.- April 7,1989i. . .
. *
Docket 50-341
Mr. B. Ralph SylviaGroup Vice President - Nuclear OperationDetroit Edison Company6400 N. Dixie HighwayNewport, Michigan 48166
Dear Mr. Sylvia:
SUBJECT: FERMI-2 NUCLEAR POWER FACILITY, SUBMITTAL OF REVISION 2 TO THEFERMI-2 UPDATED FINAL SAFETY ANALYSIS REPORT AND THE ANNUAL10CFR50,59 SAFETY EVALUATION SUMMARY REPORT (TAC NO. 71235)
The NRC has 1eceived your March 17, 1989 submittal of Revision 2 to theUpdated Final Safety Analysis Report (UFSAR) for Fermi-2 and the annual SafetyEvaluation Summary Report.
During a future site visit, NRR staff would be interested in inspecting two ofthe design changes in the annual Safety Evaluation Summary Report. We wouldlike to inspect the design changes and review the design packages and anycalculations associated with the package. The two design changes that we haveselected for review are:
(1) Replacement of the Reactor Water Cleanup System Holdup Line(Safety Evaluation No. 86-0255, Implementation Document No. EPP6671, System No. G33-00); and
(2) Relocated Control Rod Drive Minimum Flow Line(Safety Evaluation No. 86-0250, Implementation Document No. EDP d6736,SystemNo.C1100).
We will work with your staff to select a date for this inspection effort.
This letter completes NPC action on TAC NO. 71235.
Sincerely,
LynFKelly, Project ManagerProject Directorate 111-1Division of Reactor Projects - III,
IV, V and Special Projects
DISTRIBUTION gpocket Fue NRC & Local PDRsGHolahan MVirgilio i tPShuttleworth LKelly ,
'
JStang OGCEJordan BGrimesACRS(10) PD31 Gray File fyI/[()LA/PD31:DRSP PM/PD31:DRSP U ' )D :DRSP 1 ,
PShuttleworth LKelly/JStang:bw TQua !
f/g/89 VT % 4/ 5/89 /89
8904200126 890407ADOCK0500ggiDR
_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - - _ _ _ _ _ _ _ _ _ _
, ---_______;_ _
g. t
k, UNITED STATES,.
;[ t NUCLEAR REGULATORY COMMISSION
(.....;jE.. """fp4W;'iirig.
~ Docket No. 50-341
Mr. B. Ralph SylviaSenior Vice President -. Nuclear OperationDetroit Edison Company'
'6400 N. Dixie HighwayNewport, Michigan 48166
Dear Mr. Sylvia:
SUBJECT:. FERMI-2 NUCLEAR POWER-FACILITY, SUBMITTAL OF REVISION 2 TO THEFERMI-2 UPDATED FINAL SAFETY ANALYSIS REPORT AND THE ANNUAL-10 CFR 50.59 SAFETY EVALUATION SUMMARY REPORT (TAC NO. 71235) i
The NRC has received your March 17, 1989 submittal of Revision 2 to the,
Updated Final Safety Analysis Report (UFSAR) for Femi-? and the annual Safety l
Evaluation Summary Report._
' During a future site visit, NRR staff would be interested in inspecting two ofthe design changes in the annual Safety Evaluation Summary Report. We would'like to inspect the design' changes and review the design packages and anycalculations associated with the package. The two design changes that we haveselected for review are:
(1) Replacement of the Reactor Water Cleanup System Holdup Line-(Safety Evaluation No. 86-0255, Implementation Document No. EPP6671, System No. G33-00); and
(2) Relocated Control Rod Drive Minimum Flow Line(Safety Evaluation No. 86-0250, Implementation Document No. EDP6736, System No. C1100).
We will work with your staff to relect a date for this inspection effort.
This letter completes NRC action on TAC NO. 71235.1
Sincerely,
}Lyn Kelly, Protect ManagerProject Directorate III-1Division of Reactor Projects - III,
IV, Y and Special Projects
1
- _ _ - ---
o . . - -.. 7-'
b, _ , .,
o' c. , .
1> ,
'Mr.' B. Ralph Sylvia . Fermi-2 Facility'
-
p Detroit Edison Company|| cc:.
Mr. Ronald C. Callen , Ms. 1,ynn Goodman..Adv.: Planning Review Section Supervisor - Licensing
:: Michigan Public' Service Commission Detroit Edison Company-6545 Mercantile Way Fermi Unit 2P. 0.: Box 30221 6400 North Dixie HighwayLansing, Michigan- 48909 Newport, Michigan '48166
' John Flynn, Esq.Senior AttorneyDetroit Edison Company2000 Second AvenueDetroit, Michigan 48226
,
.
Nuclear Facilities'and EnvironmentalMonitoring Section Office
Division of Radiological. Health,
P. 0. Box.30035 '
Lansing,, Michigan.:48909
Mr. Walt Rogers-U.S. Nuclear Regulatory CommissionResident Inspector's Office.6450 W. Dixie HighwayNewport, M'chigan 48166-
Monroe County Office of CivilPreparedness
963 South RaisinvilleMonroe, Michigan .48161
Regional Administrator, Region IIIU.S. Nuclear Regulatory Commission799 Roosevelt RoadGlen Ellyn, Illinois 60137
,