+ All Categories
Home > Documents > Ack receipt of 890317 submittal of Rev 2 to updated FSAR ...Evaluation Summary Report. _ ' During a...

Ack receipt of 890317 submittal of Rev 2 to updated FSAR ...Evaluation Summary Report. _ ' During a...

Date post: 30-Nov-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
3
7 . _ _ . .- April 7,1989 i . . . . * Docket 50-341 Mr. B. Ralph Sylvia Group Vice President - Nuclear Operation Detroit Edison Company 6400 N. Dixie Highway Newport, Michigan 48166 Dear Mr. Sylvia: SUBJECT: FERMI-2 NUCLEAR POWER FACILITY, SUBMITTAL OF REVISION 2 TO THE FERMI-2 UPDATED FINAL SAFETY ANALYSIS REPORT AND THE ANNUAL 10CFR50,59 SAFETY EVALUATION SUMMARY REPORT (TAC NO. 71235) The NRC has 1eceived your March 17, 1989 submittal of Revision 2 to the Updated Final Safety Analysis Report (UFSAR) for Fermi-2 and the annual Safety Evaluation Summary Report. During a future site visit, NRR staff would be interested in inspecting two of the design changes in the annual Safety Evaluation Summary Report. We would like to inspect the design changes and review the design packages and any calculations associated with the package. The two design changes that we have selected for review are: (1) Replacement of the Reactor Water Cleanup System Holdup Line (Safety Evaluation No. 86-0255, Implementation Document No. EPP 6671, System No. G33-00); and (2) Relocated Control Rod Drive Minimum Flow Line (Safety Evaluation No. 86-0250, Implementation Document No. EDP d 6736,SystemNo.C1100). We will work with your staff to select a date for this inspection effort. This letter completes NPC action on TAC NO. 71235. Sincerely, LynFKelly, Project Manager Project Directorate 111-1 Division of Reactor Projects - III, IV, V and Special Projects DISTRIBUTION g pocket Fue NRC & Local PDRs GHolahan MVirgilio i t PShuttleworth LKelly , ' JStang OGC EJordan BGrimes ACRS(10) PD31 Gray File fyI/[() LA/PD31:DRSP PM/PD31:DRSP U ' )D :DRSP 1 , PShuttleworth LKelly/JStang:bw TQua ! f/g/89 VT % 4/ 5/89 /89 8904200126 890407 ADOCK0500ggi DR _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - - _ _ _ _ _ _ _ _ _ _
Transcript
Page 1: Ack receipt of 890317 submittal of Rev 2 to updated FSAR ...Evaluation Summary Report. _ ' During a future site visit, NRR staff would be interested in inspecting two of the design

7. _ _ .

.- April 7,1989i. . .

. *

Docket 50-341

Mr. B. Ralph SylviaGroup Vice President - Nuclear OperationDetroit Edison Company6400 N. Dixie HighwayNewport, Michigan 48166

Dear Mr. Sylvia:

SUBJECT: FERMI-2 NUCLEAR POWER FACILITY, SUBMITTAL OF REVISION 2 TO THEFERMI-2 UPDATED FINAL SAFETY ANALYSIS REPORT AND THE ANNUAL10CFR50,59 SAFETY EVALUATION SUMMARY REPORT (TAC NO. 71235)

The NRC has 1eceived your March 17, 1989 submittal of Revision 2 to theUpdated Final Safety Analysis Report (UFSAR) for Fermi-2 and the annual SafetyEvaluation Summary Report.

During a future site visit, NRR staff would be interested in inspecting two ofthe design changes in the annual Safety Evaluation Summary Report. We wouldlike to inspect the design changes and review the design packages and anycalculations associated with the package. The two design changes that we haveselected for review are:

(1) Replacement of the Reactor Water Cleanup System Holdup Line(Safety Evaluation No. 86-0255, Implementation Document No. EPP6671, System No. G33-00); and

(2) Relocated Control Rod Drive Minimum Flow Line(Safety Evaluation No. 86-0250, Implementation Document No. EDP d6736,SystemNo.C1100).

We will work with your staff to select a date for this inspection effort.

This letter completes NPC action on TAC NO. 71235.

Sincerely,

LynFKelly, Project ManagerProject Directorate 111-1Division of Reactor Projects - III,

IV, V and Special Projects

DISTRIBUTION gpocket Fue NRC & Local PDRsGHolahan MVirgilio i tPShuttleworth LKelly ,

'

JStang OGCEJordan BGrimesACRS(10) PD31 Gray File fyI/[()LA/PD31:DRSP PM/PD31:DRSP U ' )D :DRSP 1 ,

PShuttleworth LKelly/JStang:bw TQua !

f/g/89 VT % 4/ 5/89 /89

8904200126 890407ADOCK0500ggiDR

_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - - _ _ _ _ _ _ _ _ _ _

Page 2: Ack receipt of 890317 submittal of Rev 2 to updated FSAR ...Evaluation Summary Report. _ ' During a future site visit, NRR staff would be interested in inspecting two of the design

, ---_______;_ _

g. t

k, UNITED STATES,.

;[ t NUCLEAR REGULATORY COMMISSION

(.....;jE.. """fp4W;'iirig.

~ Docket No. 50-341

Mr. B. Ralph SylviaSenior Vice President -. Nuclear OperationDetroit Edison Company'

'6400 N. Dixie HighwayNewport, Michigan 48166

Dear Mr. Sylvia:

SUBJECT:. FERMI-2 NUCLEAR POWER-FACILITY, SUBMITTAL OF REVISION 2 TO THEFERMI-2 UPDATED FINAL SAFETY ANALYSIS REPORT AND THE ANNUAL-10 CFR 50.59 SAFETY EVALUATION SUMMARY REPORT (TAC NO. 71235) i

The NRC has received your March 17, 1989 submittal of Revision 2 to the,

Updated Final Safety Analysis Report (UFSAR) for Femi-? and the annual Safety l

Evaluation Summary Report._

' During a future site visit, NRR staff would be interested in inspecting two ofthe design changes in the annual Safety Evaluation Summary Report. We would'like to inspect the design' changes and review the design packages and anycalculations associated with the package. The two design changes that we haveselected for review are:

(1) Replacement of the Reactor Water Cleanup System Holdup Line-(Safety Evaluation No. 86-0255, Implementation Document No. EPP6671, System No. G33-00); and

(2) Relocated Control Rod Drive Minimum Flow Line(Safety Evaluation No. 86-0250, Implementation Document No. EDP6736, System No. C1100).

We will work with your staff to relect a date for this inspection effort.

This letter completes NRC action on TAC NO. 71235.1

Sincerely,

}Lyn Kelly, Protect ManagerProject Directorate III-1Division of Reactor Projects - III,

IV, Y and Special Projects

1

- _ _ - ---

Page 3: Ack receipt of 890317 submittal of Rev 2 to updated FSAR ...Evaluation Summary Report. _ ' During a future site visit, NRR staff would be interested in inspecting two of the design

o . . - -.. 7-'

b, _ , .,

o' c. , .

1> ,

'Mr.' B. Ralph Sylvia . Fermi-2 Facility'

-

p Detroit Edison Company|| cc:.

Mr. Ronald C. Callen , Ms. 1,ynn Goodman..Adv.: Planning Review Section Supervisor - Licensing

:: Michigan Public' Service Commission Detroit Edison Company-6545 Mercantile Way Fermi Unit 2P. 0.: Box 30221 6400 North Dixie HighwayLansing, Michigan- 48909 Newport, Michigan '48166

' John Flynn, Esq.Senior AttorneyDetroit Edison Company2000 Second AvenueDetroit, Michigan 48226

,

.

Nuclear Facilities'and EnvironmentalMonitoring Section Office

Division of Radiological. Health,

P. 0. Box.30035 '

Lansing,, Michigan.:48909

Mr. Walt Rogers-U.S. Nuclear Regulatory CommissionResident Inspector's Office.6450 W. Dixie HighwayNewport, M'chigan 48166-

Monroe County Office of CivilPreparedness

963 South RaisinvilleMonroe, Michigan .48161

Regional Administrator, Region IIIU.S. Nuclear Regulatory Commission799 Roosevelt RoadGlen Ellyn, Illinois 60137

,

4

I

.

- - - - - - - - - _ - - _ - . _ _ _ _ _ _ _ _ _ _ _ _ _ - .


Recommended