AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, JANUARY 6, 2017 8:00 A.M. ROOM 205 151 MARTIN ST., BIRMINGHAM, MI A. Roll Call B. Introductions C. Approval of Minutes, Meeting of October 7, 2016 D. Parking System Utilization E. Draft Bates St. RFQ – Review F. Project Process Overview & Timeline G. For Information Only: Miscellaneous Articles H. Meeting Open for Matters Not on the Agenda I. Adjournment Notice: Due to building security, public entrance during non-business hours is through the Police Department, Pierce St. Entrance only. Individuals with disabilities requiring assistance to enter the building should request aid via intercom system at the parking lot entrance gate on Henrietta St. Persons with disabilities that may require assistance for effective participation in this public meeting should contact the City Clerk’s Office at the number (248) 530-1880, or (248) 644-5115 (for the hearing impaired) at least one day before the meeting to request help in mobility, visual, hearing, or other assistance. Las personas con incapacidad que requieren algún tipo de ayuda para la participación en esta sesión pública deben ponerse en contacto con la oficina del escribano de la ciudad en el número (248) 530-1800 o al (248) 644-5115 (para las personas con incapacidad auditiva) por lo menos un dia antes de la reunió para solicitar ayuda a la movilidad, visual, auditiva, o de otras asistencias. (Title VI of the Civil Rights Act of 1964).
Transcript
Page 1: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, JANUARY 6, 2017

8:00 A.M. ROOM 205

151 MARTIN ST., BIRMINGHAM, MI

A. Roll Call

B. Introductions

C. Approval of Minutes, Meeting of October 7, 2016

D. Parking System Utilization

E. Draft Bates St. RFQ – Review

F. Project Process Overview & Timeline

G. For Information Only: Miscellaneous Articles

H. Meeting Open for Matters Not on the Agenda

I. Adjournment

Notice: Due to building security, public entrance during non-business hours is through the Police Department, Pierce St. Entrance only. Individuals with disabilities requiring assistance to enter the building should request aid via intercom system at the parking lot entrance gate on Henrietta St. Persons with disabilities that may require assistance for effective participation in this public meeting should contact the City Clerk’s Office at the number (248) 530-1880, or (248) 644-5115 (for the hearing impaired) at least one day before the meeting to request help in mobility, visual, hearing, or other assistance. Las personas con incapacidad que requieren algún tipo de ayuda para la participación en esta sesión pública deben ponerse en contacto con la oficina del escribano de la ciudad en el número (248) 530-1800 o al (248) 644-5115 (para las personas con incapacidad auditiva) por lo menos un dia antes de la reunió para solicitar ayuda a la movilidad, visual, auditiva, o de otras asistencias. (Title VI of the Civil Rights Act of 1964).

Page 2: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

CITY OF BIRMINGHAM AD HOC PARKING DEVELOPMENT COMMITTEE

8:00 A.M., THURSDAY, OCTOBER 7, 2016 Conference Room 205

151 Martin Street, Birmingham, Michigan Minutes of the meeting of the City of Birmingham Ad Hoc Parking Development Committee held October 7, 2016. A. ROLL CALL Present: Ad Hoc Committee Members: Richard Astrein (BSD)

Scott Clein (Planning Board) Rackeline Hoff (City Commissioner) Terry Lang (Finance Representative)

Mark Nickita (City Commissioner) Judy Paskiewicz (Advisory Parking Committee) – Departed at 9:55 a.m. Gordon Rinschler (Developer Representative) Absent: None Administration: Joe Valentine, City Manager Paul O’Meara, City Engineer Austin Fletcher, Assistant City Engineer

Jana Ecker, Planning Director Mark Gerber, Finance Director John Heiney, BSD Executive Director

Guests: Sarah Burton, SP+

Jay O’Dell, SP+ Brian Blaesing, First Baptist Church of Birmingham Linda Taubman, 327 N. Old Woodward B. INTRODUCTIONS

Members and guests introduced themselves. C. APPROVAL OF MINUTES, MEETING OF MAY 16, 2016

Motion by Mr. Rinschler Seconded by Mr. Lang to approve the minutes of the Regular Meeting of May 16, 2016 as presented. APPROVAL OF MINUTES, MEETING OF JUNE 16, 2016

Motion by Mr. Rinschler Seconded by Mr. Lang to approve the minutes of the Regular Meeting of May 16, 2016 as presented with one correction (reference to Mr. Gordon).

Page 3: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

D. DRAFT BATES ST. RFQ – REVIEW Ms. Hoff questioned if this is a RFQ or an RFP. Mr. Valentine indicated it could be either, but is more of a RFQ. Mr. Rinschler believes the current version (more general, not as specific) is what the Committee was looking for. Mr. Valentine indicated the next step would be to have someone else review it and then bring it back to this committee prior to forwarding it on to the City Commission. Mr. Nickita asked if the 1,150 parking spaces is a ‘desirable’ or a ‘must’. He feels this should be clearly ‘spelled out’. Also, he thinks the 3D renderings should be included and that only one scheme should be included. Mr. Clein and Mr. Rinschler both agreed. Ms. Paskiewicz thinks the number of existing parking spaces should be referenced as well as the number of additional needed/required spaces. She also believes the primary objective should be expanded to include residential, community and recreation. Mr. Nickita suggested using ‘mixed use’. After general discussion, it was decided to add residential/community. General discussion occurred on how to obtain/hire a professional to provide feedback on the N. Old Woodward / Bates RFQ. Ms. Taubman asked if this were to go to a vote, how it would be done (as a package or separately). Mr. Valentine indicated there are two (2) issues that will need action; 1) Selling Bonds and, 2) Sale of Property.

E. PROPOSED PARKING STRUCTURE ASSESSMENT ROLL

Mr. Valentine provided a brief overview of the Parking Structure Assessment Roll and how it was derived. The Committee liked the general direction of the new policy.

F. PROPOSED PROJECT TIMELINE

Mr. Valentine indicated the presented material is more of a process rather than a timeline. He provided a brief overview. General discussion occurred on whether a charter amendment that would address all potential parking lot land sales in the future, or if it would be preferable to just get approval for the sale of this specific parcel (in which case a charter amendment would not be necessary). Mr. Rinschler asked what happened to the ‘sense of urgency’ for this project. Mr. Valentine indicated that additional steps have been taken recently to add additional parking such as roof level valet and temporary lots. Demand is down since last June, and the structures are not filling nearly as often as they were last spring. NEXT STEPS – RFQ

Revise RFQ based on Committee’s comments;

Page 4: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

Have an ‘outside’ consultant review current RFQ;

Provide ‘outside’ consultants comments to Committee for review as well as a timeline;

Forward RFQ to City Commission. G. FOR INFORMATION ONLY

News articles(s) were provided to the Committee Members for information and general discussion.

H. MEETING OPEN FOR MATTERS NOT ON THE AGENDA

Mr. Blaesing provided a brief overview of a letter from the 1st Baptist Church (dated 10/05/16 addressed to Mr. Valentine) that was presented to the Committee Members. Mr. Clein agreed that something should be included in the RFQ in regards to being sensitive to the surrounding buildings needs and operations (i.e. 1st Baptist Church, Google, Willits). The Committee agreed. Ms. Taubman indicated she would be in favor of separating the project; parking structure / buildings.

I. ADJOURNMENT

No further business being evident, committee members motioned to adjourn at 10:10 a.m. NEXT REGULARLY SCHEDULED MEETINGS - TBD

Sincerely, ________________________ Paul T. O’Meara, City Engineer

Page 5: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

MEMORANDUM

Engineering Dept. DATE: January 4, 2017 TO: Ad Hoc Parking Development Committee FROM: Paul T. O’Meara, City Engineer SUBJECT: Parking System Utilization, 2014-2016 As you know, this committee was formed to respond to the excessive demand being placed on the parking system in the recent past, and to develop recommendations for potential expansion projects. At the end of the calendar year, it is appropriate to provide an update on the usage trends for the system. Attached are three sets of charts for data in the five parking structures. The first charts show the number of times a parking structure filled during its peak hour, combining activity at all five structures for each month. The second set shows the same information, distributed among the five structures for the course of the year. The third chart displays the number of times that the valet assist program helped the N. Old Woodward Ave. Parking Structure avoid filling to capacity once it was started in June of this past year. Here are some notes to take from the detailed data:

1. Structures filling to capacity became more routine for the first time in the summer of 2015. The garages were at their busiest when the weather is excellent in May and September.

2. Once the Palladium Building office space opened in January, 2016, demand for the structures became acute during the peak hour of the business day. Raising the daily rate to $10 per day in June made a significant impact on demand system-wide. While the structures are still very busy, the demand has become much more manageable. It is not clear where those that were parking here last spring are now parking.

3. Demand continues to be greatest on the north side of the district. The valet assist program has helped ensure that at least one of the two north side parking structures is open at all times.

1

Page 6: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

Jan 8 251Feb 5 251March 0 251April 6 251May 23 251June 5 251July 14 251Aug 16 251Sept 37 251Oct 10 251Nov 0 251Dec 2 251

8 5 0 6

23

5 14 16

37

10 0 2

0

50

100

150

200

250

300

Jan Feb March April May June July Aug Sept Oct Nov Dec

Num

ber o

f bus

ines

s day

s/ye

ar -

251

2015

2015 All Parking Structure Full Status

Total occurrences full all structures combined Total business days/year - 251

Page 7: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

Jan 42 251

Feb 55 251

March 42 251

April 29 251

May 48 251

June 41 251

July 6 251

Aug 5 251

Sept 5 251

Oct 4 251

Nov 10 251

Dec 10 251

42

55

42

29

48 41

6 5 5 4 10 10

0

50

100

150

200

250

300

Jan Feb March April May June July Aug Sept Oct Nov Dec

Nu

mb

er

of

bu

sin

ess

day

s/ye

ar -

25

1

2016

2016 All Parking Structure Full Status

Total monthly occurrences of all structures combined being full (1-4 hrs)

Total business days/year (M-Friday)

= July 1, 2016 - daily parking rates doubled

Page 8: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

Chester 10 251N.Old Woodward 59 251Park St. 32 251Peabody St. 19 251Pierce St. 6 251

10

59

32

19

6

251

251

251

251

251

Chester

N.Old Woodward

Park St.

Peabody St.

Pierce St.

0 50 100 150 200 250 300

Total Number of Occurrences when structure full out of 251 days

Parking Full Status by Structure Jan-Dec. 2015 Business Days Only (M-Friday)

251 Business days (Jan-Dec)

Total occurrences by structure of being full (1-4 hrs)

Page 9: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

Chester 15 251N.Old Woodward 101 251Park St. 101 251Peabody St. 39 251Pierce St. 41 251

15

101

101

39

41

Chester

N.Old Woodward

Park St.

Peabody St.

Pierce St.

0 50 100 150 200 250 300Total Number of occurrences when structure full out of 251 days

Parking Full Status by Structure Jan-Dec. 2016 Business Days Only (M-Friday)

251 days (Jan-Dec) M-Friday

Total occurrences by structure of it beingfull (1-4 hrs)

Page 10: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

June 12 22July 2 21Aug 0 23Sept 4 22Oct 1 20Nov 3 22Dec 2 22

0

5

10

15

20

25

June July Aug Sept Oct Nov Dec

12

2

0

4

1

3 2

22 21

23 22

20

22 22

Days valet assisted to keep garage open

Business days garage open (M-Friday)

Valet Assist N. Old Woodward Structure June-Dec. 2016

Page 11: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

MEMORANDUMPlanning Division

DATE: November 23, 2016

TO: Joseph A. Valentine, City Manager

FROM: Jana L. Ecker, Planning Director

SUBJECT: Review of the Request for Proposals for the development of the Bates St. extension of N. Old Woodward parking facilities

The City of Birmingham is currently engaged in the planning of parking expansion of the N. Old Woodward deck and the Bates St. extension and redevelopment as recommended in the Downtown Birmingham 2016 plan. To further this effort, the City has drafted an RFP (request for proposals) to solicit information from potential developers. At the direction of the Ad Hoc Parking Committee, the Planning Division sought an independent review of the RFP by a qualified consultant prior to its release to the general public. To this end, the City engaged Tim Kay of Jones Lang LaSalle (JLL), which is a national commercial real estate strategy, services and support firm.

JLL provides a wide range of services related to commercial real estate throughout the United States, including project and development services. Tim Kay is the Managing Director of the Project and Development Services Division for the Detroit branch of JLL. Mr. Kay has provided a professional review of the draft RFP (see attached). In addition, a professional biography for Mr. Kay and an overview of the professional services provided by JLL Project and Development Services Division have also been included for your review.

Page 12: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

11/18/2016 Tim Kay | Managing Director | JLL

http://www.jll.com/detroit/enus/Pages/RemoteBio.aspx?URL=http://www.jll.com/unitedstates/enus/people/224/timkay 1/2

Investor Relations About us Careers

Tim Kay

Managing Director226 East Hudson Avenue Royal Oak, MI 48067

+1 248 581 3311

[email protected]

Current responsibilitiesMr. Kay is Managing Director and Market Leader for Michigan, Ohio and Western, PA. He isresponsible for business and team development, resource management and accountability for hisarea. His team is responsible for the planning and execution of variable projects on a local, regionaland global basis for clients such as Whirlpool, The State of Michigan, Stryker, The College forCreative Studies, Detroit Riverfront Conservancy and others.

Mr. Kay is currently providing executive oversight for the capital projects program for Bowling GreenState University; the Detroit Riverfront Conservancy and the Detroit Medical Center Capital program,a 3 year $126 million series of projects in downtown Detroit. In addition and most recently the teamhas been hired to manage the construction of a headquarters expansion for the Kresge Foundationin Troy, Michigan.

Experience Mr. Kay has over 25 years of experience in business with a proven track record in building durablerelationships with his clients. Prior to his experience at JLL, Mr. Kay has been the lead or executivesponsor on strategic workplace projects with Visteon, Lowe Campbell Ewald, General Motors, TheUniversity of Michigan, The University of Notre Dame and others. Mr. Kay has recently providedoversight for two large development projects in Shanghai, China and in Detroit for an AutomotiveSupplier and a local College.

Prior to joining JLL, Mr. Kay was a Director for Herman Miller, Inc for the Great Lakes Region and aPrincipal in Facility Matrix Group, a Herman Miller distribution partner in Michigan. Among hisexperiences, Mr. Kay has lead national automotive and banking retail programs and corporateworkplace transformation projects. Through a customer centered approach to discovery and beingprocess driven, Mr. Kay has enjoyed an exemplary reputation for client satisfaction and deliveringsuccessful projects, on time and according to budget for his clients.

Education and affiliationsMr. Kay earned a Bachelor of General Studies from the College of Literature Science and the Arts atthe University of Michigan. Mr. Kay has recently completed service as Chairman of Membership forCoreNet Global, is Trustee of the Grosse Pointe Farms Foundation and serves on an advisorycommittee for the new CS Mott Children's hospital at the University of Michigan. Mr. Kay has enjoyedpast involvement in Cornerstone Schools and the International Facility Management Association.

United States / Detroit

Our People

Worldwide

View global site

View U.S. site

Information for

Tenants and Corporates

Investors

Industries

Learn more about

Awards and recognition

Corporate responsibility

Our history

Sustainability

Research & Insights

Chart of the week

Industrial and Logistics

Office

Real Views

Contact us

Follow us

Search

Services Research Properties Success stories News Leadership Contact us

Detroit

Page 13: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

11/18/2016 Project and Development Services

http://www.jll.com/detroit/enus/services/tenantsandcorporates/projectanddevelopmentservices 1/2

Investor Relations About us Careers

ContactsMinimize cost and risk by outsourcingyour Detroit corporate real estateprojects, from small office remodels tolargescale LEED construction. You have a business to run. A job to do. A fulltimeandthensome job,with tasks that can’t be neglected. So if you’re taking on a real estateproject, let us take on the burden. We serve the real estate projectmanagement needs of corporations across Detroit in the following ways:

Project, development and construction management: We managethe design and construction of corporate real estate projects frombeginning to end, handling every detail so you don’t have to. We'll getyour project completed on time and on budget, with at least a 100percent ROI on our services.

In fact, in 2014 we delivered 414 percent ROI on total North Americanproject management fees.

Sustainability upgrades: We advocate for and implement sustainabledesign and sound environmental practices that make your businessmore attractive to shareholders, and often result in operational costsavings.

Specialized consulting: We review operations and recommendupdates to improve efficiencies and cut costs. This includes facilityassessments, building system analyses, value engineering, qualityassurance and more.

Outsourced project management: Our team will join your team, fulltime and on site, to deliver ongoing support for all of your real estateneeds—from daily operations to largescale strategic plans.

Real value. Delivered.

Our Six Sigmacertified professionals use their training and experiencealong with the latest technology to keep your projects on track, ontime and on budget.

In 2014, our North American clients saved $345 million by outsourcingreal estate project management to us. And, they scored us an average4.71 out of 5 in overall satisfaction..

We're here to helpSpeak with a commercial realestate project manager.

Contact us

United States / Detroit / Services / Tenants and Corporates

Project and Development Services

Search

Research Properties Success stories News Leadership Contact usServices

Detroit

Page 14: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

11/18/2016 Project and Development Services

http://www.jll.com/detroit/enus/services/tenantsandcorporates/projectanddevelopmentservices 2/2

Tenant Representation

We'll help you find the ideal officeor industrial space for your Detroitbusiness, and handle your leasenegotiations.

Learn more

Privacy Statement Terms Of Use Site Map © Copyright 2016 Jones Lang LaSalle, IP, Inc.

Related service

Worldwide

View global site

View U.S. site

Information for

Tenants and Corporates

Investors

Industries

Learn more about

Awards and recognition

Corporate responsibility

Our history

Sustainability

Research & Insights

Chart of the week

Industrial and Logistics

Office

Real Views

Contact us

Follow us

Page 15: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

Project and Development Services

226 East Hudson Avenue, Suite 200 Royal Oak, MI 48067 tel +1 313 967-4111

November 22, 2016

Jana Ecker SENT VIA EMAIL

Planning Director

City of Birmingham

151 Martin Street

Birmingham, MI 48009

RE: RFP for North Old Woodward / Bates Street Site Development

Dear Jana

I had a good look at this. As did Andrea Burg and our local public institutions person Chris

Johnson (both residents). It is a very well done document for what it is. This is very exciting

and if your market demand study supports the mixed use elements and scale plus the number of

parking spaces this will be fantastic. The parking is a mushy topic that will no doubt be the

bigger elements for discussion: Renovate, demo and relocate a new one, the City wants to own

and manage, etc. We are seeing privatization of City parking as a big trend right now. (Chicago

for example). You may want to analyze that option while you are at it. We know the good people

at Walker Parking consultants are great an am sure have made good recommendations for the

scenarios based on efficiency and current condition. In general I have some thoughts:

• We are going to hit a recession in 14 – 16 months so speed to market on any mixed use

development is so critical to lock down available funds while capitalizing on the current

market energy. I can see in your schedule that the early activities are aggressive and

show urgency, however, you have two holidays in there and you might be challenged to get quality responses. Given this I would suggest you tweak this to be a Request for

Qualifications as the first phase so can will have a better chance of getting more

responses, cull the list and then do an RFP. The Quals phase can be based on creative

ideas and thoughts for this project, past project experience, resumes and capacity of the resources that will be assigned; especially the chemistry and personality of the person that

will interface with the community. The teams should have a strong ability to prove

investment success for each element of the mixed use so scale is vetted for market demand and positioning. Finally proof of financial abilities to deliver the projects.

• In this RFP document it does not look like there is mention of the development currently

underway north adjacent to this site so you have a competing development literally next

door. This is pretty huge detail to leave out for developers who do not know Birmingham. Absorption rate over time would be any developers concern.

• We have also brainstormed on likely Developers locally, regionally and nationally and

can provide a list of potential to add to your list. It is key to have ready and available

respondents (not too many other projects going on) to move quickly, with finances and

strong relevant experience

Page 16: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

I hope these thoughts can help you get the quality responses you are looking for. I grew up in

Birmingham and many on our team are residents so we are invested stakeholders in your success

so please do not hesitate to call on us for any advice the firm can bring.

If you have any questions please call my mobile 313 910-6396. I hope you and your family have

a very Happy Thanksgiving and Holiday Season.

With best regards,

Timothy Kay

Managing Director

Jones Lang LaSalle, Americas Inc

Page 17: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

REQUEST FOR PROPOSALS

North Old Woodward / Bates Street Parking and Site Development

Issued by: City of Birmingham, 151 Martin Street

P.O. Box 3001 Birmingham, MI 48012

(248) 530-1850 www.bhamgov.org

Page 18: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

N. Old Woodward / Bates Parking & Site Development

City of Birmingham, Michigan 2 Request for Proposals

NORTH OLD WOODWARD / BATES STREET PARKING AND SITE DEVELOPMENT

REQUEST FOR PROPOSALS

CONTENTS

PAGE

Introduction………………………………………………………………………………………....3

Development Objectives and Guidelines……………...……………………………..……5

Request for Proposals Process..……………………………………………………………..10

Submission Requirements and Guidelines…………………………………….……..….12

Terms and Conditions…………………………………………………….…………….….….16

Attachment A: Parcel Dimensions…………………………………………….…………..17

Attachment B: Current Zoning ……………….…………………………………….……..18

Attachment C: Overlay Zoning ……………….………………………………………...…19

Attachment D: Additional Conceptual Illustrations of Development Area…..20

Attachment E: Easement Benefitting 325 N. Old Woodward.………………....27 Attachment F: Booth Park Trail Connection…………………………………….…....28

Page 19: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

N. Old Woodward / Bates Parking & Site Development

City of Birmingham, Michigan 3 Request for Proposals

INTRODUCTION

The City of Birmingham, Michigan (the “City”) is seeking a developer or a development team (the “Developer”) to undertake the collective redevelopment of a parcel of public property of approximately 4 acres located in the City’s Central Business District. The details of the City’s interests are outlined within this Request for Proposal (RFP). Figure 1 shows the location of the subject property being offered for redevelopment. This property currently contains a public parking structure and surface parking lot.

Figure 1

Page 20: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

N. Old Woodward / Bates Parking & Site Development

City of Birmingham, Michigan 4 Request for Proposals

The City’s objective is to solicit creative and innovative development plans from qualified Developers that will extend Bates Street from Willits to North Old Woodward and redevelop the remainder of the site by constructing a parking facility that provides a minimum of 278 parking spaces in addition to replacing the 770 parking spaces currently on the N. Old Woodward / Bates Street site, introducing residential, commercial and/or mixed uses to create an activated, pedestrian-oriented urban streetscape and provide public access to the Rouge River and Booth Park to the north. (Note that if additional commercial space is provided by this project, parking spaces in addition to the 278 noted above shall be provided at the rate of 1 space for every 564 sq.ft. of new gross commercial space. Residential parking spaces are assumed to be provided and reserved outside of these numbers, at the rate of 1.5 spaces per unit.) The City owns the entire parcel and its parking structure as illustrated in Figure 1. Parcel dimensions are illustrated in Attachment A. The northern end of this parcel is planned for designation as park property along the Rouge River. A sample plan of what the City envisions can be done with this property, while accomplishing the parking goals listed, is provided in Attachment D. Important desirable amenities of the plan as provided by the City include:

• New parking structure(s) with a minimum of 1150 parking spaces. • New mixed use building adjacent to parking structure facing N. Old Woodward Ave. • Service drive access to the adjacent buildings both north and south of the parking

structure. • New mixed use building facing Willits St. • Public park property and connection between a new City street and the existing

Rouge River to the north. • Residential building on the north end of the site taking advantage of the existing

views present in this area.

The existing zoning of this parcel is Public Property. An illustration of the existing zoning for this parcel and the immediate area is contained in Attachment B. This parcel is included in the City’s Overlay Zoning District as illustrated in Attachment C, which provides for certain development opportunities. Modifications to the zoning of this parcel may occur to conform to the selected development plan, if the creativity of development plan does not meet existing parameters of the Overlay Zoning District. Additional information concerning the zoning regulations can be obtained from the City’s Planning Division.

The selected Developer will work with the Ad-Hoc Parking Development Committee to present and review their plan at public meetings to receive community input on their development plan. This process may include presenting the plan to one or more of the following boards and commissions:

a. The Ad-Hoc Parking Development Committee;

Page 21: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

N. Old Woodward / Bates Parking & Site Development

City of Birmingham, Michigan 5 Request for Proposals

b. The Birmingham Planning Board; c. The Historic District and Design Review Committee; d. The Advisory Parking Committee; e. The Multi-Modal Transportation Board; and d. The City Commission.

The final approval of the development plans will be concluded by the Birmingham City Commission following the community review process.

Based on the development plan selected, the City may lease or sell a portion or all of the property for development provided the development guidelines are met. The sale of public property would require the City to engage in placing the sale of property on the ballot for a vote in accordance with its City Charter. Once a development plan is accepted by the City, the process for the sale of property to the Developer may take from 4 to 12 months.

Page 22: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

N. Old Woodward / Bates Parking & Site Development

City of Birmingham, Michigan 6 Request for Proposals

DEVELOPMENT OBJECTIVES AND GUIDELINES

The City’s master planning document for the downtown, known as the Downtown Birmingham 2016 Report (DB2016 Report), identifies the N. Old Woodward / Bates Street site as a proposed location for redevelopment and provides conceptual illustrations of proposed modifications. The concept from the DB2016 Report referencing this area is provided herein for reference as Figure 2. Additional conceptual illustrations based on the DB2016 Report and incorporating various elements are provided as Attachment D.

Developers will be expected to present creative concepts for the site that incorporate these objectives and guidelines. The objectives and guidelines presented in this RFP will be used in evaluating the submitted proposals.

Figure 2.

Page 23: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

N. Old Woodward / Bates Parking & Site Development

City of Birmingham, Michigan 7 Request for Proposals

Development Objectives

The City’s overall objectives for redevelopment of the N. Old Woodward / N. Old Woodward / Bates Street site are as follows:

• To extend Bates Street from Willits and provide access to a

location on North Old Woodward as envisioned in the Downtown Birmingham 2016 Plan.

• To accommodate current and future public parking needs with consideration for transient, employee permit parking, shoppers and faith-based community uses.

• To provide a form of residential, commercial and/or mixed use development along the extension to Bates Street to create an activated urban streetscape.

A number of primary objectives for the redevelopment of Bates Street as a whole are outlined below:

• To contribute to the improvement of the downtown as an active,

pedestrian- oriented retail, residential and community environment.

• Ensure an adequate supply of conveniently located and attractively designed parking.

• To coordinate parking utilization in conjunction with public parking standards modified to accommodate mixed residential and business uses.

• To incorporate existing streetscape standards into proposed streetscape design and create an attractive streetscape that unifies, enhances and connects the N. Old Woodward / Bates Street site with the rest of the downtown.

• Enhance the N. Old Woodward / Bates Street site as a safe, convenient and hospitable pedestrian environment, while linking Willits to North Old Woodward.

• To ensure that new construction is compatible with the existing building fabric.

• Minimize conflicts between vehicles, pedestrians and cyclists.

These objectives should be a fundamental part of any development proposal for the N. Old Woodward / Bates Street site. The guidelines discussed below for the physical framework, mix and location of land uses, and design of buildings and public spaces are drawn directly from the Downtown Birmingham 2016 Report and/or have been developed with these objectives in mind.

Page 24: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

N. Old Woodward / Bates Parking & Site Development

City of Birmingham, Michigan 8 Request for Proposals

Development Guidelines

1. Pedestrian Circulation. Redevelopment of the N. Old Woodward /

Bates Street site should include a pedestrian circulation system that links public parking, public open space and new developments to surrounding uses and activities. All pedestrian access routes must be compliant with Americans with Disabilities Act (ADA) requirements.

2. Vehicular Connection. Bates Street will be preserved as a public

street to promote efficient access and circulation by vehicles, pedestrians, cyclists and transit riders. Bates Street will connect Willits to North Old Woodward.

3. Parking. The existing parking structure should be renovated and

expanded to accommodate additional parking, if current location is maintained. Should a proposal involve the removal and reconstruction due to relocation of the parking structure, the developer is responsible for the demolition and reconstruction costs. It is expected the City will own and operate any parking structure and own the land underneath the structure. Parking lots or garages serving residential developments would be privately owned. During construction phasing, the Developer shall coordinate development with respect to the existing parking operation.

4. Topography and Redevelopment. Building designs that take

advantage of the natural topography in the area should be utilized. Site designs that provide public access to or overlooks of the Rouge River and Booth Park to the north are encouraged.

5. Storm Water Management – Special consideration for development on

the Rouge River must be in accordance with best management practices permitted by the Environmental Protection Agency (EPA) and the Michigan Department of Environmental Quality (MDEQ).

6. Infrastructure. This project will require extending sewer and water

utilities to any new developments. New water mains must be looped into the existing system. The addition of sewer or water services for this site must conform to the City’s standards. Information on these standards can be obtained from the City’s Engineering Division.

7. Utilities. All utilities within and leading to the site shall be underground.

The adequacy of gas, electric, telephone and cable service availability to the site will need to be determined by those making a proposal by contacting the respective utility companies.

Page 25: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

N. Old Woodward / Bates Parking & Site Development

City of Birmingham, Michigan 9 Request for Proposals

8. Financial. No City subsidies will be made available. Land will be sold or

leased at market rates and all private property or private use of public property will be subject to property taxes.

9. Required Easements. All necessary easements must be provided in

accordance with the Consolidating Easement and Restriction Agreement dated November 28, 2005 between the City and B/K/G Birmingham LLC, benefiting 325 N. Old Woodward (located at corner of Willits and Old Woodward). A copy of this easement is included as Attachment E.

10. Booth Park Trail. Booth Park is located to the immediate north of the

N. Old Woodward / Bates Street site. A proposed bridge connection to Booth Park from the site is planned as part of a trail master plan. The bridge will provide access between the downtown and Booth Park. This proposed bridge will be a vital link in the overall trail system. A conceptual illustration is provided as Attachment F.

Design Issues

1. Building Height Considerations. The portion of the site not used for

public parking is zoned D-3 under the Downtown Birmingham Overlay Zoning, which allows a maximum of 4 stories, provided the 4th story is used for residential units and is set back 10’ from the front building façade. Maximum overall height is 68’. Specific regulations also apply. These regulations are outlined in the City’s Zoning Ordinance.

2. Residential Building Relationships. Any proposed residential uses

should be integrated into an overall mixed use development.

3. Design of Buildings. Specific design and architectural requirements are in place in the Downtown Birmingham Overlay Zoning District as outlined in the City’s Zoning Ordinance.

4. Design of Street. The extension of Bates Street must conform to the City’s street standards.

5. Streetscape and Landscaping.

• Streetscape designs must incorporate the City’s Downtown Streetscape

Design Standards. • Landscaping designs should include innovative and aesthetically

appealing plants and landscape features that enhance the pedestrian experience while enhancing the natural area along the Rouge River.

Page 26: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

N. Old Woodward / Bates Parking & Site Development

City of Birmingham, Michigan 10 Request for Proposals

6. Public Safety. Fire and emergency access must be accommodated for all buildings in the development area. Hydrants must be placed where required by the City’s Fire Department.

7. Parking. Most residential parking should be emphasized underground

or within buildings, which would allow land areas to be used for buildings and open spaces. The change in elevation in the area should be used to facilitate underground parking.

Page 27: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

N. Old Woodward / Bates Parking & Site Development

City of Birmingham, Michigan 11 Request for Proposals

REQUEST FOR PROPOSALS PROCESS

The City will conduct a public selection process for qualified developments to redevelop the N. Old Woodward/Bates Street site, with oversight and review to be provided by the Ad Hoc Parking Development Committee and the City Commission.

In evaluating Developer’s qualifications, the City will consider past development success, experience in working or partnering with communities, financial capacity and the design quality of previous development projects. The City may identify one or more of developers with qualifications that the City determines at their sole discretion, demonstrate the capability of the Developer(s) to successfully undertake and complete this redevelopment project.

All qualifying proposals must be received by the City Clerk no later than February 28, 2017. Submission requirements and guidelines are detailed in the Submission Requirements and Guidelines section of this RFP.

Mandatory Site Visit Meeting

Each prospective developer is required to attend a mandatory pre-bid meeting to visit the site and meet with City staff prior to submitting proposals. The mandatory site visit meeting will be held on ___________, 2017 at 1:00 p.m. This meeting will begin in room 205 of the Birmingham Municipal Building located at 151 Martin Street and will conclude at the project site. Prospective developers are asked to pre-register by ____________, 2017 by contacting Paul O’Meara at (248) 530-1836 or at [email protected].

Selection Process

Following a review of Developer proposals, the City will establish a “short list” of Developers that will be extended an invitation to participate in an interview with the Ad Hoc Parking Development Committee and/or the City Commission to discuss their qualifications and proposal for the redevelopment of this site. Once a final proposal is accepted, a redevelopment agreement will be finalized.

During the evaluation process, the City reserves the right, where it may serve the City’s best interest, to request additional information or clarification from Developers, or to allow corrections of errors or omissions. At the discretion of the City, firms submitting proposals may be requested to make public presentations as part of the evaluation process.

Page 28: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

N. Old Woodward / Bates Parking & Site Development

City of Birmingham, Michigan 12 Request for Proposals

The City will select a single developer or development team for the redevelopment of the parcel offered in this RFP. The City may offer to sell or lease the property it currently owns within the Bates Street Site, exclusive of land to be used for public parking and public roads, for private use to the selected developer or development team.

Anticipated Timetable of Selection Process

Submittal & Review Process Target Date Release of Request for Proposal _____ Registration for Site Visit with staff _____ Mandatory site visit with staff _____ Proposal Due Date _____ Extend invitation for Interviews _____ Interviews Conducted _____ Recommendation of Development Plan to City Commission _____ Conduct community review process _____ City Commission approval of final development plan _____

Developer rights and responsibilities

The following outlines the rights and responsibilities of the developer and the City of Birmingham in the redevelopment of the North Old Woodward / Bates Street Parking and Site Development:

• Exclusive development rights and right to purchase or lease land for

private uses (excludes purchase of any City owned land that will be used for public purposes, such as public parking.)

• To serve as developer or development team of the property for a mix of uses; all sub-developers must be identified if other firms will carry out portions of the project.

• Prepare all site plans and elevation drawings for approval by the City in accordance with the specifications and requirements of the City of Birmingham.

• Plan for and construct public parking as indicated in the development program.

• Work with the City during construction to accommodate temporary parking and minimize disruption to residents, tenants and the faith community in the surrounding area.

• Develop public infrastructure and utilities necessary for the site. • Attend public meetings as necessary in order to present plans for

review. It is expected that plans will need to be presented at up to ten (10) boards and committee meetings for review.

Page 29: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

N. Old Woodward / Bates Parking & Site Development

City of Birmingham, Michigan 13 Request for Proposals

City’s Role

• Assist with necessary development review process and approvals. • Cooperate with any land acquisition pursued by the developer in

accordance with this RFP. • Assist with construction phasing and coordination with respect to

temporary parking operation during construction. • Provide existing information relating to the site such as 1) title search,

2) site survey, 3) baseline environmental analysis, and 4) utility availability analysis.

SUBMISSION REQUIREMENTS AND GUIDELINES

The following outlines the submission requirements and guidelines for the North Old Woodward / Bates Street Parking and Site Development project.

A. Cover sheet as provided in RFP; B. Transmittal letter; C. Qualification Statement (see details below); D. Financial Information from Developer (Separate Sealed Envelope); E. Narrative description of what is proposed in detail and how

proposal meets the development objectives; F. Conceptual development plan for the entire site; G. Proposed terms of the submitted development plan; and H. Offer price for sale or lease of City property with a description

of the necessity to purchase or lease; Qualification Statement Requirements

1. Firm/Team Description A development team headed by an experienced developer should be identified including, as required, an architect, construction consultant, Developer, economic-financial consultant, and leasing/management company. Depending on the developer’s capabilities, the team may include as few or as many firms as required. For all companies on the team, the following is required:

• Identification of all principal firms to be involved in the project including their roles, responsibilities and authorities.

• The size of each firm and the depth of experience of their personnel. • Resumes of the persons who would be responsible for the day-to-day

operation of the project and his/her back up in the event of this person’s absence. Also, resumes of all other key persons directly involved with this project shall be included.

2. Organizational Structure and Workload • Legal Name of development entity and managing entity which will be

Page 30: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

N. Old Woodward / Bates Parking & Site Development

City of Birmingham, Michigan 14 Request for Proposals

considered the developer. • Business type (corporation, partnership, LLC, individual, joint venture,

not for profit, etc.). • Date established (for constituent firms if joint venture). • If the developer is a subsidiary or affiliate of any other corporation,

list such entity or entities including name, address, relationship to developer, and officers and directors.

• Names, addresses, title of position, and nature and extent of the interest of the officers and principals, shareholders and investors of both the developer and the development entity as follows:

o For corporations, the officers, directors or trustees, and each stockholder owning more than 10% of any class of stock.

o For partnerships or limited liability corporations, each partner or member, whether a general or limited partner or member, and either the percent of interest or a description of the character and extent of interest.

o For joint ventures, each participant and either the percent of interest or a description of the character and extent of interest. If the joint venture partners are corporations or partnerships, then the information for such firms should be provided.

o For any other type of entity, the officers, members of governing body, and each person having an interest of more than 10 %.

o No City of Birmingham elected or appointed City official or employee, and no person who serves on any City of Birmingham public board or commission may have a direct or material indirect interest in the development entity or any part of that entity.

• The number, location and magnitude of projects currently on the developer’s work plan for 2016 - 2019.

• A proposed organizational structure for the development team showing roles of each member of the team.

3. Experience • Description, illustrations, location and a brief summary of the

performance of similar projects, especially as they relate to the project. • A comprehensive list of all projects for which the firm has served as a

developer over the past three years including size, construction costs, major tenants, uses involved, and the current occupancy and ownership of these projects.

• Minimum experience required: o Demonstrated experience in at least two completed projects of

similar size and quality as proposed in this RFP. o Demonstrated financial resources and commitments to both

acquire and develop the property (provided in financial statements, evidence of equity and debt financing, etc.)

o Demonstrated commitment to the overall goals of the City and specific land uses and evidence of substantial efforts to comply with the development guidelines stated in this RFP.

Page 31: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

N. Old Woodward / Bates Parking & Site Development

City of Birmingham, Michigan 15 Request for Proposals

4. References A minimum of three references for similar projects is required. References reflecting experience working on public/private ventures with government officials and public bodies should be included, if applicable.

Financial Information

One copy of the following information should be submitted in a separate sealed envelope to be kept confidential:

• Audited financial statement or federal income tax forms for the

developer from the last three years; personal financial statements may be required as supplemental information at the option of the City’s development advisor.

• References from financial institutions with whom the developer has dealt as a borrower or as a joint venture partner.

• Proposed sources of financing and preliminary evidence of interest from financial institutions or partners if available.

• List of pending litigation or other disputes with which the developer, development entity, or joint venture partners are involved, indicate status, the potential of a financial settlement, and impact on your ability to execute this project.

• If the firm or any individual in the proposed project has ever filed for bankruptcy or has had projects that have been foreclosed (or return lenders via deed-in-lieu of foreclosure), list dates and circumstances.

All of the above information will be provided only to the City’s legal counsel and is considered exempt from the Freedom of Information Act as private information. Only t h o s e firms who are short - l i s ted and invited for an interview with the City will have their financial information reviewed. All other sealed packets will be returned unopened to their respective firms. Upon completion of the selection process all firms will have their financial information returned.

Submission Procedure

Ten (10) h a r d copies a n d o n e ( 1 ) P D F c o p y o f e a c h p r o p o s a l a n d o ne (1) copy of the developer’s financial information shall be submitted no later than 4:00 p.m., on _____________, 2017 to:

City of Birmingham

Attn: City Clerk 151 Martin Street

Birmingham, Michigan 48009

Page 32: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

N. Old Woodward / Bates Parking & Site Development

City of Birmingham, Michigan 16 Request for Proposals

Submittals should be firmly sealed in an envelope, which shall be clearly marked on the outside, “Request for Proposals – N. Old Woodward / Bates Street Parking and Site Development”. Any proposal received after the due date cannot be accepted and will be rejected and returned, unopened, to the proposer. Proposer may submit more than one submittal provided each proposal meets the functional requirements.

Each respondent shall include in their submittal the following information: Firm name, address, city, state, zip code, telephone number, fax number and website address. The company shall also provide the name, address, telephone number and e-mail address of an individual in their organization to whom notices and inquiries by the City should be directed as part of their proposal.

The City of Birmingham reserves the right, at its sole discretion, to reject any or all submittals when, in its opinion, it is determined to be in the public interest to do so; to waive minor irregularities and informalities of a submittal; or to cancel, revise, or extend this solicitation. The Request for Proposals does not obligate the City of Birmingham to pay any costs incurred by any respondent in the submission of a proposal or in making necessary studies or designs for the preparation of that proposal, or for procuring or contracting for the services to be furnished under this Request for Proposals.

Selection Criteria Evaluation of qualified proposals will be based upon:

• Qualifications and experience of developer and team members with

projects of similar scale and magnitude; • Financial capability including resources available as equity for the project and

strength of financial commitments; • Design quality of previous development projects; • Detailed description of conceptual development plan and how t h e

proposal meets the City’s objectives; • Past performance of firms as verified by references of previous

clients/projects including demonstrated ability to work with local government clients in similar relationships; and

• Offer price for sale or lease of City property with a description of the necessity to purchase or lease.

Page 33: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

N. Old Woodward / Bates Parking & Site Development

City of Birmingham, Michigan 17 Request for Proposals

TERMS AND CONDITIONS

1. The City reserves the right to reject any or all qualification and/or

proposals received at any time during this process, waive informalities, or accept any qualification and/or proposal, in whole or in part, it deems best. The City reserves the right to award the contract to the next most qualified Developer if the successful Developer does not execute a development agreement within thirty (30) days after the award of the proposal.

2. The City reserves the right to request clarification of information submitted

and to request additional information of one or more Developers.

3. The City reserves the right to terminate the contract at its discretion should it be determined that the services provided do not meet the specifications contained herein. The City may terminate this Agreement at any point in the process upon notice to Developer sufficient to indicate the City’s desire to do so. In the case of such a stoppage, the City agrees to pay Developer for services rendered to the time of notice, subject to the contract maximum amount.

4. The successful bidder will be required to furnish a Performance Bond

in an amount not less than 100% of the contract price in favor of the City of Birmingham, conditioned upon the faithful performance of the contract, and completion on or before the date specified.

5. Any proposal may be withdrawn up until the date and time set above

for the opening of the proposals. Any proposal not so withdrawn shall constitute an irrevocable offer, for a period of ninety (90) days, to provide the services set forth in accordance with the specifications outlined in this RFP.

6. The cost of preparing and submitting a proposal is the responsibility of the

Developer and shall not be chargeable in any manner to the City.

7. The Developer will not exceed the timelines established for the completion of this project.

8. The successful Developer shall enter into and execute a development

agreement with the City.

Page 34: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

N. Old Woodward / Bates Parking & Site Development

City of Birmingham, Michigan 18 Request for Proposals

ATTACHMENT A

Page 35: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

Bates Street Site Redevelopment

City of Birmingham, Michigan 19 Request for Developer Qualifications

ATTACHMENT B

Page 36: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

Bates Street Site Redevelopment

City of Birmingham, Michigan 20 Request for Developer Qualifications

ATTACHMENT C

Page 37: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

Bates Street Site Redevelopment

City of Birmingham, Michigan 21 Request for Developer Qualifications

ATTACHMENT D Conceptual Illustrations of Development Area

Page 38: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

Bates Street Site Redevelopment

City of Birmingham, Michigan 22 Request for Developer Qualifications

Page 39: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

Bates Street Site Redevelopment

City of Birmingham, Michigan 23 Request for Developer Qualifications

Page 40: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

Bates Street Site Redevelopment

City of Birmingham, Michigan 24 Request for Developer Qualifications

ATTACHMENT E

Easement Benefitting 325 N. Old Woodward

Page 41: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

Bates Street Site Redevelopment

City of Birmingham, Michigan 25 Request for Developer Qualifications

ATTACHMENT F Booth Park Trail

Connection

Booth Park trail connection to Bates Street site.

Page 42: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

MEMORANDUM

Engineering Dept. DATE: January 4, 2017 TO: Ad Hoc Parking Development Committee FROM: Paul T. O’Meara, City Engineer SUBJECT: N. Old Woodward Ave. Parking Structure Reconstruction

Project Timeline for Authorization and Construction The attached suggested timeline has been prepared to give the Committee information about the next steps needed in the process of moving towards the redevelopment of the N. Old Woodward Ave. Parking Structure property. The following considerations may warrant further discussion for clarity:

1. There is a question about whether the land that will be made available for private development must be sold, or if a lease arrangement can work.

2. As noted in the last agenda item, it has been suggested that a solicitation of a development partner may be best done with a two step process, wherein a short list of developers is created first through an RFQ (request for qualifications). Finalizing on a specific project plan with a specific developer would take more effort on the part of the candidates, who likely would need to know the status of the land lease or sale. Developers may not be able to make commitments to this project while there is uncertainty to whether the land can be divided and sold as proposed. With that in mind, the timeline provided shows a split process wherein the final RFP to the selected list of developer finalists may have to wait until the land lease/sale question is resolved.

3. If the land is to be sold, this issue can be addressed in two different ways. One would be to amend the charter in such a way as to gain permission to split and sell this property, as well as perhaps other similar property issues that may come up in the future (such as in the Triangle District). The other option would be to present a plan to the public just for this project, and ask the electorate to approve the sale of parts of the land. The timeline is the same for either option, as mapped out on the spreadsheet. However, the Commission could review and consider the merits of either path and determine the best course of action.

4. As shown on the timeline, the question of whether to approve bonding for the project could be done at the same time as the land sale question. The drawback of doing the bonding early in the process is that the amount of funding needed would not be certain, given the steps that still need to occur. If the election is held concurrently as shown, bonding would be in place much earlier than actually needed, but would not hold up the process. The sale of the bonds can be postponed until after completion of the development deal stage, if desired. Actual bonds sold could be reduced from that authorized at the election if appropriate. If the Commission prefers to wait until after the development deal and project concept is in place, there will be another three to four month delay to authorize the bonds.

1

Page 43: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

5. The construction sequence provides for the construction of the parking structure as the first priority. It is the biggest, most important component of the project. Having the other areas of the site available for construction staging, as well as a potential shuttle transit stop (by Willits St.) would help reduce the difficulty of this project for the adjacent business community. As the building begins to take shape, a separate contract could be let to build the utility and pavement improvements connected to the extension of Bates St. so that both components are done about the same time. Once those two steps are done, the developer would then be free and able to begin developing the two remaining vacant parcels, based on their available finances and market demand.

6. If any of the above steps does not pan out as discussed, and there is not support for a complete redevelopment, a “Plan B” should continue to be considered. The Committee should consider if the horizontal expansion option has merit as a feasible Plan B.

7. The timeline is a best case scenario. It does not provide delays for such things as the actual timing of the election (now only allowed in May, August, or November), and weather issues related to construction (some types of construction cannot be done during the winter).

2

Page 44: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

N. OLD WOODWARD AVE. PARKING STRUCTUREPROJECT TIMELINE FOR AUTHORIZATION AND CONSTRUCTIONEstimated Time in Months

ACTIVITY 1 2 3 4 5 6 7 8 9 10 11-14 15-20 21 22 23-33 34 35 36 37-40 41+Saroki Presentation to Commission

RFQ TO DEVELOPERSRFQ IssuanceReview RFQ submittals & Interviews

AUTHORIZATION TO SELL LANDBallot Language Prep.Commission Approves Ballot LanguagePublic Education ProcessApproval by Governor's OfficeElection Scheduled

BONDINGCost Estimate/Ballot Language Prep.Commission Approves Ballot LanguagePublic Education ProcessElection ScheduledBond Issuance and Availability

RFP TO SELECTED DEVELOPERSRFP AdvertisementInterviewsApproval of Developer by CommissionPrepare Detailed Plan/Final Approval

CONSTRUCTION/PARKING STRUCTUREDesignBidAward/Bonding/InsuranceConstruction

CONSTRUCTION/BATES ST. & SITE PREP.DesignBid Award/Bonding/InsuranceConstruction

CONSTRUCTION/PRIVATE SITESTiming Depends on Market/Developer

Page 45: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

12/12/2016 Getting downtown vibe: Troy, other communities aim to create walkable, urban areas amid sprawl Crain's Detroit Business

http://www.crainsdetroit.com/article/20161211/NEWS/161219974/gettingadowntownvibetroyothercommunitieslookingtocreate 1/9

Login

Subscribe

Connect

U )

NEWS

AWARDS

EXTRAS

DATA

BLOGS / OPINION

EVENTS

MULTIMEDIA

Photo by Gibbs Planning Group Inc.

December 11, 2016 12:01 a.m. UPDATED 14 HOURS AGO

Getting downtown vibe: Troy, other communities aimto create walkable, urban areas amid sprawlBy KIRK PINHO

Metro Times Economic Development Government More +

An artist's rendering shows what Troy could look like with a plan for a bustling retail, residential and governmental district.

Page 46: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

12/12/2016 Getting downtown vibe: Troy, other communities aim to create walkable, urban areas amid sprawl Crain's Detroit Business

http://www.crainsdetroit.com/article/20161211/NEWS/161219974/gettingadowntownvibetroyothercommunitieslookingtocreate 2/9

Login

Subscribe

Connect

U )

NEWS

AWARDS

EXTRAS

DATA

BLOGS / OPINION

EVENTS

MULTIMEDIA

In his office, Brian Kischnick pulls out two rolled-up maps of downtown Royal Oak and downtownBirmingham and places them individually over an aerial photo of the 127-acre Troy civic campus. They bothfit, with room to spare.

Those are the stakes that Kischnick, Troy's city manager, and a team of planners have in the back of theirminds as they shop around a master plan for the campus that would cost at least $350 million and bring atleast 850 residences and hundreds of thousands of square feet of walkable retail space to the city, one ofOakland County's economic engines — even with no downtown.

Troy is one of several suburban communities thinking like developers, looking at increasingly valuablemunicipal real estate holdings and viewing them as opportunities to create bustling, walkable urban areasattractive to both millennials and baby boomers, and bring in more city revenue in the process.

Royal Oak, Northville, Warren and Commerce Township, just to name a few, are all taking aim at the newlust for downtown living.

For more than six months, Troy has been working with Bingham Farms-based Core Partners LLC andBirmingham-based Gibbs Planning Group Inc. to develop a master plan for 127 acres of city-owned landon which Troy's civic complex sits nestled between I-75 to the west, Livernois to the east and north of BigBeaver Road.

Not only does the site contain City Hall, but also the police department, library, community center, anaquatic center and the 52-4 District Court. Those buildings would remain largely unchanged, minus a newfacade and clocktower for City Hall.

It's the acreage surrounding those buildings that's expected to see the most activity as retail spaces,townhouses, live-work units, condominiums, apartments and cottage homes are built, plus a 300-roomhotel.

The planners and city council and planning commission have come to a consensus on a master plan for thearea that involves the development of what Robert Gibbs, the urban planner and landscape architect on theproject, likened to Troy's version of downtown Birmingham, fresh out of the City Beautiful planningmovement of the 1920s that built downtowns around civic buildings.

"The overall goal is to give Troy a downtown that they never had," he said last week.

TROY'S PLANS

At least 180,000 square feet of retail space and restaurants.

At least 850 residences: townhouses, live-work spaces, condominiums, apartments and cottage homes.

20 acres of parks.

A 6-acre man-made lake.

A 300-room, four-star hotel.

Two formal town squares.

Expand

Page 47: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

12/12/2016 Getting downtown vibe: Troy, other communities aim to create walkable, urban areas amid sprawl Crain's Detroit Business

http://www.crainsdetroit.com/article/20161211/NEWS/161219974/gettingadowntownvibetroyothercommunitieslookingtocreate 3/9

Login

Subscribe

Connect

U )

NEWS

AWARDS

EXTRAS

DATA

BLOGS / OPINION

EVENTS

MULTIMEDIA

The site, said Matt Farrell, founder of Core Partners, is a gem that has been overlooked by developers.

"It has been right underneath everybody's noses for a long time," he said.

Ambitious plan

Troy, one of Oakland County's economic hubs with 83,000 residents and 13.26 million square feet of officespace, is almost 34 square miles of large office buildings, high-end shopping centers like the SomersetCollection, department stores, strip malls, restaurants, houses and apartment buildings. It has 125,000workers during the day.

The problem, according to Gibbs?

"They have to get in their car and drive to Chili's for lunch," he said.

If its residents and workers want a walkable community, they have to look to other areas like Birmingham,Royal Oak, Rochester or Ferndale, which have vibrant downtowns nearby with their own uniquepersonalities and challenges. Birmingham and Ferndale have parking shortages. Royal Oak has a dearth ofoffice workers. Rochester is a trickier commute.

The Troy project could be less daunting with what essentially is a development blank slate and a massiveblock of land with substantial infrastructure already in place, not to mention the residential andemployment base to support it.

What happens with Troy's property remains an open-ended question. Things could change; five-yearprojections for the site based on market studies, said Dave Mangum, planning associate at Gibbs Planning,are enormous: 2,000 or more residences, 600,000 square feet or more of retail space.

Yet the planners are being conservative with their early project estimates: 850 residences, 180,000 squarefeet of retail at a $350 million price tag.

Troy's plan, presented last week to what Kischnick said were 50 to 100 developers at the InternationalCouncil of Shopping Centers deal-making conference in New York City, could take years to materialize.First, a master developer has to be chosen; a request for qualifications could be sent out next year.

Best-case scenario: "Some (construction) activity" beginning in 2018, said Larry Goss, executive vicepresident of Core Partners.

Happening elsewhere

It's not just Troy that is taking its real estate and putting it in the hands of private developers to turn intosomething urban and unique.

The largest in the works is the Commerce Towne Place project in Commerce Township, which is well over300 acres of land.

For more than a decade, Commerce has plugged away on the project at M-5 and Pontiac Trail, with amassive 340 acres (130 or so would be preserved as parkland). The project, chugging along after coming toa screeching halt in 2008 with the economic collapse, is expected to bring about 700 single-family houses,senior housing units and townhouses to the market, along with 550,000 square feet of retail and officespace in a project expected to cost more than $270 million.

The land for the project is owned by the township's DDA, which purchased a pair of golf courses and severalother large parcels with the Commerce Towne Place vision in mind.

Page 48: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

12/12/2016 Getting downtown vibe: Troy, other communities aim to create walkable, urban areas amid sprawl Crain's Detroit Business

http://www.crainsdetroit.com/article/20161211/NEWS/161219974/gettingadowntownvibetroyothercommunitieslookingtocreate 4/9

Login

Subscribe

Connect

U )

NEWS

AWARDS

EXTRAS

DATA

BLOGS / OPINION

EVENTS

MULTIMEDIA

In Royal Oak, the plans for a new $100 million city hall in the Royal Oak City Center development havebeen delayed slightly but are still proceeding as the city commission mulls whether to lease 30,000 squarefeet for city operations in a multitenant office building to be built or be the lone user in another one, saidRon Boji, president and founder of Lansing-based The Boji Group, one of the developers.

"Certain communities have had — and mostly everyone has had — very, very modest growth because of thedownturn in the economy in Michigan the last 10-12 years," Boji said.

"They are using their own infrastructure, whether that be courts, police, a city hall, other civic items such asconference centers, things of that nature, as stimulators to a private-public partnership to bring on otheritems such as retail, residential and office."

Boji's development group also includes The Surnow Co. and RAD Development Group, both based inBirmingham.

The 190,000-square-foot building was originally planned to include 30,000 square feet for city governmentoperations and about 130,000 square feet of leasable office space with 20,000-square-foot floor plates.Financing for the project is now expected to close in the spring or summer.

The building would also include a rooftop garden terrace and event center, along with leasable space for aspecialty grocery store and a restaurant with a liquor license, Boji said.

Also included in the project plans are a 533-space, six-story parking deck, a park with an amphitheater andplayground, and new Royal Oak Police Department headquarters.

In Northville Township, a former state corrections facility site is planned to be redeveloped into more than350 residences with 28,000 square feet of retail, three or four restaurants and a 50,000-square-foot anchorretailer, said Dale Watchowski, president, COO and CEO of Southfield-based Redico LLC, one of thedevelopers on the project.

He said the redevelopment of the 57-acre former Robert Scott Correctional Facility site, which was ownedby the township, at Five Mile and Beck roads, is expected to break ground in the spring. Some of theresidences — which include 111 single-family houses, 66 townhouses and 180 apartments — are expectedto be complete late fall next year.

Farmington Hills-based Pinnacle Homes is a developer on the residential components of the project.

In Warren, 210 loft units south and east of city hall at a $32 million development cost have been planned,said Mayor Jim Fouts.

A groundbreaking for the Bingham Farms-based Burton-Katzman LLC project is expected next year.

In Dearborn, the city sold its old City Hall on Michigan Avenue in the east downtown area to a Minneapolis-based developer that converted the three-building campus into 53 lofts.

The ensuing development, the City Hall Artspace Lofts, welcomed its first residents to the $16.5 millionredevelopment of the 1920s buildings Jan. 1.

Millennial movement?

Robin Boyle was skeptical at first when briefed on the plans in Troy.

"Incredibly hard to walk around there," said Boyle, a professor and chairman of the Wayne StateUniversity Department of Urban Studies & Planning and a member of the Birmingham Planning Board.

Page 49: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

12/12/2016 Getting downtown vibe: Troy, other communities aim to create walkable, urban areas amid sprawl Crain's Detroit Business

http://www.crainsdetroit.com/article/20161211/NEWS/161219974/gettingadowntownvibetroyothercommunitieslookingtocreate 5/9

Login

Subscribe

Connect

U )

NEWS

AWARDS

EXTRAS

DATA

BLOGS / OPINION

EVENTS

MULTIMEDIA

SUBMIT

MICHIGAN MORNING NEWSLETTER

Get a roundup of important news that happens each day.

email address

He also said a lot of prerecession mixed-use suburban developments touting walkability were largelypaying lip service to the concept.

But he is beginning to change his mind.

"Now, I am beginning to think that the developers are genuinely interested in this and they think themillennial buyer wants to have a tightened development," he said. "They want to have a chance ... to takethe kids for an ice cream or buy the paper or get a drink or get dinner and walk there."

And that's what Troy hopes to provide, in perhaps one of the least-expected cities in the region.

"Of all places," Boyle said.

Advertisement

Page 50: AD HOC PARKING DEVELOPMENT COMMITTEE FRIDAY, … COMPLETE 17.106.pdf · 2019-03-26 · AD HOC PARKING DEVELOPMENT COMMITTEE . FRIDAY, JANUARY 6, 2017 . 8:00 A.M. ROOM 205 . 151 MARTIN

12/12/2016 For your info [email protected] City of Birmingham MI Mail

https://mail.google.com/mail/u/0/#inbox/1586daefdc93a36c 1/1

COMPOSE

Inbox (1)StarredImportantSent MailDrafts (167)Circles

Follow upMiscAttaBoyBridgeBudgetCity CommissionEOCOfficeParkingPavingPersnnelPlanningSewerShain ParkSidewalkSPR

This sevenstory parking deck will be built in Royal Oak on the surface parkinglot on Second Street across from the U.S. Post Office in thedowntown. Rendering from Rich & Associates architects

By Mike McConnell, [email protected], @mmcconnell01 on Twitter

POSTED: 11/15/16, 12:08 PM EST | UPDATED: 44 SECS AGO0 COMMENTS

Royal Oak city commissioners narrowly approved building a sevenstoryparking deck in the downtown Monday and funding most of it with a$13.5 million bond.

The deck is to be built on an existing surface parking lot and will cost upto $15.5 million and be paid for with funds from the city auto parkingfund and the Downtown Development Authority over 20 years.

“The prices are going up higher than anticipated,” said CityCommissioner Michael Fournier, who opposed the project in a close 43vote Monday.

The deck is planned for the city parking lot on Second Street across fromthe U.S. Post office between Center Street and Washington Avenue. Itabuts the existing threestory Center Street Parking Deck.

Jay