10435 Downsville Pike Hagerstown MD 21740
301-766-2800
Addendum 2 Bid #2020-16
February 6, 2020
Addendum 2
TO: All Prospective Offerors
FROM: Scott Bachtell, Supervisor of Purchasing
REF: Bid #2020 -16 Renovations for New Programs at Washington County Technical High School
REVISED BID DUE DATE: Wednesday, February 19, 2020 at 11:00 am EST
Please note the following changes/clarifications to Bid #2020-16:
Receipt of this Addendum is to be acknowledged, in the space provided in the Revised Bid Form. Failure to do so may
subject the Bid to be considered as non-responsive. This Addendum forms a part of the Contract Documents.
A. GENERAL
1. CLARIFICATIONS: a) The Bid Due Date has been revised from Friday February 4, 2020 at 11:00 a.m. EST to
Wednesday February 19, 2020 at 11:00 a.m. EST. All other bid day submission requirements remain the same.
2. CONTRACTORS QUESTIONS:
a) Question: Can the bid date be pushed back a few days due to Addendum #1? Response: Refer to a) in the Clarifications, Revised Bid Due Date is Wednesday February
19, 2020 at 11:00 a.m.
b) Question: I do not see a hardware schedule in the specs, please advise. Please advise if door #201 is going into aluminum storefront system, if so I need hardware set.
Response: Refer to Addendum #1 dated February 3, 2020.
b) Question: Do doors 103, 202, & 208 get aluminum frames, once again if so I need hardware set. Also if you look at details on A401 some details are showing center set & some are showing front set. Response: Refer to Addendum #1 dated February 3, 2020.
c) Question: Missing the panel schedule and details for Panel LHA on the drawings. Need that info for pricing. Response: Panel schedules and information are shown on Drawing E602 as provided in Addendum #1 dated February 3, 2020.
10435 Downsville Pike Hagerstown MD 21740
301-766-2800
Addendum 2 Bid #2020-16
d) Question: Missing the existing panel schedule and details of the MDP. Need this info to price breakers to match. Response: Refer to revised Drawing E601 in this Addendum #2. Power distribution was revised to include a new transformer fed from a new single circuit breaker in the MDP. The transformer will extend power to each of the new Panels. In addition to the provided panel manufacturer information on Drawing E601, the model number of Panel MDP is HCR5488162U with ratings of 1200A, 480V, 3-Phase & 4-Wire.
e) Question: Missing the existing panel schedules and details for Panels HA-1 and HA-2. Need this to info for pricing breakers to match. Response: Refer to Addendum #1 dated February 3, 2020. Panel schedules and information are shown on Drawing E602.
f) Question: We will need the existing Fire Alarm device types and a POC for pricing the fire alarm work. Existing facility I’m sure they have a preferred sub to use. Response: The existing Fire Alarm System is Simplex. Refer to Addendum #1 dated February 3, 2020 for specified requirements.
g) Question: There are no details on the power poles needed per drawing E302. We will need the details to get pricing. Response: Refer to revised Drawing E302 in this Addendum #2.
h) Question: Based on the drawings it appears that VAV2 is a panel? There are several VAV’s to be fed from VAV2 but it is not shown anywhere in the drawings. Need the details on this panel to know the distance needed for circuitry and what breakers we will need to match. Response: Panel VAV-2: Manufacturer – Square D. Electrical Ratings – 400A with 400A (MCB), 277/480V, 3-Phase, 4-Wire. Panel is shown on E303.
i) Question: Panel schedule LN1 shows circuits (9,11,13)(10,12,14)(15,17,19) to feed equipment in room 204. There is nothing shown for this equipment as far as location. We need those details for pricing. Response: Equipment and cord reel are mislabeled on E302 as being fed from Panel LN. These are to be fed from Panel LN1. Refer to revised E302 in this addendum.
j) Question: Drawing E304 shows a new transformer and panel that we have no feeder information for. We will need that for pricing. Response: Refer to Addendum #1 dated February 3, 2020. Transformer and panel feeders are shown on Drawing E602.
10435 Downsville Pike Hagerstown MD 21740
301-766-2800
Addendum 2 Bid #2020-16
k) Question: Looking for more information or at least detail information on the stub wall in the classrooms. Will there be floor cutting to route conduits for communication, power, etc.. Also could you look into the wage rates on this job, or send me information on the wages. Could we also receive more information on the specs for the cord reels? Response: There is a raised floor for the lab areas and server room. There is also a stub wall and power pole for the classroom, as such there should be no need for floor cutting to run power or data circuits in these areas. Refer to Note 5 on Drawing E302 in this Addendum #2 for cord reel manufacturer and coordinate color with owner. With regards to wage rates, they are not required for this project, please refer to specifications for all bidding requirements.
l) Question: Details 2 and 3 do not adequately show where “switch A/B” is located or if “Switch A/B” is actually “switch A” and “switch B”. Detail 2 calls for (4) data’s to be installed from “switch A/B” to WCPS Rack in server room, there are (2) WCPS racks in the server room. Does this require (4) data’s to each WCPS Rack from each student rack? (4) data’s from each triangle to each WCPS rack? (4) data’s from wherever “switch A/B:” is located to (1) of the 2 WCPS racks? The same questions apply to Detail 3 with the teacher connections. Response: Refer to revised E301 in this Addendum #2 for clarification. Four (4) data cables shall extend from the patch location on one of the two WCPS Racks to a four (4) port wall plate at each student/teacher location. There is not a switch required at each of the student/teacher locations. The data should terminate at each student/teacher location with the four (4) port wall plate. Coordinate patch rack configuration with WCPS prior to termination of cabling.
m) Question: On Drawing ID001 it shows floor finishes of ACFL-1/RF-1 for Rooms 101 and 106, but I can’t seem to figure out which portions of these rooms receive the ACFL and which portions receive the RF. Response: There is a small area of resilient flooring just inside the corridor doors, before the ramps and the raised floor. That’s what the RF-1 is.
3. CHANGES TO DRAWINGS:
a) DRAWING E301: Remove sheet E301 dated January 31, 2020 Addendum #1 in its entirety and replace with attached sheet E301 dated “February 06 Addendum #2”. i. Revised details to indicate that the cabling from each of the student/teacher locations
will be from one of the WCPS Patch Racks to a 4-port data wall plate at each “workstation”.
ii. Revised sheet to include UPS power outlet at one of the WCPS Racks. iii. Revised sheet to indicate requirement of Fiber to be extended from WCPS Racks to MDF
Room on floor above.
10435 Downsville Pike Hagerstown MD 21740
301-766-2800
Addendum 2 Bid #2020-16
b) DRAWING E302: Remove sheet E302 dated January 31, 2020 Addendum #1 in its entirety and replace with attached sheet E302 dated “February 06 Addendum #2”.
i. Revised sheet to correct three circuit designations to indicated to be provided power
from Panel LN1. ii. Revised sheet to add basis of design manufacturer and model of Power Poles to Number
Note 10. And added schematic detail for power pole.
c) DRAWING E304: Remove sheet E304 dated January 31, 2020 Addendum #1 in its entirety and replace with attached sheet E304 dated “February 06 Addendum #2”.
i. Revised power distribution to new Panels (LN1, LJ1, LJ2) to extend power via New
transformer on Mezzanine. ii. Power for transformer to be fed from a new breaker in MDP on Mezzanine via wire
trough and disconnect switches.
d) DRAWING E305: Remove sheet E305 dated January 31, 2020 Addendum #1 in its entirety and replace with attached sheet E305 dated “February 06 Addendum #2”.
i. Location of Air-Cooled Condensing Units associated with CRAC Units revised to be
located on the Lower Level roof.
e) DRAWING E601: Remove sheet E601 dated January 31, 2020 Addendum #1 in its entirety and replace with attached sheet E601 dated “February 06 Addendum #2”.
i. Revised power distribution to new Panels (LN1, LJ1, LJ2) to be provided via New
transformer on Mezzanine. ii. Power for transformer to be fed from a new breaker in MDP on Mezzanine via wire
trough and disconnect switches. iii. Revised Panel LN Schedule to make incorrect designated circuits spares. iv. Revised Panel LJ2 Schedule to add UPS and removed kVA load entries on spared circuits.
f) DRAWING M201: Remove sheet M201 dated January 17, 2020 in its entirety and replace with attached sheet M201 dated “February 06 Addendum #2”.
i. Rerouted piping between CRAC Units and Air -Cooled Condensing Units to
accommodate new location of outdoor units on Lower Level Roof.
g) DRAWING M202: Remove sheet M202 dated January 17, 2020 in its entirety and replace with attached sheet M202 dated “February 06 Addendum #2”.
i. Rerouted piping between CRAC Units and Air-Cooled Condensing Units to accommodate
new location of outdoor units on Lower Level Roof.
10435 Downsville Pike Hagerstown MD 21740
301-766-2800
Addendum 2 Bid #2020-16
h) DRAWING M203: Remove sheet M203 dated January 17, 2020 in its entirety and replace with attached sheet M203 dated “February 06 Addendum #2”.
i. Location of Air-Cooled Condensing Units associated with CRAC Units revised to be
located on the Lower Level roof.
4. ATTACHMENTS
Drawings ( 8 pages) E301, E302, E304, E305, E601, M201, M202, M203
END OF ADDENDUM 2
Addendum #2 Drawings (8 pages)
Drawing # Drawing Date E 301 Revised 2/6/2020 E 302 Revised 2/6/2020 E 304 Revised 2/6/2020 E 305 Revised 2/6/2020 E 601 Revised 2/6/2020 M201 Revised 2/6/2020 M202 Revised 2/6/2020 M203 Revised 2/6/2020
UPUP
PRN
PRN
PRN
PRN
PRN
PRN
PRN
PRN
XR
XR
PANEL LJ (XR)
+60"
+60"
+60"
+60"
+60"
+60"
+60"
+60"
LJ1-1 LJ1-2 LJ1-3 LJ1-4
LJ1-17
LJ1-18
LJ1-26
LJ1-9
LJ1-25
LJ1-27
LJ1-16
LJ1-11
LJ1-12
LJ1-13
LJ1-14
LJ1-21
LJ1-22
LJ1-23
LJ1-24
LJ1-20
LJ1-5 LJ1-6 LJ1-7 LJ1-8
LJ1-32 LJ1-33
LJ1-34
LJ1-35
LJ1-28 LJ1-29 LJ1-30
LJ1-31
PANEL LJ1
LJ1-38
CLASSROOM105
AI / CLOUDCOMPUTING
LAB106
CISCO / CRANLAB101
CLASSROOM102
SERVERROOM
104
WORK AREA103
+60"
+60"
+60"
+60"
+60"
LJ1-36
LJ1-37
LJ1-39
4
(TYP)
5
(TYP)
6
(TYP)
3
(TYP)
LJ1-10
1
(TYP)
PANEL LJ2
(SECTIONS 1 & 2)
3(TYP)
1
(TYP)
16
16(TYP)
2
(TYP)
EX. IDF ROOM207
EX. TELECOMROOM178
VMS
13
12
12
VMS
13
AVP
14
14
AVP
+60"
+60"
+60"
LJ1-19
LJ2-1
LJ2-3
LJ2-5
LJ2-7
LJ2-9
LJ2-11
LJ2-13
LJ2-15
LJ2-2
LJ2-4
LJ2-6
LJ2-8
LJ2-10
LJ2-12
LJ2-14
LJ2-16
LJ2-23
LJ2-25
LJ2-27
LJ2-29
LJ2-31
LJ2-33
LJ2-24
LJ2-26
LJ2-28
LJ2-30
LJ2-32
LJ2-34
LJ2-35
LJ2-36
LJ2-17
LJ2-18
LJ2-19
LJ2-20
LJ2-21
LJ2-22
LJ1-48
9
(TYP)
9
(TYP)
9
(TYP)
10
(TYP)
11
15
(TYP)
10
(TYP)
9
(TYP)
9
(TYP)
17
17
17
18
18
18
LJ2-37
8
19
© COPYRIGHT 2020 NOELKER AND HULL ASSOCIATES, INC
ISSUE DATE:
SCALE:
SHEET INFORMATION
M/E/P ENGINEER
STRUCTURAL ENGINEER
CIVIL ENGINEER
LANDSCAPE ARCHITECT
PROJECT ADDRESS
PROJECT OWNER
PROJECT STATUS
PROJECT INFORMATION
REVISIONS
PROJECT TEAM
ARCHITECT
JOB NUMBER:
SHEET TITLE:
SHEET NUMBER:
PROJECT TITLE
30 WEST KING STREETCHAMBERSBURG, PA | 17201-1540P: 717.263.8464 | F: 717.263.6031
NOELKERHULL.COMPA | MD | VA
TECH HIGHPROGRAMS
50 WEST OAK RIDGE DRIVEHAGERSTOWN, MD 21740
100% CD'S
01-17-2020PROJ. #19-0476
WASHINGTON COUNTYPUBLIC SCHOOLS
REV. #: DESCRIPTION: DATE:
Professional Certification. I
hereby certify that these
documents were prepared or
approved by me, and that I
am a duly licensed
professional engineer under
the laws of the State of
Maryland. License No:45511
Expiration Date: 06/03/2020
CJL ENGINEERING
TRUE NORTH
PLANNORTH
KEY PLAN
EXISTING
PROGRAM 1 PROGRAM2
5285 WESTVIEW DR., SUITE 203 | FREDERICK MD, 21703P: 301.695.9424 | F: 301.293.6338
CJL Project #19-0476
1 ADDENDUM #1 01-31-202 ADDENDUM #2 02-06-20
E301
PART FIRST FLOOR PLAN - NEW WORK -POWER & COMMUNICATION
1/4" = 1'-0"
E301
1
PART FIRST FLOOR PLAN - NEW WORK - POWER & COMMUNICATION
NUMBERED NOTES:
CONTRACTOR SHALL INSTALLED LOCATION OF POWER AND DATA, IN THE LABS, ON STUB WALL WITH ARCHITECT AND OWNER PRIOR TO
INSTALLATION. CIRCUITS SHALL BE INSTALLED AT NEAREST WALL TO THE EQUIPMENT THEY SUPPLY.
DEVICES SHALL BE INSTALLED ABOVE LOWER CABINETS. CONTRACTOR SHALL COORDINATE INSTALLATION WITH OWNER PRIOR TO
INSTALLING.
CONTRACTOR SHALL PROVIDE AND WIRE DATA CONNECTION FOR STUDENTS IN THE LABS. FOUR-PORT WALL PLATE AND DATA QUICK
CONNECTS SHALL BE INSTALLED AT EACH POINT OF CONNECTION AS SHOWN. REFER TO DETAIL 2 OF THIS DRAWING. CONTRACTOR SHALL
ALSO CLEARLY LABEL SOURCE AND DESTINATION OF EACH DATA LINE.
COORDINATE ACTUAL LOCATION AND HEIGHTS WITH OWNER PRIOR TO INSTALLING DEVICES FOR TV MONITOR.
PROVIDE 12X12X6 JUNCTION BOX FLUSH MOUNTED IN WALL AND INSTALL 1" CONDUITS INDICATED.
PROVIDE INFLOOR BOX BY HUBBELL OR APPROVED EQUAL. PROVIDE ALL THE REQUIRED MATERIALS FOR A COMPLETE INSTALLATION.
CIRCUITS SHALL BE INSTALLED ON NEAREST INTERIOR STUB WALL.
POWER STRIP, CONTRACTOR SHALL INSTALL ON RACK.
CONTRACTOR TO INSTALL NEMA L5-30R RECEPTACLE TO POWER THE UPS. CO-ORDINATE ACTUAL LOCATION OF RECEPTACLE WITH
LOCATION OF UPS.
STUDENT RACKS. FOR EACH RACK, CONTRACTOR SHALL PROVIDE ITEMS LISTED BELOW. ALSO REFER TO DETAIL 2 ON DRAWING E701 FOR
A TYPICAL STUDENT RACK DETAIL.
1. 1 TWO POST RACK WITH 5" VERTICAL FRONT AND REAR CABLE MANAGEMENT, STUDENT RACKS, WITH MODEL NUMBER
GLRR-1984BA-5FR OR EQUAL.
2. 3 STATIONARY SHELVES, STUDENT RACK, WITH MODEL NUMBER 7206-EIA.
3. 3 POWER STRIP FOR STUDENT EQUIPMENT WITH MODEL NUMBER 7219 OR EQUAL.
TEACHER RACKS. FOR EACH OF THE 2 RACKS, CONTRACTOR SHALL PROVIDE ITEMS LISTED BELOW. ALSO REFER TO DETAIL 3 ON DRAWING
E701 FOR A TYPICAL TEACHER RACK DETAIL.
1. 1 FOUR POST RACK WITH M6 MOUNTING AND 5" VERTICAL FRONT AND REAR CABLE MANAGEMENT WITH MODEL NUMBER 4PM6-29-5FR
OR EQUAL.
2. 1 POWER STRIP WITH MODEL NUMBER 7219 OR EQUAL.
WCPS RACK, CONTRACTOR SHALL PROVIDE THE FOLLOWINGS FOR THIS RACK:
1. 1 RACK ENCLOSURE WITH MOUNTING RAILS AND CABLE MANAGEMENT, WITH MODEL NUMBER GL840ENT-4048SSS OR EQUAL.
2. 4 DISCRETE DISTRIBUTION MODULE PANEL, PATCH PANEL FOR WCPS RACK, WITH MODEL NUMBER CPP-UDDM-SL-2U-48.
3. 1 HIGH DENSITY MODULAR CASSETTE SLIDING PANEL, FIBER TRAY FOR WCPS RACK, WITH MODEL NUMBER HD-1U OR EQUAL.
4. 1 POWER STRIP WITH MODEL NUMBER 7219 OR EQUAL.
CONTRACTOR SHALL PROVIDE AUDIO VISUAL PLATE (AVP) WITH MINIMUM OF TWO HDMI INPUT AND ONE ETHERNET. CONTRACTOR SHALL
ALSO PROVIDE ASSOCIATED 4K HDMI CABLE FOR A COMPLETE SYSTEM.
CONTRACTOR SHALL PROVIDE TWO VIDEO MATRIX SWITCHER (VMS) -1 FOR EACH TEACHER WORKSTATION, WITH 4 HDMI SOURCES TO 4
DISPLAYS, REFER TO DETAIL 4 FOR CONNECTION RISER DETAIL. ATEN MODEL VM0404HA SHALL BE USED AS A BASIS OF DESIGN FOR THE
VMS.
CONTRACTOR SHALL PROVIDE CABINET FOR EACH VIDEO MATRIX SWITCHER. STARTECH RK619WALL CABINET SHALL USED AS A BASIS OF
DESIGN FOR THE CABINET.
WCPS RACK, CONTRACTOR SHALL PROVIDE THE FOLLOWINGS FOR THIS RACK:
1. 1 RACK ENCLOSURE WITH MOUNTING RAILS AND CABLE MANAGEMENT, WITH MODEL NUMBER GL840ENT-4048SSS OR EQUAL.
2. 4 DISCRETE DISTRIBUTION MODULE PANEL, PATCH PANEL FOR WCPS RACK, WITH MODEL NUMBER CPP-UDDM-SL-2U-48.
3. 1 POWER STRIP WITH MODEL NUMBER 7219 OR EQUAL.
CONTRACTOR SHALL PROVIDE AND WIRE DATA CONNECTION FOR TEACHERS IN THE LABS. FOUR-PORT WALL PLATE AND DATA QUICK
CONNECTS SHALL BE INSTALLED AT EACH POINT OF CONNECTION AS SHOWN. REFER TO DETAIL 3 OF THIS DRAWING. CONTRACTOR SHALL
ALSO CLEARLY LABEL SOURCE AND DESTINATION OF EACH DATA LINE.
CONTRACTOR SHALL INSTALL QUAD RECEPTACLE FOR RACK POWER STRIP IN THE SUB-FLOOR IN THE PROXIMITY OF THE RACK IT IS
SUPPLYING. COORDINATE EXACT LOCATION WITH THE ARCHITECT AND OWNER.
CONTRACTOR SHALL COORDINATE ACTUAL LOCATION OF SPEAKERS WITH OWNER.
CONTRACTOR SHALL PROVIDE FIBER CABLE FROM WCPS RACK TO THE MDF ROOM ON THE MAIN FLOOR.
1
2
3
4
5
6
7
8
DATA LINE 1
DATA LINE 2
DATA LINE 3
DATA LINE 4
DATA TO PATCH PANEL
IN WCPS RACK IN
SERVER ROOM
1/4" = 1'-0"
E301
2
LAB DATA SWITCH CONNECTION FOR STUDENTS
9
10
11
12
13
14
15
DATA LINE 1
DATA LINE 2
DATA LINE 3
DATA LINE 4
FOUR-PORT
DATA
WALL-PLATE
1/4" = 1'-0"
E301
3
LAB DATA CONNECTION FOR TEACHERS
16
1/4" = 1'-0"
E301
4
LAB AUDIO-VISUAL MATRIX RISER
INPUT
OUTPUT
4X4 VIDEO MATRIX SWITCHER (VMS)
AVP
TV
(TYP. OF 4)
HDMI 1
HDMI FOR TV / MONITOR (TYP. OF 4)
HDMI 2
ETHERNET
GENERAL NOTES:
1. CONTRACTOR SHALL ROUTE ALL DATA CABLES IN THIS AREA TO THE SERVER ROOM.
17
18
2
19
2
DATA TO PATCH PANEL
IN WCPS RACK IN
SERVER ROOM
2
2
2
2
2
FOUR-PORT
DATA
WALL-PLATE
ON
KNEE-WALL
A
B
C
D
PRN
PRN
PRN PRN
PRN
PRN
PRN
PRN
PRN
PRN
PRN
PANEL LM (XR)
PANEL LN (XR)
+60"
+60" +60"
+60"
LN-2
LN-4 LN-6
LN-7
LN-8 LN-9
LN-10 LN-11
LN-12
LN-14
LN-16
+60"
+60"
+60"
SAW
CORD REEL (TYP)
IRON
WORKER
PRESS
WELDER
LN-1
LN-3
LN-5LN-13
LN-15
LN-17
HA SECT.2 - 40
LN1-3
LN1-1 LN1-2
LHA-7,9
LHA-11,13
LN1-5
LN1-6
LN-20
LHA-2,4,6
LHA-8,10,12
PANEL LN1
LHA-1,3,5
LHA-15,17
10
3(TYP)
4
(TYP)
5
6
7
8
QA / QC205
STORAGE202
WELDING206
TRAININGUNIT SPACE
204
MACHINETECH SPACE
203
CLASSROOM201
EMERGENCY POWER OFF
FOR PANEL LN1
LN-19
9
LN1-9,11,13
LN1-15,17,19 LN1-10,12,14
8
8
8
8
8
8
8 8
TBTP
MILL
TBTP
MILL
TBTP
LATHE
TBTP
LATHE
TBTP CNC LATHETBTP CNC LATHE
TBTP CNC
MILL
TBTP CNC
MILL
DRILL
PRESS
1
(TYP)
10
2
(TYP)
2
VMS
12
11
LN-28
14
(TYP)
LN-30
LN-32
LN-33
14
(TYP)
LN-35
LN-37
LN-34
LN-36
LN-38
14
(TYP)
13
AVP
+60"
+60"+60"
15
15
15
9876
© COPYRIGHT 2020 NOELKER AND HULL ASSOCIATES, INC
ISSUE DATE:
SCALE:
SHEET INFORMATION
M/E/P ENGINEER
STRUCTURAL ENGINEER
CIVIL ENGINEER
LANDSCAPE ARCHITECT
PROJECT ADDRESS
PROJECT OWNER
PROJECT STATUS
PROJECT INFORMATION
REVISIONS
PROJECT TEAM
ARCHITECT
JOB NUMBER:
SHEET TITLE:
SHEET NUMBER:
PROJECT TITLE
30 WEST KING STREETCHAMBERSBURG, PA | 17201-1540P: 717.263.8464 | F: 717.263.6031
NOELKERHULL.COMPA | MD | VA
TECH HIGHPROGRAMS
50 WEST OAK RIDGE DRIVEHAGERSTOWN, MD 21740
100% CD'S
01-17-2020PROJ. #19-0476
WASHINGTON COUNTYPUBLIC SCHOOLS
REV. #: DESCRIPTION: DATE:
Professional Certification. I
hereby certify that these
documents were prepared or
approved by me, and that I
am a duly licensed
professional engineer under
the laws of the State of
Maryland. License No:45511
Expiration Date: 06/03/2020
CJL ENGINEERING
TRUE NORTH
PLANNORTH
KEY PLAN
EXISTING
PROGRAM 1 PROGRAM2
5285 WESTVIEW DR., SUITE 203 | FREDERICK MD, 21703P: 301.695.9424 | F: 301.293.6338
CJL Project #19-0476
1 ADDENDUM #1 01-31-202 ADDENDUM #2 02-06-20
E302
PART FIRST FLOOR PLAN - NEW WORK -POWER & COMMUNICATION
1/4" = 1'-0"
E302
1
PART FIRST FLOOR PLAN - NEW WORK - POWER & COMMUNICATION
NUMBERED NOTES:
CONTRACTOR SHALL INSTALL POWER AND DATA, IN THE CLASSROOM, ON STUB WALL. ACTUAL LOCATION
OF EQUIPMENT SHALL BE CO-ORDINATED WITH ARCHITECT AND OWNER PRIOR TO INSTALLATION.
CIRCUITS SHALL BE INSTALLED AT NEAREST WALL TO THE EQUIPMENT THEY SUPPLY.
CONTRACTOR SHALL HARDWIRE DATA CONNECTION FOR STUDENTS AND TEACHER TO THE IDF ROOM.
CONTRACTOR SHALL ALSO CLEARLY LABEL SOURCE AND DESTINATION OF EACH DATA LINE.
COORDINATE ACTUAL LOCATION AND HEIGHTS WITH OWNER PRIOR TO INSTALLING DEVICES FOR TV
MONITOR.
PROVIDE 12X12X6 JUNCTION BOX FLUSH MOUNTED IN WALL AND INSTALL 1" CONDUITS INDICATED.
PROVIDE HUBBELL OR APPROVED EQUAL CORD REEL WITH RECEPTACLE AS INDICATED FOR 120V, ALL 3
PHASE RECEPTACLES SHALL BE COORDINATED WITH MANUFACTURERS EQUIPMENT. REELS SHALL BE
INSTALLED ON GRID WORK, COORDINATE WITH G.C. PRIOR TO INSTALLING.
HEAVY DUTY, 240V, 2 POLE, 100A, NEMA 12, NON-FUSED DISCONNECT
3 #3 & 1 #8 EGC IN 1 1/4"C
3 #12 & 1 #12 EGC IN 3/4"C
PRESS IS HYDRAULICALLY OPERATED FROM THE IRON WORKER, NO SEPARATE POWER IS REQUIRED.
POWER POLE FOR ROUTING POWER REQUIRED SEPARATION SHALL BE MAINTAINED BETWEEN POWER
AND DATA CABLES. WIREMOLD MODEL: 30TC-4V OR APPROVED EQUAL FOR THE POWER POLE. HEIGHT OF
POLE SHALL BE FIELD VERIFIED. COORDINATE COLOR AND FINISH WITH ARCHITECT AND OWNER.
CONTRACTOR SHALL PROVIDE AUDIO VISUAL WALL PLATE WITH MINIMUM OF TWO HDMI INPUT AND ONE
ETHERNET. CONTRACTOR SHALL ALSO PROVIDE ASSOCIATED 4K HDMI CABLE FOR A COMPLETE SYSTEM.
CONTRACTOR SHALL PROVIDE VIDEO MATRIX SWITCHER (VMS) WITH 8 HDMI SOURCES TO 8 DISPLAYS,
REFER TO DETAIL 2 FOR CONNECTION RISER DETAIL. ATEN MODEL VM0808HA SHALL BE USED AS A BASIS
OF DESIGN FOR THE VMS.
CONTRACTOR SHALL PROVIDE CABINET FOR VIDEO MATRIX SWITCHER.
CONTRACTOR SHALL PROVIDE POWER AND DATA DROPS FOR WIRELESS ROUTERS. ACTUAL LOCATION OF
DROPS SHALL BE CO-ORDINATED WITH WITH ARCHITECT AND OWNER PRIOR TO INSTALLATION.
CONTRACTOR SHALL COORDINATE ACTUAL LOCATION OF SPEAKERS WITH OWNER.
1
2
3
4
5
6
7
8
9
10
GENERAL NOTES:
1. CONTRACTOR SHALL ROUTE ALL DATA CABLES IN THIS AREA TO THE IDF ROOM.
11
12
13
14
1/4" = 1'-0"
E302
2
CLASS-ROOM AUDIO-VISUAL MATRIX RISER
INPUT
OUTPUT
8X8 VIDEO MATRIX SWITCHER (VMS)
AVP
TV
(TYP. OF 5)
HDMI 1
HDMI FOR TV / MONITOR (TYP. OF 5)
HDMI 2
ETHERNET
15
2
2
2
2
NONESCALE:
KNEE WALL
POWER FEED COVERPLATE.
POWER FEED CABLE.
DATA FEED COVERPLATE, PASS & SEYMOUR SS753 OR SIMILAR.
PROVIDE SPIRAL WRAP FOR MANAGING PATCH CABLES OR ZONE
CABLES FROM WALL BOX TO OFFICE PARTITION.
FLOOR
PROVIDE GROMMET STRIP
AROUND EDGE OF CABLE
OPENING TO PROTECT CABLES
FROM SHARP EDGES.
POWER POLE PARTITION FEED DETAIL
POWERPOLE
P
D
E302
3
NOTES:
1. DETAIL IS REPRESENTATIVE OF ANTICIPATED
ARRANGEMENT. THE POWER POLE FOR THE KNEE WALL
SHOULD BE INSTALLED TIGHT TO THE KNEE WALL WITH
POWER AND DATA EXTENDED INTO THE KNEE WALL IN
ACCORDANCE WITH ALL APPLICABLE CODES. POWER PLATE
SHOULD FACILITATE EXTENSION OF POWER CIRCUITS
INDICATED ON PLAN. DATA MANAGEMENT PLATE SHALL
FACILITATE EXTENSION OF CABLING TO LOCATIONS
INDICATED ON PLAN.
2
QA / QC
STORAGE202
WELDING206
TRAININGUNIT SPACE
204
MACHINETECH SPACE
203
CLASSROOM201
EX.CLASSROOM
168
LN1-16,18,20
M
AHU-1
1
2
A
B
C
D
205
9876E
DN
LHA-14,16,18
M
AIR COMPRESSOR
1
2
EX PANEL HA SECT 1
EX PANEL HA SECT 2
EX PANEL LA1 SECT 1 & 2
EX PANEL LA
EX PANEL MDP
EX TRANSFORMER
EX PANEL HA SECT 3
PANEL LHA (NEW)
TRANSFORMER (NEW)
3
TRANSFORMER (NEW)
4
WIRE TROUGH (NEW)
7
6
5
987
© COPYRIGHT 2020 NOELKER AND HULL ASSOCIATES, INC
ISSUE DATE:
SCALE:
SHEET INFORMATION
M/E/P ENGINEER
STRUCTURAL ENGINEER
CIVIL ENGINEER
LANDSCAPE ARCHITECT
PROJECT ADDRESS
PROJECT OWNER
PROJECT STATUS
PROJECT INFORMATION
REVISIONS
PROJECT TEAM
ARCHITECT
JOB NUMBER:
SHEET TITLE:
SHEET NUMBER:
PROJECT TITLE
30 WEST KING STREETCHAMBERSBURG, PA | 17201-1540P: 717.263.8464 | F: 717.263.6031
NOELKERHULL.COMPA | MD | VA
TECH HIGHPROGRAMS
50 WEST OAK RIDGE DRIVEHAGERSTOWN, MD 21740
100% CD'S
01-17-2020PROJ. #19-0476
WASHINGTON COUNTYPUBLIC SCHOOLS
REV. #: DESCRIPTION: DATE:
Professional Certification. I
hereby certify that these
documents were prepared or
approved by me, and that I
am a duly licensed
professional engineer under
the laws of the State of
Maryland. License No:45511
Expiration Date: 06/03/2020
CJL ENGINEERING
TRUE NORTH
PLANNORTH
KEY PLAN
EXISTING
PROGRAM 1 PROGRAM2
5285 WESTVIEW DR., SUITE 203 | FREDERICK MD, 21703P: 301.695.9424 | F: 301.293.6338
CJL Project #19-0476
1 ADDENDUM #1 01-31-202 ADDENDUM #2 02-06-20
E304
PART FIRST FLOOR ANDMEZZANINE PLANS -
NEW WORK - MECHANICAL POWER
1/4" = 1'-0"
E304
1
PART FIRST FLOOR PLAN - NEW WORK - MECHANICAL POWER
NUMBERED NOTES:
HEAVY DUTY, 240V, 3 POLE, 60A, NEMA 1, NON-FUSED DISCONNECT
3 #4 & 1 #10 EGC IN 1 1/4"C
NEW FLOOR-MOUNTED 75kVA, 480-120/240V, 3-PH, TRANSFORMER TO BE FED
FROM PANEL HA. CONTRACTOR SHALL MOUNT TRANSFORMER PER
MANUFACTURER'S INSTALLATION AND MOUNTING DETAILS.
NEW FLOOR-MOUNTED 225KVA, 480-120/208V, 3-PH, TRANSFORMER TO BE
FED FROM PANEL MDP. CONTRACTOR SHALL MOUNT TRANSFORMER PER
MANUFACTURER'S INSTALLATION AND MOUNTING DETAILS.
DISCONNECT SWITCH FOR PANEL LJ1, SEE DRAWING E601 FOR SWITCH
INFORMATION.
DISCONNECT SWITCH FOR PANEL LJ2, SEE DRAWING E601 FOR SWITCH
INFORMATION.
DISCONNECT SWITCH FOR PANEL LN1, SEE DRAWING E601 FOR SWITCH
INFORMATION.
1
2
1/4" = 1'-0"
E304
2
PART MEZZANINE PLAN - NEW WORK - MECHANICAL POWER
3
4
2
5
6
7
2
ACCU-1
WEF-1
RTU-19
ACCU-2 ACCU-3
1
2
3
4
5
6
7
8
7
8
G1
G2
HA SECT. 2-37
LA1-2,4,6
LA1-5,7,9
LJ1-40,42LJ1-41,43
© COPYRIGHT 2020 NOELKER AND HULL ASSOCIATES, INC
ISSUE DATE:
SCALE:
SHEET INFORMATION
M/E/P ENGINEER
STRUCTURAL ENGINEER
CIVIL ENGINEER
LANDSCAPE ARCHITECT
PROJECT ADDRESS
PROJECT OWNER
PROJECT STATUS
PROJECT INFORMATION
REVISIONS
PROJECT TEAM
ARCHITECT
JOB NUMBER:
SHEET TITLE:
SHEET NUMBER:
PROJECT TITLE
30 WEST KING STREETCHAMBERSBURG, PA | 17201-1540P: 717.263.8464 | F: 717.263.6031
NOELKERHULL.COMPA | MD | VA
TECH HIGHPROGRAMS
50 WEST OAK RIDGE DRIVEHAGERSTOWN, MD 21740
100% CD'S
01-17-2020PROJ. #19-0476
WASHINGTON COUNTYPUBLIC SCHOOLS
REV. #: DESCRIPTION: DATE:
Professional Certification. I
hereby certify that these
documents were prepared or
approved by me, and that I
am a duly licensed
professional engineer under
the laws of the State of
Maryland. License No:45511
Expiration Date: 06/03/2020
CJL ENGINEERING
TRUE NORTH
PLANNORTH
KEY PLAN
EXISTING
PROGRAM 1 PROGRAM2
5285 WESTVIEW DR., SUITE 203 | FREDERICK MD, 21703P: 301.695.9424 | F: 301.293.6338
CJL Project #19-0476
1 ADDENDUM #1 01-31-202 ADDENDUM #2 02-06-20
E305
PART ROOF PLAN -NEW WORK - MECHANICAL POWER
1/8" = 1'-0"
E305
1
PART ROOF PLAN - NEW WORK - MECHANICAL POWER
NUMBERED NOTES:
HEAVY DUTY, 600V, 3 POLE, 100A, NEMA 3R, FUSED DISCONNECT
WITH 70A FUSES
3 #4 & 1 #8 EGC IN 1 1/4"C
HEAVY DUTY, 240V, 3 POLE, 30A, NEMA 3R, NON-FUSED
DISCONNECT
3 #12 & 1 #12 EGC IN 3/4"C
HEAVY DUTY, 240V, 3-POLE, 60A, NEMA 3R, FUSED DISCONNECT
WITH 35A FUSES
3 #8 & 1 #10 EGC IN 1"C
HEAVY DUTY, 240V, 2 POLE, 30A, NEMA 3R, FUSED DISCONNECT
WITH 25A FUSES
2 #10 & 1 #10 EGC IN 3/4"C
1
2
3
GENERAL NOTES:
ALTERNATE #1: PROVIDE NEW GAS FIRED ROOFTOP UNIT
BASE BID: PROVIDE NEW AIR COOLED CONDENSING UNIT LOCATED
BASE BID: PROVIDE NEW AIR COOLED CONDENSING UNIT
G1
G2
G3
4
5
6
7
8
2
2
© COPYRIGHT 2020 NOELKER AND HULL ASSOCIATES, INC
ISSUE DATE:
SCALE:
SHEET INFORMATION
M/E/P ENGINEER
STRUCTURAL ENGINEER
CIVIL ENGINEER
LANDSCAPE ARCHITECT
PROJECT ADDRESS
PROJECT OWNER
PROJECT STATUS
PROJECT INFORMATION
REVISIONS
PROJECT TEAM
ARCHITECT
JOB NUMBER:
SHEET TITLE:
SHEET NUMBER:
PROJECT TITLE
30 WEST KING STREETCHAMBERSBURG, PA | 17201-1540P: 717.263.8464 | F: 717.263.6031
NOELKERHULL.COMPA | MD | VA
TECH HIGHPROGRAMS
50 WEST OAK RIDGE DRIVEHAGERSTOWN, MD 21740
100% CD'S
01-17-2020PROJ. #19-0476
WASHINGTON COUNTYPUBLIC SCHOOLS
REV. #: DESCRIPTION: DATE:
Professional Certification. I
hereby certify that these
documents were prepared or
approved by me, and that I
am a duly licensed
professional engineer under
the laws of the State of
Maryland. License No:45511
Expiration Date: 06/03/2020
CJL ENGINEERING
TRUE NORTH
PLANNORTH
KEY PLAN
EXISTING
PROGRAM 1 PROGRAM2
5285 WESTVIEW DR., SUITE 203 | FREDERICK MD, 21703P: 301.695.9424 | F: 301.293.6338
CJL Project #19-0476
1 ADDENDUM #1 01-31-202 ADDENDUM #2 02-06-20
E601
RISER DIAGRAM & PANEL SCHEDULES
DWG.
CCT.
NO.
LOAD
kVA
TRIP
POLE
CIRCUIT DESCRIPTION
PANELBOARD
DIRECTORY
NO. NO.
PANELBOARD DESIGNATION :
LOCATION :
VOLTAGE :
MAINS : 200A MCB
GROUND BUS : COPPER
INTERRUPTING
CAPACITY
MOUNTING :
PANEL TYPE :
:
1 2
3 4
7
5
8
6
11
9
12
10
15
13
16
14
19
17
20
18
23
21
24
22
27
25
28
26
31
29
32
30
35
33
36
34
39
37
40
38
41 42
39
41
35
37
31
33
27
29
23
25
21
19
15
17
11
13
9
7
3
5
1
40
42
32
34
36
38
24
26
28
30
16
18
22
20
10
8
12
14
4
2
6
SQUARE D
SURFACE
22 KAIC
120/208V-3Ø-4W
PANEL LJ1 (NEW)
NO.
CCT.
DWG.
LOAD
kVA
TRIP
POLE
CIRCUIT DESCRIPTION
RM. 104
20/1 20/1
20/1 20/1
20/1 20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
:TOTAL :TOTAL
24.02
25.28
0.36
0.72
0.72
0.72
0.54
0.72
0.72
0.72
0.72
0.54
0.36
20/1
20/1
20/1
20/1
20/1
25/2
20/120/1
20/1
20/1
20/1
20/1
20/1
25/2
RECEPTACLES RM 101
RECEPTACLES RM 101
RECEPTACLES RM 101
RECEPTACLES RM 101
RECEPTACLES RM 101
RECEPTACLES RM 101
RECEPTACLES RM 101
RECEPTACLES RM 106
RECEPTACLES RM 103
RECEPTACLES RM 103
ACCU-2
RECEPTACLES RM 101
RECEPTACLES RM 101
RECEPTACLES RM 101
RECEPTACLES RM 101
RECEPTACLES RM 102
RECEPTACLES RM 101
RECEPTACLES RM 101
RECEPTACLES RM 102
RECEPTACLES RM 103
RECEPTACLES RM 103
RECEPTACLES RM 106
RECEPTACLES RM 106
RECEPTACLES RM 105
RECEPTACLES RM 106
RECEPTACLES RM 106
RECEPTACLES RM 106
RECEPTACLES RM 106
RECEPTACLES RM 103
RECEPTACLES RM 101
ACCU-3
20/1
20/1
RECEPTACLES RM 106
RECEPTACLES RM 106
SPARE
0.72
0.72
0.72
0.72
0.54
0.72
0.72
0.72
0.72
0.72
0.72
0.72
0.72
0.72
0.54
DWG.
CCT.
NO.
LOAD
kVA
TRIP
POLE
CIRCUIT DESCRIPTION
PANELBOARD
DIRECTORY
NO. NO.
PANELBOARD DESIGNATION :
LOCATION :
VOLTAGE :
MAINS : 200A MCB
GROUND BUS : COPPER
INTERRUPTING
CAPACITY
MOUNTING :
PANEL TYPE :
:
1 2
3 4
7
5
8
6
11
9
12
10
15
13
16
14
19
17
20
18
23
21
24
22
27
25
28
26
31
29
32
30
35
33
36
34
39
37
40
38
41 42
39
41
35
37
31
33
27
29
23
25
21
19
15
17
11
13
9
7
3
5
1
40
42
32
34
36
38
24
26
28
30
16
18
22
20
10
8
12
14
4
2
6
SQUARE D
SURFACE
22 KAIC
120/208V-3Ø-4W
EX LN
NO.
CCT.
DWG.
LOAD
kVA
TRIP
POLE
CIRCUIT DESCRIPTION
EX 179
20/1 20/1
20/1 20/1
20/1 20/1
20/1
20/1
20/1
20/1
20/1
0.72
0.72
0.72
0.72
0.72
20/1
20/1
20/1
:TOTAL :TOTAL7.28
7.32
0.72
0.72
0.72
0.72
0.72
0.72
0.72
0.72
0.54
0.72
0.72
0.18
0.36
20/1
20/1
20/1
20/1
20/1
20/1
20/120/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
RECEPTACLES RM 201
RECEPTACLES RM 201
RECEPTACLES RM 201
RECEPTACLES RM 201
RECEPTACLES RM 201
RECEPTACLES RM 201
RECEPTACLES RM 201
RECEPTACLES RM 203
X
X
RECEPTACLES RM 201
RECEPTACLES RM 201
RECEPTACLES RM 201
RECEPTACLES RM 201
RECEPTACLES RM 201
RECEPTACLES RM 201
RECEPTACLES RM 201
RECEPTACLES RM 204
RECEPTACLES RM 204
RECEPTACLES RM 204
WIRELESS ROUTER RM 203
X
X
20/1
PANEL
LJ1
120/208V
1
2
NUMBERED NOTES
4 #4/0 & 1 #4 EGC IN 2 1/2"C
PROVIDE 350A/3P BREAKER IN EXISTING 1200A, 480V, 3-PHASE PANEL MDP FOR NEW TRANSFORMER TMDP. MDP IS
A SQUARE D PANEL WITH CAT. NO. HCR548612U . BREAKER SHALL MATCH PANEL CHARACTERISTICS.
GROUND TRANSFORMER USING 1#3/0 IN 1 1/4"C.
(2) 4 #600 & 1 #3/0 EGC IN 4"C.
4 #3/0 & 1 #6 EGC IN 2 1/2"C
REPLACE EXISTING 30A/3P SQUARE D BREAKER IN CIRCUIT 2,4,6 OF PANEL LA WITH A 35A/3P BREAKER. NEW
BREAKER SHALL MATCH EXISTING PANEL CHARACTERISTICS.
REPLACE EXISTING 20A/3P SQUARE D BREAKER IN CIRCUIT 7,9,11 OF PANEL LA WITH A 15A/3P BREAKER. NEW
BREAKER SHALL MATCH EXISTING PANEL CHARACTERISTICS.
PROVIDE HEAVY DUTY, 240V, 3 POLE, 400A FUSED DISCONNECT. FUSED FOR 225A.
PROVIDE HEAVY DUTY, 240V, 3 POLE, 200A FUSED DISCONNECT. FUSED FOR 200A.
PROVIDE NEW WIRE TROUGH, 8" X 8" X 3'-0". TAP CONDUCTOR SIZE SHALL BE (2) 4-600KCMIL & 1 #3/0 G.
3 #500 & 1 #3 EGC IN 3"C
3
4
5
NOTES:
1.
2.
ALL EQUIPMENT IS TO BE GROUNDED AND BONDED AS REQUIRED BY NEC
ALL WIRE SIZES INDICATED ON RISER DIAGRAM ARE FOR COPPER CONDUCTORS
UNLESS NOTED OTHERWISE.
SECTION 1
PANEL
LN1
120/208V
2
5
MEZZANINE
FIRST FLOOR - RM 104 FIRST FLOOR - RM 203
PARTIAL POWER RISER
43 44
25/2
CRU-1
45 4625/2
CRU-2
47 48
49 5020/1
20/1
SPARE SPARE
51 5220/1
20/1
SPARE SPARE
53 5420/1
20/1
SPARE SPARE
44
46
48
50
52
54
43
45
47
49
51
53
20/1
20/1
20/1RECEPTACLES RM 106
20/1RECEPTACLES RM 106
20/1RECEPTACLES RM 105
20/1RECEPTACLES RM 106
20/1RECEPTACLES RM 106
20/1RECEPTACLES RM 103
20/1RECEPTACLES RM 103
DWG.
CCT.
NO.
LOAD
kVA
TRIP
POLE
CIRCUIT DESCRIPTION
PANELBOARD
DIRECTORY
NO. NO.
PANELBOARD DESIGNATION :
LOCATION :
VOLTAGE :
MAINS : 225A MCB
GROUND BUS : COPPER
INTERRUPTING
CAPACITY
MOUNTING :
PANEL TYPE :
:
81
83
77
79
73
75
69
71
65
67
63
61
57
59
53
55
51
49
45
47
43
SQUARE D
SURFACE
22 KAIC
120/208V-3Ø-4W
PANEL LJ2 SECTION II (NEW)
NO.
CCT.
DWG.
LOAD
kVA
TRIP
POLE
CIRCUIT DESCRIPTION
RM. 104
20/1
20/1
EMERGENCY POWER OFF PNL LN120/1
0.72 RECEPTACLES RM 20420/1
DWG.
CCT.
NO.
LOAD
kVA
TRIP
POLE
CIRCUIT DESCRIPTION
PANELBOARD
DIRECTORY
NO. NO.
PANELBOARD DESIGNATION :
LOCATION :
VOLTAGE :
MAINS : 200A MCB
GROUND BUS : COPPER
INTERRUPTING
CAPACITY
MOUNTING :
PANEL TYPE :
:
1 2
3 4
7
5
8
6
11
9
12
10
15
13
16
14
19
17
20
18
23
21
24
22
27
25
28
26
29 30
27
29
23
25
21
19
15
17
11
13
9
7
3
5
1
24
26
28
30
16
18
22
20
10
8
12
14
4
2
6
SQUARE D
SURFACE
22 KAIC
120/208V-3Ø-4W
LN1 (NEW)
NO.
CCT.
DWG.
LOAD
kVA
TRIP
POLE
CIRCUIT DESCRIPTION
RM 203
20/1 20/1
20/1 20/1
20/1 20/1
20/1
20/1
20/1
60/3
1.0
1.0
1.0
20/1
20/1
20/3
:TOTAL :TOTAL7.625.3
1.0
1.0
20/3
20/120/1
20/1
CNC LATHE
DRILL
CNC MILL
SPARE
CORD REEL RECEPTACLE RM 204
ELECTRIC EQMT RECEPTACLE RM 204
SPARE
SPARE
CNC LATHE
SPARE
CNC MILL
SPARE
ELECTRIC EQMT RECEPTACLE RM 204
AHU-1
SPARE
SPARE
SPARE
SPARE
SPARE
20/3
20/1
20/1
SPARE20/1
SPARE20/1
SPARE20/1
0.36
0.72
0.72
0.72
0.72
0.54
0.72
0.72
0.72
0.72
0.36
0.36
WITH SHUNT TRIP
0.20
PANEL
LN
120/208V
(NEW)
(NEW)
(EXISTING)
2.50
2.50
3.52
3.52
2.3
2.3
2.3
SECTION 2
PANEL LJ2 (NEW)
225A, 120/208V
DWG.
CCT.
NO.
LOAD
kVA
TRIP
POLE
CIRCUIT DESCRIPTION
PANELBOARD
DIRECTORY
NO. NO.
PANELBOARD DESIGNATION :
LOCATION :
VOLTAGE :
MAINS : 225A MCB
GROUND BUS : COPPER
INTERRUPTING
CAPACITY
MOUNTING :
PANEL TYPE :
:
39
41
35
37
31
33
27
29
23
25
21
19
15
17
11
13
9
7
3
5
1
40
42
32
34
36
38
24
26
28
30
16
18
22
20
10
8
12
14
4
2
6
SQUARE D
SURFACE
22 KAIC
120/208V-3Ø-4W
PANEL LJ2 SECTION I (NEW)
NO.
CCT.
DWG.
LOAD
kVA
TRIP
POLE
CIRCUIT DESCRIPTION
EX 104
:TOTAL :TOTAL31.3629.16
1 2
3 4
7
5
8
6
11
9
12
10
15
13
16
14
19
17
20
18
23
21
24
22
27
25
28
26
31
29
32
30
35
33
36
34
39
37
40
38
41 42
20/1 20/1
20/1 20/1
20/1 20/1
20/1
20/1
20/1
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
1.62
1.62
20/1
20/1
20/1DATA POWER STRIP RM 104
:TOTAL :TOTAL
81
83
77
79
73
75
69
71
65
67
63
61
57
59
53
55
51
49
45
47
43
82
84
78
80
74
76
70
72
66
68
64
62
58
60
54
56
52
50
46
48
44
82
84
78
80
74
76
70
72
66
68
64
62
58
60
54
56
52
50
46
48
44
WIRELESS ROUTER RM 203
WIRELESS ROUTER RM 203
WIRELESS ROUTER RM 201
WIRELESS ROUTER RM 201
WIRELESS ROUTER RM 201
WIRELESS ROUTER RM 204
WIRELESS ROUTER RM 204
WIRELESS ROUTER RM 204
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
20/1
20/1
20/1
20/1
20/1
20/1
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
1.62
20/1
20/1
20/1DATA POWER STRIP RM 104
UPS POWER RECEPTACLE30/1
20/1
20/1
20/1
20/1
20/1
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
20/1
20/1
20/1
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
20/1
20/1
20/1
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
20/1
20/1
20/1
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
20/1
20/1
20/1
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
20/1
20/1
20/1
20/1 20/1
20/1 20/1
20/1 20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
SPARE
SPARE
SPARE
SPARE
SPARE
0.72
20/1
RECEPTACLES RM 106
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
DWG.
CCT.
NO.
LOAD
kVA
TRIP
POLE
CIRCUIT DESCRIPTION
PANELBOARD
DIRECTORY
NO. NO.
PANELBOARD DESIGNATION :
LOCATION :
VOLTAGE :
MAINS : 225A MCB
GROUND BUS : COPPER
INTERRUPTING
CAPACITY
MOUNTING :
PANEL TYPE :
:
1 2
3 4
7
5
8
6
11
9
12
10
15
13
16
14
19
17
20
18
23
21
24
22
27
25
28
26
31
29
32
30
35
33
36
34
39
37
40
38
41 42
39
41
35
37
31
33
27
29
23
25
21
19
15
17
11
13
9
7
3
5
1
40
42
32
34
36
38
24
26
28
30
16
18
22
20
10
8
12
14
4
2
6
SQUARE D
SURFACE
22 KAIC
120/208V-3Ø-4W
PANEL LA (SECTION I)
NO.
CCT.
DWG.
LOAD
kVA
TRIP
POLE
CIRCUIT DESCRIPTION
MEZZANINE
20/1 35/3
20/1
20/1
20/1
X
20/120/1
20/1
20/1
20/1
:TOTAL :TOTAL0.87
8.07
0.87
X
X
X
X
X
X
X
X
X
X
X
X
X
8.07
X
X
X
X
X
X
X
X
X
X
X
X
X
15/3
X
X
X
X
EXISTING LOAD
WEF-1
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
X
X
X
X
X
X
X
X
X
X
X
X
X
X
ACCU-1
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
7
6
6
7
NOTE: RELABEL PANEL CIRCUIT NUMBER AS SHOWN.
21.0
SPARE20/1
SPARE20/1
SPARE20/1
SPARE20/1
SPARE20/1
SPARE20/1
SPARE
SPARE
SPARE
20/1
20/1
20/1
2
2
2 2
DATA POWER STRIP RM 104
DATA POWER STRIP RM 104
2.20
XFMR
TMDP
225 KVA
(NEW)
3
1
5
200A
EXISTING CIRCUIT
9
8
9
4
8
9
200A
10
10
2
2
11
11
2
2
2
TO MDP
MDP
2
UPUP
EX.TELECOMM
CLOS.178
EX. IDF ROOM207
CLASSROOM102
CISCO / CRANLAB101
SERVERROOM
104
WORK AREA103
CLASSROOM105
AI / CLOUDCOMPUTING
LAB106
(XR)
32/18
RA UP
(XR)32/18
SA UP
(XR)14-3
(XR)14-2
(XR)20/18
(XR)12/12
12/12
(XR)
30/18 RA
S1
275
R1
895
14-6
14-7
14-5
14-4
14-1
S1
235
S1
240
S1
235
S1
240
S1
275
S1
275
S1
275
S1
275
30/12 RA
24/12 RA
24/8
24/8
R1
945
R1
895
R1
750
R1
750
S1
230
S1
235
S1
240
S1
240
S1
235
S1
230
S1
230
S1
230
S1
230
8Ø
8Ø
8Ø
8Ø
12/10 SA
10/10
8Ø
8Ø
8Ø
8Ø
8Ø
8Ø
8Ø
8Ø
8Ø
8Ø
8Ø
8Ø
8Ø
18/10 10/10
20/10
8Ø
8Ø
8Ø
8Ø
24/8
24/8
24/12 RA
24/14 SA
22/16 S
A
20/16 SA
20/10
12Ø
12Ø
12Ø
12Ø
12Ø
20/18
T
T
T
T
CRU-1
1
CRU-2
1
A
M201
B
M201
32/18 SA
18/10
14/10
20/10 SA
12/10
24/8
24/12 R
A
S1
275
S1
275
S1
275
14-4
14-5
T
14-7
14-6
12Ø
S2
375
R3
375
R3
375
R3
375
R3
375
S2
375
S2
375
12/12
12/12
10Ø10Ø
10Ø
10Ø
10Ø
10Ø
10Ø
10Ø
S2
375
12/12
12/12
T
1,21
14-1
RL/RS
CO
2
3/4"
3/4"
3/4"
RL/RS
CONTINUATION
TO M202
RL/RS
32/18
32/18
30/18
(XR)32/18
(XR)32/18
30/8
(XR)32/18
30/12
© COPYRIGHT 2020 NOELKER AND HULL ASSOCIATES, INC
ISSUE DATE:
SCALE:
SHEET INFORMATION
M/E/P ENGINEER
STRUCTURAL ENGINEER
CIVIL ENGINEER
LANDSCAPE ARCHITECT
PROJECT ADDRESS
PROJECT OWNER
PROJECT STATUS
PROJECT INFORMATION
REVISIONS
PROJECT TEAM
ARCHITECT
JOB NUMBER:
SHEET TITLE:
SHEET NUMBER:
PROJECT TITLE
30 WEST KING STREETCHAMBERSBURG, PA | 17201-1540P: 717.263.8464 | F: 717.263.6031
NOELKERHULL.COMPA | MD | VA
TECH HIGHPROGRAMS
50 WEST OAK RIDGE DRIVEHAGERSTOWN, MD 21740
100% CD'S
01-17-2020PROJ. #19-0476
WASHINGTON COUNTYPUBLIC SCHOOLS
REV. #: DESCRIPTION: DATE:
Professional Certification. I
hereby certify that these
documents were prepared or
approved by me, and that I
am a duly licensed
professional engineer under
the laws of the State of
Maryland. License No:45511
Expiration Date: 06/03/2020
CJL ENGINEERING
TRUE NORTH
PLANNORTH
KEY PLAN
EXISTING
PROGRAM 1 PROGRAM2
5285 WESTVIEW DR., SUITE 203 | FREDERICK MD, 21703P: 301.695.9424 | F: 301.293.6338
CJL Project #19-0476
1 ADDENDUM #1 01-31-202 ADDENDUM #2 02-06-20
M201
PART FIRST FLOOR PLAN -NEW WORK - MECHANICAL
1/4" = 1'-0"
M201
1
PART FIRST FLOOR PLAN - NEW WORK - MECHANICAL
NUMBERED NOTES:
PROVIDE NEW COMPUTER ROOM AIR CONDITIONING
UNIT. EXTEND REFRIGERANT PIPING TO ASSOCIATED
AIR COOLED CONDENSING UNIT LOCATED ON ROOF
ABOVE. REFRIGERANT PIPING TO EXTEND IN EXISTING
SHAFT FOR RTU-14 UP TO ABOVE CEILING ON UPPER
LEVEL OUT OF SHAFT TO ASSOCIATED OUTDOOR
UNIT. CRU-1 & CRU-2 TO SHARE A COMMON
THERMOSTAT. REFER TO SCHEDULE FOR ADDITIONAL
REQUIREMENTS.
CONNECT CONDENSATE PIPING TO EXISTING STORM
WATER PIPE. VERIFY EXACT LOCATION IN FIELD PRIOR
TO NEW PIPE INSTALLATION.
1
NO SCALE
M201
A
SECTION A - NEW WORK - MECHANICAL
M201
B
SECTION B - NEW WORK - MECHANICAL
NO SCALE
2
GENERAL NOTES:
ALL REFRIGERANT PIPING SHALL BE SIZED PER
MANUFACTURER'S REQUIREMENTS.
PROVIDE ALL CLEARANCES PER MANUFACTURER'S
REQUIREMENTS.
G1.
G2.
2
QA / QC205
STORAGE202
WELDING206
TRAININGUNIT SPACE
204
MACHINETECH SPACE
203
CLASSROOM201
TBTP CNCLATHE
TBTP CNCLATHE
TBTP CNCMILL
TBTP CNCMILL
TBTP LATHE TBTP LATHE
TBTP MILL TBTP MILL
IRONWORKER
PRESS
SAWDRILLPRESS
WELDER
A
B
C
D
(XR)15/15
(XR)34/12 TYP.
(XR)25/20
(X
R)3
2/2
0
(XR)32/25
UP
(XR)36/24
UP
(XR)
UH-1
(XR)28/12
(X
R)2
4/2
0
(XR)48/18
UP
(XR)50/20
RAR
(XR)28/12
(XR)34/12
(XR)34/12 TYP.
(XR)6Ø
UP
(XR)
RL/RS
DN
RL/RS
DN
RL/RS
T
(XR)RTU
(XR)15/20
(X
R)1
5/2
0(X
R)24
/20
(X
R)32
/1
2
(XR)RL/RS
(X
R)2
4/2
0
S2
400
S2
400
S2
400
S2
400
12Ø
10Ø
10Ø
10Ø
10Ø
12/12
18/12
AHU-11
10/8
12
Ø
R4
640
R4
640
TAHU-1
8Ø
360
CFM
3
14/14
EA UP
RL/RS
DN
CO
4
3/4"
3/4"
2
5
5
6
885
CFM
RL/RS
UP
RL/RS
CONTINUATION
FROM
M201
RL/RS
© COPYRIGHT 2020 NOELKER AND HULL ASSOCIATES, INC
ISSUE DATE:
SCALE:
SHEET INFORMATION
M/E/P ENGINEER
STRUCTURAL ENGINEER
CIVIL ENGINEER
LANDSCAPE ARCHITECT
PROJECT ADDRESS
PROJECT OWNER
PROJECT STATUS
PROJECT INFORMATION
REVISIONS
PROJECT TEAM
ARCHITECT
JOB NUMBER:
SHEET TITLE:
SHEET NUMBER:
PROJECT TITLE
30 WEST KING STREETCHAMBERSBURG, PA | 17201-1540P: 717.263.8464 | F: 717.263.6031
NOELKERHULL.COMPA | MD | VA
TECH HIGHPROGRAMS
50 WEST OAK RIDGE DRIVEHAGERSTOWN, MD 21740
100% CD'S
01-17-2020PROJ. #19-0476
WASHINGTON COUNTYPUBLIC SCHOOLS
REV. #: DESCRIPTION: DATE:
Professional Certification. I
hereby certify that these
documents were prepared or
approved by me, and that I
am a duly licensed
professional engineer under
the laws of the State of
Maryland. License No:45511
Expiration Date: 06/03/2020
CJL ENGINEERING
TRUE NORTH
PLANNORTH
KEY PLAN
EXISTING
PROGRAM 1 PROGRAM2
5285 WESTVIEW DR., SUITE 203 | FREDERICK MD, 21703P: 301.695.9424 | F: 301.293.6338
CJL Project #19-0476
1 ADDENDUM #1 01-31-202 ADDENDUM #2 02-06-20
M202
PART FIRST FLOOR PLAN -NEW WORK - MECHANICAL
1/4" = 1'-0"
M202
1
PART FIRST FLOOR PLAN - NEW WORK - MECHANICAL
NUMBERED NOTES:
PROVIDE NEW ELECTRIC AIR HANDLING UNIT LOCATED ABOVE
CEILING. EXTEND REFRIGERANT PIPING TO ASSOCIATED
OUTDOOR UNIT. SIZE AND INSTALL PER MANUFACTURER'S
REQUIREMENTS.
8" ROUND CONNECTION DOWN TO EXTRACTION ARM. INSTALL PER
MANUFACTURER'S REQUIREMENTS.
BALANCE TO INDICATED AIRFLOW.
CONNECT CONDENSATE DRAIN TO EXIT THE BUILDING AT THIS
LOCATION. SPILL TO GRADE ONTO SPLASH BLOCK.
BALANCE TO INDICATED. AIRFLOW WILL BE PROVIDE FROM PRE
DEMOLITION TESTING.
ALTERNATE - #1: BALANCE TO INDICATED AIRFLOW
1 G1.
2
3
GENERAL NOTES:
ALL REFRIGERANT PIPING SHALL BE SIZED PER
MANUFACTURER'S REQUIREMENTS.
PROVIDE ALL CLEARANCES PER MANUFACTURER'S
REQUIREMENTS.
G1.
G2.
4
5
6
2
(XR)RTU
(XR)ACCU
(XR)
FV
ACCU-1
(XR)PRV
(XR)RTU-10
(XR)F-3
(XR)PRV
(XR)PRV-24
(XR)PRV
(XR)PRV
(XR)PRV
(XR)RTU-14
(XR)RTU-4
(XR)RTU-1
(XR)VTR
(XR)RTU-11
G
G
(XR)2"
G
G
(XR)3"
(XR)2
1
2
"
(XR)2"
G
(XR)
1
1
2
"
G
(XR)1
1
2
"
(XR)2"
1
1
2
"
G
(XR)
1
1
2
"
(XR)RTU-3
RL/RS
DN
WEF-1
4
2
RTU-191
ACCU-2
3
ACCU-3
3
RL/RS
DN
© COPYRIGHT 2020 NOELKER AND HULL ASSOCIATES, INC
ISSUE DATE:
SCALE:
SHEET INFORMATION
M/E/P ENGINEER
STRUCTURAL ENGINEER
CIVIL ENGINEER
LANDSCAPE ARCHITECT
PROJECT ADDRESS
PROJECT OWNER
PROJECT STATUS
PROJECT INFORMATION
REVISIONS
PROJECT TEAM
ARCHITECT
JOB NUMBER:
SHEET TITLE:
SHEET NUMBER:
PROJECT TITLE
30 WEST KING STREETCHAMBERSBURG, PA | 17201-1540P: 717.263.8464 | F: 717.263.6031
NOELKERHULL.COMPA | MD | VA
TECH HIGHPROGRAMS
50 WEST OAK RIDGE DRIVEHAGERSTOWN, MD 21740
100% CD'S
01-17-2020PROJ. #19-0476
WASHINGTON COUNTYPUBLIC SCHOOLS
REV. #: DESCRIPTION: DATE:
Professional Certification. I
hereby certify that these
documents were prepared or
approved by me, and that I
am a duly licensed
professional engineer under
the laws of the State of
Maryland. License No:45511
Expiration Date: 06/03/2020
CJL ENGINEERING
TRUE NORTH
PLANNORTH
KEY PLAN
EXISTING
PROGRAM 1 PROGRAM2
5285 WESTVIEW DR., SUITE 203 | FREDERICK MD, 21703P: 301.695.9424 | F: 301.293.6338
CJL Project #19-0476
1 ADDENDUM #1 01-31-202 ADDENDUM #2 02-06-20
M203
PART ROOF PLAN -NEW WORK - MECHANICAL
1/8" = 1'-0"
M203
1
PART ROOF PLAN - NEW WORK - MECHANICAL
NUMBERED NOTES:
ALTERNATE #1: PROVIDE NEW GAS FIRED ROOFTOP UNIT ON
EXISTING STEEL. CONTRACTOR TO FIELD VERIFY AND CONNECT
TO EXISTING ROOF TOP DUCTWORK. INSTALL PER
MANUFACTURER'S REQUIREMENTS. EXTEND NEW GAS PIPE FROM
EXISTING, MATCH EXISTING PIPE SIZE AS REQUIRED.
PROVIDE NEW AIR COOLED CONDENSING UNIT LOCATED ON
EXISTING STEEL. EXTEND REFRIGERANT PIPING TO ASSOCIATED
INDOOR UNIT. SIZE AND INSTALL PER MANUFACTURER'S
REQUIREMENTS.
PROVIDE NEW AIR COOLED CONDENSING UNIT LOCATED ON NEW
ROOF SUPPORTS. EXTEND REFRIGERANT PIPING TO ASSOCIATED
INDOOR UNIT. SIZE AND INSTALL PER MANUFACTURER'S
REQUIREMENTS.
PROVIDE WELDING EXHAUST FAN ON ROOF CURB. EXTEND
DUCTWORK DOWN THROUGH TO EXTRACTION WELDING ARM.
INSTALL PER MANUFACTURER'S REQUIREMENTS.
1
GENERAL NOTES:
2
3
ALL REFRIGERANT PIPING SHALL BE SIZED PER
MANUFACTURER'S REQUIREMENTS.
PROVIDE ALL CLEARANCES PER MANUFACTURER'S
REQUIREMENTS.
G2.
G1.
4
2