    Activity ID Activity descriptionMOBI-01 Site Mobilisation

    MOBI-03 Fencing work

    MOBI-02 Establish Temporary ServiciesEARTH-03 Shoring ( I- Section Concrete pannel )

    EARTH-02 Priliminary Earth Work

    EARTH-04 1st Phase ExcavationEARTH-05 2nd stage Excavation & concrete panel instlation

    EARTH-07 Carting Excess Excavated material

    EARTH-06 DewaterringEARTH-08 Formation of Deep Area

    EARTH-09 Compaction & Formation for Raft bed

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    2/114

    FOUND-02 GroundingFOUND-01 PCC Deep Area

    FOUND-03 PCC below RAFT

    FOUND-05 Rubberised Bitumen CoatingFOUND-06 Waterproofing & Screed Protection

    FOUND-04 Vertical area water proffing

    FOUND-07 Steel work for RAFTMEP-01 Drainage pipe laying and testing (UG Drainage)

    FOUND-08 Raft Slab Casting (Part A&B)

    SUB-01 Retaining WallSUB-06 Ramp Work

    SUB-02 Shear Wall & Lift Core Wall

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    3/114

    SUB-03 steel work for columnSUB-04 Form work for column

    SUB-05 Column casting For GF Slab

    SUB-07 Decking Work for G.F SlabSUB-08 Steel Work for G.F Slab

    SUB-09 MEP sleves & conduits for G.F Slab

    SUB-10 Ground Floor Slab CastingSUB-11 Deshuttering

    SUB-12 Ramp Side RCC wall

    SUB-13 Rcc planters & side wall / upstaandSUCO-GF-02 steel work for column/A

    SUCO-GF-03 Form work for column/A

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    4/114

    SUCO-GF-01 Shear Wall /ASUCO-GF-04 Column casting For 1F/A Slab

    SUCO-GF-05 Decking work for 1F/ASlab

    SUCO-GF-07 Steel Work for 1F/A SlabSUCO-GF-08 MEP sleves & conduits for 1.F/A Slab

    SUCO-GF-09 First Floor Slab Casting[Part-A ]

    SUCO-GF-10 Deshuttring PART- ASUCO-GF-12 steel work for column

    SUCO-GF-11 Shear Wall & Lift Core Wall

    SUCO-GF-13 Form work for columnSUCO-GF-14 Column casting For 1F Slab

    SUCO-GF-15 Decking work for 1F Slab

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    5/114

    SUCO-GF-17 Steel Work for 1F SlabSUCO-GF-18 MEP sleves & conduits for 1.F Slab

    SUCO-GF-19 First Floor Slab Casting[Part-B ]

    SUCO-GF-20 Deshuttering PART- BSUCO-GF-16 Ramp Side RCC wall

    SUCO-1F-01 steel work for column/A

    SUCO-1F-02 Form work for column/ASUCO-1F-03 Shear Wall /A

    SUCO-1F-04 Column casting For 2F/A Slab

    SUCO-1F-05 Decking work for 2F/ASlabSUCO-1F-06 Steel Work for 2F/A Slab

    SUCO-1F-07 MEP sleves & conduits for 2.F/A Slab

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    6/114

    SUCO-1F-08 Second Floor Slab Casting[Part-A ]SUCO-1F-09 Deshuttering PART- A

    SUCO-1F-11 Steel work for column

    SUCO-1F-12 Form work for columnSUCO-1F-10 Shear Wall & Lift Core Wall

    SUCO-1F-13 Column casting For 2F Slab

    SUCO-1F-14 Decking Work for 2F SlabSUCO-1F-15 Steel Work for 2F Slab

    SUCO-1F-16 MEP sleves & conduits for 2 F Slab

    SUCO-1F-17 Second Floor Slab Casting [Part-B ]SUCO-1F-18 Deshuttering PART- B

    SUCO-2F-01 steel work for column/A

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    7/114

    SUCO-2F-02 Form work for column/ASUCO-2F-03 Shear Wall /A

    SUCO-2F-04 Column casting For 3F/A Slab

    SUCO-2F-05 Decking work for3F/ASlabSUCO-2F-06 Steel Work for3F/A Slab

    SUCO-2F-07 MEP sleves & conduits for 3 F/A Slab

    SUCO-2F-08 ThirdFloor Slab Casting[Part-A ]SUCO-2F-09 Third floor slab Deshuttering PART- A

    SUCO-2F-11 steel work for column

    SUCO-2F-10 Shear WallSUCO-2F-12 Form work for column

    SUCO-2F-13 Column casting For 3F Slab

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    8/114

    SUCO-2F-14 Decking Work for 3F SlabSUCO-2F-15 Steel Work for 3F Slab

    SUCO-2F-16 MEP sleves & conduits for 3F Slab

    SUCO-2F-17 Third Floor Slab Casting [Part-B]SUCO-2F-18 Deshuttering PART- B

    SUCO-3F-01 steel work for column/A

    SUCO-3F-02 Form work for column/ASUCO-3F-03 Shear Wall /A

    SUCO-3F-04 Column casting For 4F/A Slab

    SUCO-3F-05 Decking work for 4F/ASlabSUCO-3F-06 Steel Work for4F/A Slab

    SUCO-3F-07 MEP sleves & conduits for4.F/A Slab

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    9/114

    SUCO-3F-08 Fourth Floor Slab Casting[Part-A ]SUCO-3F-09 Deshuttering PART- A

    SUCO-3F-11 steel work for column

    SUCO-3F-10 Shear Wall & Lift Core WallSUCO-3F-12 Form work for column

    SUCO-3F-13 Column casting For 4F Slab

    SUCO-3F-14 Decking Work for 4F SlabSUCO-3F-15 Steel Work for 4F Slab

    SUCO-3F-16 MEP sleves & conduits for 4F Slab

    SUCO-3F-17 Fourth Floor Slab Casting [Part-BSUCO-3F-18 Deshuttering 4 F slab PART- B

    SUCO-4F-01 steel work for column/A

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    10/114

    SUCO-4F-02 Form work for column/ASUCO-4F-03 Shear Wall /A

    SUCO-4F-04 Column casting For5F/A Slab

    SUCO-4F-05 Decking work for 5F/ASlabSUCO-4F-06 Steel Work for 5F/A Slab

    SUCO-4F-07 MEP sleves & conduits for 5F/A Slab

    SUCO-4F-08 Fifth Floor Slab Casting[Part-A ]SUCO-4F-09 Deshuttering PART- A

    SUCO-4F-11 steel work for column

    SUCO-4F-10 Shear Wall & Lift Core WallSUCO-4F-12 Form work for column

    SUCO-4F-13 Column casting For 5F Slab

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    11/114

    SUCO-4F-14 Decking Work for 5.F SlabSUCO-4F-15 Steel Work for 5.F Slab

    SUCO-4F-16 MEP sleves & conduits for 5.F Slab

    SUCO-4F-17 Fifth Floor Slab [Part-B]SUCO-4F-18 Deshuttering 5F Slab PART- B

    SUCO-5F-01 steel work for column/A

    SUCO-5F-02 Form work for column/ASUCO-5F-03 Shear Wall /A

    SUCO-5F-04 Column casting For 6F/A Slab

    SUCO-5F-05 Decking work for 6F/ASlabSUCO-5F-06 Steel Work for 6F/A Slab

    SUCO-5F-07 MEP sleves & conduits for 6 F/A Slab

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    12/114

    SUCO-5F-08 Sixth Floor Slab Casting[Part-A ]SUCO-5F-09 Deshuttering PART- A

    SUCO-5F-11 steel work for column

    SUCO-5F-10 Shear Wall & Lift Core WallSUCO-5F-12 Form work for column

    SUCO-5F-13 Column casting For 6 F Slab

    SUCO-5F-14 Decking Work for 6.F SlabSUCO-5F-15 Steel Work for 6.F Slab

    SUCO-5F-16 MEP sleves & conduits for 6.F Slab

    SUCO-5F-17 Sixth Floor Slab Casting PART-BSUCO-5F-18 Deshuttering PART- B

    SUCO-6F-01 steel work for column/A

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    13/114

    SUCO-6F-02 Form work for column/ASUCO-6F-03 Shear Wall /A

    SUCO-6F-04 Column casting For 7F/A Slab

    SUCO-6F-05 Decking work for 7F/ASlabSUCO-6F-06 Steel Work for 7F/A Slab

    SUCO-6F-07 MEP sleves & conduits for 7F/A Slab

    SUCO-6F-08 Seventh Floor Slab Casting[Part-A ]SUCO-6F-09 Deshuttering PART- A

    SUCO-6F-11 steel work for column

    SUCO-6F-10 Shear Wall & Lift Core WallSUCO-6F-12 Form work for column

    SUCO-6F-13 Column casting For 7F Slab

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    14/114

    SUCO-6F-14 Decking Work for 7.F SlabSUCO-6F-15 Steel Work for 7.F Slab

    SUCO-6F-16 MEP sleves & conduits for 7.F Slab

    SUCO-6F-17 Seventh Floor Slab Casting (PART-B)SUCO-6F-18 Deshuttering PART- B

    SUCO-7F-01 steel work for column/A

    SUCO-7F-02 Form work for column/ASUCO-7F-03 Shear Wall /A

    SUCO-7F-04 Column casting For RF /A Slab

    SUCO-7F-05 Decking work for RF/A SlabSUCO-7F-06 Steel Work for RF/A Slab

    SUCO-7F-07 MEP sleves & conduits for RF/A Slab

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    15/114

    SUCO-7F-08 Roof Floor Slab Casting[Part-A ]SUCO-7F-09 Deshuttering PART- A

    SUCO-7F-11 steel work for column

    SUCO-7F-10 Shear Wall & Lift Core WallSUCO-7F-12 Form work for column

    SUCO-7F-13 Column casting For RF Slab

    SUCO-7F-14 Decking Work for R.F SlabSUCO-7F-15 Steel Work for R.F Slab

    SUCO-7F-16 MEP sleves & conduits for R.F Slab

    SUCO-7F-17 Roof Slab Casting (PART-B)SUCO-7F-18 Deshuttering PART- B

    SUCO-HC-01 steel work for column

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    16/114

    SUCO-HC-02 Shear Wall & Lift Core WallSUCO-HC-03 Form work for column

    SUCO-HC-05 Parapet Wall

    SUCO-HC-04 Column castingSUCO-HC-07 Swimming pool Shell

    SUCO-HC-10 Pool Deck

    SUCO-HC-06 Decking Work for HC SlabSUCO-HC-09 MEP sleves & conduits for HC Slab

    SUCO-HC-08 Steel Work for HC Slab

    SUCO-HC-11 Helth Club Slab CastingSUCO-HC-12 Deshuttering

    SUCO-UR-03 steel work for column

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    17/114

    SUCO-UR-02 Shear Wall & Lift Core WallSUCO-UR-04 Form work for column

    SUCO-UR-05 Parapet Wall above HC

    SUCO-UR-01 Column casting For lift m/c roomSUCO-UR-06 Decking Work for lift m/c room

    SUCO-UR-08 MEP sleves & conduits for lift m/c room

    SUCO-UR-07 Steel Work for lift m/c roomSUCO-UR-09 Lift m/c room Slab

    BLO-B-01 cleaning

    BLO-B-02 Block layout and checkingBLO-B-03 Block work in Basement

    BLO-B-04 R.C.C Lintel

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    18/114

    PLAS-B-01 Wall Plaster - BasementPLAS-B-02 Celing Plaster-Basement

    FLO-B-02 marble flooring to lift loby

    A0EXAV-09 Earth filling above raft 8tkFLO-B-04 Marble Wall Clading to Lift Loby

    FLO-B-05 4 PCC with mesh

    FLO-B-07 Pump/ Store room flooringFLO-B-01 Car parking /Driveway Floor Finishing

    FLO-B-03 floor finish to water tank area

    FLO-B-06 Wall clading to Pump roomFLO-B-08 Thrishold

    FAL-B-01 False Ceiling

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    19/114

    PANT-B-01 Internal wall & ceiling paintingPANT-B-02 Anticarbonation painting in wall

    PANT-B-03 Final internal painting

    CARP-B-01 Fixing of Door FrameCARP-B-02 Fixing of Door Shutter

    A0MIS-01 Substation Trenching Work

    MET-01 Aluminium (LOUVER WORK) SubstationPANT-GF-01 Transformer room painting

    A0PRO-17 Dewa Inspection Substation

    A0PRO-18 Sub station hand over to DEWABLO-GF-01 cleaning

    BLO-GF-02 Block layout and checking

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    20/114

    BLO-GF-03 Internal Block WorkBLO-GF-04 Block work- GF

    A0ON-GF-08 R.C.C Lintel

    PLAS-GF-02 Celing Plaster- GFPLAS-GF-01 Wall Plaster GF

    WPR-GF-02 GF- Parking W/P

    WPR-GF-01 Water proof coating to Wet areasWPR-GF-03 Vertical side w/p of wet area

    FLO-GF-08 Wet area wall clading ( garbage room)

    FLO-GF-06 Wet area flooring (ceramic tiles)WPR-GF-04 Water proofing to substation slab roof

    FLO-GF-02 Floor Screed for Electrical Room/gym/

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    21/114

    FLO-GF-01 4 PCC with meshFLO-GF-03 Floor Screed for M.hall

    FLO-GF-05 Floor Screed for Electricaal Sub-station

    FLO-GF-04 Car parking /Driveway Floor FinishingFLO-GF-07 Floor Screed for Gym / Shop

    FLO-GF-09 Mosaic flooring to stair floor & landing area

    FLO-GF-10 Floor Screed for Gen. RoomFLO-GF-11 Store and other room flooring

    FLO-GF-12 mosaic step

    FLO-GF-14 Marble flooring to Entrance passageFLO-GF-15 mosaic skirting for steps

    FLO-GF-13 Threshold

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    22/114

    FLO-GF-17 Fixing Marble StepsFLO-GF-16 Marble Wall Clading to Lift Loby

    FAL-GF-01 False Ceiling

    PANT-GF-02 Internal wall & ceiling paintingPANT-GF-03 Final internal painting

    PANT-GF-04 Anticarbonation painting in wall

    CARP-GF-01 Fixing of Door FrameCARP-GF-02 Fixing of Door Shutter

    CARP-GF-03 Fixing of Kitchen Cabinet

    CARP-GF-04 Fixing of WardrobesMEP-GF-07 Sanitary fixing & Mixer

    BLO-1F-01 Cleaning

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    23/114

    BLO-1F-02 Block layout and checkingBLO-1F-04 Block work- 1F

    BLO-1F-03 Internal Block Work

    A0ON-1F-07 R.C.C LintelPLAS-1F-02 Celing Plaster- 1F

    PLAS-1F-01 Wall Plaster - 1F

    WPR-1F-02 Water proof coating to Wet areasWPR-1F-03 Vertical side w/p of wet area

    FL0-1F-10 Wet area -Ceramic Wall Clading

    FL0-1F-04 Wet area- Ceramic flooringFL0-1F-02 Floor Screed for Electrical Room

    FL0-1F-01 Ceramic flooring inside room

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    24/114

    FL0-1F-03 Ceramic tiling to balconey and terraseFL0-1F-05 Ceramic tile to entrance loby

    FL0-1F-06 Marble flooring to Corridor

    FL0-1F-07 SkirtingFL0-1F-09 Corridor Wall Clading-Ceramic

    FL0-1F-08 Telephone room & other room flooring

    FL0-1F-11 ThresholdFAL-1F-01 1F-Baalcony False Ceiling

    FAL-1F-02 False Ceiling

    PANT-1F-01 Internal wall & ceiling paintingPANT-1F-02 Final internal painting

    CARP-1F-01 Fixing of Door Frame

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    25/114

    CARP-1F-02 Fixing of Door ShutterCARP-1F-03 Fixing of Kitchen Cabinet

    CARP-1F-04 Fixing of Wardrobes

    MEP-1F-08 Bath Tub FixingMEP-1F-09 Sanitary fixing & Mixer

    BLO-2F-01 clening

    BLO-2F-02 Block layout and checkingBLO-2F-04 Block work- 2F

    BLO-2F-03 Internal Block Work

    A0ON-2F-07 R.C.C LintelPLAS-2F-01 Wall Plaster - 2F

    PLAS-2F-02 Celing Plaster- 2F

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    26/114

    WPR-2F-02 Water proof coating to Wet areasWPR-2F-03 Vertical side w/p of wet area

    FLO-2F-10 Wet area -Ceramic Wall Clading

    FLO-2F-05 Wet area- Ceramic flooringFLO-2F-01 Ceramic tile to entrance loby

    FLO-2F-02 Floor Screed for Electrical Room

    FLO-2F-03 Ceramic tile iside the roomFLO-2F-04 Ceramic tiling to balconey and terrase

    FLO-2F-06 Marble flooring to Corridor

    FLO-2F-07 Skirting

    FLO-2F-09 Corridor Wall Clading-Ceramic

    FLO-2F-08 Telephone room & other room flooring

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    27/114

    FLO-2F-11 ThresholdFAL-2F-01 2F-Baalcony False Ceiling

    FAL-2F-02 False Ceiling

    PANT-2F-01 Internal wall & ceiling paintingPANT-2F-02 Final internal painting

    CARP-2F-01 Fixing of Door Frame

    CARP-2F-02 Fixing of Door ShutterCARP-2F-03 Fixing of Kitchen Cabinet

    CARP-2F-04 Fixing of Wardrobes

    MEP-2F-08 Bath Tub Fixing

    MEP-2F-09 Sanitary fixing & Mixer

    BLO-3F-01 cleaning

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    28/114

    BLO-3F-02 Block layout and checkingBLO-3F-03 Block work -3F

    BLO-3F-04 Internal Block Work

    A0ON-3F-07 R.C.C LintelPLAS-3F-01 Wall Plaster - 3F

    PLAS-3F-02 Celing Plaster- 3F

    WPR-3F-02 Water proof coating to Wet areasWPR-3F-03 Vertical side w/p of wet area

    FLO-3F-08 Wet area -Ceramic Wall Clading

    FLO-3F-03 Wet area- Ceramic flooring

    FLO-3F-01 Ceramic tiling to balconey and terrase

    FLO-3F-02 Ceramic tile iside the room

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    29/114

    FLO-3F-06 Floor Screed for Electrical RoomFLO-3F-04 Ceramic tile to entrance loby

    FLO-3F-05 Skirting

    FLO-3F-07 Telephone room & other room flooringFLO-3F-09 Marble flooring to Corridor

    FLO-3F-10 Threshold

    FLO-3F-11 Corridor Wall Clading-CeramicFAL-3F-01 3F-Baalcony False Ceiling

    FAL-3F-02 False Ceiling

    PANT-3F-01 Internal wall & ceiling painting

    PANT-3F-02 Final internal painting

    CARP-3F-01 Fixing of Door Frame

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    30/114

    CARP-3F-02 Fixing of Door ShutterCARP-3F-03 Fixing of Kitchen Cabinet

    CARP-3F-04 Fixing of Wardrobes

    MEP-3F-08 Bath Tub FixingMEP-3F-09 Sanitary fixing & Mixer

    BLO-4F-01 cleaning

    BLO-4F-02 Block layout and checkingBLO-4F-04 Block work -4F

    BLO-4F-03 Internal Block Work

    A0ON-4F-07 R.C.C Lintel

    PLAS-4F-01 Wall Plaster - 4F

    PLAS-4F-02 Celing Plaster- 4F

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    31/114

    WPR-4F-02 Water proof coating to Wet areasWPR-4F-03 Vertical side w/p of wet area

    FLO-4F-09 Wet area -Ceramic Wall Clading

    FLO-4F-08 Wet area- Ceramic flooringFLO-4F-02 Floor Screed for Electrical Room

    FLO-4F-01 Ceramic tile to entrance loby

    FLO-4F-03 Ceramic tiling to balconey and terraseFLO-4F-05 Marble flooring to Corridor

    FLO-4F-04 Ceramic tile iside the room

    FLO-4F-10 Telephone room & other room flooring

    FLO-4F-06 Corridor Wall Clading-Ceramic

    FLO-4F-07 Skirting

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    32/114

    FLO-4F-11 ThresholdFAL-4F-01 4F-Balcony False Ceiling

    FAL-4F-02 False Ceiling

    PANT-4F-01 Internal wall & ceiling paintingPANT-4F-02 Final internal painting

    CARP-4F-02 Fixing of Door Frame

    CARP-4F-03 Fixing of Door ShutterCARP-4F-01 Fixing of Kitchen Cabinet

    CARP-4F-04 Fixing of Wardrobes

    MEP-4F-08 Bath Tub Fixing

    MEP-4F-09 Sanitary fixing & Mixer

    BLO-5F-01 cleaning

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    33/114

    BLO-5F-02 Block layout and checkingBLO-5F-04 Block work -5F

    BLO-5F-03 Internal Block Work

    A0ON-5F-07 R.C.C LintelPLAS-5F-01 Wall Plaster - 5F

    PLAS-5F-02 Celing Plaster- 5F

    WRP-5F-02 Water proof coating to Wet areasWRP-5F-03 Vertical side w/p of wet area

    FLO-5F-10 Wet area -Ceramic Wall Clading

    FLO-5F-04 Wet area- Ceramic flooring

    FLO-5F-01 Floor Screed for Electrical Room

    FLO-5F-03 Ceramic tile to entrance loby

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    34/114

    FLO-5F-06 Marble flooring to CorridorFLO-5F-05 Ceramic tile iside the room

    FLO-5F-02 Ceramic tiling to balconey and terrase

    FLO-5F-08 Telephone room & other room flooringFLO-5F-07 Corridor Wall Clading-Ceramic

    FLO-5F-09 Skirting

    FLO-5F-11 ThresholdFAL-5F-01 5F-Balcony False Ceiling

    FAL-5F-02 False Ceiling

    PANT-5F-01 Internal wall & ceiling painting

    PANT-5F-02 Final internal painting

    CARP-5F-02 Fixing of Door Frame

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    35/114

    CARP-5F-03 Fixing of Door ShutterCARP-5F-01 Fixing of Kitchen Cabinet

    CARP-5F-04 Fixing of Wardrobes

    MEP-5F-08 Bath Tub FixingMEP-5F-09 Sanitary fixing & Mixer

    BLO-6F-01 cleaning

    BLO-6F-02 Block layout and checkingBLO-6F-03 Block work -6F

    BLO-6F-04 Internal Block Work

    A0ON-6F-07 R.C.C Lintel

    PLAS-6F-01 Wall Plaster - 6F

    PLAS-6F-02 Celing Plaster- 6F

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    36/114

    WRP-6F-02 Water proof coating to Wet areasWRP-6F-03 Vertical side w/p of wet area

    FLO-6F-11 Wet area -Ceramic Wall Clading

    FLO-6F-05 Wet area- Ceramic flooringFLO-6F-01 Floor Screed for Electrical Room

    FLO-6F-03 Ceramic tile to entrance loby

    FLO-6F-04 Ceramic tile iside the roomFLO-6F-02 Ceramic tiling to balconey and terrase

    FLO-6F-06 Skirting

    FLO-6F-09 Marble flooring to Corridor

    FLO-6F-10 Corridor Wall Clading-Ceramic

    FLO-6F-07 Telephone room & other room flooring

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    37/114

    FLO-6F-08 ThresholdFAL-6F-01 6F-Balcony False Ceiling

    FAL-6F-02 False Ceiling

    PANT-6F-01 Internal wall & ceiling paintingPANT-6F-02 Final internal painting

    CARP-6F-01 Fixing of Door Frame

    CARP-6F-02 Fixing of Door ShutterCARP-6F-03 Fixing of Kitchen Cabinet

    CARP-6F-04 Fixing of Wardrobes

    MEP-6F-08 Bath Tub Fixing

    MEP-6F-11 Sanitary fixing & Mixer

    BLO-7F-01 cleaning

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    38/114

    BLO-7F-02 Block layout and checkingBLO-7F-03 Block work -7F

    BLO-7F-04 Internal Block Work

    A0ON-7F-07 R.C.C LintelPLAS-7F-01 Wall Plaster - 7F

    PLAS-7F-02 Celing Plaster- 7F

    WRP-7F-02 Water proof coating to Wet areas

    WRP-7F-03 Vertical side w/p of wet area

    FLO-7F-11 Wet area -Ceramic Wall Clading

    FLO-7F-06 Wet area- Ceramic flooring

    FLO-7F-02 Floor Screed for Electrical Room

    FLO-7F-01 Ceramic tile to entrance loby

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    39/114

    FLO-7F-04 SkirtingFLO-7F-03 Ceramic tile iside the room

    FLO-7F-05 Ceramic tiling to balconey and terrase

    FLO-7F-08 Marble flooring to coridoorFLO-7F-10 Corridor Wall Clading-Ceramic

    FLO-7F-07 Telephone room & other room flooring

    FLO-7F-09 Threshold

    FAL-7F-01 7F-Balcony False Ceiling

    FAL-7F-02 False Ceiling

    PANT-7F-01 Internal wall & ceiling painting

    PANT-7F-02 Final internal painting

    CARP-7F-01 Fixing of Door Frame

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    40/114

    CARP-7F-02 Fixing of Door ShutterCARP-7F-03 Fixing of Kitchen Cabinet

    CARP-7F-04 Fixing of Wardrobes

    MEP-7F-08 Bath Tub FixingMEP-7F-12 Sanitary fixing & Mixer

    BLO-HC-01 cleaning

    BLO-HC-02 Block layout and checking

    BLO-HC-04 Internal Block Work

    BLO-HC-03 Block work -HC

    A0ON-HC-10 R.C.C Lintel - HC

    PLAS-HC-01 Wall Plaster - HC

    A0AS-HC-02 Celing Plaster- HC

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    41/114

    FLO-HC-07 rubber floor above screed in gymFLO-HC-09 rubber skirting

    FLO-HC-10 Graniti Ceramic tile( Steps to pool Dake Area)

    FLO-HC-11 swimming pool wall cladingFLO-HC-14 Graniti Ceramic tile ( lift m/c room)

    WRP-HC-02 Water proof coating to Wet areas

    FLO-HC-02 White cement tiles

    WRP-HC-03 Vertical side w/p of wet area

    FLO-HC-04 wet area wall clading

    FLO-HC-05 Ceramic flooring to swiming pool wall

    A0LO-EX-02 Fixing of window sill

    FLO-HC-01 Floor Screed for Electrical / store / tel room

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    42/114

    FLO-HC-03 Marble flooring to lift lobyFLO-HC-06 Threshold

    FLO-HC-08 Corridor Wall Clading-Ceramic

    FLO-HC-12 Ceramic flooring to Filter RoomFLO-HC-13 Step to pool Deck

    PANT-HC-01 Lift Int .wall bitumen coating

    FAL-HC-01 False Ceiling

    PANT-HC-02 Internal wall & ceiling painting

    PANT-HC-03 Final internal painting

    PANT-HC-04 Epoxy painting to staircase

    CARP-HC-01 Fixing of Door Frame

    CARP-HC-02 Fixing of Door shutter

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    43/114

    MEP-HC-12 Sanitary fixing & MixerBLO-UR-01 Block work-UR

    PLAS-UR-01 Wall Plaster- UR

    PLAS-UR-02 Celing Plaster- URPLAS-UR-03 Staircase wall plaster

    PLAS-UR-04 Staircase Ceilling plaster

    CARP-UR-01 Fixing of Door Frame

    CARP-UR-02 Fixing of Door shutter

    MEP-B-02 MEP -Wall Conduites

    MEP-B-03 Fixing of DB Back box ,GI box

    MEP-B-04 Fixing of DB

    MEP-B-06 Internal wiring

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    44/114

    MEP-B-07 Main Cable workMEP-B-08 Switches & Sockets

    MEP-B-10 Instalation of Islolater for A/C

    MEP-B-09 Light FittingsMEP-GF-01 MEP -Wall Conduites

    MEP-GF-02 Fixing of DB Back box ,GI box

    MEP-GF-00 Fixing of DB

    MEP-GF-04 Internal wiring

    MEP-GF-06 Main Cable work

    MEP-GF-08 Switches & Sockets

    MEP-GF-10 Instalation of Islolater for A/C

    MEP-GF-09 Light Fittings

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    45/114

    MEP-1F-01 MEP -Wall ConduitesMEP-1F-04 Fixing of DB Back box ,GI box

    MEP-1F-03 Fixing of DB

    MEP-1F-05 Internal wiringMEP-1F-07 Main Cable work

    MEP-1F-10 Switches & Sockets

    MEP-1F-12 Instalation of Islolater for A/C

    MEP-1F-11 Light Fittings

    MEP-2F-01 MEP -Wall Conduites

    MEP-2F-02 Fixing of DB Back box ,GI box

    MEP-2F-03 Fixing of DB

    MEP-2F-05 Internal wiring

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    46/114

    MEP-2F-07 Main Cable workMEP-2F-10 Switches & Sockets

    MEP-2F-12 Instalation of Islolater for A/C

    MEP-2F-11 Light FittingsMEP-3F-02 MEP -Wall Conduites

    MEP-3F-04 Fixing of DB Back box ,GI box

    MEP-3F-03 Fixing of DB

    MEP-3F-05 Internal wiring

    MEP-3F-07 Main Cable work

    MEP-3F-10 Switches & Sockets

    MEP-3F-12 Instalation of Islolater for A/C

    MEP-3F-11 Light Fittings

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    47/114

    MEP-4F-01 MEP -Wall ConduitesMEP-4F-04 Fixing of DB Back box ,GI box

    MEP-4F-03 Fixing of DB

    MEP-4F-05 Internal wiringMEP-4F-07 Main Cable work

    MEP-4F-10 Switches & Sockets

    MEP-4F-15 Instalation of Islolater for A/C

    MEP-4F-14 Light Fittings

    MEP-5F-01 MEP -Wall Conduites

    MEP-5F-04 Fixing of DB Back box ,GI box

    MEP-5F-03 Fixing of DB

    MEP-5F-05 Internal wiring

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    48/114

    MEP-5F-07 Main Cable workMEP-5F-13 Switches & Sockets

    MEP-5F-15 Instalation of Islolater for A/C

    MEP-5F-14 Light FittingsMEP-6F-01 MEP -Wall Conduites

    MEP-6F-03 Fixing of DB Back box ,GI box

    MEP-6F-02 Fixing of DB

    MEP-6F-06 Internal wiring

    MEP-6F-07 Main Cable work

    MEP-6F-13 Switches & Sockets

    MEP-6F-15 Instalation of Islolater for A/C

    MEP-6F-14 Light Fittings

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    49/114

    MEP-7F-01 MEP -Wall ConduitesMEP-7F-03 Fixing of DB Back box ,GI box

    MEP-7F-02 Fixing of DB

    MEP-7F-05 Internal wiring

    MEP-7F-07 Main Cable work

    MEP-7F-13 Switches & Sockets

    MEP-7F-14 Light Fittings

    MEP-7F-15 Instalation of Islolater for A/C

    MEP-HC-01 MEP -Wall Conduites

    MEP-HC-02 Fixing of DB

    MEP-HC-03 Fixing of DB Back box ,GI box

    MEP-UR-01 MEP Wall Conduites & instalation of DB Box

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    50/114

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    51/114

    MEP-1F-06 Water Supply PPR pipingMEP-2F-06 Water Supply PPR piping

    MEP-4F-02 Water supply PEX piping

    MEP-3F-06 Water Supply PPR piping

    MEP-5F-02 Water supply PEX piping

    MEP-4F-06 Water Supply PPR piping

    MEP-6F-04 Water supply PEX piping

    MEP-5F-06 Water Supply PPR piping

    MEP-7F-04 Water supply PEX piping

    MEP-6F-05 Water Supply PPR piping

    MEP-HC-04 Water supply PEX piping

    MEP-7F-06 Water Supply PPR piping

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    52/114

    MEP-HC-05 Water Supply PPR pipingMEP-HC-07 Above ground Drainage

    MEP-GF-11 Drainage Risers

    MEP-GF-12 Water supply Riser

    MEP-1F-13 Drainage Risers

    MEP-1F-14 Water supply Riser

    MEP-GF-15 Civil work for maanhole / fic /Sand traap /etc

    MEP-2F-13 Drainage Risers

    MEP-2F-14 Water supply Riser

    MEP-3F-13 Drainage Risers

    MEP-3F-14 Water supply Riser

    MEP-GF-13 Water Heater fixing

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    53/114

    MEP-4F-11 Drainage RisersMEP-4F-12 Water supply Riser

    MEP-1F-15 Water Heater fixing

    MEP-2F-15 Water Heater fixing

    MEP-5F-10 Drainage Risers

    MEP-5F-11 Water supply Riser

    MEP-3F-15 Water Heater fixing

    MEP-6F-09 Drainage Risers

    MEP-6F-10 Water supply Riser

    MEP-4F-13 Water Heater fixing

    MEP-7F-09 Drainage Risers

    MEP-7F-10 Water supply Riser

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    54/114

    MEP-5F-12 Water Heter fixingMEP-HC-09 Water supply Riser

    MEP-HC-10 Drainage Risers

    MEP-6F-12 Water Heater fixing

    MEP-HC-13 Roof water supply work

    MEP-7F-11 Water Heter fixing

    MEP-HC-11 Water Heter fixing

    MEP-HC-14 Water tank Instlation

    MEP-HC-15 Pump Fitting

    A0VAC-B-17 Ducting work for A/C

    A0AC-GF-17 A/C unit hanging (indoor)

    A0AC-1F-18 A/C unit hanging (indoor)

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    55/114

    A0VAC-B-19 Ref. piping WorkA0AC-GF-18 Ducting work for A/C

    A0AC-GF-20 Ref. piping Work

    A0AC-2F-18 A/C unit hanging (indoor)

    A0AC-3F-18 A/C unit hanging (indoor)

    A0AC-1F-19 Ducting work for A/C

    A0AC-1F-21 Ref. piping Work

    A0AC-2F-19 Ducting work for A/C

    A0AC-4F-18 A/C unit hanging (indoor)

    A0AC-2F-21 Ref. piping Work

    A0AC-GF-19 Ext.Fan Fixing

    A0AC-GF-21 Air out let fixing

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    56/114

    A0AC-3F-19 Ducting work for A/CA0VAC-B-16 Fresh air Duct

    A0AC-3F-21 Ref. piping Work

    A0AC-5F-18 A/C unit hanging (indoor)

    A0VAC-B-18 Ext.Fan Fixing

    A0VAC-B-20 Air out let fixing

    A0AC-4F-19 Ducting work for A/C

    A0AC-4F-21 Ref. piping Work

    A0AC-6F-18 A/C unit hanging (indoor)

    A0AC-2F-20 Ext.Fan Fixing

    A0AC-2F-22 Air out let fixing

    A0AC-1F-20 Ext.Fan Fixing

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    57/114

    A0AC-1F-22 Air out let fixingA0AC-5F-19 Ducting work for A/C

    A0AC-7F-18 A/C unit hanging (indoor)

    A0AC-3F-20 Ext.Fan Fixing

    A0AC-3F-22 Air out let fixing

    A0AC-6F-19 Ducting work for A/C

    A0AC-5F-21 Ref. piping Work

    A0AC-6F-21 Ref. piping Work

    A0AC-4F-20 Ext.Fan Fixing

    A0AC-4F-22 Air out let fixing

    A0AC-HC-20 A/C unit hanging (indoor)

    A0AC-7F-19 Ducting work for A/C

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    58/114

    A0AC-7F-21 Ref. piping WorkA0AC-HC-21 Ducting work for A/C

    A0AC-5F-20 Ext.Fan Fixing

    A0AC-5F-22 Air out let fixing

    A0AC-6F-20 Ext.Fan Fixing

    A0AC-6F-22 Air out let fixing

    A0AC-HC-24 Ref. piping Work

    A0AC-HC-23 Ext.Fan Fixing

    A0AC-HC-25 Air out let fixing

    A0AC-7F-20 Ext.Fan Fixing

    A0AC-7F-22 Air out let fixing

    A0AC-HC-22 A/C units ( outdoor)

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    59/114

    WPR-1F-01 Balcony W/P 1FPAV-01 Precast Wheel Stopper

    WPR-2F-01 Balcony W/P 2F

    WPR-3F-01 Balcony W/P 3F

    WPR-4F-01 Balcony W/P 4F

    WRP-5F-01 Balcony W/P 5F

    WRP-6F-01 Balcony W/P 6F

    PLAS-EX-01 External roof area Plastering

    WRP-7F-01 Balcony W/P 7F

    PANT-EX-01 Epoxy painting to Roof

    PLAS-EX-02 Airwell Plastering

    PANT-EX-02 Epoxy painting to side of stair wall to S.Pool

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    60/114

    MET-06 Balconey Rainling

    PANT-EX-03 Fless Coat to Air Wall

    WRP-HC-01 waterproofing to swiming pool

    WRP-EX-01 Roof , Parapet wall W/P & Testing

    WRP-EX-02 W/P to Air wall flr,skirt,R. rain water outlet

    WRP-EX-03 Bitumen coating to External Block Wall -A

    PLAS-EX-03 External elevation Plastering -A

    FLO-EX-01 External elevation marble wall clading-A

    MET-02 Aluminium Cladding On elevation- A

    MET-04 Aluminium Claading Upper Roof Area

    WRP-EX-04 Bitumen coating to External Block Wal- B

    PLAS-EX-04 External elevation Plastering -B

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    61/114

    FLO-EX-02 External elevation marble wall clading-B

    MET-03 Aluminium Cladding On elevation- B

    WRP-EX-05 Bitumen coating to External Block Wal-C

    PLAS-EX-05 External elevation Plastering -C

    FLO-EX-03 External elevation marble wall clading-C

    MET-07 Aluminium Cladding On elevation- C

    WRP-EX-06 Bitumen coating to External Block Wal-D

    PLAS-EX-06 External elevation Plastering -D

    FLO-EX-04 External elevation marble wall clading-D

    MET-08 Aluminium Cladding On elevation- D

    PAV-02 Fixing Kerb Stone at island & footh path

    PAV-03 Fixing 60mm Paving block

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    62/114

    PAV-04 80 mm Interlock at parking

    PAV-05 Trafic line marking

    A0MIS-03 Fixing of column guards

    MET-05 Aluminium / door & Window

    A0MIS-06 Compound Wall

    MET-09 Staircase Hand Rail

    MET-10 Cat ladders (For Airwel )

    MET-11 Steel Pipe Gaurde (basement water side)

    PR0-01 Security System

    PR0-05 Gate barriers

    PR0-03 Garbeg Disposal system

    PR0-02 Pool Work

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    63/114

    PRO-14 Reception counter

    PR0-08 Instaltion Of Generator

    PR0-09 TV system

    PR0-06 Fixing of lockers

    PR0-04 Sauna & Steam System

    PR0-07 Lift instalation & Commissioning

    PR0-11 Intercom system

    PR0-10 Cradle system instalation

    PR0-12 Transformar Instlation

    PR0-13 Music system

    TES-02 Testing & Commissioning

    TES-01 Signage

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    64/114

    TES-03 Civil Defance Inspection

    TES-04 DM Inspection

    TES-05 Complition certificate from DM

    TES-06 P R O J E C T H A N D O V E R

    SUCO-6F-15 Steel Work for 7.F Slab

    SUCO-6F-16 MEP sleves & conduits for 7.F Slab

    SUCO-6F-17 Seventh Floor Slab Casting (PART-B)

    SUCO-6F-18 Deshuttering PART- B

    SUCO-7F-01 steel work for column/A

    SUCO-7F-02 Form work for column/A

    SUCO-7F-03 Shear Wall /A

    SUCO-7F-04 Column casting For RF /A Slab

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    65/114

    SUCO-7F-05 Decking work for RF/A Slab

    SUCO-7F-06 Steel Work for RF/A Slab

    SUCO-7F-07 MEP sleves & conduits for RF/A Slab

    SUCO-7F-08 Roof Floor Slab Casting[Part-A ]

    SUCO-7F-09 Deshuttering PART- A

    SUCO-7F-11 steel work for column

    SUCO-7F-10 Shear Wall & Lift Core Wall

    SUCO-7F-12 Form work for column

    SUCO-7F-13 Column casting For RF Slab

    SUCO-7F-14 Decking Work for R.F Slab

    SUCO-7F-15 Steel Work for R.F Slab

    SUCO-7F-16 MEP sleves & conduits for R.F Slab

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    66/114

    SUCO-7F-17 Roof Slab Casting (PART-B)

    SUCO-7F-18 Deshuttering PART- B

    SUCO-HC-01 steel work for column

    SUCO-HC-02 Shear Wall & Lift Core Wall

    SUCO-HC-03 Form work for column

    SUCO-HC-05 Parapet Wall

    SUCO-HC-04 Column casting

    SUCO-HC-07 Swimming pool Shell

    SUCO-HC-10 Pool Deck

    SUCO-HC-06 Decking Work for HC Slab

    SUCO-HC-09 MEP sleves & conduits for HC Slab

    SUCO-HC-08 Steel Work for HC Slab

    SUCO HC 11 H l h Cl b Sl b C i

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    67/114

    SUCO-HC-11 Helth Club Slab Casting

    SUCO-HC-12 Deshuttering

    SUCO-UR-03 steel work for column

    SUCO-UR-02 Shear Wall & Lift Core Wall

    SUCO-UR-04 Form work for column

    SUCO-UR-05 Parapet Wall above HC

    SUCO-UR-01 Column casting For lift m/c room

    SUCO-UR-06 Decking Work for lift m/c room

    SUCO-UR-08 MEP sleves & conduits for lift m/c room

    SUCO-UR-07 Steel Work for lift m/c room

    SUCO-UR-09 Lift m/c room Slab

    BLO-B-01 cleaning

    BLO B 02 Bl k l t d h ki

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    68/114

    BLO-B-02 Block layout and checking

    BLO-B-03 Block work in Basement

    BLO-B-04 R.C.C Lintel

    PLAS-B-01 Wall Plaster - Basement

    PLAS-B-02 Celing Plaster-Basement

    FLO-B-02 marble flooring to lift loby

    A0EXAV-09 Earth filling above raft 8tk

    FLO-B-04 Marble Wall Clading to Lift Loby

    FLO-B-05 4 PCC with mesh

    FLO-B-07 Pump/ Store room flooring

    FLO-B-01 Car parking /Driveway Floor Finishing

    FLO-B-03 floor finish to water tank area

    FLO B 06 W ll l di t P

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    69/114

    FLO-B-06 Wall clading to Pump room

    FLO-B-08 Thrishold

    FAL-B-01 False Ceiling

    PANT-B-01 Internal wall & ceiling painting

    PANT-B-02 Anticarbonation painting in wall

    PANT-B-03 Final internal painting

    CARP-B-01 Fixing of Door Frame

    CARP-B-02 Fixing of Door Shutter

    A0MIS-01 Substation Trenching Work

    MET-01 Aluminium (LOUVER WORK) Substation

    PANT-GF-01 Transformer room painting

    A0PRO-17 Dewa Inspection Substation

    A0PRO 18 S b station hand o er to DEWA

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    70/114

    A0PRO-18 Sub station hand over to DEWA

    BLO-GF-01 cleaning

    BLO-GF-02 Block layout and checking

    BLO-GF-03 Internal Block Work

    BLO-GF-04 Block work- GF

    A0ON-GF-08 R.C.C Lintel

    PLAS-GF-02 Celing Plaster- GF

    PLAS-GF-01 Wall Plaster GF

    WPR-GF-02 GF- Parking W/P

    WPR-GF-01 Water proof coating to Wet areas

    WPR-GF-03 Vertical side w/p of wet area

    FLO-GF-08 Wet area wall clading ( garbage room)

    FLO GF 06 Wet area flooring (ceramic tiles)

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    71/114

    FLO-GF-06 Wet area flooring (ceramic tiles)

    WPR-GF-04 Water proofing to substation slab roof

    FLO-GF-02 Floor Screed for Electrical Room/gym/

    FLO-GF-01 4 PCC with mesh

    FLO-GF-03 Floor Screed for M.hall

    FLO-GF-05 Floor Screed for Electricaal Sub-station

    FLO-GF-04 Car parking /Driveway Floor Finishing

    FLO-GF-07 Floor Screed for Gym / Shop

    FLO-GF-09 Mosaic flooring to stair floor & landing area

    FLO-GF-10 Floor Screed for Gen. Room

    FLO-GF-11 Store and other room flooring

    FLO-GF-12 mosaic step

    FLO GF 14 Marble flooring to Entrance passage

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    72/114

    FLO-GF-14 Marble flooring to Entrance passage

    FLO-GF-15 mosaic skirting for steps

    FLO-GF-13 Threshold

    FLO-GF-17 Fixing Marble Steps

    FLO-GF-16 Marble Wall Clading to Lift Loby

    FAL-GF-01 False Ceiling

    PANT-GF-02 Internal wall & ceiling painting

    PANT-GF-03 Final internal painting

    PANT-GF-04 Anticarbonation painting in wall

    CARP-GF-01 Fixing of Door Frame

    CARP-GF-02 Fixing of Door Shutter

    CARP-GF-03 Fixing of Kitchen Cabinet

    CARP GF 04 Fixing of Wardrobes

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    73/114

    CARP-GF-04 Fixing of Wardrobes

    MEP-GF-07 Sanitary fixing & Mixer

    BLO-1F-01 Cleaning

    BLO-1F-02 Block layout and checking

    BLO-1F-04 Block work- 1F

    BLO-1F-03 Internal Block Work

    A0ON-1F-07 R.C.C Lintel

    PLAS-1F-02 Celing Plaster- 1F

    PLAS-1F-01 Wall Plaster - 1F

    WPR-1F-02 Water proof coating to Wet areas

    WPR-1F-03 Vertical side w/p of wet area

    FL0-1F-10 Wet area -Ceramic Wall Clading

    FL0-1F-04 Wet area- Ceramic flooring

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    74/114

    FL0-1F-04 Wet area- Ceramic flooring

    FL0-1F-02 Floor Screed for Electrical Room

    FL0-1F-01 Ceramic flooring inside room

    FL0-1F-03 Ceramic tiling to balconey and terrase

    FL0-1F-05 Ceramic tile to entrance loby

    FL0-1F-06 Marble flooring to Corridor

    FL0-1F-07 Skirting

    FL0-1F-09 Corridor Wall Clading-Ceramic

    FL0-1F-08 Telephone room & other room flooring

    FL0-1F-11 Threshold

    FAL-1F-01 1F-Baalcony False Ceiling

    FAL-1F-02 False Ceiling

    PANT-1F-01 Internal wall & ceiling painting

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    75/114

    PANT 1F 01 Internal wall & ceiling painting

    PANT-1F-02 Final internal painting

    CARP-1F-01 Fixing of Door Frame

    CARP-1F-02 Fixing of Door Shutter

    CARP-1F-03 Fixing of Kitchen Cabinet

    CARP-1F-04 Fixing of Wardrobes

    MEP-1F-08 Bath Tub Fixing

    MEP-1F-09 Sanitary fixing & Mixer

    BLO-2F-01 clening

    BLO-2F-02 Block layout and checking

    BLO-2F-04 Block work- 2F

    BLO-2F-03 Internal Block Work

    A0ON-2F-07 R C C Lintel

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    76/114

    A0ON 2F 07 R.C.C Lintel

    PLAS-2F-01 Wall Plaster - 2F

    PLAS-2F-02 Celing Plaster- 2F

    WPR-2F-02 Water proof coating to Wet areas

    WPR-2F-03 Vertical side w/p of wet area

    FLO-2F-10 Wet area -Ceramic Wall Clading

    FLO-2F-05 Wet area- Ceramic flooring

    FLO-2F-01 Ceramic tile to entrance loby

    FLO-2F-02 Floor Screed for Electrical Room

    FLO-2F-03 Ceramic tile iside the room

    FLO-2F-04 Ceramic tiling to balconey and terrase

    FLO-2F-06 Marble flooring to Corridor

    FLO-2F-07 Skirting

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    77/114

    FLO 2F 07 Skirting

    FLO-2F-09 Corridor Wall Clading-Ceramic

    FLO-2F-08 Telephone room & other room flooring

    FLO-2F-11 Threshold

    FAL-2F-01 2F-Baalcony False Ceiling

    FAL-2F-02 False Ceiling

    PANT-2F-01 Internal wall & ceiling painting

    PANT-2F-02 Final internal painting

    CARP-2F-01 Fixing of Door Frame

    CARP-2F-02 Fixing of Door Shutter

    CARP-2F-03 Fixing of Kitchen Cabinet

    CARP-2F-04 Fixing of Wardrobes

    MEP-2F-08 Bath Tub Fixing

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    78/114

    g

    MEP-2F-09 Sanitary fixing & Mixer

    BLO-3F-01 cleaning

    BLO-3F-02 Block layout and checking

    BLO-3F-03 Block work -3F

    BLO-3F-04 Internal Block Work

    A0ON-3F-07 R.C.C Lintel

    PLAS-3F-01 Wall Plaster - 3F

    PLAS-3F-02 Celing Plaster- 3F

    WPR-3F-02 Water proof coating to Wet areas

    WPR-3F-03 Vertical side w/p of wet area

    FLO-3F-08 Wet area -Ceramic Wall Clading

    FLO-3F-03 Wet area- Ceramic flooring

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    79/114

    g

    FLO-3F-01 Ceramic tiling to balconey and terrase

    FLO-3F-02 Ceramic tile iside the room

    FLO-3F-06 Floor Screed for Electrical Room

    FLO-3F-04 Ceramic tile to entrance loby

    FLO-3F-05 Skirting

    FLO-3F-07 Telephone room & other room flooring

    FLO-3F-09 Marble flooring to Corridor

    FLO-3F-10 Threshold

    FLO-3F-11 Corridor Wall Clading-Ceramic

    FAL-3F-01 3F-Baalcony False Ceiling

    FAL-3F-02 False Ceiling

    PANT-3F-01 Internal wall & ceiling painting

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    80/114

    g p g

    PANT-3F-02 Final internal painting

    CARP-3F-01 Fixing of Door Frame

    CARP-3F-02 Fixing of Door Shutter

    CARP-3F-03 Fixing of Kitchen Cabinet

    CARP-3F-04 Fixing of Wardrobes

    MEP-3F-08 Bath Tub Fixing

    MEP-3F-09 Sanitary fixing & Mixer

    BLO-4F-01 cleaning

    BLO-4F-02 Block layout and checking

    BLO-4F-04 Block work -4F

    BLO-4F-03 Internal Block Work

    A0ON-4F-07 R.C.C Lintel

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    81/114

    PLAS-4F-01 Wall Plaster - 4F

    PLAS-4F-02 Celing Plaster- 4F

    WPR-4F-02 Water proof coating to Wet areas

    WPR-4F-03 Vertical side w/p of wet area

    FLO-4F-09 Wet area -Ceramic Wall Clading

    FLO-4F-08 Wet area- Ceramic flooring

    FLO-4F-02 Floor Screed for Electrical Room

    FLO-4F-01 Ceramic tile to entrance loby

    FLO-4F-03 Ceramic tiling to balconey and terrase

    FLO-4F-05 Marble flooring to Corridor

    FLO-4F-04 Ceramic tile iside the room

    FLO-4F-10 Telephone room & other room flooring

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    82/114

    FLO-4F-06 Corridor Wall Clading-Ceramic

    FLO-4F-07 Skirting

    FLO-4F-11 Threshold

    FAL-4F-01 4F-Balcony False Ceiling

    FAL-4F-02 False Ceiling

    PANT-4F-01 Internal wall & ceiling painting

    PANT-4F-02 Final internal painting

    CARP-4F-02 Fixing of Door Frame

    CARP-4F-03 Fixing of Door Shutter

    CARP-4F-01 Fixing of Kitchen Cabinet

    CARP-4F-04 Fixing of Wardrobes

    MEP-4F-08 Bath Tub Fixing

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    83/114

    MEP-4F-09 Sanitary fixing & Mixer

    BLO-5F-01 cleaning

    BLO-5F-02 Block layout and checking

    BLO-5F-04 Block work -5F

    BLO-5F-03 Internal Block Work

    A0ON-5F-07 R.C.C Lintel

    PLAS-5F-01 Wall Plaster - 5F

    PLAS-5F-02 Celing Plaster- 5F

    WRP-5F-02 Water proof coating to Wet areas

    WRP-5F-03 Vertical side w/p of wet area

    FLO-5F-10 Wet area -Ceramic Wall Clading

    FLO-5F-04 Wet area- Ceramic flooring

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    84/114

    FLO-5F-01 Floor Screed for Electrical Room

    FLO-5F-03 Ceramic tile to entrance loby

    FLO-5F-06 Marble flooring to Corridor

    FLO-5F-05 Ceramic tile iside the room

    FLO-5F-02 Ceramic tiling to balconey and terrase

    FLO-5F-08 Telephone room & other room flooring

    FLO-5F-07 Corridor Wall Clading-Ceramic

    FLO-5F-09 Skirting

    FLO-5F-11 Threshold

    FAL-5F-01 5F-Balcony False Ceiling

    FAL-5F-02 False Ceiling

    PANT-5F-01 Internal wall & ceiling painting

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    85/114

    PANT-5F-02 Final internal painting

    CARP-5F-02 Fixing of Door Frame

    CARP-5F-03 Fixing of Door Shutter

    CARP-5F-01 Fixing of Kitchen Cabinet

    CARP-5F-04 Fixing of Wardrobes

    MEP-5F-08 Bath Tub Fixing

    MEP-5F-09 Sanitary fixing & Mixer

    BLO-6F-01 cleaning

    BLO-6F-02 Block layout and checking

    BLO-6F-03 Block work -6FBLO-6F-04 Internal Block Work

    A0ON-6F-07 R.C.C Lintel

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    86/114

    PLAS-6F-01 Wall Plaster - 6F

    PLAS-6F-02 Celing Plaster- 6F

    WRP-6F-02 Water proof coating to Wet areas

    WRP-6F-03 Vertical side w/p of wet area

    FLO-6F-11 Wet area -Ceramic Wall Clading

    FLO-6F-05 Wet area- Ceramic flooring

    FLO-6F-01 Floor Screed for Electrical Room

    FLO-6F-03 Ceramic tile to entrance loby

    FLO-6F-04 Ceramic tile iside the room

    FLO-6F-02 Ceramic tiling to balconey and terraseFLO-6F-06 Skirting

    FLO-6F-09 Marble flooring to Corridor

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    87/114

    FLO-6F-10 Corridor Wall Clading-Ceramic

    FLO-6F-07 Telephone room & other room flooring

    FLO-6F-08 Threshold

    FAL-6F-01 6F-Balcony False Ceiling

    FAL-6F-02 False Ceiling

    PANT-6F-01 Internal wall & ceiling painting

    PANT-6F-02 Final internal painting

    CARP-6F-01 Fixing of Door Frame

    CARP-6F-02 Fixing of Door Shutter

    CARP-6F-03 Fixing of Kitchen CabinetCARP-6F-04 Fixing of Wardrobes

    MEP-6F-08 Bath Tub Fixing

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    88/114

    MEP-6F-11 Sanitary fixing & Mixer

    BLO-7F-01 cleaning

    BLO-7F-02 Block layout and checking

    BLO-7F-03 Block work -7F

    BLO-7F-04 Internal Block Work

    A0ON-7F-07 R.C.C Lintel

    PLAS-7F-01 Wall Plaster - 7F

    PLAS-7F-02 Celing Plaster- 7F

    WRP-7F-02 Water proof coating to Wet areas

    WRP-7F-03 Vertical side w/p of wet areaFLO-7F-11 Wet area -Ceramic Wall Clading

    FLO-7F-06 Wet area- Ceramic flooring

    FLO 7F 02 Fl S d f El i l R

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    89/114

    FLO-7F-02 Floor Screed for Electrical Room

    FLO-7F-01 Ceramic tile to entrance loby

    FLO-7F-04 Skirting

    FLO-7F-03 Ceramic tile iside the room

    FLO-7F-05 Ceramic tiling to balconey and terrase

    FLO-7F-08 Marble flooring to coridoor

    FLO-7F-10 Corridor Wall Clading-Ceramic

    FLO-7F-07 Telephone room & other room flooring

    FLO-7F-09 Threshold

    FAL-7F-01 7F-Balcony False CeilingFAL-7F-02 False Ceiling

    PANT-7F-01 Internal wall & ceiling painting

    PANT 7F 02 Fi l i l i i

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    90/114

    PANT-7F-02 Final internal painting

    CARP-7F-01 Fixing of Door Frame

    CARP-7F-02 Fixing of Door Shutter

    CARP-7F-03 Fixing of Kitchen Cabinet

    CARP-7F-04 Fixing of Wardrobes

    MEP-7F-08 Bath Tub Fixing

    MEP-7F-12 Sanitary fixing & Mixer

    BLO-HC-01 cleaning

    BLO-HC-02 Block layout and checking

    BLO-HC-04 Internal Block WorkBLO-HC-03 Block work -HC

    A0ON-HC-10 R.C.C Lintel - HC

    PLAS HC 01 W ll Pl t HC

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    91/114

    PLAS-HC-01 Wall Plaster - HC

    A0AS-HC-02 Celing Plaster- HC

    FLO-HC-07 rubber floor above screed in gym

    FLO-HC-09 rubber skirting

    FLO-HC-10 Graniti Ceramic tile( Steps to pool Dake Area)

    FLO-HC-11 swimming pool wall clading

    FLO-HC-14 Graniti Ceramic tile ( lift m/c room)

    WRP-HC-02 Water proof coating to Wet areas

    FLO-HC-02 White cement tiles

    WRP-HC-03 Vertical side w/p of wet areaFLO-HC-04 wet area wall clading

    FLO-HC-05 Ceramic flooring to swiming pool wall

    A0LO EX 02 Fi i f i d ill

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    92/114

    A0LO-EX-02 Fixing of window sill

    FLO-HC-01 Floor Screed for Electrical / store / tel room

    FLO-HC-03 Marble flooring to lift loby

    FLO-HC-06 Threshold

    FLO-HC-08 Corridor Wall Clading-Ceramic

    FLO-HC-12 Ceramic flooring to Filter Room

    FLO-HC-13 Step to pool Deck

    PANT-HC-01 Lift Int .wall bitumen coating

    FAL-HC-01 False Ceiling

    PANT-HC-02 Internal wall & ceiling paintingPANT-HC-03 Final internal painting

    PANT-HC-04 Epoxy painting to staircase

    CARP HC 01 Fixing of Door Frame

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    93/114

    CARP-HC-01 Fixing of Door Frame

    CARP-HC-02 Fixing of Door shutter

    MEP-HC-12 Sanitary fixing & Mixer

    BLO-UR-01 Block work-UR

    PLAS-UR-01 Wall Plaster- UR

    PLAS-UR-02 Celing Plaster- UR

    PLAS-UR-03 Staircase wall plaster

    PLAS-UR-04 Staircase Ceilling plaster

    CARP-UR-01 Fixing of Door Frame

    CARP-UR-02 Fixing of Door shutterMEP-B-02 MEP -Wall Conduites

    MEP-B-03 Fixing of DB Back box ,GI box

    MEP B 04 Fixing of DB

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    94/114

    MEP-B-04 Fixing of DB

    MEP-B-06 Internal wiring

    MEP-B-07 Main Cable work

    MEP-B-08 Switches & Sockets

    MEP-B-10 Instalation of Islolater for A/C

    MEP-B-09 Light Fittings

    MEP-GF-01 MEP -Wall Conduites

    MEP-GF-02 Fixing of DB Back box ,GI box

    MEP-GF-00 Fixing of DB

    MEP-GF-04 Internal wiringMEP-GF-06 Main Cable work

    MEP-GF-08 Switches & Sockets

    MEP GF 10 Instalation of Islolater for A/C

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    95/114

    MEP-GF-10 Instalation of Islolater for A/C

    MEP-GF-09 Light Fittings

    MEP-1F-01 MEP -Wall Conduites

    MEP-1F-04 Fixing of DB Back box ,GI box

    MEP-1F-03 Fixing of DB

    MEP-1F-05 Internal wiring

    MEP-1F-07 Main Cable work

    MEP-1F-10 Switches & Sockets

    MEP-1F-12 Instalation of Islolater for A/C

    MEP-1F-11 Light FittingsMEP-2F-01 MEP -Wall Conduites

    MEP-2F-02 Fixing of DB Back box ,GI box

    MEP-2F-03 Fixing of DB

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    96/114

    MEP-2F-03 Fixing of DB

    MEP-2F-05 Internal wiring

    MEP-2F-07 Main Cable work

    MEP-2F-10 Switches & Sockets

    MEP-2F-12 Instalation of Islolater for A/C

    MEP-2F-11 Light Fittings

    MEP-3F-02 MEP -Wall ConduitesMEP-3F-04 Fixing of DB Back box ,GI box

    MEP-3F-03 Fixing of DB

    MEP-3F-05 Internal wiringMEP-3F-07 Main Cable work

    MEP-3F-10 Switches & Sockets

    MEP-3F-12 Instalation of Islolater for A/C

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    97/114

    MEP-3F-12 Instalation of Islolater for A/C

    MEP-3F-11 Light Fittings

    MEP-4F-01 MEP -Wall Conduites

    MEP-4F-04 Fixing of DB Back box ,GI box

    MEP-4F-03 Fixing of DB

    MEP-4F-05 Internal wiring

    MEP-4F-07 Main Cable workMEP-4F-10 Switches & Sockets

    MEP-4F-15 Instalation of Islolater for A/C

    MEP-4F-14 Light FittingsMEP-5F-01 MEP -Wall Conduites

    MEP-5F-04 Fixing of DB Back box ,GI box

    MEP-5F-03 Fixing of DB

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    98/114

    MEP 5F 03 Fixing of DB

    MEP-5F-05 Internal wiring

    MEP-5F-07 Main Cable work

    MEP-5F-13 Switches & Sockets

    MEP-5F-15 Instalation of Islolater for A/C

    MEP-5F-14 Light Fittings

    MEP-6F-01 MEP -Wall ConduitesMEP-6F-03 Fixing of DB Back box ,GI box

    MEP-6F-02 Fixing of DB

    MEP-6F-06 Internal wiringMEP-6F-07 Main Cable work

    MEP-6F-13 Switches & Sockets

    MEP-6F-15 Instalation of Islolater for A/C

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    99/114

    MEP 6F 15 Instalation of Islolater for A/C

    MEP-6F-14 Light Fittings

    MEP-7F-01 MEP -Wall Conduites

    MEP-7F-03 Fixing of DB Back box ,GI box

    MEP-7F-02 Fixing of DB

    MEP-7F-05 Internal wiring

    MEP-7F-07 Main Cable workMEP-7F-13 Switches & Sockets

    MEP-7F-14 Light Fittings

    MEP-7F-15 Instalation of Islolater for A/CMEP-HC-01 MEP -Wall Conduites

    MEP-HC-02 Fixing of DB

    MEP-HC-03 Fixing of DB Back box ,GI box

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    100/114

    MEP HC 03 Fixing of DB Back box ,GI box

    MEP-UR-01 MEP Wall Conduites & instalation of DB Box

    MEP-HC-06 Internal wiring

    MEP-HC-08 Main Cable work

    MEP-HC-16 Switches & Sockets

    MEP-HC-17 Light Fittings

    MEP-HC-18 Instalation of Islolater for A/CMEP-B-01 Water supply PEX piping

    MEP-B-05 Water Supply PPR piping

    MEP-GF-03 Water supply PEX pipingMEP-1F-02 Water supply PEX piping

    MEP-GF-05 Water Supply PPR piping

    MEP-2F-04 Water supply PEX piping

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    101/114

    pp y p p g

    MEP-3F-01 Water supply PEX piping

    MEP-1F-06 Water Supply PPR piping

    MEP-2F-06 Water Supply PPR piping

    MEP-4F-02 Water supply PEX piping

    MEP-3F-06 Water Supply PPR piping

    MEP-5F-02 Water supply PEX pipingMEP-4F-06 Water Supply PPR piping

    MEP-6F-04 Water supply PEX piping

    MEP-5F-06 Water Supply PPR pipingMEP-7F-04 Water supply PEX piping

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    102/114

    MEP-3F-13 Drainage Risers

    MEP-3F-14 Water supply Riser

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    103/114

    pp y

    MEP-GF-13 Water Heater fixing

    MEP-4F-11 Drainage Risers

    MEP-4F-12 Water supply Riser

    MEP-1F-15 Water Heater fixing

    MEP-2F-15 Water Heater fixing

    MEP-5F-10 Drainage RisersMEP-5F-11 Water supply Riser

    MEP-3F-15 Water Heater fixing

    MEP-6F-09 Drainage RisersMEP-6F-10 Water supply Riser

    MEP-4F-13 Water Heater fixing

    MEP-7F-09 Drainage Risers

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    104/114

    g

    MEP-7F-10 Water supply Riser

    MEP-5F-12 Water Heter fixing

    MEP-HC-09 Water supply Riser

    MEP-HC-10 Drainage Risers

    MEP-6F-12 Water Heater fixing

    MEP-HC-13 Roof water supply workMEP-7F-11 Water Heter fixing

    MEP-HC-11 Water Heter fixing

    MEP-HC-14 Water tank InstlationMEP-HC-15 Pump Fitting

    A0VAC-B-17 Ducting work for A/C

    A0AC-GF-17 A/C unit hanging (indoor)

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    105/114

    A0AC-1F-18 A/C unit hanging (indoor)

    A0VAC-B-19 Ref. piping Work

    A0AC-GF-18 Ducting work for A/C

    A0AC-GF-20 Ref. piping Work

    A0AC-2F-18 A/C unit hanging (indoor)

    A0AC-3F-18 A/C unit hanging (indoor)A0AC-1F-19 Ducting work for A/C

    A0AC-1F-21 Ref. piping Work

    A0AC-2F-19 Ducting work for A/CA0AC-4F-18 A/C unit hanging (indoor)

    A0AC-2F-21 Ref. piping Work

    A0AC-GF-19 Ext.Fan Fixing

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    106/114

    A0AC-GF-21 Air out let fixing

    A0AC-3F-19 Ducting work for A/C

    A0VAC-B-16 Fresh air Duct

    A0AC-3F-21 Ref. piping Work

    A0AC-5F-18 A/C unit hanging (indoor)

    A0VAC-B-18 Ext.Fan FixingA0VAC-B-20 Air out let fixing

    A0AC-4F-19 Ducting work for A/C

    A0AC-4F-21 Ref. piping WorkA0AC-6F-18 A/C unit hanging (indoor)

    A0AC-2F-20 Ext.Fan Fixing

    A0AC-2F-22 Air out let fixing

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    107/114

    A0AC-1F-20 Ext.Fan Fixing

    A0AC-1F-22 Air out let fixing

    A0AC-5F-19 Ducting work for A/C

    A0AC-7F-18 A/C unit hanging (indoor)

    A0AC-3F-20 Ext.Fan Fixing

    A0AC-3F-22 Air out let fixingA0AC-6F-19 Ducting work for A/C

    A0AC-5F-21 Ref. piping Work

    A0AC-6F-21 Ref. piping WorkA0AC-4F-20 Ext.Fan Fixing

    A0AC-4F-22 Air out let fixing

    A0AC-HC-20 A/C unit hanging (indoor)

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    108/114

    A0AC-7F-19 Ducting work for A/C

    A0AC-7F-21 Ref. piping Work

    A0AC-HC-21 Ducting work for A/CA0AC-5F-20 Ext.Fan Fixing

    A0AC-5F-22 Air out let fixing

    A0AC-6F-20 Ext.Fan FixingA0AC-6F-22 Air out let fixing

    A0AC-HC-24 Ref. piping Work

    A0AC-HC-23 Ext.Fan FixingA0AC-HC-25 Air out let fixing

    A0AC-7F-20 Ext.Fan Fixing

    A0AC-7F-22 Air out let fixing

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    109/114

    A0AC-HC-22 A/C units ( outdoor)

    WPR-1F-01 Balcony W/P 1F

    PAV-01 Precast Wheel StopperWPR-2F-01 Balcony W/P 2F

    WPR-3F-01 Balcony W/P 3F

    WPR-4F-01 Balcony W/P 4FWRP-5F-01 Balcony W/P 5F

    WRP-6F-01 Balcony W/P 6F

    PLAS-EX-01 External roof area PlasteringWRP-7F-01 Balcony W/P 7F

    PANT-EX-01 Epoxy painting to Roof

    PLAS-EX-02 Airwell Plastering

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    110/114

    PANT-EX-02 Epoxy painting to side of stair wall to S.Pool

    MET-06 Balconey Rainling

    PANT-EX-03 Fless Coat to Air WallWRP-HC-01 waterproofing to swiming pool

    WRP-EX-01 Roof , Parapet wall W/P & Testing

    WRP-EX-02 W/P to Air wall flr,skirt,R. rain water outletWRP-EX-03 Bitumen coating to External Block Wall -A

    PLAS-EX-03 External elevation Plastering -A

    FLO-EX-01 External elevation marble wall clading-AMET-02 Aluminium Cladding On elevation- A

    MET-04 Aluminium Claading Upper Roof Area

    WRP-EX-04 Bitumen coating to External Block Wal- B

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    111/114

    PLAS-EX-04 External elevation Plastering -B

    FLO-EX-02 External elevation marble wall clading-B

    MET-03 Aluminium Cladding On elevation- BWRP-EX-05 Bitumen coating to External Block Wal-C

    PLAS-EX-05 External elevation Plastering -C

    FLO-EX-03 External elevation marble wall clading-CMET-07 Aluminium Cladding On elevation- C

    WRP-EX-06 Bitumen coating to External Block Wal-D

    PLAS-EX-06 External elevation Plastering -DFLO-EX-04 External elevation marble wall clading-D

    MET-08 Aluminium Cladding On elevation- D

    PAV-02 Fixing Kerb Stone at island & footh path

    PAV 03 Fi i 60 P i bl k

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    112/114

    PAV-03 Fixing 60mm Paving block

    PAV-04 80 mm Interlock at parking

    PAV-05 Trafic line markingA0MIS-03 Fixing of column guards

    MET-05 Aluminium / door & Window

    A0MIS-06 Compound WallMET-09 Staircase Hand Rail

    MET-10 Cat ladders (For Airwel )

    MET-11 Steel Pipe Gaurde (basement water side)PR0-01 Security System

    PR0-05 Gate barriers

    PR0-03 Garbeg Disposal system

    PR0 02 P l W k

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    113/114

    PR0-02 Pool Work

    PRO-14 Reception counter

    PR0-08 Instaltion Of GeneratorPR0-09 TV system

    PR0-06 Fixing of lockers

    PR0-04 Sauna & Steam SystemPR0-07 Lift instalation & Commissioning

    PR0-11 Intercom system

    PR0-10 Cradle system instalationPR0-12 Transformar Instlation

    PR0-13 Music system

    TES-02 Testing & Commissioning

    TES 01 Si

  • 8/7/2019 ACTIVITIES OF CONSTRUCTIONS

    114/114

    TES-01 Signage

    TES-03 Civil Defance Inspection

    TES-04 DM InspectionTES-05 Complition certificate from DM

    TES-06 P R O J E C T H A N D O V E R