Date post: | 23-Dec-2015 |
Category: |
Documents |
Upload: | oswald-allen |
View: | 222 times |
Download: | 0 times |
Activation of SSAS
XYZ Port FacilityMaritime Security Drill
Briefing for Players
date
Activation of SSAS
Emergency Response –Security measures compromised
Activation of SSAS
Drill D413
Activation of SSAS
Scope• Review of the previous drill• Date, time, location• Aim• Objectives• Desired outcomes• Controllers• Players• Scenario• Port Facility security instructions• Communications• Safety• Debrief• Update on the ISPS Code/local regulations• Developments in maritime security
Activation of SSAS
Review of Previous Port Facility Drill no. X/XX
Date conducted:
Objectives:
Lessons Learnt:
• • •
Activation of SSAS
Drill number: X/XX
Date:
Start Time:
Location:
Estimated End Time:
Activation of SSAS
Aim
To enhance the proficiency of port facility security staff in responding to an activation of the Ship Security Alert System (SSAS) onboard a ship in the port facility
Activation of SSAS
Objectives
• Respond to an activation of the SSAS onboard a ship in the port facility according to procedure in the PFSP.
Activation of SSAS
Desired outcomes
Security staff will be able to:• Recognize the various means by which an activation of the SSAS from a ship alongside may be communicated to the Port Facility.
• • Communicate with and render assistance to ship as required.
Activation of SSAS
Control Team
• Chief Controller: Safety Manager, Mr. AAA
Activation of SSAS
Players
• Security staff
Activation of SSAS
ScenarioThe SSAS on a ship alongside the port facility has been activated. The Flag State has, through the Port State, requested the port facility to verify the alert and to provide the necessary assistance.
Activation of SSAS
Port Facility Security Instructions
• •
Activation of SSAS
Communications
• Telephone • Walkie-Talkie
Player – Ch YY
Activation of SSAS
Drill Start The drill is to commence
Drill Suspend The drill is temporarily suspended
Drill Go The drill is to resume from where it was suspended
Drill Stop The drill is to be terminated (prematurely)
Drill End The drill is completed
Drill, Drill, Drill The message or statement that follows this preamble relates to the drill only, and is not to be confused with real activity
Code words
Activation of SSAS
Safety• Physical safety of personnel is paramount• There is to be no physical contact between player and controllers acting as intruders, etc.• Security staff are not to use abusive language when talking to controllers acting as “intruders”• Do not neglect the safety of equipment
Activation of SSAS
Debrief
• Location:
• Secretary:
• Attendance
Activation of SSAS
Updates on the ISPS Code andlocal Regulations
• • •
Activation of SSAS
Developments in Maritime Security• • •
Activation of SSAS
Any questions ?