+ All Categories
Home > Documents > ACPR1000 +

ACPR1000 +

Date post: 22-Feb-2016
Category:
Upload: chana
View: 37 times
Download: 0 times
Share this document with a friend
Description:
The Third Generation Nuclear Reactor. ACPR1000 +. Advanced, cost competitive, proven technology, and reliable. Content. I. Summary. II. Main Features. III. Key Figures of Comparative Reactors. IV. Roadmap. V. Technology Introduction. VI. Regulator Evaluation. I. Summary. - PowerPoint PPT Presentation
Popular Tags:
19
1 ACPR1000 ACPR1000 + + Advanced, cost competitive, proven technology, and reliable Advanced, cost competitive, proven technology, and reliable The Third Generation Nuclear Reactor The Third Generation Nuclear Reactor
Transcript
Page 1: ACPR1000 +

1

ACPR1000ACPR1000++

Advanced, cost competitive, proven technology, and reliableAdvanced, cost competitive, proven technology, and reliable

The Third Generation Nuclear ReactorThe Third Generation Nuclear Reactor

Page 2: ACPR1000 +

2页

II. Main Features

IV. Roadmap

VI. Regulator Evaluation

Content

V. Technology Introduction

I. Summary

III. Key Figures of Comparative Reactors

Page 3: ACPR1000 +

3页

– ACPR1000+ is an advanced nuclear power technology developed by CGNPC with independent intellectual property right.

– Main performances meet the technical standards of the third generation technology and the requirements of Post-Fukushima.

– Its engineering work is being made taking advantage of proven technology and experience feedback, in line with the national and international laws and regulations.

– Pursuing superb safety performance is focused, with due consideration to economic competitiveness, which satisfy the multiple requirements of the users in China and abroad.

I. Summary

Page 4: ACPR1000 +

4页

1. Advanced– Meet the safety requirements of post-Fukushima

– Meet the HAF102 and refer to relevant URD/EUR requirements

– Fully achieve the third generation targets

II. Main Features

Page 5: ACPR1000 +

5页

2. MaturePrimary system design, loop configuration and main equipment are similar to the PWR NPPs in operation. Experience feedback from design, construction and operation of PWR NPPs, including EPR, are taken into account. Validated and proven technologies are referred to for its design.

• Over 1,000 reactor years operating experience of the similar NPPs

• Complete and mature industry systems for primary equipment manufacturing

• Extensive construction experience

CPR1000+CPR1000+ EPREPRCPR1000CPR1000

Page 6: ACPR1000 +

6页

3. Safe

– Three independent trains of safety systems;

– Decreased linear power density to increase

core thermal margin;

– Double containment to protect against

airplane crash and external explosion;

– Improved seismic capability;

– Effective mitigation measures for severe

accidents

Page 7: ACPR1000 +

7页

4. Economic

– 60 years of design lifetime

– Metal reflector to reduce fast neutronflux in RPV

– Online maintenance

– 18-month fuel cycle

– Improved seismic capability to increase the site adaptability

– Centralized disposal of radioactive waste to improve volume reduction ratio.

Page 8: ACPR1000 +

8页

ITEM ACPR1000+ CPR1000+ AP1000 EPR URD/EUR

Core Damage Frequency ,/(pile·year)

< 1×10-5 ~ 1×10-5 ≤5.1×10-7 7.75×10-7 < 1×10-5

Large Release Frequency , /(pile·year)

< 1×10-6 ~ 1×10-6 ≤5.9×10-8 8.1×10-8 < 1×10-6

Electrical Output , MWe

1150 1085 1250 1700Improved

PWR upper limit 1350

Core Thermal Margin

>15% 10 % >15 % >15 % >15 %Fuel Cycle , month

18-24 18 18 18 24

III. Key Figures of Comparative Reactors

Page 9: ACPR1000 +

9页

ITEM ACPR1000+ CPR1000+ AP1000 EPR URD/EUR

Capacity Factor , % 92 ≥90 93 ≥92 87

SSE , g 0.3 0.2 0.3 0.25 EUR 0.25URD 0.3

Period without operator actions

30min 10min 72hour 30min At least30min

Solid waste generation , m3/(a·Unit)

< 50 <50 <50 >50

Design lifetime,Year

60 60 60 60 60

Page 10: ACPR1000 +

10页

1. Reactor– 157 fuel assemblies (active length 14 feet)

• Core thermal power is increased by 10.5% and core average linear power density (LPD) is decreased by 5.5%, comparing to CPR1000+;

– In-core instrumentation inserted from the top;

– Metal reflector to extend the RPV design lifetime to 60 years.

Core safety margin and fuel burnup are increased,Core safety margin and fuel burnup are increased,structure simplified, RPV design lifetime prolonged structure simplified, RPV design lifetime prolonged

IV. Technology Introduction

Page 11: ACPR1000 +

11页

2. Nuclear Steam Supply System (NSSS)

– Heat transfer area of steam generator (SG) is increased by 28% compared with

CPR1000+ ;– Pressurizer cavity is increased by 26% compared with CPR1000+ ;– Large capacity pressure relief valve introduced to the pressure relief system for

reactor coolant system to quick relief coolant in severe accident conditions ;– LBB technology is adopted to simplify the system design.

Design basis is improved. Design basis is improved. Accident mitigation capacity is Accident mitigation capacity is enhanced.enhanced.

Page 12: ACPR1000 +

12页

3. NI Auxiliary System– Residual heat removal system is combined with low pressure safety injection

system;

– RCV (Chemical and Volume Control) is simplified, to execute non–safety related functions only;

– Two independent trains of spent fuel cooling systems are set up to improve the safety of spent fuel storage.

4. Engineered Safety Systems

– Three independent trains of safety systems are installed in physical

separation pattern, which are backup for each other,

– Simplified system design,

– In-containment water storage.

Page 13: ACPR1000 +

13页

5. Advanced I&C Systems– Optimized DCS system and state-of-the-art operator information system

– Sequence control technology, to improve automation and reduce the burden

of the operator

– DAS (Diversity Actuation System), to further improve safety and reliability

– Improved ventilation system, to improve the habitability of main control room

Page 14: ACPR1000 +

14页

6. Double Containments

• The outer containment can withstand

large commercial aircraft crash and

improve the safety.

• The cavity in containment is enlarged.

The emergency response ability to

design basis accident is improved.

• The double containment further reduces

the radioactive release to environment

during severe accident.

CPR1000CPR1000

ACPR1000ACPR1000++

Page 15: ACPR1000 +

15页

7. Site Adaptability

– Improved SSE

• 0.2g→ 0.3g

– Single reactor layout

• Physical separation pattern, to improve safety

• Flexible to the grid

Page 16: ACPR1000 +

16页

8. Severe Accident Mitigation Measures– High-pressure core melting, hydrogen explosion, RPV melt wear,

containment overpressure and heat discharge…

• Pressurizer pressure relief

• IVR (in-vessel retention)

• Passive autocatalytic recombiners and igniters

– SAMG

– Emergency response plan

Scheme of the Passive Autocatalytic Recombiner –Totally passive technology

©A

RE

VA

Page 17: ACPR1000 +

17页

9. Waste Management

– Centralized disposal of radioactive wastes from the pile

• Less buildings, to shorten the construction period of NI

• Minimized waste release, solid waste generation for a reactor is less than 50m3/a 。

– Advanced tritium removal technology

Meet the emission limits of inland plants.Meet the emission limits of inland plants.

Page 18: ACPR1000 +

18页

10. Tests– Integral scaling of hydraulic test for RPV

– CRDM drive line test

– Internals flow-induced vibration test

– IVR test (RPV bottom head cooling performance test)

Page 19: ACPR1000 +

19页

ThanksThanks!!