Actuator for the TMT Preliminary Design Review TMT Project Office – Pasadena 1 and 2 October 2013 P.K. Mahesh, P.S. Parihar, Surojit Kumar Roy, Prasanna G. Deshmukh TMT.CTR.PRE.aa.aaa.CCR01 1 India TMT Co-ordination Centre (ITCC)
Transcript
Page 1: Actuator for the TMT Preliminary Design Review TMT Project Office – Pasadena 1 and 2 October 2013 P.K. Mahesh, P.S. Parihar, Surojit Kumar Roy, Prasanna.

Actuator for the TMT

Preliminary Design Review

TMT Project Office – Pasadena1 and 2 October 2013

P.K. Mahesh, P.S. Parihar,

Surojit Kumar Roy, Prasanna G. Deshmukh

TMT.CTR.PRE.aa.aaa.CCR01 1

India TMT Co-ordination Centre (ITCC)

Page 2: Actuator for the TMT Preliminary Design Review TMT Project Office – Pasadena 1 and 2 October 2013 P.K. Mahesh, P.S. Parihar, Surojit Kumar Roy, Prasanna.

Plan of talk– Supplier Qualification Status and Plans.

1. PII + activites at Avasarala Technolgies Limited (ATL)

2. Brief overview of actuator activity in India.

3. Comaprison of estimated production costs

4. Additional Suppliers

5. Any other business

TMT.CTR.PRE.aa.aaa.CCR01 2

India TMT Co-ordination Centre (ITCC)

Page 3: Actuator for the TMT Preliminary Design Review TMT Project Office – Pasadena 1 and 2 October 2013 P.K. Mahesh, P.S. Parihar, Surojit Kumar Roy, Prasanna.

Supplier Qualification Status and Plans.

TMT.CTR.PRE.aa.aaa.CCR01 3

India TMT Co-ordination Centre (ITCC)

Page 4: Actuator for the TMT Preliminary Design Review TMT Project Office – Pasadena 1 and 2 October 2013 P.K. Mahesh, P.S. Parihar, Surojit Kumar Roy, Prasanna.

1. PII + activites at ATL– Ten assembled actuators (PII +) and one set of

manufactured parts made at Avasarala Techologies Ltd., Bangalore, India (ATL)

– Functional tests conducted at works of ATL at Bangalore

Actuator functional test.xls

– Third party inspection of parts done by TMT at Pasadena-Results acceptable; Clearance to go ahead for the rest provided by TMT

collection_of_AML_prototype_actuator_reports.xlsx

TMT.CTR.PRE.aa.aaa.CCR01 4

India TMT Co-ordination Centre (ITCC)

Page 5: Actuator for the TMT Preliminary Design Review TMT Project Office – Pasadena 1 and 2 October 2013 P.K. Mahesh, P.S. Parihar, Surojit Kumar Roy, Prasanna.

2. Brief overview of actuator activity in India.– Summary of efforts at ATL.

Learning from ATL. ATL noted that some hole dimensions were missing in the SAT Housing drawing. TMT noted and corrected the drawing

ATL also noted some missing dimensions and wrong dimensions in other drawings like that of Connecting Link, Upper Connect Block etc. TMT noted and corrected the same.

TMT.CTR.PRE.aa.aaa.CCR01 5

India TMT Co-ordination Centre (ITCC)

Page 6: Actuator for the TMT Preliminary Design Review TMT Project Office – Pasadena 1 and 2 October 2013 P.K. Mahesh, P.S. Parihar, Surojit Kumar Roy, Prasanna.

While assembling Connecting Links and Copper plate, ATL found centre to centre distance of holes i.e., 93mm of Copper Plate was not matching with the Connecting Links. TMT checked and changed the dimension of Copper plate.

A fixture for assembling the magnets was designed and made by ATL which enables magnets to be assembled for an actuator by 2 personnel in 20 minutes.

TMT.CTR.PRE.aa.aaa.CCR01 6

India TMT Co-ordination Centre (ITCC)

Page 7: Actuator for the TMT Preliminary Design Review TMT Project Office – Pasadena 1 and 2 October 2013 P.K. Mahesh, P.S. Parihar, Surojit Kumar Roy, Prasanna.

Schedule– Delay in schedule in first et of parts and 2 assembled

actuators.

– Delay due to non-availability of certified material in small quantities and also technical problems encounterd in casting.

– Problem encountered in obtaining bought out items from McMaster

– Schedule for second stage-manufacture and assembly of 8 actuators-ahead of planned period

TMT.CTR.PRE.aa.aaa.CCR01 7

India TMT Co-ordination Centre (ITCC)

Page 8: Actuator for the TMT Preliminary Design Review TMT Project Office – Pasadena 1 and 2 October 2013 P.K. Mahesh, P.S. Parihar, Surojit Kumar Roy, Prasanna.

Quality

TMT.CTR.PRE.aa.aaa.CCR01 8

India TMT Co-ordination Centre (ITCC)

Page 9: Actuator for the TMT Preliminary Design Review TMT Project Office – Pasadena 1 and 2 October 2013 P.K. Mahesh, P.S. Parihar, Surojit Kumar Roy, Prasanna.

Quality

TMT.CTR.PRE.aa.aaa.CCR01 9

India TMT Co-ordination Centre (ITCC)

Page 10: Actuator for the TMT Preliminary Design Review TMT Project Office – Pasadena 1 and 2 October 2013 P.K. Mahesh, P.S. Parihar, Surojit Kumar Roy, Prasanna.

TMT to visit ATL to conduct quality audit.

TMT.CTR.PRE.aa.aaa.CCR01 10

India TMT Co-ordination Centre (ITCC)

Page 11: Actuator for the TMT Preliminary Design Review TMT Project Office – Pasadena 1 and 2 October 2013 P.K. Mahesh, P.S. Parihar, Surojit Kumar Roy, Prasanna.

3. Comaprison of estimated production costs

– Comparison of prices of bought out parts.

Brought out parts ITCC Vs ATL Vs TPG.xls– Comparison of Production Cost

Actuator Bulk Qty Prices_Comparison.xls– Production cost estimate by ATL

BY ATL Revised Quote 23.9.13.xlsx

TMT.CTR.PRE.aa.aaa.CCR01 11

India TMT Co-ordination Centre (ITCC)

Page 12: Actuator for the TMT Preliminary Design Review TMT Project Office – Pasadena 1 and 2 October 2013 P.K. Mahesh, P.S. Parihar, Surojit Kumar Roy, Prasanna.

4. Additional Suppliers – Avalon

Discussion for 5 sets of prototype conducted with Avalon.

Quote was provided.

Avalon_Copy of Offer sheet for TMT (12-Sep-13).xls

Inputs required from TMT about materials substitution, list of bought out items, fasteners and assembly procedure.

Avalon will provide the standards of AMS for alternate raw material

Assembly, shipping and packing price will be supplied by Avalon.

TMT.CTR.PRE.aa.aaa.CCR01 12

India TMT Co-ordination Centre (ITCC)

Page 13: Actuator for the TMT Preliminary Design Review TMT Project Office – Pasadena 1 and 2 October 2013 P.K. Mahesh, P.S. Parihar, Surojit Kumar Roy, Prasanna.

Sand casting for protoypes.

One mould required for 1600 numbers of casting. Pressure die casting for production

Avalon will provide the details for Delrin and 18-8 SS material.

Avalon will provide the standards of AMS for alternate raw material

– Godrej and L&T to be contacted to provide quotation.

TMT.CTR.PRE.aa.aaa.CCR01 13

India TMT Co-ordination Centre (ITCC)

Page 14: Actuator for the TMT Preliminary Design Review TMT Project Office – Pasadena 1 and 2 October 2013 P.K. Mahesh, P.S. Parihar, Surojit Kumar Roy, Prasanna.

5. Any other business.

TMT.CTR.PRE.aa.aaa.CCR01 14

India TMT Co-ordination Centre (ITCC)