Ministry of Land, Infrastructure, Transport and Tourism Activities toward Runway Surface Condition Assessment Yoichi Hamahira Airport Safety and Aviation Security Division, Aviation Safety and Security Department Japan Civil Aviation Bureau
Transcript
Page 1: Activities toward Runway Surface Condition Assessment · 3 Compacted snow 1 –2mm 3 1 Ice (coverage at or less than 20% 1 MG 3 Dry, Wet snow 2mm 5 M 1 Dry 1mm 5 Good to Medium 1

Ministry of Land, Infrastructure, Transport and Tourism

Activities toward Runway Surface

Condition Assessment

Yoichi Hamahira

Airport Safety and Aviation Security Division,

Aviation Safety and Security Department

Japan Civil Aviation Bureau

Page 2: Activities toward Runway Surface Condition Assessment · 3 Compacted snow 1 –2mm 3 1 Ice (coverage at or less than 20% 1 MG 3 Dry, Wet snow 2mm 5 M 1 Dry 1mm 5 Good to Medium 1

Airport in Japan

2

Wakkanai

Monbetsu

Memanbetsu

Nakashibetsu

Kushiro Obihiro

Asahikawa Sapporo

New-Chitose

Hakodate

Okushiri

Aomori

Rishiri

Misawa

Hanamaki

Sendai

Odate-Noshiro

Akita

Shonai

Yamagata

Fukushima Niigata

Sado

Hyakuri

Tokyo-Narita Tokyo-Haneda

Oshima

Hachijyojima

Miyakejima

Shizuoka

Matsumoto

Chubu-Centrair

Toyama

Noto

Komatsu

Nanki-Shirahama

Kansai

Yao

Osaka Kobe

Okayama

Tottori Yonago Izumo

Oki

Hiroshima

Yamaguchi-Ube Takamatsu

Tokushima Matsuyama

Kochi Oita

Kitakyushu Fukuoka

Tsushima Iki

Saga

Kumamoto

Miyazaki Kagoshima

Nagasaki

Fukue

Amakusa *

Tanegashima Yakushima

Naha

Amami-oshima

Miyako Ishigaki

Kikaijima Yoron

Tokunoshima

Okinoerabu

Kumejima

Kita-Daitou

Minami-Daito Yonaguni

Niijima Kozushima

Iwami Tajima

45°N

35°N

26°N

Rebun

Ojika

kamigoto

Chofu

* oitakenoh

konan *

Nagoya

Iwakuni

Shimojijima

MLIT managed Airport (20)

Local government managed Airport (65)

Company managed Airport (4)

Civil - Military joint Airport (7)

Sea of Japan

Pacific ocean

Chitose

Page 3: Activities toward Runway Surface Condition Assessment · 3 Compacted snow 1 –2mm 3 1 Ice (coverage at or less than 20% 1 MG 3 Dry, Wet snow 2mm 5 M 1 Dry 1mm 5 Good to Medium 1

Snowy area

3

Wakkanai

Monbetsu

Memanbetsu

Nakashibetsu

Kushiro Obihiro

Asahikawa Sapporo

New-Chitose

Hakodate

Okushiri

Aomori

Rishiri

Misawa

Hanamaki

Sendai

Odate-Noshiro

Akita

Shonai

Yamagata

Fukushima Niigata

Sado

Hyakuri

Tokyo-Narita Tokyo-Haneda

Oshima

Hachijyojima

Miyakejima

Shizuoka

Matsumoto

Chubu-Centrair

Toyama

Noto

Komatsu

Nanki-Shirahama

Kansai

Yao

Osaka Kobe

Okayama

Tottori Yonago Izumo

Oki

Hiroshima

Yamaguchi-Ube Takamatsu

Tokushima Matsuyama

Kochi Oita

Kitakyushu Fukuoka

Tsushima Iki

Saga

Kumamoto

Miyazaki Kagoshima

Nagasaki

Fukue

Amakusa *

Tanegashima Yakushima

Naha

Amami-oshima

Miyako Ishigaki

Kikaijima Yoron

Tokunoshima

Okinoerabu

Kumejima

Kita-Daitou

Minami-Daito Yonaguni

Niijima Kozushima

Iwami Tajima

45°N

35°N

26°N

Rebun

Ojika

kamigoto

Chofu

* oitakenoh

konan *

Nagoya

Iwakuni

Shimojijima

Sea of Japan

Pacific ocean

Page 4: Activities toward Runway Surface Condition Assessment · 3 Compacted snow 1 –2mm 3 1 Ice (coverage at or less than 20% 1 MG 3 Dry, Wet snow 2mm 5 M 1 Dry 1mm 5 Good to Medium 1

Current practice

Airport Snow/ice inspection

• Mean depth of snow

• Type of snow

• Braking action by

measuring device

• Coverage etc.

ATC

AL FLT

Ops

AIS

Surface friction

tester(SFT) Bowmonk AFM2 Tapley meter

160131 RJAAYNYX

(0162/16 NOTAMR 0161/16

Q)RJJJ/QQSIC/IV/M/A/000/999/

A)RJCH B)1601160131 C)UFN

E)S/I COND AS OF 1601160112

RUNWAY 12/30 TWY AND APN CONDITION

A2 B1 C3 D5

E2 F1 G1 H4

I2 J1 K1 L3

M2 N2 O2

P2 Q3 R4

W3

RMKS 1)A.3MM B.1MM C.1MM

2)P5,P6...............1

P4..................3

P2,P3,T3 THRU T7....5

T1,T2,P1............6

3)31/95/95

SURFACE FRICTION TESTER)

←A section

←B section

←C section

←μ value ←Type of device

Braking Action

Good 1

Medium to Good 2

Medium 3

Medium to Poor 4

Poor 5

Very Poor 6

NOTAM example

Page 5: Activities toward Runway Surface Condition Assessment · 3 Compacted snow 1 –2mm 3 1 Ice (coverage at or less than 20% 1 MG 3 Dry, Wet snow 2mm 5 M 1 Dry 1mm 5 Good to Medium 1

Study Group

Winter airport operation study group established in 2012 for

the purpose of

• Conduct TALPA/ARC trial (simulation-based)

• Identify issues when implementing RWYCC assignment

procedures through analysis of the converted data from

current practice

• Develop optimal runway condition assessment

procedures and training manual in Japan

Participants: JCAB (Airport, ATS, AIS, ACFT-OPS)

Aircraft operator (Japan airlines, All Nippon Airways etc.)

Airport operator

Page 6: Activities toward Runway Surface Condition Assessment · 3 Compacted snow 1 –2mm 3 1 Ice (coverage at or less than 20% 1 MG 3 Dry, Wet snow 2mm 5 M 1 Dry 1mm 5 Good to Medium 1

Aomori

Hanamaki Odatenoshiro

Akita

Shonai

Yamagata

Toyama

45°N

35°N

26°N

Participated

Airport

RWY

(all grooved) Operating Aircraft

Aomori/RJSA 3000×60m B738、DHC8、CRJ200、E170/175

Odatenoshiro/RJSR 2000×45m A320、B738

Hanamaki/RJSI 2500×45m CRJ200、E170/175

Akita/RJSK 2500×60m B767、B738、CRJ200、DHC8

Shonai/RJSY 2000×45m A320、B738

Yamagata/RJSI 2000×45m E170、CRJ

Toyama/RJNT 2000×45m B787、B767、B737、A321、A319

TALPA/ARC Trial in 2015 (JAN 1 ~ MAR 31)

Page 7: Activities toward Runway Surface Condition Assessment · 3 Compacted snow 1 –2mm 3 1 Ice (coverage at or less than 20% 1 MG 3 Dry, Wet snow 2mm 5 M 1 Dry 1mm 5 Good to Medium 1

TALPA/ARC Trial Procedures

Snow & ice condition

with RWY B/A

Pilot B/A

Study Group

• Convert to RWYCC

• Comparison between RWY B/A and RWYCC

• Comparison between Pilot B/A and RWYCC

• Data analysis

Airport operator Airline/Pilot

NOTAM

ATS

Total Airport report at 2015 trial 618

Total Pilot B/A report at 2015 trial 147

Page 8: Activities toward Runway Surface Condition Assessment · 3 Compacted snow 1 –2mm 3 1 Ice (coverage at or less than 20% 1 MG 3 Dry, Wet snow 2mm 5 M 1 Dry 1mm 5 Good to Medium 1

A B C A B C A B C A B C A B C A B C

G 144 145 137 8 8 10 8 8 8

MG 8 10 12 2 1 2

M 12 11 15 3 5 2

MP 3 1 3 1 3 3

P 6 3 3

VP

SLUSH

計 167 167 167 20 20 20 8 8 8

05 4 3 2 1

Akita Airport (195 airport reports)

TYPE OF SNOW NR of Report

DRY SNOW 267

WET SNOW 267

DRY SNOW&

COMPACTED SNOW 27

ICE 24

Depth of SN NR

Up to and including 3mm 525

More than 3mm 33

In case of depth of snow with up to including 3mm, 15% of RWY BA is worse than “Good”

When converted RWYCC is “5”, 15% of RWY BA is worse than “Good”

When converted RWYCC is “3”, 32% of RWY BA is worse than “Medium”

* The number derived from the condition of each runway third

RWYCC RWY BA

Correlation between RWY BA and RWYCC

Page 9: Activities toward Runway Surface Condition Assessment · 3 Compacted snow 1 –2mm 3 1 Ice (coverage at or less than 20% 1 MG 3 Dry, Wet snow 2mm 5 M 1 Dry 1mm 5 Good to Medium 1

Akita Airport (55 pilot BA reports) Correlation between Pilot BA and RWY BA and RWYCC

Pilot BA NR RWY BA/NR Type snow & depth RWY CC Downgrade Upgrade

requirement

Good

46

G

38 Dry, Wet snow 1 - 2mm 5

3 Compacted snow 1 – 2mm 3

1 Ice (coverage at or less

than 20% 1 Upgrade

MG 3 Dry, Wet snow 2mm 5

M 1 Dry 1mm 5

Good to Medium 1 MG 1 Wet snow 2mm 5

Medium 7

G 3 Dry, Wet snow 1 – 3mm 5 Downgrade

MG 1 Wet snow 3mm 5 Downgrade

MG 1 Dry snow 4mm 3

M 2 Dry snow 2 – 3mm 5 Downgrade

Medium to Poor

Poor 1 P 1 Wet snow 5mm 3 Downgrade

Less than Poor *RWY BA is worst BA of each RWY third

Pilot BA reports which are worse than what the pilot may be expecting・・・7 reports

Page 10: Activities toward Runway Surface Condition Assessment · 3 Compacted snow 1 –2mm 3 1 Ice (coverage at or less than 20% 1 MG 3 Dry, Wet snow 2mm 5 M 1 Dry 1mm 5 Good to Medium 1

Odatenoshiro Airport (83 airport reports)

TYPE OF SNOW NR of Report

DRY SNOW 183

WET SNOW 63

COMPACTED SNOW 3

Depth of SN NR

Up to and including 3mm 246

More than 3mm 3

* The number derived from the condition of each runway third

A B C A B C A B C A B C A B C A B CG 54 54 55 2 2 2MG 7 7 4M 7 7 18MP 2 4 3 1 1 1P 2 1VPSLUSH計 72 72 81 3 3 3

3 2 1 05 4

Correlation between RWY BA and RWYCC

In case of depth of snow with up to including 3mm, 32% of RWY BA is worse than “Good”

When converted RWYCC is “5”, 28% of RWY BA is worse than “Good”

When converted RWYCC is “3”, 33% of RWY BA is worse than “Medium”

Page 11: Activities toward Runway Surface Condition Assessment · 3 Compacted snow 1 –2mm 3 1 Ice (coverage at or less than 20% 1 MG 3 Dry, Wet snow 2mm 5 M 1 Dry 1mm 5 Good to Medium 1

Odatenoshiro Airport (42 pilot BA reports)

Correlation between Pilot BA and RWY BA and RWYCC

Pilot BA NR RWY BA/NR Type snow & depth RWY CC Downgrade Upgrade

requirement

Good

29 G 29 Dry, Wet snow 1 - 2mm 5

Compacted snow 1mm 3

Good to Medium 5 G 3 Dry snow 1 - 2mm 5 Downgrade

M 2 Dry snow 2mm

Wet snow1mm 5 Downgrade

Medium 6 MG 1

Dry snow 1mm

Wet snow 3mm 5 Downgrade

M 5 Dry snow 1mm 5 Downgrade

Medium to Poor 1 MG 1 Dry snow 1mm 5 Downgrade

Poor 1 M 1 Dry snow 1mm 3 Downgrade

Less than Poor

*RWY BA is worst BA of each RWY third

Pilot BA reports which are worse than what the pilot may be expecting・・・13 reports

Page 12: Activities toward Runway Surface Condition Assessment · 3 Compacted snow 1 –2mm 3 1 Ice (coverage at or less than 20% 1 MG 3 Dry, Wet snow 2mm 5 M 1 Dry 1mm 5 Good to Medium 1

Summary ‘type of snow’

Aomori

Hanamaki Oodatenoshiro

Akita

Shonai Yamagata

Toyama Type of snow Nr

DRY S/N 931

WET S/N 847

COMPACTED S/N 299

ICE 33

SLUSH 31

DRY & COMPACTED 27

WET & COMPACTED 12

Page 13: Activities toward Runway Surface Condition Assessment · 3 Compacted snow 1 –2mm 3 1 Ice (coverage at or less than 20% 1 MG 3 Dry, Wet snow 2mm 5 M 1 Dry 1mm 5 Good to Medium 1

Summary ‘depth, type of snow, RWY BA’

「G」 「MG」 「M」 「MP」 「P」 「VP」

DRY 713 47 90 17 3 -

WET 691 38 30 10 2 -

COMPACTED 275 16 5 - - -

DRY & COMPACTED 25 2 1 - - -

WET & COMPACTED 3 - 2 1 - -

「G」 「MG」 「M」 「MP」 「P」 「VP」

DRY 16 7 15 11 8 -

WET - 2 - 1 - -

COMPACTED 14 9 13 7 11 -

DRY & COMPACTED - - - - - -

WET & COMPACTED 1 2 3 - - -

DRY、WET SNOW : 82~90%「Good」, 10-18% worse than「Good」

COMPACTED etc. : 92%「Good」, 8% worse than「Good」

DRY SNOW : 41% at or better than「Medium to Good」, 33% worse than 「Medium」

COMPACTED etc. : 43% at or better than「Medium to Good」, 30% worse than 「Medium」

RWY BA up to and including

3mm depth

RWY BA more than 3mm depth

Page 14: Activities toward Runway Surface Condition Assessment · 3 Compacted snow 1 –2mm 3 1 Ice (coverage at or less than 20% 1 MG 3 Dry, Wet snow 2mm 5 M 1 Dry 1mm 5 Good to Medium 1

Summary ‘RWY BA & RWYCC’

RWY BA converted RWYCC

Page 15: Activities toward Runway Surface Condition Assessment · 3 Compacted snow 1 –2mm 3 1 Ice (coverage at or less than 20% 1 MG 3 Dry, Wet snow 2mm 5 M 1 Dry 1mm 5 Good to Medium 1

Summary ‘ RWY BA at converted RWYCC’

No RWY BA 「SLUSH」3

Page 16: Activities toward Runway Surface Condition Assessment · 3 Compacted snow 1 –2mm 3 1 Ice (coverage at or less than 20% 1 MG 3 Dry, Wet snow 2mm 5 M 1 Dry 1mm 5 Good to Medium 1

Summary ‘ Pilot BA at converted RWYCC

RWYCC「5」

20% of Pilot BA is worse than what the pilot may be expecting

RWYCC「3」

11% of Pilot BA is worse than what the pilot may be expecting

RWYCC「1」

Contamination is ice with 20% coverage.

Totally 73% of Pilot BA and what the pilot may be expecting matches

20% of Pilot BA is worse than what the pilot may be expecting

7% of Pilot BA is better than what the pilot may be expecting

*RWYCC is worst RWYCC of each RWY thirds

Pilot BA at converted RWYCC

worse

30(20%)

equivalent

better

10(7%)

Page 17: Activities toward Runway Surface Condition Assessment · 3 Compacted snow 1 –2mm 3 1 Ice (coverage at or less than 20% 1 MG 3 Dry, Wet snow 2mm 5 M 1 Dry 1mm 5 Good to Medium 1

Recent serious incident

Hanamaki AP (RJSI)

Dec.25 2012 PM 17:20

Type: Bombardier CL600

RWY: 2500×45m

Last RWY COND

ALL area wet snow 10mm B/A P

Inspection time 16:18

Shonai Airport (RJSY)

Dec.8 2012 PM 22:26

Type: Boeing 737-800

RWY: 2000×45m

Last RWY COND

A: wet snow 2mm B/A G

B: wet snow 2mm B/A G

C: wet snow 2mm B/A G

Inspection time 22:07

RWY excursion Overrun

Page 18: Activities toward Runway Surface Condition Assessment · 3 Compacted snow 1 –2mm 3 1 Ice (coverage at or less than 20% 1 MG 3 Dry, Wet snow 2mm 5 M 1 Dry 1mm 5 Good to Medium 1

issues

Is it enough?

• How should we deal with RWY friction measurement?

• How is the first flyer going without pilot BA?

• Will airport operator be able to assess runway surface

condition adequately?

etc.

Page 19: Activities toward Runway Surface Condition Assessment · 3 Compacted snow 1 –2mm 3 1 Ice (coverage at or less than 20% 1 MG 3 Dry, Wet snow 2mm 5 M 1 Dry 1mm 5 Good to Medium 1

Study Group task list & schedule

Task Time scale

Develop domestic runway surface condition assessment procedures 2018 Q3

Develop domestic friction measurement approval standards 2019 Q1

Develop training manual 2018 Q3

NOTAM system modification (AIS, Airlines) (proposed) 2020 Q2

Application of minimum friction level TBD

Others ・・・

2016 2017 2018 2019 2020

Develop relevant domestic

rules & guidance

Training for airport operator