Acquisition Modeling: The Key to Managing Acquisition Complexity? January 26, 2004 Linda A. Abelson Richard J. Adams Suellen Eslinger © 2004 The Aerospace Corporation. 3 rd OSD Conference on the Acquisition of Software- Intensive Systems
Transcript
Page 1: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

Acquisition Modeling: The Key toManaging Acquisition Complexity?

January 26, 2004

Linda A. AbelsonRichard J. AdamsSuellen Eslinger

© 2004 The Aerospace Corporation.

3rd OSD Conference on the Acquisition of Software-Intensive Systems

Page 2: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

2

Acknowledgements

This work would not have been possible without assistance from thefollowing:

• Reviewers• Douglas Buettner, Software Architecture and Engineering Department• Peter Hantos, Software Acquisition and Process Office• Karen Owens, Software Acquisition and Process Office• Mary Rich, Software Engineering Subdivision

• Funding Source• Aerospace Sponsored Independent Research and Development

Page 3: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

3

Outline

• Introduction

• Selected Modeling Technique

• Current Model Structure

• Status and Conclusion

Page 4: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

4

Personal Observation & Experience

• Cost and schedule overruns, and performance and qualitydeficiencies are the norm for software-intensive space systemacquisitions

• Problems persist despite• The best efforts of “Blue Ribbon” commissions and a long list of acquisition

initiatives• Significant advances in systems and software engineering technical

processes

• These problems are observed in every large program and programresponses result in similar unsatisfactory outcomes• This happens even though the Government and contractor personnel are

different from program to program

Why do these problems continue to happen?

Page 5: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

5

Proposition

• DoD Acquisitions have

• A unique set of Government and contractor organizations and personnel

• A large diverse set of policies, strategies and processes

• A large unique set of political, management and technical activities

• A dynamic political, budgetary and technical environment

• One chance to succeed

• Acquisitions are complex, dynamic, interconnected socioeconomicsystems

• Consequences of System Program Office (SPO) and contractoractions are not evident for months or even years

Modeling is the most cost effective way to describethe complexity of these phenomena

Page 6: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

6

Aerospace Research

• Aerospace has a multiyear research project to study theusefulness of acquisition modeling techniques to improveacquisition success• Enhance acquisition management capabilities• Analyze the long-term impact of policy alternatives• Provide a project management simulation training environment

• This briefing provides an overview of the research to date

Page 7: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

7

Outline

• Introduction

• Selected Modeling Technique

• Current Model Structure

• Status and Conclusion

Page 8: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

8

System Dynamics Modeling

• “System Dynamics is the application of feedback control systemprinciples and techniques to managerial, organizational andsocioeconomic problems” (Dr. E. B. Roberts)

• “System Dynamics is a method of studying the behavior ofsystems to show how decisions, policies, structures and delaysare interrelated to influence growth and stability.” (Dr. J. Forrester)

*

* Adapted from “Integrating System Dynamics and Agent-Based Modeling”

Characteristic System Dynamics Agent-Based Building block Feedback loop connecting

behavioral variables Individual agents connected

by feedback loop Object of interest Structure of the System Agents' Rules

Research approach Deductive: Infer from structure to

behavior

Inductive: Infer from individual agent's behavior to system behavior

Handling of Time Continuous simulation Discrete or continuous Character of object of

interest over time Structure is fixed Agents' rules can be fixed or

adaptive

Page 9: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

9

How Could Modeling Help?

System Technical Performance Analysis

• How is coverage affected by a change in constellation altitude?

• What is the impact on throughput of this system architecture?

Policy, Strategy and Process Performance Analysis

• Is this program executable using the proposed policies, strategies,processes, budget and schedule?

• Where should the SPO focus its effort to make the greatest impact?

• What is the impact of performing these unplanned tasks?

• What is the impact of delays in these decisions?

• What is the impact of product quality on acquisition success?

• What is the impact of rework caused by these requirementschanges?

• How does SPO size and experience impact acquisition success?

• Etc.

Page 10: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

10

Outline

• Introduction

• Selected Modeling Technique

• Current Model Structure

• Status and Conclusion

Page 11: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

11

SPO External Influences

Contractor & Contractor External Influences

SPO

Acquisition Management Organizations

External Technology

Organizations

Staff Organizations

Government Maintenance

Organizations

Certification Organizations

Interfacing System

Organizations

Line Management Organizations

User Organizations

Line Management

Organizations

Quality Assurance

Organizations

Process Improvement Organizations

Policy Making

Organizations

Shared Resources

Organizations

Product DevelopmentOrganization

The SPO’s Essential Role in Acquisition Success

The SPO is theCenter of theAcquisitionHour Glass

Page 12: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

12

Real Progress Rate

UndiscoveredRework Rework

GenerationRate

7

Simplified SPO Rework Sector*

* Adapted fromReferences 3, 4,

5 & 6

Work ToBe Done

1

Apparent Progress Rate2

SPO Workforce Sector

SPO Workforce Size

Civilian Military

3

SPO Productivity Sector

SPO Productivity

AverageCivilian

Experience

AverageMilitary

Experience

4

Work DoneCorrectly

5

SPO Quality Sector

SPO Quality 6

SPO Schedule Sector

SPO Schedule Pressure8

Discovering Rework Rate

9

Page 13: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

13

SPO Rework Sector

SPO Quality Sector

SPO Productivity Sector

SPO Schedule Sector

SPO Workforce Sector

SPO Average ExperienceSPO Workforce SizeSPO FatigueSPO Schedule PressureSPO Work Done CorrectlySPO Undiscovered Rework Contractor Average Work Quality

SPO Effort Perceived RemainingSPO Fraction Perceived CompleteSPO Workforce SizeScheduled Completion Date

Time RemainingEffort Perceived RemainingMilitary Transfer In RateMilitary Transfer Out RateCivilian Hire RateCivilian Attrition Rate

SPO Average ExperienceSPO Workforce SizeSPO FatigueSPO Schedule PressureContractor Productivity

SPO Workforce Size

SPO Quality SPO Schedule Pressure

SPO Productivity

SPO Rework Influences*

* Adapted fromReference 6

Page 14: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

14

SPO Rework Sector

SPO Quality Sector

SPO Productivity

Sector

SPO Schedule

Sector

SPO Workforce

Sector

Contractor Rework Sector

Contractor Quality Sector

Contractor Productivity

Sector

Contractor Schedule

Sector

Contractor Workforce

Sector

2 SPO Qualityaffects

Contractor Quality

1 Contractor Qualityaffects

SPO Quality

5 Contractor ReworkaffectsSPO

Productivity

6 SPO Reworkaffects

Contractor Productivity

4 SPO Rework affectsContractor Rework

3 Contractor Rework affects SPO Rework

3

4

5

6

1

2

SPO-Contractor Model Sector Relationships*

SPO Half

ContractorHalf

* Adapted fromReference 6

Page 15: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

15

Outline

• Introduction

• Selected Modeling Technique

• Current Model Structure

• Status and Conclusion

Page 16: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

16

Model Status

• Completed the first iteration

• Currently gathering data needed to begin model validation• Initial focus is on a retrospective analysis of an existing program

• Potential model enhancements• Decompose the model into multiple space system acquisition phases• Decompose communication/decision delays by type• Explicitly incorporate the impact of concurrent engineering task

parallelism• Explicitly incorporate SPO personnel task overload

Page 17: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

17

Conclusion

• System dynamics modeling is a way to describe SPO andcontractor alternative courses of action and answerquestions about their long term consequences• Has already been used in many industries for the contractor half

• Acquisition modeling success depends on model validationand the willingness of decision makers to act on the results• Has already been done in many industries for the contractor half

• Successful use of SPO-contractor system dynamicsmodels in the software-intensive space system acquisitiondomain depends on• Demonstrating than the models provide useful insight into

questions important to acquisition decision makers and• Acquisition decision makers trusting the models sufficiently to act

based on the models’ results

Page 18: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

Backup Material

Page 19: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

19

Contact Information

• Linda A. Abelson• Email: [email protected]• Telephone: 310 336-7350

• Richard J. Adams• Email: [email protected]• Telephone: 310 336-2907

• Suellen Eslinger• Email: [email protected]• Telephone: 310 336-2906

Page 20: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

20

Acquisition Modeling Research Goals: Support IncreasedAcquisition and Program Execution Success

Training

PolicyAnalysis

ProgramOffice Support

• Program ManagementSimulators

• Discipline Specific Simulators• Systems & SoftwareEngineering

• Facilitated Problem SolvingWorkshops

• Acquisition Strategy• Cost and ScheduleAnalysis

• Strategic ProgramManagement

• Tactical ProgramManagement

• Program Post-MortemAnalysis

• Facilitated ProblemAnalysis

• Budget Changes• Acquisition PolicyChanges

• Requirements Changes• Schedule Changes• Resource Allocation• Systems of SystemsIntegration

Implementation & Education

Long Term Objectives

Start

Feasibility

FY 03

FY 04

FY 05+

Page 21: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

21

SPO Work to be Done

SPO Work Done

Correctly

SPO ApparentProgress

Rate

SPO UndiscoveredRework

SPO Total Effort

SPO InitialUnrecog

Proj Work

SPO Active

SPO Real Progress

Rate

SPO Rework Generation

Rate

SPO CumulativePerceived Progress

SPODiscovering

Rework

SPO Change inProj Size

SPO Time to Add New Work

SPO UndiscoveredWork

SPO Discovering Work

SPO InitialProj Size Est

SPO InitialUnrecog

Proj Work

~

SPO Fract of UndiscoveredWork Recog

SPO Effective Pdy

SPO Time to Detect Rework

SPO SchedulePressure

SPO Fract PerceivedComplete

SPO CurrentProj Definition

~SPO Fract Percieved Complete

Rework Detection Effect

KTR Progress Effect onSPO Rework Discovery

~SPO Sched Pressure

Rework Detection Effect

SPO Normal Timeto Detect Rework

SPO Min Time toDetect Rework

SPOQuality

MIL Workforce

Civ Workforce

SPO Rework Sector – Stella® Version*

*High Performance Systems

Page 22: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

22

General Project Model Sectors*

* Adapted fromReference 6

Rework Sector

Quality Sector

Productivity Sector

ScheduleSector

WorkforceSector

Models the flow of work and rework through the project

The sectors below influence how quickly and how well the work is performed

Models how much of the work

performed will need to be reworked later

in the project

Models how much work can be performed

per person

Models how many people with what experience are

needed to perform the work and when

they can be available

Models how quickly work

product defects are identified for

rework

Page 23: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

23

References - 1

Introductory• “System Dynamics Modeling for Project Management”

• Available on the author’s website, http://web.mit.edu/jsterman/www/• John D. Sterman

• “A Skeptics Guide to Computer Models”• Available on the author’s website, http://web.mit.edu/jsterman/www/• John D. Sterman

• References 1 & 2 are useful, short introductions to system dynamics and computer models

• “The Rework Cycle: Benchmarks for the Project Manager”• Project Management Journal, Volume XXIV, March 1993

• “Swords and Plowshares: The Rework Cycles of Defense and Commercial Software Development Projects”• American Programmer, May 1993

• The $2000 Hour: How Managers Influence Project Performance Through the Rework Cycle• Project Management Journal, Volume XXV, March 1994• Kenneth G. Cooper

• References 3, 4 & 5 are important early papers

Program Related Analysis• “The Cost and Cycle Time Implications of Selected Contractor and Air Force System Program Office

Management Policies During the Development Phase of Major Aircraft Acquisition Programs”• MIT Masters Thesis, 1999• Sean Morgan

• The paper that instigated the current research and the inspiration for the current model

Page 24: Acquisition Modeling: The Key to Managing Acquisition ...€¦ · 8 System Dynamics Modeling • “System Dynamics is the application of feedback control system principles and techniques

24

References –2

• “Understanding Firefighting in New Product Development”• The Journal of Product Innovation Management 18, (2001) 258-300• Nelson P. Repenning

• Analyzes resource limited program behavior

• “Iteration Management for Reduced Cycle Time in Concurrent Engineering”• Concurrent Engineering Research and Applications Journal Special Issue: A Complex Systems

Perspective on Concurrent Engineering, 2003• David N. Ford and John D. Sterman

• “Dynamic Modeling of Product Development Processes”• System Dynamics Review, Vol. 14, No. 1, (Spring 1998): 31-68• David N. Ford and John D. Sterman

• References 8 & 9 are related papers on program concurrent engineering characteristics

• “Systemic Project Risk Management – the way ahead”• International Journal of Risk Assessment and Management, Vol. 1, Nos. 1 and 2, 149-159, 2000• Terry M. Williams

• Use of system dynamics in project risk management

Recent Project Management Use• “Strategic Management of Complex Projects: A Case Study Using System Dynamics”

• System Dynamics Review 17, 237-260, (2002)• Lyneis, James M., Cooper, Kenneth G., Els, Sharon A.

• Contractor focused system dynamics application on the Air Force Peace Shield Program

• “Learning to Learn, From Past to Future”• Fourth European Project Management Conference, PMI Europe 2001• Kenneth G. Cooper

• References 11 & 12 are related papers for the Peace Shield Program