16225 Park Ten Place, #810
Houston, TX 77084 281.961.0355 (p) [email protected]
ADD3-1
ADDENDUM 03
December 11, 2013
Project: Security Foyers
Aldine Independent School District
Prepared by: S. Chu Architects, Inc.
16225 Park Ten Place
Suite 810
Houston, Texas 77084
Project No.: 1304
Prepared for: Prospective Proposers
PART A: NOTICE TO PROPOSERS:
1. Receipt of this Addendum shall be acknowledged on the Proposal Form. Failure to do so may
subject Proposers to disqualification. Each Proposer shall make necessary adjustments and submit
his proposal with full knowledge of all modifications, clarification, and supplemental data
included therein.
2. This Addendum forms part of the Contract Documents and shall be incorporated integrally
therewith. Where provisions of the following supplemental data differ from those of previously
issued documents, this Addendum shall govern.
3. The following Contract Documents have been issued to date delineating the Work (Project):
Contract Documents November 15, 2013
Addendum 01 December 04, 2013
Addendum 02 December 10, 2013
This Addendum consists of ADD3-1~ADD3.3, Revised Sheets A1.16, A4.01, A4.02, S9 & SK-
ADD3-E1
PART B CHANGES TO THE PROJECT MANUAL
4. Section 087100 Finish Hardware
a, Under Hardware Schedule, Revise Set 5.0 to read as follows:
Doors: Goodman Elementary
Description: Existing- Office Remote Release
1 Elec. Hinge TA2714QC12 4 1/2x41/2 US26D McKinney
2 Hinge TA2714 41/2x4 ½ US26D McKinney
1 Elec Exit Divce – EL 16 56 8504 US32D Sargent
1 Elec Cable Exit to HingeQC-C006P McKinney
2 Dummy Mortise Cylinders 26D Sargent
1 Elec Cable-Hinge to AboveQC-C1500P McKenny
1 Push Button PB4LN-2 Securitron
GLS
GLSTypewritten Text12/11/2013
ADD3-2
NOTE: PUSH BUTTON TO BE MOUNTED FOR REMOTE RELEASE, REUSE
EXISTING PULL.
5. Section 17300 Door Monitoring System
a, Under PART 2, add the following paragraph:
2.5 Acceptable Manufacturers
a. RS2 Technologies
b. Vanderbilt
c. Genetec
d. Approved equal
PART C CHANGES TO THE DRAWINGS
6. Cover Sheet
a, Index of Drawings, under Architectural, revise Sheet A1.16 to “FLOOR PLANS-
GRANTHAM ACADEMY, DAVIS HS & DAVIS 9THE GRADE”; revise last Sheet
“Sheet A3.02 Door Monitoring…….” to “Sheet A4.02 Door Monitoring…..”; Under
Electrical, revise Sheet E1.16 to “Grantham Academy, Davis HS & Davis 9th
Grade-
Electrical Floor Plan”.
7. Sheet A1.05
a, At 24/A1.05, revise note @ existing door from General Office to Foyer “HW SET XX”
to read “HW SET #5”
8. Sheet A1.10
a, Detail 21, revise the note for the interior existing storefront to read: “…..REPLACE HW
TO HW SET #6”
9. Sheet A1.14
a, At 24/A1.14, the exit device added to existing door from Cafeteria to Foyer shall be equal
to Sargeant 351.
10. Sheet A1.15
a, At 2/A1.15, change note “ADD NEW STOREFRONT TYPE 42” to read “ADD NEW
STOREFRONT TYPE 45”.
11. Sheet A1.16
a, Add 6/A1.16 FLOOR PLAN-DAVIS 9TH
GRADE. Revised Sheet A1.16 is issued with
this Addendum.
12. Sheet A2.01
a, Type 4 Frame, add note ‘PAIR ALUMINUM DOORS HW SET #1” to the opening
13. Sheet A2.02
a, Delete Frame Type 36.
14. Sheets A4.01 & A4.02
a, Revised Sheets A4.01 and A4.02 are issued with this Addendum.
15. Sheet S9
a, Revise Carver High School as shown on revised Sheet S9 issued with this addendum.
16. Sheets E1.16
a, Davis High School Electrical Floor Plan, change the detail number to “2”.
b. Add Davis 9th
Grade Electrical Floor Plan as shown on attached SK-ADD3-E1.
17. Sheets E2.01~E2.07
a, Door monitoring system shown on these sheets shall be Alternate #1.
END OF ADDENDUM
ADD3-3
GLSCloud
GLSCloud
GLSCloud
GLSCloud
GLSCloud
GLSCloud
GLSCloud
GLSCloud
GLSCloud
GLSCloud
MAXIMUM 3
'-0" OFF WA
LL AT ROO
F
DECK OPENING
(3"x3"x1/4" LLH)
SECTION VIEW
RTU CURBFRAME AROUND
EXISTING JOIST
THROUGH METAL DECK
PLAN VIEW
UNDER BLOCKING.
(DO NOT DEFORMDECK WHEN
METAL DECK TO RUN
TIGHTENING BOLTS)
3/16
WOOD BLOCKING BOLT
MECHANICAL UNIT AND CURBSEE MECHANICAL DWGS FOR
(3"x3"x1/4" LLH)
RTU CURBFRAME AROUND
EXISTING JOIST
SEE MECHANICAL
ROOF OPENING WITH2" x 2" x 1/8" ANGLE AROUND
METAL DECK TO RUN TO EDGE OF ROOF OPENING
ANGLE 2" x 2" x 1/8" AROUND ROOFOPENING SCREW TO METAL DECK
INSULATED DECK TO BE CUT AT FACE OF BLOCK
OPENING SEE MECH FOR SIZE & LOCATIONNOT SHOWN
TO ANGLE.
PLACE OPENING AND UNITCENTERED BETWEEN JOIST
DECK OPENING
(3"x3"x1/4" LLH)
SECTION VIEW
PERIMETER OF RTU CURBFRAME AROUND
EXISTING CHANNELS
THROUGH DECK
PLAN VIEW
UNDER BLOCKING)(DECK TO RUN
3/16
WOOD BLOCKING SCREW
MECHANICAL UNIT AND CURBSEE MECHANICAL DWGS FOR
CENTERED BETWEEN CHANNELSPLACE CURB AND RTU
(3"x3"x1/4" LLH)
RTU CURBFRAME AROUND
EXISTING CHANNELS
SEE MECHANICAL
EXISTING WOOD BLOCK BOLTED TO CHANNEL
ANGLE BOLTED TO ANGLES WITHADD WOOD BLOCKING ON TOP OF CURB
1/2" BOLTS AT 24" O.C. (MIN TWO PER SIDE)
WOOD DECK TO RUN TO EDGE OF ROOF OPENING
DECK WITH 16 d NAILS @ 12" O.C.WOOD BLOCKING NAIL TO EXISTING
ROOF OPENING SEE MECHFOR SIZE & LOCATION
AROUND OPENING
DGJMS
S-9STRUC. RTU SUPPORT PLANS
SMITH ACADEMYCARVER H.S.
DATE ISSUE
11/16/2013
CHECKEDDRAWNDATEPROJECT NO. 1304
281-945-4545 (p)
JSE Consulting Engineers, Inc.Houston, Texas 7708416225 Park Ten Place, Suite 810
281-945-4549 (f)
S. Chu Architects 16225 Park Ten Place
Suite 810Houston, Texas 77084
281-961-0355
5629 SchumacherHouston, Texas 77057
Schmitz/Lamb Engineers, Inc.
713-772-5562 (p)Houston, Texas 770
713-587-3299 (f)
ADDENDA
GLSTypewritten Text
GLSTypewritten Text12/11/13