agro Industries Project
| WWW.ACEHINVESTMENT.COM
NO INVESTMENT OPPORTUNITY CAPACITY EXPLAIN
1 Block Ice Factory 80 tons/day
2 Modern fishery processing industry 50 ton Pelagic
3 Shipyard (Wood & fiber) 4 unit Repairs & Shipyard
4 Fish transportation service (domestic and foreign) 2 unit
THE POTENTIALS IN IDITotal catch of fishermen reached 48.67 tons dailyThe number of fishermen as much as 8246 people (Year 2012)Total fleet of 447 fishing fleets units (Year 2012)Various Fishing gear reaching 571 pieces (Year 2012).
Photo: Idi Fishing Port
94
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
Establishing fishery industries (taking, culturing, processing, preserving, storing, transporting, marketing or selling fish or fish products).
PROJECT PURPOSE INVESTMENT ESTIMATION
USD 10,000,000
EAST ACEHIdi Fishing Port
62.5 HALhokseumawe
Banda Aceh
Meulaboh
95
Detailed Plan of Infrastructure and Energy
| WWW.ACEHINVESTMENT.COM
96
Detailed Plan of Infrastructure and Energy
III
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
97
Detailed Plan of Infrastructure and Energy
| WWW.ACEHINVESTMENT.COM
98
3.1 DETAILED PLAN OF INFRASTRUCTURE
ROLL-ON/ROLL-OFFCARGO FERRY SERVICE
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
99
Photo: Illustration
Detailed Plan of Infrastructure and Energy
| WWW.ACEHINVESTMENT.COM
100
Frequent Route of PT. Pelayaran Alkan Abadi
Loading Port Destination Port Ship Name
Tg. Priok, Jakarta Malahayati, Aceh Hirondex V.9
Malahayati, Aceh Tg. Priok, Jakarta Hirondex V.10
Photo: Krueng Gekuh Seaport
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
101
Establishing Ro-Ro Freight Ferry Shipping
EXISTING COMPANY Langsa: Kenangan Passanger Ferry PT. Pelayaran Alkan Abadi
PROJECT PURPOSE INVESTMENT ESTIMATION
USD 1,025,960
NORTH ACEHKrueng Geukuh
Sea Port
LANGSAKuala Langsa
Sea Port
Detailed Plan of Infrastructure and Energy
| WWW.ACEHINVESTMENT.COM
102
3.2 DETAILED PLAN OF ENERGY
GEOTHERMAL POWER PLANT
Photo: Illustration
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
103
The power for the district of Bener Meriah is supplied from the 150kV transmission Aceh - Sumatra interconnection system from North Sumatra.The power supply is only able to serve 207 villages (89.22%) of the total 232 villages. A total of 25 village have not been served yet.
INVESTMENT FEASIBILITY INVESTMENT ESTIMATION
USD 288,080,000
BENER MERIAH
Detailed Plan of Infrastructure and Energy
| WWW.ACEHINVESTMENT.COM
104
GEOTHERMAL POWER PLANT PROJECT 2013-2026
No Objects Regency/City Coordinate
Energy Potential (Mwe)
NoteResource (Mwe)Reserve (Mwe)
Spec Hipo Expec
1 Iboih Sabang LU 0437 ; BT 9645 25 - -
2 Lho Pria Laot Sabang LU 0347 ; BT 9741 50 - -
3 Jaboi Keuneukai Sabang LU 0553 ; BT 9514 - - 50 Bukaka Group/ PT. Sabang Energi
4 Ie Seum-Krueng Raya Aceh Besar LU 0529 ; BT 9539 - 63 -
5 Seulawah Agam Aceh Besar LU 0550 ; BT 9518 - - 165 Pertamina
6 Alur Canang Pidie LU 0501 ; BT 9555 25 - -
7 Alue Long-Bangga Pidie LU 0448 ; BT 9648 100 - -
8 Tangse Pidie LU 0456 ; BT 9644 25 - - Hitay Energi Holding
9 Rimba Raya Bener Meriah LU 0328 ; BT 9751 100 - -
10 Simpang Balik Bener Meriah LU 0419 ; BT 9753 100
11 G. Geureudong Central Aceh LU 0548 ; BT 9519 - 120 - Chevron/PT.Jasa Ayah
12 Silih Nara Central Aceh LU 0437 ; BT 9742 100 - -
13 Meranti East Aceh LU 0505 ; BT 9554 25 - -
14 Brawang Buaya Aceh Tamiang LU 0508 ; BT 9618 25 - -
15 Kafi Gayo Luwes 25 - -
16 Gunung Kembar Gayo Luwes LU 0533 ; BT 9533 - 92 - Hitay Energi Holding
17 Dolok Perkirapan Gayo Luwes LU 0442 BT 9649 25 - -
TOTAL POTENTIALS = 1.115 Mwe 625 275 215
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
105
BENER MERIAH
EAST ACEH
ACEH TAMIANG
GAYO LUES
CENTRAL ACEH
SABANG
ACEH BESAR
PIDIE
Detailed Plan of Infrastructure and Energy
| WWW.ACEHINVESTMENT.COM
106
HYDROPOWER PLANT
Photo: Illustration
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
107
Establishing Irrigation 19.50 HA and Hydropower Plant 160 MW/580 MWH
INVESTMENT FEASIBILITY INVESTMENT ESTIMATION
USD 539,280,000
NORTH ACEH
Detailed Plan of Infrastructure and Energy
| WWW.ACEHINVESTMENT.COM
108
No. District/City Project Name Location Capacity (MW)
Invesment Estimation
(Million USD)
1 North Aceh
Jambuaye-3 Wh Jambu Air 37.2 111.6
Jambuaye-5 Kr. Jambuaye 181.8 545.4
Bidin/Jambuaye Kr. Jambuaye 246 738
2 Gayo Lues Ramasan-1 Kr. Ramasan 171.6 514.8
3 East Aceh Peureulak Kr. Peureulak 34.8 104.4
4 Aceh Tamiang Tampur W. Tampur 428 1284
5 South Aceh
Jambo Papeun-2 Kr. Jambo Papeun 95.2 285.6
Kluet Kr. Kluet 141 423
Sibubung-2 Kr. Sibubung 121.1 363.3
6 Nagan RayaTeripa-3 Kr. Teripa 172.6 517.8
Teripa-4 Kr. Teripa 306.4 919.2
7 West AcehMeureubo-1 Kr. Meulaboh 82.1 246.3
Woyla-2 Kr. Woyla 274 822
8 Central AcehPameu Kr. Pameu 160.6 481.8
Peusangan Kr. Peusangan 90 270
9 Southeast Aceh Dolok-1 Kr. Dolok 32.2 96.6
10 Aceh Jaya Teunom-2 Kr. Teunom 288.2 864.6
Total 2862.8 8,588.40
HYDRO POWER PLANT PROJECT 2013-2026
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
109
NORTH ACEH
CENTRAL ACEH
EAST ACEH
ACEH TAMIANG
GAYO LUES
SOUTHEAST ACEH
WEST ACEH
NAGAN RAYA
SOUTH ACEH
ACEH JAYA
Detailed Plan of Tourism Development Project in Banda Aceh
| WWW.ACEHINVESTMENT.COM
110
Detailed Plan of Tourism Development Project in Banda Aceh
IV
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
111
Detailed Plan of Tourism Development Project in Banda Aceh
| WWW.ACEHINVESTMENT.COM
112
KRUENG ACEH RIVER WALK
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
113
Detailed Plan of Tourism Development Project in Banda Aceh
| WWW.ACEHINVESTMENT.COM
114
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
115
Food Court Restaurant Playground Jogging Track Mini Port Amphitheater Park
FASILITIES INVESTMENT ESTIMATION
USD 10,000,000
BANDA ACEH
Detailed Plan of Tourism Development Project in Banda Aceh
| WWW.ACEHINVESTMENT.COM
116
ULE LHEUBEACH
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
117
Detailed Plan of Tourism Development Project in Banda Aceh
| WWW.ACEHINVESTMENT.COM
118
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
119
Food Court Restaurant Playground Jogging Track Mini Port Amphitheater Park Fishing Spot
FASILITIES INVESTMENT ESTIMATION
USD 10,000,000
BANDA ACEH
Sabang Management and Development Agency (BPKS) Project
| WWW.ACEHINVESTMENT.COM
120
Sabang Free Port and Free Trade Zone Project
V
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
121
Sabang Management and Development Agency (BPKS) Project
| WWW.ACEHINVESTMENT.COM
122
VIEW OF THE SABANG BAY
FRESH WATER LAKE BUILT BY THE DUTCH
Sabang has been designated as one of national and international tourist destinations, especially with the enactment of Sabang port as a cruise ship destination in 2011. The Govermant of Aceh has targeted 1 million visitor in 2007.
Sabang is located at the Malaca Strait gate, directly adjacent to Malaysia and Thailand, and is part of Andaman Cluster, a very advanced and developed tourism destination. Its next to Phuket and Langkawi.
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
123
ENTRANCE TO THE PORT OF SABANG
Ecotourism, Adventure, Beach and Sport Heritage and Education
THE POTENTIALS
Sabang Management and Development Agency (BPKS) Project
| WWW.ACEHINVESTMENT.COM
124
INTERNATIONAL SHIPPING LINE
The Law No.37 year 2000 about Free Trade and Free Port Zone of Sabang
Descision of Governor of Aceh Province as Chief Council of Sabang, Number: 193/034, year 2001 about Forming of Management Board of Sabang Free Port and Free Trade Zone (BPKS)
The Law No.11 year 2006 regarding Aceh Goverment; article 167 to 170
Goverment Regulation No.83/2011 concering Delegation of Authority from Central Goverment to Sabang Zone Council or DKS.
FRIENDLY TO INVESTMENT REGULATION
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
125
SUEZ - SABANG - KRA - TOKYO : 8,353 MILESSUEZ - SABANG - SINGAPURE - TOKYO : 8,793 MILESSUEZ - SUNDA STRAIT - TOKYO : 9,427 MILESSUEZ - LOMBOK - TOKYO : 10,216 MILES
Sabang Management and Development Agency (BPKS) Project
| WWW.ACEHINVESTMENT.COM
126
SABANG INTERNATIONAL WATER FRONTRESORT AND CONVENTION CENTRE
Land Area : 0.5 HaLocation : Paradiso BeachLand Status : Goverment OwnershipSupporting Land : 1 Ha Sabang Fair Areal
Road by Condition : GoodRoad by Surface : AsphaltedWater : Like and SpringElecticity : Supported
INFRASTRUCTURE SUPPORTAirport : Maimun SalehSeaport : Balohan (passanger port) and Sabang International Hubport
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
127
USD 35,000,000Payback : 8 Years
B/C Ratio : 1.21
INVESTMENT ESTIMATION
Photo: Illustration
Sabang Management and Development Agency (BPKS) Project
| WWW.ACEHINVESTMENT.COM
128
Land Area : 117 HaLocation : Sabang BayLand Status : Goverment OwnershipDepth : 22 mCT 1 Length : 180 m2 x 25 m2CT 3 Length : 423 m2 x 50 m2
Road by Condition : GoodRoad by Surface : AsphaltedWater : Like and SpringElecticity : Supported
INFRASTRUCTURE SUPPORTAirport : Maimun SalehSeaport : Balohan (passanger port) and Sabang International Hubport
PASSANGER CRUISE TERMINAL
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
129
USD 120,000,000Payback : 8 Years
B/C Ratio : 1.23
INVESTMENT ESTIMATION
Photo: Sabang bay
Sabang Management and Development Agency (BPKS) Project
| WWW.ACEHINVESTMENT.COM
130
YACHT MARINA & SUPPORTING FACILITIES
Batchmetri Area : 26.5 HaLand Area : 13 HaLocation : Lhok Wieng LandLand Status : Goverment Ownership
Road by Condition : GoodRoad by Surface : AsphaltedWater : Like and SpringElecticity : Supported
INFRASTRUCTURE SUPPORTAirport : Maimun SalehSeaport : Balohan (passanger port) and Sabang International Hubport
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
131
USD 6,000,000Payback : 5 Years
B/C Ratio : 1.3
INVESTMENT ESTIMATION
Photo: Sabang
Sabang Management and Development Agency (BPKS) Project
| WWW.ACEHINVESTMENT.COM
132
Location : Gapang and Iboih BeachLand Status : Goverment Ownership
Road by Condition : GoodRoad by Surface : AsphaltedWater : Like and SpringElecticity : Supported
INFRASTRUCTURE SUPPORTAirport : Maimun SalehSeaport : Balohan (passanger port) and Sabang International Hubport
DIVING CENTER
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
133
USD 1,100,000Payback : 4 Years
B/C Ratio : 1.3
INVESTMENT ESTIMATION
Photo: Sabang Sea Garden
Sabang Management and Development Agency (BPKS) Project
| WWW.ACEHINVESTMENT.COM
134
SEA PORT
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
135
Commerce, Export-Import Transshipment port Cruise line Docking yard
Fuel Bunkering Service Storage Water Supply Other
INVESTMENT OPPORTUNITIES
Photo: Sabang Port
Sabang Management and Development Agency (BPKS) Project
| WWW.ACEHINVESTMENT.COM
136
PLAN OF SABANG PORT
Banda Aceh
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
137
CT1 : Multi Purpose TerminalCT2 : Cargo TerminalCT3 : Transhipment Terminal
Sabang Management and Development Agency (BPKS) Project
| WWW.ACEHINVESTMENT.COM
138
INDUSTRY AND TRADING SECTOR
Service of export or import trade Fuel Bunker, Transit & Supply Down Stream for Agro Industry (CPO, Cacao, Rubber, etc) Shipping Industry/ Ship Docking Fishery Industry
BUSINEESS OPPORTUNITIES
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
139
INDUSTRIAL PARK AT BALOHAN
We will offer the greatest advantages in todays challenging manufacturing environtment. We will offer the most advanced Industrial Free Zone in Indonesia-minutes from the Container Seaport. We will offer competitive labor rates, on-site property management and 24-hours security. We will layout the Parks to best utilize the land area and provide for only High Tech Industries that create jobs beneficial to the people of Pulau Weh and Indonesia.
Sabang Management and Development Agency (BPKS) Project
| WWW.ACEHINVESTMENT.COM
140
FISHERY SECTOR
It is surrounded by Hindia Ocean, Benggala Bay and Malacca Strait.
Sabang Zone has a big potential for marine fish related industies
Part of Sub Regional Indonesia-Malaysia-Thailand Growth Triangle (IMT-GT)/ Cluster Andaman
Some location along the coast of Weh Island and Pulo Aceh Island are potentials for marine culture
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
141
Export Processing Zone (EPZ) Fresh Fish Export Terminal (sea and air cargo) Marine Culture, such as sea weed, lobsters. Cold Storage Docking Yard
BUSINEESS OPPORTUNITIES
Sabang Zone has free: Custom Clearance Custom (Export-Import) duties Luxury good tax Value Added Tax (VAT)
Free Trade and Free Port determined for 70 years. Management Board of Free Trade and Free
Port Sabang (BPKS) has an authority to publish business license and others licensings, hence, the procedures are faster and easier
INCENTIVESBPKS has an authority to provide incentives for the business in Sabang Zone:
Detailed Plan of Infrastructure and Energy
| WWW.ACEHINVESTMENT.COM
142
Detailed Plan of Industrial and Trading Estates
VI
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
143
Detailed Plan of Infrastructure and Energy
| WWW.ACEHINVESTMENT.COM
144
6.1 ACEH INDUSTRIAL AREA PLAN AT LADONG
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
145
Detailed Plan of Infrastructure and Energy
| WWW.ACEHINVESTMENT.COM
146
Reserved LandArea : 552.663 sqm
LOCATION:Ladong, Great Aceh (about 18 Km to Banda Aceh and 9 Km to Port of Malahayati).
CONSISTED OF: 19 lots for small scale industries (0.10 Ha 0.30 Ha). 23 lots for medium scale industries (0.30 Ha 0,50 Ha). 10 lots for large scale industries (0.50 Ha 1 Ha).
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD |
147
ACEH BESAR
LADONG556.663 sqm (55 Ha)
BEEF PROCESSING FOCUSED
INVESTMENT AREA
COCONUT FOCUSEDINVESTMENT AREA
MALAHAYATI SEAPORT
PIDIE
Detailed Plan of Infrastructure and Energy
| WWW.ACEHINVESTMENT.COM
148
Chief of Editor IskandarNetty Muharni
Editor Arif ArhamCut Eliza Mutia
Design and LayoutEka SaputraZulfahmi
Copyrigth 2014 | Aceh Investment Coordinating Board
INTRODUCTION
| WWW.ACEHINVESTMENT.COM
150
Jl. Ahmad Yani No. 39, Banda Aceh, IndonesiaP : +62 651 23170 | F : +62 651 23171E : [email protected] | [email protected] : investasi.acehprov.go.id | acehinvestment.com
Aceh InvestmentCoordinating Board
Download E-Book