Addendum #2 Construction of Substation H (December 23, 2020) 1.0 Several inquiries have been received regarding the project. Please see questions and responses below: 1.1 Question: “Drawing FD02-01 does not list the number of vertical rebar and hoops needed on each foundation type. Can you provide those quantities?” Answer: Please see attached revised sheet FD02-01 for quantities as requested. 1.2 Question: “Can you please provide the depths on the drilled piers?” Answer: Please see attached revised sheet FD02-01 for depths as requested. 1.3 Question: “Will Concast be acceptable for the cable trench?” Answer: Please note any exceptions or clarifications within your proposal regarding offerings that differ from the specifications. 1.4 Question: “Do you have a spec for the granular filter that is under the rip rap for culvert installation?” Answer: Please see attached detail including granular filter specification. 1.5 Question: “Can you please verify size and type of culvert pipe at the entrances?” Answer: Please refer to sheet SP01-01 in the bid documents. Culvert pipe at south entrance to be 35LF of 15” RCP with FES and Riprap. Culvert pipe at temp construction entrance to be 25LF of 12” RCP with FES and Riprap. Culvert pipe at west entrance to be 60LF of 12” RCP with FES and Riprap. 1.6 Question: “Would crushed concrete be acceptable for the 8” base material?” Answer: Crushed concrete for the base course is acceptable. Base course material shall meet NDOR 2017 Specification 1033.02 Section 7, see attached. 1.7 Question: “There is not any geo-grid or fabric shown, is that correct?” Answer: This is called out on dwg SP04-01 in Outlet Detail 2, Granular Filter Blanket Note 1. MIRAFI 160N Geofabric (or equivalent) should cover the granular filter. See attached.
Transcript
Page 1: Addendum #2 Construction of Substation H (December 23, 2020)

Addendum #2 Construction of Substation H

(December 23, 2020)

1.0 Several inquiries have been received regarding the project. Please see questions and responses below:

1.1 Question: “Drawing FD02-01 does not list the number of vertical rebar and hoops needed on each foundation type. Can you provide those quantities?”

Answer: Please see attached revised sheet FD02-01 for quantities as requested.

1.2 Question: “Can you please provide the depths on the drilled piers?”

Answer: Please see attached revised sheet FD02-01 for depths as requested.

1.3 Question: “Will Concast be acceptable for the cable trench?”

Answer: Please note any exceptions or clarifications within your proposal regarding offerings that differ from the specifications.

1.4 Question: “Do you have a spec for the granular filter that is under the rip rap for culvert installation?”

Answer: Please see attached detail including granular filter specification.

1.5 Question: “Can you please verify size and type of culvert pipe at the entrances?”

Answer: Please refer to sheet SP01-01 in the bid documents. Culvert pipe at south entrance to be 35LF of 15” RCP with FES and Riprap. Culvert pipe at temp construction entrance to be 25LF of 12” RCP with FES and Riprap. Culvert pipe at west entrance to be 60LF of 12” RCP with FES and Riprap.

1.6 Question: “Would crushed concrete be acceptable for the 8” base material?”

Answer: Crushed concrete for the base course is acceptable. Base course material shall meet NDOR 2017 Specification 1033.02 Section 7, see attached.

1.7 Question: “There is not any geo-grid or fabric shown, is that correct?”

Answer: This is called out on dwg SP04-01 in Outlet Detail 2, Granular Filter Blanket Note 1. MIRAFI 160N Geofabric (or equivalent) should cover the granular filter. See attached.

Page 2: Addendum #2 Construction of Substation H (December 23, 2020)

1.8 Question: “Are the .xml and .dwg files available for the grading plans to verify quantities?”

Answer: These are available upon request. Please contact Nate Royuk – [email protected].

1.9 Question: “Who is providing the station service transformer?”

Answer: The station service transformer will be provided and installed by the Owner, including primary cable and terminations. The single-phase fiberglass transformer pad will be provided by the Owner for the Contractor to install along with associated conduits as shown on the project drawings.

Page 3: Addendum #2 Construction of Substation H (December 23, 2020)

Fremont Department of UtilitiesFremont, Nebraska

2020

69 kV Substation andLines Construction

AutoCAD SHX Text
BOTTOM TEMPLATE
AutoCAD SHX Text
TOP TEMPLATE
AutoCAD SHX Text
ANCHOR BOLTS
AutoCAD SHX Text
(4)-ABx BOLTS
AutoCAD SHX Text
PIER EDGE
AutoCAD SHX Text
EXISTING SOILS
AutoCAD SHX Text
TACK WELD
AutoCAD SHX Text
3 HEAVY HEX NUTS (A563) 2 FLAT WASHERS (F436 GALV)
AutoCAD SHX Text
1" F1554 GR.55 BOLT (HOT DIP GALVANIZED)
AutoCAD SHX Text
HEAVY HEX NUT
AutoCAD SHX Text
THREAD LENGTH
AutoCAD SHX Text
ANCHOR BOLT DETAIL AB4 SCALE: N.T.S. N.T.S. (32) REQUIRED PROVIDED BY STEEL FABRICATOR
AutoCAD SHX Text
ANCHOR BOLT DETAIL AB5 SCALE: N.T.S. N.T.S. (16) REQUIRED PROVIDED BY STEEL FABRICATOR
AutoCAD SHX Text
3 HEAVY HEX NUTS (A563) 2 FLAT WASHERS (F436 GALV)
AutoCAD SHX Text
2-1/4" F1554 GR.55 BOLT (HOT DIP GALVANIZED)
AutoCAD SHX Text
THREAD LENGTH
AutoCAD SHX Text
2 BAR HOOPS WITHIN TOP 5", 2" SPACING
AutoCAD SHX Text
T.O.C. ELEV. (SEE FD01-01)
AutoCAD SHX Text
REBAR HOOPS OUTER DIAMETER = D-6" (MAX) SPACED @ 12" O.C. MAX.
AutoCAD SHX Text
VERTICAL REBAR = H-6"
AutoCAD SHX Text
HOOP BARS (SEE SCHEDULE FOR QUANTITY)
AutoCAD SHX Text
TYPICAL VERTICAL BARS SPACED EVENLY, WITHIN HOOP (SEE SCHEDULE FOR QUANTITY)
AutoCAD SHX Text
CHAMFER EXPOSED EDGES
AutoCAD SHX Text
TYPICAL PIER ELEVATION
AutoCAD SHX Text
TYPICAL REBAR HOOP
AutoCAD SHX Text
'C' = MINUS 3"CLEAR EACH SIDE, DGE-TO-EDGE (SEE SCHEDULE)
AutoCAD SHX Text
TYPICAL PIER PLAN
AutoCAD SHX Text
N
AutoCAD SHX Text
SUBSTATION NORTH
AutoCAD SHX Text
3 HEAVY HEX NUTS (A563) 2 FLAT WASHERS (F436 GALV)
AutoCAD SHX Text
3/4" F1554 GR.55 BOLT (HOT DIP GALVANIZED)
AutoCAD SHX Text
THREAD LENGTH
AutoCAD SHX Text
ANCHOR BOLT DETAIL AB3 SCALE: N.T.S. N.T.S. (48) REQUIRED PROVIDED BY STEEL FABRICATOR
AutoCAD SHX Text
TACK WELD
AutoCAD SHX Text
HEAVY HEX NUT
AutoCAD SHX Text
PIER EDGE
AutoCAD SHX Text
Issue
AutoCAD SHX Text
No.
AutoCAD SHX Text
Description
AutoCAD SHX Text
Date
AutoCAD SHX Text
Drwn.
AutoCAD SHX Text
Chkd.
AutoCAD SHX Text
Resp.
AutoCAD SHX Text
Engr.
AutoCAD SHX Text
Proj.
AutoCAD SHX Text
Mgr.
AutoCAD SHX Text
Issue
AutoCAD SHX Text
No.
AutoCAD SHX Text
Description
AutoCAD SHX Text
Date
AutoCAD SHX Text
Drwn.
AutoCAD SHX Text
Chkd.
AutoCAD SHX Text
Resp.
AutoCAD SHX Text
Engr.
AutoCAD SHX Text
Proj.
AutoCAD SHX Text
Mgr.
AutoCAD SHX Text
Date
AutoCAD SHX Text
Scale
AutoCAD SHX Text
Project NO.
AutoCAD SHX Text
Drawing No.
AutoCAD SHX Text
Issue
AutoCAD SHX Text
Drawn By
AutoCAD SHX Text
I&C/Process
AutoCAD SHX Text
Mechanical
AutoCAD SHX Text
Structural
AutoCAD SHX Text
Electrical
AutoCAD SHX Text
Civil
AutoCAD SHX Text
Architect
AutoCAD SHX Text
Project Manager
AutoCAD SHX Text
6
AutoCAD SHX Text
5
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
7
AutoCAD SHX Text
A
AutoCAD SHX Text
Project Engineer
AutoCAD SHX Text
File Name
AutoCAD SHX Text
PROJECT-SPECIFIC NOTES: 1. SEE TERRACON'S GEOTECH REPORT 05205056 FOR SOIL AND SEE TERRACON'S GEOTECH REPORT 05205056 FOR SOIL AND BORING DETAILS. 2. SEE SG02-01 FOR CONTROL POINTS, BENCHMARKS, AND DESIGN SEE SG02-01 FOR CONTROL POINTS, BENCHMARKS, AND DESIGN ELEVATION OF SUBSTATION PAD. 3. CONTRACTOR TO VERIFY PAD CORNER AND CROWN LINE CONTRACTOR TO VERIFY PAD CORNER AND CROWN LINE ELEVATIONS PRIOR TO POURING FOUNDATIONS.
AutoCAD SHX Text
GENERAL NOTES: 1. REBAR SHALL HAVE 3" CLEAR COVER, UNLESS NOTED OTHERWISE. REBAR SHALL HAVE 3" CLEAR COVER, UNLESS NOTED OTHERWISE. ANY METAL SUPPORT BRACKETS/RODS MUST MAINTAIN 3" CLEAR COVER TO PREVENT WATER INTRUSION PATHS. ANY METAL SUPPORTS WITHIN THE FOUNDATION MUST BE REMOVED OR DRILLED OUT PRIOR TO CONCRETE SETTING. MAINTAINING 3" MINIMUM CLEAR COVER. 2. STAGGER REBAR HOOD LAP AROUND PIER. STAGGER REBAR HOOD LAP AROUND PIER. 3. EXCAVATION, BACKFILL, GRAVEL AND CONCRETE SHALL BE IN EXCAVATION, BACKFILL, GRAVEL AND CONCRETE SHALL BE IN ACCORDANCE WITH THE TECHNICAL SPECIFICATIONS. 4. DETAILS SHOWN INDICATE TYPICAL CONSTRUCTION REQUIREMENTS FOR DETAILS SHOWN INDICATE TYPICAL CONSTRUCTION REQUIREMENTS FOR DEPTH OF EXCAVATION AND ABOVE GRADE FORMING. ACTUAL REQUIREMENTS SHALL BE DETERMINED FROM FOUNDATION TOP ELEVATIONS AS SHOWN ON THE FD01-01. 5. CHAMFER ALL EXPOSED EDGES 3/4". CHAMFER ALL EXPOSED EDGES 3/4". 6. ALL EXPOSED CONCRETE FOUNDATION SURFACES SHALL BE CURED, ALL EXPOSED CONCRETE FOUNDATION SURFACES SHALL BE CURED, AS PER SPEC. 7. CONCRETE SHALL BE TESTED BY AN ACI CERTIFIED TESTING FIRM, ON CONCRETE SHALL BE TESTED BY AN ACI CERTIFIED TESTING FIRM, ON EACH DAY OF CONCRETE POURING AND EVERY 50 C.Y. OF CONCRETE, AS PER SPEC. A) 4 CYLINDERS ARE REQUIRED IF USING 6x12" MOLDS; 1 CYLINDER FOR 7 DAY 2 CYLINDER FOR 28 DAY ACCEPTANCE B) 6 CYLINDERS ARE REQUIRED IF USING 4x8" MOLDS; 1 CYLINDER FOR 7 DAY 3 CYLINDER FOR 28 DAY ACCEPTANCE 8. FOUNDATIONS SHALL NOT BE LOADED UNTIL SEVEN (7) DAYS AFTER FOUNDATIONS SHALL NOT BE LOADED UNTIL SEVEN (7) DAYS AFTER CONCRETE PLACEMENT, CONCRETE HAS MET A MINIMUM 75% F'C, AND BACKFILL HAS BEEN PLACED AND COMPACTED, AS PER SPEC. 9. CONCRETE SHALL NOT BE DROPPED MORE THEN 5.0' WITHOUT THE CONCRETE SHALL NOT BE DROPPED MORE THEN 5.0' WITHOUT THE USE OF A TREMMIE, TUNNEL, BUCKET, OR OTHER DEVICE TO PREVENT CONCRETE FROM HITTING SOIL WALLS DURING PLACEMENT. 10. ALL CONCRETE SHALL BE THOROUGHLY COMPACTED BY VIBRATING, ALL CONCRETE SHALL BE THOROUGHLY COMPACTED BY VIBRATING, TAMPING, AND WORKING AROUND REBAR AND CORNERS OF FORMS. 11. CONSTRUCTION JOINTS WILL NOT BE ALLOWED. CONSTRUCTION JOINTS WILL NOT BE ALLOWED. 12. CONCRETE QUANTITIES HAVE NOT BEEN ADJUSTED FOR CONCRETE QUANTITIES HAVE NOT BEEN ADJUSTED FOR REINFORCEMENT VOLUME, DRILLING, OR FORMING OPERATIONS. 13. ALL EXPOSED VERTICAL SURFACES SHALL RECEIVE A SAND-SACKED ALL EXPOSED VERTICAL SURFACES SHALL RECEIVE A SAND-SACKED FINISH. 14. ALL EXPOSED HORIZONTAL SURFACES SHALL RECEIVE A BRUSHED ALL EXPOSED HORIZONTAL SURFACES SHALL RECEIVE A BRUSHED FINISH. CONTROL PADS SHALL HAVE A FLOATED FINISH. 15. SLAB TOLERANCE FOR BOTH LENGTH AND WIDTH: PLUS OR MINUS ". SLAB TOLERANCE FOR BOTH LENGTH AND WIDTH: PLUS OR MINUS ". 14". 16. MEASURED DIAGONAL LENGTHS SHALL BE WITHIN " OF EACH OTHER. MEASURED DIAGONAL LENGTHS SHALL BE WITHIN " OF EACH OTHER. 12" OF EACH OTHER. THE FOLLOWING SLAB SPECIFICATIONS APPLY TO THE AREA OF THE SLAB DEFINED BY THE SLAB OUTER EDGE INWARD 8". VARIATION FROM LEVEL: 1.) IN ANY 10' OF LENGTH - " MAX. 14" MAX. VARIATION FROM FLAT: 1.) IN ANY 10' OF LENGTH - " MAX. 14" MAX. 17. NON-FROST SUSCEPTIBLE FILL SHALL BE NDOR CRUSHED ROCK NON-FROST SUSCEPTIBLE FILL SHALL BE NDOR CRUSHED ROCK SURFACING OR EQUIVALENT, AND SHALL MEET THE FOLLOWING GRADATION: SIEVE % PASSING % PASSING #200 <6% <6% #40 <40% <40% 0% 1" 100% 100% 18. ALL FILL SHALL BE COMPACTED TO 95% OF THE STANDARD PROCTOR ALL FILL SHALL BE COMPACTED TO 95% OF THE STANDARD PROCTOR DENSITY WITH MAXIMUM LIFTS OF 6". 19. ALL STRUCTURAL CONCRETE SHALL BE 4000 PSI TYPE II CEMENT. ALL STRUCTURAL CONCRETE SHALL BE 4000 PSI TYPE II CEMENT. 20. AGGREGATES WITHIN THE CONCRETE MIXTURE SHALL CONFORM TO AGGREGATES WITHIN THE CONCRETE MIXTURE SHALL CONFORM TO ASTM C33, SIZE 57 OR 67 (MAXIMUM COARSE SIZE OF 1.5"). 21. REBAR SHALL HAVE A MINIMUM YIELD STRENGTH OF 60 KSI. REBAR SHALL HAVE A MINIMUM YIELD STRENGTH OF 60 KSI. 22. SLUMP SHALL BE IN THE RANGE OF 6 TO 8 INCHES. SLUMP SHALL BE IN THE RANGE OF 6 TO 8 INCHES. 23. AIR CONTENT SHALL BE 5 +/-1% BY VOLUME. AIR CONTENT SHALL BE 5 +/-1% BY VOLUME. 24. FOUNDATIONS USING POST-INSTALL ANCHOR BOLTS MUST CURE FOR FOUNDATIONS USING POST-INSTALL ANCHOR BOLTS MUST CURE FOR A MINIMUM OF 21 DAYS BEFORE DRILLING & INSTALLING THE ANCHOR BOLTS. 25. STEEL PACKAGER SHALL PROVIDE ANCHOR BOLTS FOR ALL PIERS STEEL PACKAGER SHALL PROVIDE ANCHOR BOLTS FOR ALL PIERS CONTRACTOR SHALL PROVIDE ANCHOR BOLTS FOR BREAKERS -- SEE FD04-01 FOR BOLT DETAILS.
AutoCAD SHX Text
CONSTRUCTION NOTES
AutoCAD SHX Text
DRILLED PIER SCHEDULE 4000 PSI TYPE II CEMENT
AutoCAD SHX Text
FOUNDATION DESCRIPTION
AutoCAD SHX Text
FOUNDATION DESIGNATION
AutoCAD SHX Text
FOUNDATION QTY
AutoCAD SHX Text
PIER DIAMETER 'D'
AutoCAD SHX Text
PIER DEPTH 'H'
AutoCAD SHX Text
CONCRETE QUANTITY
AutoCAD SHX Text
REINFORCING BAR
AutoCAD SHX Text
ANCHOR BOLTS (PER PIER)
AutoCAD SHX Text
VERTICALS
AutoCAD SHX Text
HOOPS
AutoCAD SHX Text
TYPE
AutoCAD SHX Text
QUANTITY
AutoCAD SHX Text
PROJECTION
AutoCAD SHX Text
SPACING "A"
AutoCAD SHX Text
SPACING "B"
AutoCAD SHX Text
PATTERN
AutoCAD SHX Text
QTY-TYPE
AutoCAD SHX Text
LENGTH
AutoCAD SHX Text
QTY-TYPE
AutoCAD SHX Text
LENGTH
AutoCAD SHX Text
OUTER DIA. 'C'
AutoCAD SHX Text
69KV DEADEND
AutoCAD SHX Text
'D'
AutoCAD SHX Text
3
AutoCAD SHX Text
5'-0"
AutoCAD SHX Text
32'-0"
AutoCAD SHX Text
23.3 C.Y.
AutoCAD SHX Text
18-#8
AutoCAD SHX Text
31'-6"
AutoCAD SHX Text
34-#5
AutoCAD SHX Text
17'-3.5"
AutoCAD SHX Text
4'-6"
AutoCAD SHX Text
AB5
AutoCAD SHX Text
4
AutoCAD SHX Text
9 1/2"
AutoCAD SHX Text
1'-5 "516"
AutoCAD SHX Text
1'-5 "516"
AutoCAD SHX Text
2'-10 " X 58" X 2'-10 "58"
AutoCAD SHX Text
69KV LOW SWITCH STAND
AutoCAD SHX Text
'E'
AutoCAD SHX Text
12
AutoCAD SHX Text
2'-6"
AutoCAD SHX Text
9'-0"
AutoCAD SHX Text
1.6 C.Y.
AutoCAD SHX Text
9-#6
AutoCAD SHX Text
8'-6"
AutoCAD SHX Text
11-#4
AutoCAD SHX Text
9'-5"
AutoCAD SHX Text
2-0"
AutoCAD SHX Text
AB3
AutoCAD SHX Text
4
AutoCAD SHX Text
4"
AutoCAD SHX Text
5 1/2"
AutoCAD SHX Text
5 1/2"
AutoCAD SHX Text
11" X 11"
AutoCAD SHX Text
69KV 1 PH LOW BUS SUPPORT
AutoCAD SHX Text
'F'
AutoCAD SHX Text
6
AutoCAD SHX Text
2'-6"
AutoCAD SHX Text
13'-0"
AutoCAD SHX Text
2.4 C.Y.
AutoCAD SHX Text
9-#6
AutoCAD SHX Text
12'-6"
AutoCAD SHX Text
15-#4
AutoCAD SHX Text
9'-5"
AutoCAD SHX Text
2'-0'
AutoCAD SHX Text
AB4
AutoCAD SHX Text
4
AutoCAD SHX Text
5"
AutoCAD SHX Text
5 1/2"
AutoCAD SHX Text
5 1/2"
AutoCAD SHX Text
11" X 11"
AutoCAD SHX Text
69KV 3 PT SUPPORT
AutoCAD SHX Text
'G'
AutoCAD SHX Text
2
AutoCAD SHX Text
2'-6"
AutoCAD SHX Text
10'-0"
AutoCAD SHX Text
1.8 C.Y.
AutoCAD SHX Text
9-#6
AutoCAD SHX Text
9'-6"
AutoCAD SHX Text
12-#4
AutoCAD SHX Text
9'-5"
AutoCAD SHX Text
2'-0"
AutoCAD SHX Text
AB4
AutoCAD SHX Text
4
AutoCAD SHX Text
5"
AutoCAD SHX Text
4 1/2"
AutoCAD SHX Text
4 1/2"
AutoCAD SHX Text
9" X 9"
AutoCAD SHX Text
STATIC MAST
AutoCAD SHX Text
'L'
AutoCAD SHX Text
1
AutoCAD SHX Text
4'-0"
AutoCAD SHX Text
17'-0"
AutoCAD SHX Text
7.9 C.Y.
AutoCAD SHX Text
12-#8
AutoCAD SHX Text
16'-6"
AutoCAD SHX Text
19-#5
AutoCAD SHX Text
15'-9"
AutoCAD SHX Text
3'-6"
AutoCAD SHX Text
AB5
AutoCAD SHX Text
4
AutoCAD SHX Text
9 1/2"
AutoCAD SHX Text
1'-5 "516"
AutoCAD SHX Text
1'-5 "516"
AutoCAD SHX Text
2'-10 " X 58" X 2'-10 "58"
AutoCAD SHX Text
TOTALS
AutoCAD SHX Text
PIERS
AutoCAD SHX Text
24
AutoCAD SHX Text
B. NOLAN
AutoCAD SHX Text
-
AutoCAD SHX Text
D. KILPELA
AutoCAD SHX Text
M. MADDEN
AutoCAD SHX Text
-
AutoCAD SHX Text
D. KILPELA
AutoCAD SHX Text
M. GLOWCZYNSKA
AutoCAD SHX Text
SUBSTATION H
AutoCAD SHX Text
FOUNDATION DETAILS
AutoCAD SHX Text
PIER DETAILS & CONSTRUCTION NOTES
AutoCAD SHX Text
11/20/2020
AutoCAD SHX Text
3/8" = 1'-0"
AutoCAD SHX Text
FMTH FD02-01.DWG
AutoCAD SHX Text
FD02-01
AutoCAD SHX Text
-
Page 4: Addendum #2 Construction of Substation H (December 23, 2020)
Page 5: Addendum #2 Construction of Substation H (December 23, 2020)

- 858 -

SECTION 1033 -- AGGREGATES 1033.01 -- Description

1. Mineral aggregates shall be crushed rock, broken stone, gravel,sand-gravel, coarse sand, fine sand, or a mixture of these materials composed of clean, hard, durable, and uncoated particles. Crushed rock shall be crushed limestone, dolomite, granite, quartzite, or other ledge rock approved for the intended purpose by the Department’s Materials and Research Engineer.

2. This combined aggregate gradation using Class R aggregate is tooptimize aggregate blends utilizing more locally available materials.

a. Achieving a uniform gradation for Class R may require the useof two or more different aggregates. It is the responsibility of the contractor to meet additional material characteristics requirements; such as, but not limited to particle shape, cubicity, angularity, etc., when designing a mix. 1033.02 -- Material Characteristics

1. Sampling and Testing Procedures:a. All materials shall be sampled and tested in accordance with

Table 1033.01. All material source locations and quarries must be approved by the Department prior to use.

Table 1033.01 Sampling and Testing Procedures

Procedure MethodSampling NDOT T 2Sieve Analysis NDOT T 27 Clay Lumps, Shale, and Soft Particles NDOT T 504 Abrasion AASHTO T 96Freeze and Thaw Soundness NDOT T 103 Specific Gravity and Absorption (course aggregate) AASHTO T 85 Specific Gravity and Absorption (fine aggregate) AASHTO T 84 Total Evaporable Moisture Content of Aggregates by Drying AASHTO T 255 Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test

AASHTO T 176

Sodium Sulfate Soundness AASHTO T 104 Calcium Carbonate NDOT C 25 Organic Impurities AASHTO T 21 Mortar-Making Properties= AASHTO T 71 Reducing Field Samples of Aggregate to Testing Size Lightweight Pieces in Aggregates

AASHTO T 248 NDOT T 113

2. General Aggregate Properties:a. Aggregates shall be free from injurious quantities of dust, soft

or flaky particles, loams, alkali, organic matter, paper, wood, or other deleterious matter as determined by the Engineer.

Page 6: Addendum #2 Construction of Substation H (December 23, 2020)

Aggregates 1033.02

- 859 -

b. Dolomite as herein defined is a magnesium limestonecontaining calcium carbonate and magnesium carbonate in approximately a 4 to 3 ratio.

c. The calcium carbonate content of limestone shall be at least80% (computed as CaCO3 from the value determined for CaO).

d. Fine sand shall have at least 95% of its particles pass theNo. 10 (2.0 mm) sieve and no more than 25% pass the No. 200 (75 m) sieve. This definition applies to the sodium sulfate soundness test.

e. Once an aggregate's soundness and abrasion quality has beendetermined, additional quality testing for soundness and abrasion loss will be at the Engineer's discretion.

f. All aggregates or combined aggregates that have beenwashed or coming from a wet pit shall be stockpiled for a minimum of 48 hours before being introduced into concrete.

3. Portland Cement Concrete Aggregate:a. Fine Aggregate:

(1) Aggregate shall be washed and composed of clean, hard,durable and uncoated particles.

(2) Aggregates produced from wet pits by pumping must beadequately washed by means approved by the Department.

(3) Aggregates from dry pits shall be adequately washed bymeans approved by the Department and have a Sand Equivalent value not less than 90 in accordance with AASHTO T 176.

(i) If the Sand Equivalent is less than 90, the Engineermay elect to stop aggregate production until such a time ASTM C 109 has been completed. The aggregate, when subjected to the test for mortar-making properties, shall produce a mortar having a compressive strength at the age of 7 days equal to or greater than that developed by mortar of the same proportions and consistency made of the same cement and aggregate after the aggregate has been washed to a sand equivalent greater than 90. Materials failing to produce equal or greater strength shall be unacceptable.

(4) Aggregate for concrete shall have a soundness loss of notmore than 10% by weight at the end of 5 cycles using Sodium Sulfate Soundness test AASHTO T 104.

(5) The weight of the aggregate shall not contain more than0.5% clay lumps.

(6) Aggregate subjected to the colorimetric test for organicimpurities which produces a color darker than the standard shall be further tested for its mortar-making properties in accordance with AASHTO T 71. The Engineer may elect to stop aggregate production until such a time AASHTO T 71 testing has been completed.

(i) Aggregate, when subjected to the test for mortar-making properties, shall produce a mortar having a compressive strength at the age of 7 days equal to or greater than that developed by mortar of the same proportions and consistency made of the same cement and aggregate after the aggregate has been treated in a 3% solution of sodium hydroxide. Materials failing to produce equal or greater strength shall be unacceptable,

Page 7: Addendum #2 Construction of Substation H (December 23, 2020)

1033.02 Aggregates

- 860 -

except when determined to be acceptable under the provisions of Subsection 105.03.

(7) Aggregate shall meet the requirement in Tables 1033.02A,1033.02B and 1033.03C.

(8) Lightweight pieces (measured by percent by volumevalues) shall not exceed 3.5%. For Class R aggregate, fine aggregate is defined as any material passing a No. 4 sieve.

Table 1033.02A AGGREGATE SPECIFICATION RANGE

Percent Passing

Percentage 1½” 1” ¾” ½” 3/8 No.4 No.10 No.20 No.30 No.200

Class A Max Min

-- -- -- -- 100 100 92

90 64

-- 40 10

3 0

Class B Max Min

-- 100 -- -- -- 97 77

70 50

-- 40 16

3 0

Class C Max Min

-- 100 -- -- -- 88 44

50 24

-- 20 4

3 0

Table 1033.02B Aggregate Classes and Uses

Aggregate Class Concrete Description A Overlay Concrete SFB 47BD, 47B-HE, 47B-OL, PR 1 and PR 3 C BX

b. Coarse Aggregate:(1) Aggregate shall consist of Limestone, Quartzite, Dolomite,

Gravel and Granite composed of clean, hard, durable, and uncoated particles.

(2) The percent of clay lumps, shale, or soft particles shall notexceed the following amounts:

Clay Lumps ..................................... 0.5% Shale ............................................... 1.0% Soft Particles ................................... 3.5% Lightweight Pieces .......................... 3.5%

(3) Any combination of clay lumps, shale and soft particles (allpercent by weight values), plus the lightweight pieces (a % by volume value) shall not exceed 3.5%. For Class R aggregate, coarse aggregate is defined as any materials retained on a No. 4 sieve.

(4) Aggregate for concrete shall be free of coatings that willinhibit bond and free of injurious quantities of loam, alkali, organic matter, thin or laminated pieces, chert, or other deleterious substances as determined by the Engineer.

Page 8: Addendum #2 Construction of Substation H (December 23, 2020)

Aggregates 1033.02

- 861 -

(5) Aggregate for concrete shall not have a soundness loss greater than 8.0% by weight at the completion of 16 cycles of alternate freezing and thawing. (6) Aggregates for concrete shall have a Los Angeles Abrasion loss percentage of not more than 40. (7) All fractions passing the No.4 sieve shall meet quality requirement of soundness loss of not more than 10% by weight at the end of 5 cycles using sodium sulfate solution. (8) The ledge rock shall be tested according to ASTM C 1260. (i) The mortar bars for the ASTM C 1260 shall not exceed 0.10% expansion at 28 days. (a) If the proposed coarse aggregate exceeds 0.10% expansion at 28 days, the aggregate proportions used on the project shall be tested in accordance to ASTM C 1567. i. The ASTM C 1567 mortar bars shall be composed of Interground/blended cement being used on the project. ii. If the expansion is greater than 0.10%, the coarse aggregate shall not be used. (9) Aggregate shall meet the requirements in Tables 1033.03A, B, and C.

Table 1033.03A Aggregate Specification Range

Percent Passing

Percentage 1½” 1” ¾” ½” 3/8 No.4 No. 10 No. 20 No. 30

No. 200

Class E Max Min 100 100

92 90 66 -- 45

15 12 0 -- *4

0 -- 3 0

Class F Max Min -- -- 100 100

96 90 40

30 4

8 0 -- -- 3

0 *If the No. 200 sieve is less than 1.5% passing, the No.20 sieve could be increased to maximum of 6% passing.

Table 1033.03B Aggregate Classes and Uses

Aggregate Class Concrete Description E 47BD, 47B-HE, PR 1 and PR 3 F 47B-OL, Overlay Concrete SF

c. Combined Aggregates: (1) The Contractor shall design and meet the specification requirements. It is the Contractor’s responsibility to provide desirable mix properties; such as, but not limited to, workability, resistance to segregation, stable air void system, good finishing properties and good consolidation properties. (2) The combined blended aggregate shall meet the requirement in Table 1033.03C and 1033.03D.

Page 9: Addendum #2 Construction of Substation H (December 23, 2020)

1033.02 Aggregates

- 862 -

Table 1033.03C

* Refer to Subsection 1002.04, Paragraph 1.b.(8) for the traditional 47B MixDesign

Table 1033.03D Aggregate Classes and Uses

Aggregate Class Concrete Description R 47B

d. Aggregate Production and Testing:(1) Any change greater than 3% in the original verified

constituent percentage of the combined aggregates gradation will be considered non-compliant. Any change of the combined gradation targets must remain within the Combined Aggregate Gradation Limits in Table 1033.03C. The Contractor shall resubmit a new mix design if the material is deemed non-compliant in accordance with Subsection 1002.04, Paragraph 1.

(2) The blended gradation tolerance ranges from theapproved mix design are established in Table 1033.03E.

(i) The Contractor shall assume the responsibility tocease operations when the specifications are not met. Production shall not be started again without the approval of the Engineer.

Table 1033.03E Blended Aggregate Production Tolerances

Sieve Size Tolerances No. 4 or greater + 5%No. 10 to No. 30 + 4%No. 50 + 3%Minus No. 200 + 1%

(3) Ledge rock and aggregate from a dry pit shall be uniformlysaturated with water before it is used. The wetting shall begin 24 hours before concrete mixing to allow complete saturation.

*Class R - Combined Aggregate Gradation Limits (Percent Passing)Sieve Size

1 ½ inch

1 inch

3/4 inch No.4 No.10 No.30 No. 50 No.

200 Max 100 100 98.0 70.0 50.0 30.0 12.0 3.0 Min - 92.0 85.0 45.0 31.0 8.0 2.0 0

Page 10: Addendum #2 Construction of Substation H (December 23, 2020)

Aggregates 1033.02

- 863 -

4. Bituminous Aggregate:Table 1033.04A

Asphalt Combined Aggregate Grading Band Tolerance Band “A” Mix [1/2 inch (12.5 mm)]

[To Be Used When Total Thickness Is 4 Inches (100 mm) Or Less] % Passing

Sieve Size Min. Max. 1 inch (25.0 mm) 100% 3/4 inch (19.0 mm) 98% 100% 1/2 inch (12.5 mm) 94% 100% 3/8 inch (9.50 mm) 80% 98% No. 4 (4.75 mm) 52% 88% No. 10 (2.00 mm) 32% 70% No. 30 (600 m) 17% 38%No. 50 (300 m) 10% 24%No. 200 (75 m) 3% 7%

Table 1033.04B Asphalt Combined Aggregate Grading Band Tolerance

Band “B” Mix [3/4 inch (19 mm)] [To Be Used When Total Thickness Is Greater than 4 Inches

(100 mm)] % Passing

Sieve Size Min. Max. 1 inch (25.0 mm) 100% 3/4 inch (19.0 mm) 98% 100% 1/2 inch (12.5 mm) 76% 93% 3/8 inch (9.5 mm) 60% 88% No. 4 (4.75 mm) 42% 78% No. 10 (2.00 mm) 27% 60% No. 30 (600 m) 14% 38%No. 50 (300 m) 8% 21%No. 200 (75 m) 3% 7%

a. Bituminous aggregate shall have the following characteristics:(1) Aggregate shall meet the requirements in

Tables 1033.04A and B. (2) The combined aggregate's compliance shall be tested on

an individual aggregate basis. (3) Tests to determine compliance with the quality

requirements for gravel shall be performed on the "Pre-Crushed" gradation. (4) Crushed rock for asphaltic concrete shall not contain

deleterious substances in a quantity to exceed the following percentage by weight:

Clay Lumps and Shale ..................................... 1.5 Soft Particles .................................................... 3.5

(5) Any combination of shale, clay, or soft particles shall notexceed 3.5% by weight.

Page 11: Addendum #2 Construction of Substation H (December 23, 2020)

1033.02 Aggregates

- 864 -

(6) All fractions of a crushed rock gradation shall be producedfrom the same type of material. The chemical and physical characteristics of the fraction passing the No. 4 (4.75 mm) sieve shall be substantially the same as those of the material which may be produced in the laboratory from the fraction which is retained on the No. 4 (4.75 mm) sieve. Crushed rock for asphaltic concrete shall have a percentage loss of not more than 8.0% by mass at the end of 16 cycles of the freezing and thawing test.

(7) Quality:(i) When any fraction of a mineral aggregate, except for

crushed rock for use in asphaltic concrete, is of a nature adapted for the Los Angeles Abrasion Test, it shall have a loss percentage of not more than 40.

(ii) Mineral aggregates, except for crushed rock forasphaltic concrete, shall have a soundness loss of not more than 12% by weight at the end of 5 cycles using sodium sulfate solution.

(8) Quartzite, granite, and chat used in Asphalt Concrete shallhave a soundness loss of not more than 12 % by weight at the end of 5 cycles using sodium sulfate solution. The Los Angeles Abrasion Test shall have a loss percentage of not more than 40, and the "D" Grading is void.

(9) Maximum percentages established for limestone excluderecycled materials.

b. Soil type mineral filler, fly-ash mineral filler, or limestone dustwhich is produced as a by-product of sugar beet refining will not be allowed.

c. Mineral filler shall consist of pulverized crushed rock, brokenstone, gravel, sand-gravel, sand, or a mixture of these materials that conforms to the following requirements:

Min. Max. Total Percent Passing the No. 50 (300 m) Sieve

95 100

Total Percent Passing the No. 200 (75 m) Sieve

80 100

Plasticity Index [material passing the No. 200 (75 m) Sieve]

0 3

d. At the start of production, one sample of mineral filler will beanalyzed for its properties by the Department’s Materials and Research Laboratory. If the sample is approved, no further tests will be required for the project. If the sample fails to meet the requirements, then further tests will be required.

e. When determining the maximum percentage of limestone inthe mix, the recycled materials will not be considered.

Page 12: Addendum #2 Construction of Substation H (December 23, 2020)

Aggregates 1033.02

- 865 -

5. Bituminous Sand Aggregate:Table 1033.05

Bituminous Sand Aggregate Gradation Limits Percent Passing

Sieve Size Min. Max.3/8 inch (9.50 mm) --- ---

No. 4 (4.75 mm) --- --- No. 10 (2.00 mm) --- --- No. 50 (300 m) 100 60No. 200 (75 m) 33 12

a. Cold-mixed bituminous mixtures shall consist of approved inertmineral matter.

b. If soil type filler is approved for use, it shall be pulverized to theextent that 100% will pass the 1/2 inch (12.5 mm) sieve and at least 90% will pass the No. 10 (2.00 mm) sieve before combining with other aggregates.

c. Aggregate shall meet the requirements in Table 1033.05.6. Surfacing Aggregates:

a. Gravel aggregate for surfacing shall have a Los AngelesAbrasion loss percentage of not more than 40.

b. Gravel aggregate for surfacing shall have a soundness loss ofnot more than 12% by weight at the end of 5 cycles using sodium sulfate solution.

c. Aggregate shall meet requirements in Table 1033.06 or1033.07, as applicable.

Table 1033.06 Gravel Surfacing Gradation Limits

Percent PassingSieve Size Target Value Tolerance

1 inch (25.0 mm) 100 0 No. 4 (4.75 mm) 78 17 No. 10 (2.00 mm) 16 * No. 50 (300 m) --- ---No. 200 (75 m) 3 3 * A deduction from contract bid price will be made as specified in

Section 310, Table 310.01.d. The gravel aggregates for surfacing shall have a Los Angeles

Abrasion loss percentage of not more than 40. e. Gravel aggregates for surfacing shall have a soundness loss of

not more than 12% by weight at the end of 5 cycles using sodium sulfate solution.

Page 13: Addendum #2 Construction of Substation H (December 23, 2020)

1033.02 Aggregates

- 866 -

Table 1033.07 Crushed Rock for Surfacing Gradation Limits

Percent Passing Sieve Size Target Value Tolerance

1 inch (25.00 mm) 100 0 No. 4 (4.75 mm) 40 +20 No. 10 (2.00 mm) 15 +15 No. 50 (300 m) --- --- No. 200 (75 m) 5 +5

f. Crushed rock for surfacing shall consist of clean, hard particles of crushed limestone, quartzite, or dolomite. g. Crushed rock for surfacing shall have a Los Angeles Abrasion loss percentage of not more than 45. h. Crushed rock for surfacing shall have a percent loss of not more than 30 at the end of 16 cycles of the freezing and thawing test. 7. Base Course:

Table 1033.08 Crushed Rock

Crushed Rock for Base Course

Crushed Rock Screenings

for Base Course Percent Passing

Sieve Size Target Value Tolerance Target

Value Tolerance 1 1/2 inch (37.5 mm) 100 0 3/4 inch (19.0 mm) 80 +15 100 0 3/8 inch (9.50 mm) 53 +17 73 +17 No. 4 (4.75 mm) --- --- 55 +15 No. 10 (2.00 mm) 20 +10 --- --- No. 20 (850 m) --- --- 28 +12 No. 200 (75 m) 5 +5 13 +7

a. Base Course Aggregate shall be crushed rock or broken stone or a mixture of these materials composed of clean, hard, durable, and uncoated particles. b. Quality: (1) Crushed rock shall be crushed limestone, dolomite, granite, quartzite, or other ledge rock approved for the intended purpose by the Department’s Materials and Research Engineer. (2) Dolomite as herein defined is a magnesium limestone containing calcium carbonate and magnesium carbonate in approximately a 4 to 3 ratio. (3) All sizes of crushed rock for base course shall be produced from the same type of material. The chemical and physical characteristics of the fraction passing the No. 4 (4.75 mm) sieve shall be substantially the same as those of the material which may be produced in the laboratory from the fraction which is retained on the No. 4 (4.75 mm) sieve.

BSTOCKHILL
Highlight
7. Base Course:
BSTOCKHILL
Highlight
Crushed Rock for Base Course
Page 14: Addendum #2 Construction of Substation H (December 23, 2020)

Aggregates 1033.02

- 867 -

(4) Crushed rock for base course shall not contain shale, claylumps, or other deleterious substances in a quantity to exceed a total of 2.5% based on the dry mass of the fraction retained on the No. 4 (4.75 mm) sieve.

(5) Crushed rock for base course shall be free from injuriousquantities of dust, soft or flaky particles, loams, alkali, organic matter, paper, wood, or other deleterious material.

(6) The Los Angeles Abrasion loss percentage shall notexceed 45.

(7) Crushed rock for base course shall have a percentageloss of not more than 14 at the end of 16 cycles of the freezing and thawing test.

(8) The absorption of crushed rock for a base course shall notexceed 5.0% by weight.

(9) The product of the plasticity index (using wet preparationAASHTO T 146) of the fraction of the crushed rock for base course passing the No. 40 (425 m) sieve and the percent of the crushed rock passing the No. 200 (75 m) sieve shall not exceed 48. When the fraction of the crushed rock for a base course passing the No. 200 (75 m) sieve does not exceed 4%, the plasticity index will not be determined and the product of the plasticity index and the percent passing the No. 200 (75 m) sieve will not be a requirement for such material.

(10) The plasticity index (using dry preparation AASHTO T87) of the crushed rock screenings passing the No. 40 (425 m) sieve shallnot exceed 4.

c. Crushed rock shall meet gradation requirements inTable 1033.08.

8. Foundation Course:Table 1033.09

Foundation Course Mixture Percent Passing

Sieve Size Target Value Tolerance 1 inch (25.0 mm) 100 0 No. 10 (2.00 mm) 62 +12No. 40 (425 m) 34 +8No. 200 (75 m) 9 +3

Page 15: Addendum #2 Construction of Substation H (December 23, 2020)

1033.02 Aggregates

- 868 -

Table 1033.10 Crushed Concrete Foundation Course Gradation

Requirements

Sieve Size Target Value (Percent Passing) Tolerance

1 1/4 inch (31.5 mm) 100 0 1 inch (25.0 mm) 95 5 3/4 inch (19.0 mm) 81 12 No. 4 (4.75 mm) 38 12 No. 10 (2.00 mm) 24 11 No. 40 (425 m) 9 5 No. 200 (75 m) 3 3

a. Soil binder from local pits shall be pulverized to the extent thatat least 90% will pass a 1/2 inch (12.5 mm) sieve and at least 60% will pass a No. 10 (2.00 mm) sieve. The binder shall be pulverized before it is mixed with the other aggregates.

b. Any fraction of a mineral aggregate is of a nature adapted forthe Los Angeles Abrasion Test, the loss percentage shall not be more than 40.

c. Mineral aggregates shall have a soundness loss of not morethan 12% by weight at the end of 5 cycles using sodium sulfate solution.

d. Foundation course material shall meet the requirements inTable 1033.09 or 1033.10, as applicable. 1033.03 -- Procedures

1. Freshly washed or pumped aggregates shall be drained for12 hours before use.

2. Protection of Material:a. It is the Contractor's responsibility to protect materials from

harmful contamination, segregation, excessive degradation, or other changes in the physical or chemical state or degree of uniformity.

b. If any detrimental change has taken place in the materials afterthe acceptance samples have been taken and tested, the right is reserved to retest and reject that part of the previously accepted material which is found unsatisfactory or require the Contractor to correct the deficiencies by reprocessing or providing other material meeting specification requirements.

3. Handling of Material:a. The use of crawler-type equipment will be allowed in the

stockpiling of fine aggregate and sand gravel aggregates. b. Aggregate shall be removed from stockpiles with cranes,

loaders, conveyors, or other approved equipment. c. The use of crawler equipped dozers or end loaders will not be

allowed in the stockpiling or the removal of crushed rock aggregates if the aggregate is damaged by the equipment.

4. Care shall be exercised to avoid segregation or degradation ofaggregates or the inclusion of foreign material in the aggregates while they are being removed from the stockpiles.

BSTOCKHILL
Highlight
Crushed Concrete Foundation Course Gradation Requirements

Recommended