+ All Categories
Home > Documents > Action plans lessons Lesson 1, Week 1 Day 1 OVERVIEW OF ENGINEERING DESIGN PROCESS: Differentiate...

Action plans lessons Lesson 1, Week 1 Day 1 OVERVIEW OF ENGINEERING DESIGN PROCESS: Differentiate...

Date post: 25-Feb-2016
Category:
Upload: bambi
View: 26 times
Download: 0 times
Share this document with a friend
Description:
TITLE OF POSTER TEMPLATE INEXPENSIVE HIGH SCHOOL LOCKER ORGANIZER: W Lee. Action plans lessons Lesson 1, Week 1 Day 1 OVERVIEW OF ENGINEERING DESIGN PROCESS: Differentiate between the EDP and the Scientific Method - PowerPoint PPT Presentation
Popular Tags:
1
ACTION PLANS LESSONS Lesson 1, Week 1 Day 1 OVERVIEW OF ENGINEERING DESIGN PROCESS: Differentiate between the EDP and the Scientific Method EDP SCI METHOD 1. PROBLEM QUESTION 2. RESEARCH RESEARCH 3. SOLUTIONS HYPOTHESES 4. CHOOSE BEST SOLUTION BEST HYPOTHESIS 5. DESIGN AND BUILD PROTOTYPE DESIGN & RUN EXPERIMENT 6. TEST PROTOTYPE ANALYZE / EVALUATE DATA 7. (REDESIGN) DESIGN NEW EXPERIEMENT 8. COMMUNICATE PUBLISH 9. ( FOLLOW EGINEERING ETHICS CANONS. USE CHALLENGER DISASTER.) (Perhaps Really Stupid Cats Prefer Tasting Rodents Con Escarabajo. PRSCPTRCE). Discuss the importance of group work with the five C’s of communal problem solving : Collaboration Creativity Coordination Concentration Communication Lesson 2. WEEK 2 Day 5 BRAINSTORM AND DISCUSS POSSIBLE RECYCLED MATERIAL ITEMS FOR LOCKER ORGANIZER OLD BAND-AID TIN, ALTOIDS TIN, OATMEAL BOX, SHOE BOX LID, SMALL CEREAL BOX, DOUBLE SIDE TAPE, REFRIGERATER MAGNET, SCRAP CLOTH, SMALL FLOWER POTS, PRESCRIPTION BOTTLES,) HAVE STUDENTS DISCOVER POSSIBLE ITEMS AT HOME OR SCHOOL, AND HAVE THEM CREATE A BULLETIN BOARD WITH DESCRIPTIONS OF ITEMS, DRAWINGS, OR ACTUAL ARTICLES TO SHARE WITH OTHER GROUPS. PROJECT GOAL DEVELOP A LOWCOST LOCKER ORGANIZER USING FREE, RECYCLED MATERIALS HELD TOGETHER WITH DUCT TAPE, ETC. STUDENTS WILL WORK IN GROUPS OF FOUR. TITLE OF POSTER TEMPLATE INEXPENSIVE HIGH SCHOOL LOCKER ORGANIZER: W Lee BEST SOLUTION HAVE THE STUDENTS COMMUNICATE THEIR PROJECTS WITH AN ADVERTISING POSTER ALONG WITH THEIR TESTED PROTOTYPE PROJECT DEFINITION RESEARCH, BRAINSTORM, DECIDE, DESIGN AND BUILD A PROTOTYPE LOCKER ORGANIZER IN FOUR WEEKS. THE ORGANIUZER MUST NEATLY HOLD ALL SCHOOLBOOKS, NOTEBOOKS, PENS, PENCILS, CALCULATORS, LUNCH CONTAINERS AND JACKETS. PROJECT PLAN WEEK 1: EDP, PROJECT GOAL, RESEARCH , SOLUTIONS WEEK 2: MATERIAL SAMPLES, CHOOSE BEST SOLUTION,. DESIGN WEEK 3: BUILD PROTOTYPE WEEK 4: TEST PROTOPTYPE, COST OF MULTIPLES, COMMUNIICATE STUDENT LESSONS LEARNED WHAT ARE THE STEPS OF THE EDP AND HOW DO YOU APPLY THEM IN SOLVING AN ENGINEERING PROBLEM? HOW DOES EDP DIFFER FROM THE SCIENTIFIC METHOD? WHAT IS MEANT BY ENGINEERING ETHICS AND IN WHAT WAY IS THIS PROJECT FOLLOWING THE ETHICAL CANONS? WHY DOES AN ENGINEERING PROJECT HAVE TO BE ON TIME, IN SPEC AND WITHIN COST.? SOME MANAGERS WANT PROJECTS TO BE COMPLETE D FASTER, BETTER, AND CHEAPER. IS THERE A POSSIBLE CONFLICT WITH THESE THREE SIMULTANEOUS DEMANDS? CAN WE SOLVE PART OF THE ENVIRONMENTAL PROBLEM WITH WASTE AND GARBAGE BY FOLLOWING THE OLD NEW ENGLAND MANTRA : USE IT UP WEAR IT OUT MAKE IT DO DO WITHOUT STUDENTS HAVE RECYCLED WASTE TO MAKE A USABLE ITEM. EXPLAIN THE PHRASE “ONE PERSON’S TRASH IS ANOTHER PERSON’S TREASURE”. Planning this project made me realize the importance of allowing freedom in inquiry so that the students Learn not about engineering, but how to think like a n Engineer. I should not teach students how to think, but rather coach them in HANDS ON, INQUIRY BASED ACTIVITIES where they learn how to thi8nk AT A HIGHER ORDER. TEACHER TAKE AWAYS
Transcript
Page 1: Action plans lessons Lesson  1, Week 1 Day 1 OVERVIEW OF ENGINEERING DESIGN PROCESS: Differentiate between  the EDP and the Scientific Method

ACTION PLANS LESSONSLesson 1, Week 1 Day 1OVERVIEW OF ENGINEERING DESIGN PROCESS:Differentiate between the EDP and the Scientific Method EDP SCI METHOD1. PROBLEM QUESTION2. RESEARCH RESEARCH3. SOLUTIONS HYPOTHESES4. CHOOSE BEST SOLUTION BEST HYPOTHESIS5. DESIGN AND BUILD PROTOTYPE DESIGN & RUN EXPERIMENT 6. TEST PROTOTYPE ANALYZE / EVALUATE DATA7. (REDESIGN) DESIGN NEW EXPERIEMENT8. COMMUNICATE PUBLISH9. ( FOLLOW EGINEERING ETHICS CANONS. USE CHALLENGER DISASTER.)(Perhaps Really Stupid Cats Prefer Tasting Rodents Con Escarabajo. PRSCPTRCE).Discuss the importance of group work with the five C’s of communal problem solving :Collaboration Creativity Coordination Concentration

Communication

Lesson 2. WEEK 2 Day 5BRAINSTORM AND DISCUSS POSSIBLE RECYCLED MATERIAL ITEMS FOR LOCKER ORGANIZEROLD BAND-AID TIN, ALTOIDS TIN, OATMEAL BOX, SHOE BOX LID, SMALL CEREAL BOX, DOUBLE SIDE TAPE, REFRIGERATER MAGNET, SCRAP CLOTH, SMALL FLOWER POTS, PRESCRIPTION BOTTLES,)HAVE STUDENTS DISCOVER POSSIBLE ITEMS AT HOME OR SCHOOL, AND HAVE THEM CREATE A BULLETIN BOARD WITH DESCRIPTIONS OF ITEMS, DRAWINGS, OR ACTUAL ARTICLES TO SHARE WITH OTHER GROUPS.

PROJECT GOAL DEVELOP A LOWCOST LOCKER ORGANIZER USING FREE, RECYCLED MATERIALS HELD TOGETHER WITH DUCT TAPE, ETC. STUDENTS WILL WORK IN GROUPS OF FOUR.

TITLE OF POSTER TEMPLATEINEXPENSIVE HIGH SCHOOL LOCKER ORGANIZER: W Lee

BEST SOLUTIONHAVE THE STUDENTS COMMUNICATE THEIR PROJECTS WITH AN ADVERTISING POSTER ALONG WITH THEIR TESTED PROTOTYPE

PROJECT DEFINITIONRESEARCH, BRAINSTORM, DECIDE, DESIGN AND BUILD A PROTOTYPE LOCKER ORGANIZER IN FOUR WEEKS. THE ORGANIUZER MUST NEATLY HOLD ALL SCHOOLBOOKS, NOTEBOOKS, PENS, PENCILS, CALCULATORS, LUNCH CONTAINERS AND JACKETS.

PROJECT PLANWEEK 1: EDP, PROJECT GOAL, RESEARCH , SOLUTIONSWEEK 2: MATERIAL SAMPLES, CHOOSE BEST SOLUTION,. DESIGNWEEK 3: BUILD PROTOTYPEWEEK 4: TEST PROTOPTYPE, COST OF MULTIPLES, COMMUNIICATE

STUDENT LESSONS LEARNEDWHAT ARE THE STEPS OF THE EDP AND HOW DO YOU APPLY THEM IN SOLVING AN ENGINEERING PROBLEM? HOW DOES EDP DIFFER FROM THE SCIENTIFIC METHOD?

WHAT IS MEANT BY ENGINEERING ETHICS AND IN WHAT WAY IS THIS PROJECT FOLLOWING THE ETHICAL CANONS?

WHY DOES AN ENGINEERING PROJECT HAVE TO BE ON TIME, IN SPEC AND WITHIN COST.?

SOME MANAGERS WANT PROJECTS TO BE COMPLETE D FASTER, BETTER, AND CHEAPER. IS THERE A POSSIBLE CONFLICT WITH THESE THREE SIMULTANEOUS DEMANDS?

CAN WE SOLVE PART OF THE ENVIRONMENTAL PROBLEM WITH WASTE AND GARBAGE BY FOLLOWING THE OLD NEW ENGLAND MANTRA : USE IT UP WEAR IT OUT MAKE IT DO DO WITHOUT

STUDENTS HAVE RECYCLED WASTE TO MAKE A USABLE ITEM. EXPLAINTHE PHRASE

“ONE PERSON’S TRASH IS ANOTHER PERSON’S TREASURE”.

Planning this project made me realize the importance of allowing freedom in inquiry so that the students

Learn not about engineering, but how to think like a nEngineer. I should not teach students how to think, but rather coach them in HANDS ON, INQUIRY BASED ACTIVITIES where they

learn how to thi8nk AT A HIGHER ORDER.

TEACHER TAKE AWAYS

Recommended