Achievements of Railways LoPN Hkkjr...Gaya - Kamakhya Express (Weekly) at Nawada and Warisaliganj...

Date post: 22-Mar-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
10
LoPN Hkkjr ,d dne LoPNrk dh vksj Works / Projects Completed : Ongoing Works / Projects : l l l l l l l l l l l l l Stoppage of Train no. 15619/15620 Gaya - Kamakhya Express (Weekly) at Nawada and Warisaliganj Stations. Extension of Loop Line at Nawada Station. Development of Nawada, Sheikh- pura, Warisaliganj, Hisua as Adarsh Station. Provision of benches and sheds at various halt stations. Electrification of Kiul - Gaya Section. Provision of additional loop line at Sheikhpura Station. Improvement work of approach road and basic infrastructure at manned LCs in Nawada. Provision of water supply with new deep tubewell with pipe line at Sheikhpura and Nawada Stations. Improvement of various Halt stations Lean to shed with benches. Doubling of Kiul - Gaya Section. Improvement of passenger amenities at different Stations. Interlocking work of all level crossings. Upgradation of STM level 1 to level 4. l l l l l l l Provision of ROB in lieu of level crossing no. 33 in Nawada Yard. Provision of Limited Height Subways in lieu of level crossings no. 27, 29, 17, 19, 40 and 50. New Line between Koderma - Tilaiya. New Line between Nawada - Lakhimpur Improvement work of circulating area, extension of FOB, renovation of station building, extension of PF No. 1, 2nd class waiting hall, Pay & Use Toilet along with passenger amenities at Warisaliganj Station. Improvement work of circulating area, replacement of old FOB by new 3 m wide FOB, renovation of station building along with passenger amenities at Nawada Station. 30 bed running room at Tilaiya. Works / Projects planned in future : ge lc dk gks ,d gh ukjkA lkiQ lqFkjk gks jsy gekjkAA Achievements of Railways in Lok Sabha Constituency of Bihar Nawada Achievements of Railways in Lok Sabha Constituency of Bihar Nawada East Central Railway, Hajipur ;k=kh lsok ,oa fodkl ds fy, lnk rRij Indian Railways Indian Railways
Transcript
Page 1: Achievements of Railways LoPN Hkkjr...Gaya - Kamakhya Express (Weekly) at Nawada and Warisaliganj Stations. Extension of Loop Line at Nawada Station. Development of Nawada, Sheikh-

LoPN Hkkjr

,d dne LoPNrk dh vksj

Works / Projects Completed :

Ongoing Works / Projects :

l

l

l

l

l

l

l

l

l

l

l

l

l

Stoppage of Train no. 15619/15620

Gaya - Kamakhya Express (Weekly) at

Nawada and Warisaliganj Stations.

Extension of Loop Line at Nawada

Station.

Development of Nawada, Sheikh- pura,

Warisaliganj, Hisua as Adarsh Station.

Provision of benches and sheds at

various halt stations.

Electrification of Kiul - Gaya Section.

Provision of additional loop line at

Sheikhpura Station.

Improvement work of approach road

and basic infrastructure at manned LCs

in Nawada.

Provision of water supply with new deep

tubewell with pipe line at Sheikhpura

and Nawada Stations.

Improvement of various Halt stations

Lean to shed with benches.

Doubling of Kiul - Gaya Section.

Improvement of passenger amenities at

different Stations.

Interlocking work of all level crossings.

Upgradation of STM level 1 to level 4.

l

l

l

l

l

l

l

Provision of ROB in lieu of level crossing no. 33 in Nawada Yard.

Provision of Limited Height Subways in lieu of level crossings no. 27, 29, 17, 19, 40 and 50.

New Line between Koderma - Tilaiya.

New Line between Nawada - Lakhimpur

Improvement work of circulating area, extension of FOB, renovation of station building, extension of PF No. 1, 2nd class waiting hall, Pay & Use Toilet along with passenger amenities at Warisaliganj Station.

Improvement work of circulating area, replacement of old FOB by new 3 m wide FOB, renovation of station building along with passenger amenities at Nawada Station.

30 bed running room at Tilaiya.

Works / Projects planned in future :

ge lc dk gks ,d gh ukjkAlkiQ lqFkjk gks jsy gekjkAA

Achievements of Railwaysin

Lok Sabha Constituencyof Bihar

Nawada

Achievements of Railwaysin

Lok Sabha Constituencyof Bihar

Nawada

East Central Railway, Hajipur

;k=kh lsok ,oa fodkl ds fy, lnk rRij

Indian RailwaysIndian Railways

Page 2: Achievements of Railways LoPN Hkkjr...Gaya - Kamakhya Express (Weekly) at Nawada and Warisaliganj Stations. Extension of Loop Line at Nawada Station. Development of Nawada, Sheikh-

LoPN Hkkjr

,d dne LoPNrk dh vksj

Works / Projects Completed :l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

Introduction of new train no. 75238 Narkat iaganj - Muzaffarpur DEMU Passenger.

Introduction of new train no. 75236 Narkatiaganj - Raxaul DEMU Passenger.

Electrification of Raxaul - Narkatiaganj - Bhikhnathori Section.

Upgradation of 5 Booking counters at Bettiah station under model station.

Provision of CCTV Cameras at UTS & PRS Counters at Bettiah Station.

Provision of CCTV Cameras at UTS & PRS Counters at Narkatiaganj Station.

Development of circulating area at Sagauli Station.

Development of circulating area at Bettiah Station under model station.

Provision of 10 water booths at Bettiah Station under model station.

Provision of 3 m wide FOB at Narkatiaganj Station.

Raising and widening of Platform no. 1 & 2 at Sagauli Station.

Provision of sufficient seats at Bettiah station for the convenience of passengers.

Conversion of Chamua Halt into crossing station of 3 lines under yard remodelling.

Provision of 3rd running line between Semra and Ramgarhwa.

Remodelling of Sagauli Yard.

Development of Circulating area at Chanpatia Station.

Provision of 2nd Passenger Platform at Sathi.

Provision of 2nd Passenger Platform at Kumarbagh.

l

l

l

l

l

l

l

l

l

l

l

l

l

l

Provision of 2nd Passenger Platform at

Majholiya.

Raising and widening of platform no. 1 for 24

coaches at Bettiah Station.

Provision of Platform Shelter at Chanpatia

Station.

Doubling of Sagauli - Valmikinagar Section.

Gauge Conversion of Raxaul - Sikta

Section.

Electrification of Valmikinagar Road -

Narkatiaganj - Sagauli - Muzaffarpur

including Sagauli - Raxaul Section.

Electrification of Raxaul - Sitamarhi -

Darbhanga - Samastipur Section.

Provision of ROB in lieu of level crossing no.

2 near Bettiah.

Provision of New Freight Terminal at

Kumarbagh Station.

Provision of New Freight Terminal at

Ramgarhwa Station.

Provision of 3 m wide FOB at Chauradano

Station.

Doubling of Muzaffarpur - Sagauli Section.

Development of entry circulating area on

both side of station, extension of existing

FOB, new high level platform and other

passenger amenities work for development

of Narkatiaganj as Adarsh Station.

Provision of 3 m wide FOB at Ramgarhwa

Station.

Facility for maintenance of platform return

trains at various station.

Ongoing Works / Projects :

l

Works / Projects planned in future :

ge lc dk gks ,d gh ukjkAlkiQ lqFkjk gks jsy gekjkAA

Achievements of Railwaysin

Lok Sabha Constituencyof Bihar

Paschim Champaran

Achievements of Railwaysin

Lok Sabha Constituencyof Bihar

Paschim Champaran

East Central Railway, Hajipur

;k=kh lsok ,oa fodkl ds fy, lnk rRij

Indian RailwaysIndian Railways

Page 3: Achievements of Railways LoPN Hkkjr...Gaya - Kamakhya Express (Weekly) at Nawada and Warisaliganj Stations. Extension of Loop Line at Nawada Station. Development of Nawada, Sheikh-

LoPN Hkkjr

,d dne LoPNrk dh vksj

Works / Projects Completed :

l

l

l

l

l

l

l

l

l

l

l

l

l

Introduction of 24 New Trains including various important trains viz 22355/22356 Patliputra - Chandigarh Superfast Exp., 22351/22352 Patliputra - Yaswantpur Superfast Exp., 12529/12530 Patliputra - Lucknow Intercity Exp. and 15125/5126 Manduadih - Patna Janshatabdi Exp.

Construction of Rail - cum - Road Bridge on River Ganga near Digha, Patna at the cost of Rs. 1897 Crore.

Provision of ROB near Danapur Station at the cost of Rs. 205 Crore.

Frequency of train no. 12529/12530 increased from 3 days to 5 days.

Stoppages of so many trains given on 34 important stations such as Patliputra, Danapur, Bihta Stations and Stoppage of 20501/20502 Anand Vihar - Agartala Rajdhani Exp. at Patliputra Staion & 12365/12366 Patna - Ranchi Janshatabdi Exp. at Taregana Station.

Upgradation of 2nd class booking office, PRS, waiting hall and other passenger amenities at Danapur Station.

Provision of 12 ft wide FOB at Danapur Statoin.

Extension of Platform at Phulwarisharif Station.

Extension of Platform at Bihta Station for accommodation of 24 coaches of LHB Trains.

Connectivity of direct delivery lines at Delhi end will be done with RRI of Danapur Station.

Replacement of steel tanks with reinforced concrete cement overhead tanks in various colonies at Danapur.

Connection with Connectivity of Ganga Bridge Patliputra line at Danapur.

Improvement of illumination of Patliputra station & Danapur

l

l

l

l

l

l

l

Work of Provision of 2nd entry to Danapur Station on opposite side of main Building

Provis ion of in tegrated passenger information systems at Danapur & Patliputra.

ROB at LC no. 35 in Danapur Yard & LC no. 31 between Danapur & Phulwarishariff.

Doubling of Patliputra - Pahleja Section including Rail - cum - Road Bridge on River Ganga.

Construction work of Patliputra Coaching Complex.

New line between Bihta - Aurangabad via Anugrahnarayan Road at cost of Rs. 328 Crore.

Construction of 390 Staff Quarters at Patliputra coaching complex.

Neora-Daniwan 42.2km new line allotted to RVNL.

Ongoing Works / Projects :

l

Works / Projects planned in future :

ge lc dk gks ,d gh ukjkAlkiQ lqFkjk gks jsy gekjkAA

Achievements of Railwaysin

Lok Sabha Constituencyof Bihar

Patliputra

Achievements of Railwaysin

Lok Sabha Constituencyof Bihar

Patliputra

East Central Railway, Hajipur

;k=kh lsok ,oa fodkl ds fy, lnk rRij

Indian RailwaysIndian Railways

Page 4: Achievements of Railways LoPN Hkkjr...Gaya - Kamakhya Express (Weekly) at Nawada and Warisaliganj Stations. Extension of Loop Line at Nawada Station. Development of Nawada, Sheikh-

LoPN Hkkjr

,d dne LoPNrk dh vksj

Works / Projects Completed :l

l

Electrification of Bakhtiyarpur - Rajgir Section.

Introduction of so many New Trains including various important trains viz 22913/22914 Bandra Terminus - Patna Humsafar Express, 15549/15550 Jaynagar - Patna Intercity Express and 63221/63222 Mokama - Patna fast MEMU Passenger.

Stoppages of 12023/2024 Howrah - Patna Janshatabdi Express at Patna Sahib, 13429/13430 Malda Town - Anand Vihar weekly at Bakhtiyarpur Station, 15623/15624 Bhagat ki kothi - Kamakhya at Patna and 15547/15548 Jaynagar - Lokmanya Tilak Jansadharan Express at Patna.

Washable Apron at Platform no. 8 at Patna Jn.

Work of pipeline networking at Patna Jn. for carriage watering.

Development of parking and passenger amenity at east end of existing circulating area at Rajendra Nagar.

Provision of 20 ft wide FOB in lieu of 6 ft wide FOB at Patna Sahib Station.

Provision of ROB in lieu of LC No. 74 between Gulzarbagh - Rajendra Nagar.

Conversion of Tekabigaha and Lemuabad as Crossing Station.

Provision of ROB in lieu of LC No. 72 near Gulzarbagh Station.

Provision of Loop Lines and cross overs at Bankaghat, Khusrupur and Karauta Station.

Provision of 2nd Transformer at Khusrupur Station.

Construction of Bakhtiyarpur - Barh 3rd line.

Upgradation of waiting hall, water supply and Provision of sufficient Benches at Fatuha Station.

New trains No.22353/22354 Patna-Banaswadi Humsafar Express, 18633/18634 Patna-Ranchi Weekly Express and 15125/15126 Manduadih-Patna Janshatapdi Express.

Electrification work of Fatuha to Islampur completed.

Construction of various passenger amenities infrastructures at 1st floor of Delhi end of Karbighahiya side at Patna Jn.

Improvement to Platform surface, circulating area and facade of station building at Patna Jn.

Provision of Platform shed on Platform No. 8 & 9 and provision of Shed from FOB to Platform shed at Patna station

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

Extension of existing FOB at Patna Saheb station.

Improvement of illumination of Mokama, Barh, Khusroopur, Fatuha, Patna saheb, Gulzarbagh, Rajendar Nagar terminal,

Patna junction and Bakhtiyarpur station completed.

Facade lighting comleted at Patna junction and Rajendar nagar station.

Bakhtiyarpur -Barh, 3rd line surface triangle between Bakhtiyarpur-Rajgir line.

Construction of Bakhtiyarpur Flyover.

Improvement in Drainage system of Patna yard and colony.

Upgradation of Patna Sahib Station.

Development of Circulating area of Fatuha Station.

Provision of coach guidance system at Patna.

Direct road connectivity of Mithapur ROB with Karbigahia 2nd entry of Patna Jn.

Up gradation of Rajendra Nagar Coaching complex.

02 no of lift at Rajendar nagar terminal and 04nos. at Patna junction.

Construction of sleeper class Gents ladies AC waiting room, enquiry office, waiting hall at Platform No. 1 at Rajendra Nagar.

Replacement of existing FOB with new 20 feet wide FOB at Bahtiyarpur stations.

Provision of 10 feet wide new FOB including raising of UP PF to HL PF at Sachivalaya Halt station

Provision of 3.66 meter wide additional FOB at Fatuha stations of Danapur Division. work started.

Construction of Road over bridge in lieu of L.C.No. 1Spl. at Km 544G6-G8 on Patna-Gaya Section

Upgradation of approach road of goods shed at Fatuha Station.

Provision of coach indication board at Patna, Rajendra Nagar, Hathidah Stations.

Extension of Platform no. 1 at Rajendra Nagar Station for 24 coaches.

Ongoing Works / Projects :l

Works / Projects planned in future :

ge lc dk gks ,d gh ukjkAlkiQ lqFkjk gks jsy gekjkAA

Achievements of Railwaysin

Lok Sabha Constituencyof Bihar

Patna Sahib

Achievements of Railwaysin

Lok Sabha Constituencyof Bihar

Patna Sahib

East Central Railway, Hajipur

;k=kh lsok ,oa fodkl ds fy, lnk rRij

Indian RailwaysIndian Railways

Page 5: Achievements of Railways LoPN Hkkjr...Gaya - Kamakhya Express (Weekly) at Nawada and Warisaliganj Stations. Extension of Loop Line at Nawada Station. Development of Nawada, Sheikh-

LoPN Hkkjr

,d dne LoPNrk dh vksj

ge lc dk gks ,d gh ukjkAlkiQ lqFkjk gks jsy gekjkAA

Works / Projects Completed :

Ongoing Works / Projects :

l

l

l

l

l

l

l

l

l

l

Gauge Conversion of 20 km Murliganj - Banmankhi Rail Line.

Gauge Conversion of 37 km Banmankhi - Purnia Rail Line.

Gauge Conversion of 75 km Mansi - Saharsa - Purnia Rail Line.

Provision of UTS cum PRS at Jalalgarh Station.

Elimination of 5 unmanned level crossings.

Construction of Toilet at Purnia Station.

Construction of Platforms at Purnia Station.

Construction of Waiting hall at Purnia Station.

New Rail Line between Jalagarh - Kishanganj.

Manning of Unmanned Level Crossings.

l

l

l

l

l

l

l

l

l

l

l

U p g r a d a t i o n o f w a t e r s u p p l y arrangement at Purnia Court Station.

Facility of free Wi-Fi at Purnia Station.

Development of Goods circulating area at Purnia Station.

Electrification of 57 km Rail line between Dauram Madhepura and Purnia.

27 km New Rail Line between Banmankhi and Bihariganj.

Provision of 3 m wide FOB at Jankinagar.

Construction of Goods running line and Stabling line between Saharsa - Purnia with shunt signal for goods traffic.

Electrification of Tejnarayanpur - Purnia Section.

Raising of PF no. 1 at Purnea Court Station.

Extension & widening of PF no. 2 at Sarsi Station.

4bay PP Shelter at Purnea Court Station.

Works / Projects planned in future :

Achievements of Railwaysin

Lok Sabha Constituencyof Bihar

Purnia

Achievements of Railwaysin

Lok Sabha Constituencyof Bihar

Purnia

East Central Railway, Hajipur

;k=kh lsok ,oa fodkl ds fy, lnk rRij

Indian RailwaysIndian Railways

Page 6: Achievements of Railways LoPN Hkkjr...Gaya - Kamakhya Express (Weekly) at Nawada and Warisaliganj Stations. Extension of Loop Line at Nawada Station. Development of Nawada, Sheikh-

LoPN Hkkjr

,d dne LoPNrk dh vksj

Works / Projects Completed :l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

Introduction of New Train no. 75232 Raxaul - Muzaffarpur DEMU Passenger.

Introduction of New Train no. 75226 Raxaul - Samastipur DEMU Passenger.

Introduction of New Train no. 75233 Raxaul - Sitamarhi DEMU Passenger.

Introduction of New Train no. 75235 Raxaul - Narkatiaganj DEMU Passenger.

Introduction of New Train no. 75230 Raxaul - Samastipur DEMU Passenger.

Introduction of New Train no. 75213 Raxaul - Sagauli DEMU Passenger.

Introduction of New Train no. 75228 Raxaul - Darbhanga DEMU Passenger.

Introduction of New Train no. 75214 Sagauli - Raxaul DEMU Passenger.

Gauge Conversion between Raxaul - Sikta.

Provision of CCTV Cameras at UTS & PRS Counters of Raxaul Station.

Provision of CCTV Cameras at UTS & PRS Counters of Bapudham Motihari Station.

Development of circulating area at Raxaul.

Development of Chakia as Adarsh Station.

Construction of Pay & Use Toilet at Bapudham Motihari Station.

Upgradation of Platform no. 1 at Jiwadhara Station

Upgradation of Platform no. 1 at Mehsi Station.

Provision of additional platform shelter at Mehsi Station.

Provision of platform shelter at Pipra Station.

Provision of 3rd running line between Pipra and Jiwadhara.

2 Lane ROB at LC no. 159A Spl. between Jivdhara-Motihari.

Provision of 3.66 m wide FOB at Ghorasahan Station.

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

30.50M tall Mounumental Indian Flag Mast in Circulating Area at Bhapudham Motihari.

Development of circulating area at Chakia Station.

Development of circulating area at Mehsi Station.

At Bapudham Motihari, improvement of Facade of Station building on Gandhian theme.

Development of circulating area and platform surface at Bapudham Motihari Station.

Provision of 3.66 m wide FOB at Adapur Station.

Provision of 3.66 m wide FOB at Raxaul Station.

Proper lighting arrangement at Bapudham Motihar Station and circulating area.

Development of approach road of Bapudham Motihari Station.

Doubling of Sagauli - Valmikinagar rail line.

Electrification of Valmikinagar - Sagauli - Muzaffarpur including Sagauli - Raxaul.

Provision of Pay & Use Toilet at Chakia Station.

Provision of Platform Shelter and sufficient sitting arrangement at stations between Mehsi and Bapudham Motihari.

Eatention of FOB at Bapudham Motihari PF1 Circulating Area.

Doubling of Muzaffarpur - Sagauli Rail Line.

Construction of Crew Lobby at Raxaul Station.

Provision of Sheds at different stations for platform return trains.

Yard remodelling work of Raxaul, Bhelwa and Adapur Stations.

Provision of 3.66 m wide FOB at Raxaul Station.Provision of Lift at Bapudham Motihari.

Provision of 3.60 m wide FOB at Pipra & Jivdhara Station.

Ongoing Works / Projects :

l

Works / Projects planned in future :

ge lc dk gks ,d gh ukjkAlkiQ lqFkjk gks jsy gekjkAA

Achievements of Railwaysin

Lok Sabha Constituencyof Bihar

Purvi Champaran

Achievements of Railwaysin

Lok Sabha Constituencyof Bihar

Purvi Champaran

East Central Railway, Hajipur

;k=kh lsok ,oa fodkl ds fy, lnk rRij

Indian RailwaysIndian Railways

Page 7: Achievements of Railways LoPN Hkkjr...Gaya - Kamakhya Express (Weekly) at Nawada and Warisaliganj Stations. Extension of Loop Line at Nawada Station. Development of Nawada, Sheikh-

LoPN Hkkjr

,d dne LoPNrk dh vksj

ge lc dk gks ,d gh ukjkAlkiQ lqFkjk gks jsy gekjkAA

Achievements of Railwaysin

Lok Sabha Constituencyof Bihar

Samastipur

Achievements of Railwaysin

Lok Sabha Constituencyof Bihar

Samastipur

Works / Projects Completed :

On Going Projects :

l

l

l

l

l

l

lll

l

l

l

l

New train no. 75225 Samastipur-Raxul, 75207 Samastipur-Muzaffarpur, 75211 Samasstipur-Sonpur, 75253 Samastipur-Darbhanga, 75209 Samastipur-Jainagar & 75227 Samastipur-Raxul Demu Trains.Electrification of 20 km Samastipur - Dubaha section.Upgradat ion of Fre ight Terminal a t Karpurigram.Provision of LED Lights in four masts of Karpurigram.Upgradation of circulating area at Shahpur Patoree Station.Provision of Pay & Use Toilet at Shahpur Patoree Station.Provision of 2nd platform at Mohiuddin Nagar.Upgradation of waiting hall at Mohiuddin Nagar.Upgradation of Hasanpur as Adarsh Station.

Provision of Shed in circulating area in front of Samastipur Station.

Doubling of 23 km Samastipur Darbhanga Section.New Rail Line between Sakri - Hasanpur Road (20 km in Samastipur)New Rail Line between Khagaria - Kusheshwar Asthan (22 km in Samastipur).

ll

l

ll

l

l

l

l

l

l

l

l

l

Reconstruction of Bridge no. 01, 13A and 14.Provision of 100% LED Lights at Mohiuddin Nagar and Shahpur Patoree stations.Commissioning of Computerized Auto announcement system at Shahpur Patoree stations.FOB at Bhagwanpur Desua & Narhan Station.Electrification of Raxaul - Sitamarhi - Darbhanga - Samastipur Section.

Electrification of Khagaria - Samastipur Section.

New Rail Line between Darbhanga - Kusheshwar Asthan (45 km in Samastipur)

New Rail Line between Hasanpur Road - Kusheshwar Asthan.

New Rail Line between Sakri - Hasanpur.

Provision of ROB in lieu of level crossing no. 53A.

Provision of ROB in lieu of level crossing no. 2.

Raising of platform no. 1 and 2 at Ruseraghat.

FOB at Hasanpur Road.

ROB at LC Gate no. 59C between Pusa-Karpuri Gram.

Works / Projects planned in future :

East Central Railway, Hajipur

;k=kh lsok ,oa fodkl ds fy, lnk rRij

Indian RailwaysIndian Railways

Page 8: Achievements of Railways LoPN Hkkjr...Gaya - Kamakhya Express (Weekly) at Nawada and Warisaliganj Stations. Extension of Loop Line at Nawada Station. Development of Nawada, Sheikh-

LoPN Hkkjr

,d dne LoPNrk dh vksj

ge lc dk gks ,d gh ukjkAlkiQ lqFkjk gks jsy gekjkAA

Works / Projects Completed :

Ongoing Works / Projects :

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

Doubling of Hajipur-Sonpur rail line including Gandak Bridge.

New Rail-cum-road bridge over river Ganga near Digha in Patna.

Upgradation of Sonpur DEMU Shed.

Upgradation of Sonpur Railway Hospital.

Upgradation of circulating area at Dighwara station.

Expansion of Nayagaon, Dighwara, Badagopal and Goldenganj stations.

Complete LED lighting at all stations.

Electrification of 88 km Chhapra-Siwan-Thawe rail line.

Introduction of 15053 Chhapra-Lucknow Express, 15115 Chhapra-Anand Vihar Express, 22531 Chhapra-Mathura Superfast, 55182 Chhapra Kachehri-Thawe Passenger and 55184 Chhapra-Kachehri Thawe Passenger.

Stoppage of 15531/15532 Saharsa-Amritsar Jansadharan Express, 22411/22412 Naharlagun- New Delhi AC Express and 12529 Patliputra-Lucknow Express at Chhapra Jn.

Automatic ticket vending machines at Chhapra and Chhapra Kachehri stations.

36 CCTV cameras at Chhapra Junction.

Foot over bridge at Ekma, Chhapra and Chhapra Kachehri stations.

Raising and extension of platforms at Chhapra and Chhapra Kachehri stations.

Train Display Board, Coach Guidance System and Electronic Reservation Chart at Chhapra Junction.

High speed Wi-Fi at Chhapra Junction.

Gauge conversion of Chhapra-Thawe rail section.

Provision of 100% LED lighting at Nayagaon, Dighwara, Badagopal, Sitalpur, Sonpur and Goldenganj stations.

Commissioning of train indication board at Sonpur.

Doubling of Rail-cum-road bridge between Patliputra and Pahleza over river Ganga.

Chapra-Muzaffarpur new rail line.

Electrification of Kaptanganj-Thawe-Khaira-Chhapra Kachehri rail section.

Limited height subways in place of level crossings no. 34C, 35C, 36C, 37C and 38C between Chhapra Kachehri and Goldenganj.

l

l

Waiting Hall, PP Shelter improvement of station building, circulating area and Yard remodeling work at Chhapra Kachehri.

12 PP Shelter and improvement of Platform surface of platform no. 2 & 3 at Chhapra Junction.

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

Limited height Subways in place of level crossings no. 27C and 29C between Goldenganj and Badagopal.

Limited height Subways in place of level crossings no. 17C, 18C, 19C, 21C, 23C and 24C between Badagopal and Dighwara.

Limited height Subway in place of level crossing no. 25C near Badagopal.

Limited height Subways in place of level crossings no. 6C and 7C near Parmanandpur.

Limited height Subways in place of level crossings no. 12C and 14C near Sitalpur.

Limited height Subways in place of level crossings no. 10KC,10HC and 10GC between Nayagaon & Sitalpur.

Limited height Subways in place of level crossings no. 10EC and 10BC near Nayagaon.

Limited height Subways in place of level crossings no. 8C, 9C, 10C and 10AC between Parmanandpur and Nayagaon.

Limited height Subway in place of level crossing no. 31C near Goldenganj.

Doubling of 65 km Chhapra-Ballia rail line.

Electrification of Chhapra-Ballia rail line.

Limited height Subways in place of level crossings no. 3, 10D, 22, 24, 29 and 34 between Sonpur-Chapra Gramin.

New Control Office in Sonpur for smooth movement of trains.

Power supply to signaling system through CLS panel for smooth movement of trains.

Renovation of Crew lobby and Running Room in Sonpur and construction of new Running Room with 10 beds.

Yard remodeling and RRI of Sonpur station.

Provision of coach indication board and additional Foot Over Bridge at Sonpur.

Redevelopment of Sonpur station including Upgradation of Circulating area, waiting hall, waiting room and other passenger amenities. Provision of additional FOB.

970 kwp rooftop solar panels in Sonpur.

6 meter wide foot over bridge and escalator at Sonpur station.

CCTV Camera at Sonpur.

Development of Gautamsthan station in tune with local architectural and religious ethos.

Upgradation work at Chhapra Jn. by providing booking office, waiting hall, toilet, benches and extension of FOB.

Construction of ROB in lieu of LC No. 16 Spl.

PP shelter at Chhapra Jn.

Wi-Fi at Bakulaha, Majhi, Revalganj Ghat and Gautamsthan.

l

l

l

l

l

l

l

l

Works / Projects planned in future :

Achievements of Railwaysin

Lok Sabha Constituencyof Bihar

Saran

Achievements of Railwaysin

Lok Sabha Constituencyof Bihar

Saran

East Central Railway, Hajipur

;k=kh lsok ,oa fodkl ds fy, lnk rRij

Indian RailwaysIndian Railways

Page 9: Achievements of Railways LoPN Hkkjr...Gaya - Kamakhya Express (Weekly) at Nawada and Warisaliganj Stations. Extension of Loop Line at Nawada Station. Development of Nawada, Sheikh-

LoPN Hkkjr

,d dne LoPNrk dh vksj

ge lc dk gks ,d gh ukjkAlkiQ lqFkjk gks jsy gekjkAA

Achievements of Railwaysin

Lok Sabha Constituencyof Bihar

Sasaram

Achievements of Railwaysin

Lok Sabha Constituencyof Bihar

Sasaram

Works / Projects planned in future :l

l

l

l

l

l

l

l

l

l

l

l

l

l

New rail line between Dehri-on-Sone and Banjari.

New rail line between Aara-Bhabhua.

Multifunctional complex in Sasaram Station.

Road over bridge in place of level crossings no. 52CE, 53CE, 54CE and 55CE between Kudra and Pusauli.

Road over bridge in place of level crossing no. 56CE between Pusauli and Mutani.

Road over bridge in place of level crossing no. 61CE between Bhabhua and Durgavati.

Road over bridge in place of level crossing no. 38CT between Pahleza and Karwandiya.

Road over bridge in place of level crossings no. 39CT, 39IE, 40CE, 41CE and 42CT between Sasaram and Karwandiya.

Road over bridge in place of level crossing no. 45CE between Kumhau and Sasaram.

Road over bridge in place of level crossings no. 46CT, 47CE and 48CT between Kumhau and Shivsagar.

Road over bridge in place of level crossings no. 49CT and 50CE between Shivsagar and Khurmabad.

Road over bridge in place of level crossing no. 52CE between Khurmabad and Kudra.

Road over bridge in place of level crossing no. 57CE between Pusauli and Mutani.

Road over bridge in place of level crossing no. 64 CE between Durgavati and Dhanechha.

Works / Projects Completed :

Ongoing Works / Projects :

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

Development of Sasaram Station as Model

Station.

Provision of train Charting on LCDs at Sasaram.

Provision of CCTV Camera Sasaram UTS.

Electrification of Ara-Sasaram rail section.

New Road over bridge in Sasaram.

New Road over bridge in Bhabua Road.

Adequate number of benches for passengers at Shivsagar Station.

Platform shed at Shivsagar Station.

20 bed Barrack for RPF personnel.

Survey for Mughalsarai-Bhabhua new rail line.

Survey for Dildarnagar-Mundeshwari Dham new rail line.

Survey for Dehri-on-Sone-Bhunathpur new rail line.

Upgradation of 12 Halts between Sasaram and Ara.

Development of Railway Stadium at Sasaram.

Development of Passenger Terminal at Bhabhu Road.

Provision of TIB & CIB at all Platform at Bhabhua Road Station.

Standardized Signages at Sasaram and Bhabhua Road stations.

Water coolers at Sasaram and Bhabhua Road stations.

Subway in place of level crossing no. 44CE between Kumau and Sasaram.

Subway in place of level crossing no. 51CE between Shivsagar and Khurmabad.

Subway in place of level crossing no. 58CT between Bhabhua Road and Mutani.

East Central Railway, Hajipur

;k=kh lsok ,oa fodkl ds fy, lnk rRij

Indian RailwaysIndian Railways

Page 10: Achievements of Railways LoPN Hkkjr...Gaya - Kamakhya Express (Weekly) at Nawada and Warisaliganj Stations. Extension of Loop Line at Nawada Station. Development of Nawada, Sheikh-

LoPN Hkkjr

,d dne LoPNrk dh vksj

ge lc dk gks ,d gh ukjkAlkiQ lqFkjk gks jsy gekjkAA

Ongoing Works / Projects :

l

l

l

Railway Electrification work of Raxaul - Sitamarhi - Darbhanga - Samastipur Section.

Construction of New Freight Terminal at Dhang under yard remodelling work.

Provision of 3 m wide Foot Over Bridge (FOB) at Dhang Station.

l

l

l

l

Provision of 3 m wide Foot Over Bridge (FOB) at Kundwachainpur Station.

Upgradation of Bairginia Station as Adarsh Station.

New FOB & Raising of PF No. 1 to high level at Bairginia Station.

Provision of 3 m wide Foot Over Bridge (FOB) at Riga Station.

Works / Projects planned in future :

Achievements of Railwaysin

Lok Sabha Constituencyof Bihar

Sheohar

Achievements of Railwaysin

Lok Sabha Constituencyof Bihar

Sheohar

East Central Railway, Hajipur

;k=kh lsok ,oa fodkl ds fy, lnk rRij

Indian RailwaysIndian Railways


Recommended