Addendum 1 to ContractMeghnaghat Power Plant
Addendum N° 1to Contract for the Sale of Power Generation Equipment
Meghnaghat Power Plant
This Addendum N° 1 to the Contract for Sale of Power Generation Equipment for theMeghnaghat Power Plant is entered into as of the 16th day of September 2013, by andbetween
SUMMIT MEGHNAGHAT POWER COMPANY LIMITED ("SMPC") a company dulyorganized and existing under the laws of Bangladesh, with a place of business at 18 KawranBazar, Summit Centre, (5th Floor), Dhaka-1215, Bangladesh (the "Buyer"),
GE ENERGY PRODUCTS FRANCE SNC (uGEEPF"), a company duly organized andexisting under the laws of France and having its registered office at 20 avenue du MarechalJuin, 90007 Belfort, France (the "Seller")
FIRST NORTHEAST ELECTRIC POWER ENGINEERING CO. (UNEPC") a company dulyorganized and existing under the laws of the People's Republic of China, with a place ofbusiness at 40, Wenhua Street, Yinzhou District, Tieling City, Liaoning Province, P.R. Chinaand
CHINA NATIONAL ELECTRIC ENGINEERING CO. LTD ("CNEEC") a company dulyorganized and existing under the laws of the People's Republic of China, with a place ofbusiness at CNEEC Building, No 9, South Shouti Road, Haidian District, Tieling City, Beijing1000048, P.R. China
SMPC, GEEPF, NEPC and CNEEC are referred to herein individually as a "Party" andcollectively as the "Parties".
WHEREAS an agreement was entered into (hereinafter "the Agreement") as of the 07th dayof December, 2011, by and between SMPC and GEEPF for the sale of power generationequipment (two model PG 9171 E Gas Turbines, Generators and Associated Auxiliaries) forthe Meghnaghat Power Plant, and
WHEREAS Assignment Agreement A/723606/001 /2012 was entered into as of the 16th dayof February, 2012, by and between SMPC, NEPC, and CNEEC, under which SMPC asAssignor assigned to NEPC AND CNEEC collectively as Assignee all rights and obligationsunder the Agreement except payment obligations, and GEEPF acknowledged and doesacknowledge such assignment
WHEREAS the Parties wish to revise the technical data in the Agreement to take account ofa change in the fuel proposed for the Meghnaghat Power Plant, from Heavy Fuel Oil (HFO)to High Speed Diesel (HSD)
The Parties now agree on this present Addendum n01to the Agreement as modified by theAssignment Agreement.
Addendum 1 to ContractMeghnaghat Power Plant
Recitals
1. This Addendum n01 is issued to revise the Technical part of the Agreement, Section3 "Performance Data", Paragraph 3.1 "Guaranteed Performance" as follows:
In the Technical part of the Contract, Section 3 "Performance Data", Tab 03a, relating toperformance with HFO, paragraph 3.1 "Guarantee Performance" (including 3.1.1) isdeleted and replaced with the new Section 3 attached hereto as Appendix 1.
It is agreed that in the event of the HSD liquid fuel not being in compliance with thelatest revision of the Seller's Liquid Fuel Specification GEI-41047 and with the designbasis of this proposal, Degradation Curves will apply.
2. The definition of EPC Contractor shall be amended as follows:
The First Northeast Electric Power Engineering Co. having its registered office at 40,Wenhua Street, Yinzhou District, Tieling City, Liaoning Province, P.R. China (Postcode12000) along with China National Electric Engineering Co. Ltd of CNEEC Building, No 9,South Shouti Road, Haidian District, Tieling City, Beijing 100048, P.R. China
3. Except as stipulated in this Addendum n~ all the provisions of the Contract shallremain unchanged and in force and shall apply also to this Addendum n~.
4. In the event of any conflict between the contents of this Addendum n01 and thecontents of the Contract, the contents of this Addendum n~ shall prevail.
5. This Addendum n01shall become effective when signed by all Parties.
This Addendum n01has been signed by duly authorised representatives of the Parties:
Signed for and on behalf ofSUMAMIT MEG::G~HATPOWER COMPANY LIMITED
--- ..Na : Mr.
TitleMohammed Faisal Karim Khan
DirectorSummit Meghnaghat Power
Company Limited
Title : Senior ManagerGPO Project Management
Date: Date:
2
Addendum 1 to ContractMeghnaghat Power Plant
Signed for and on behalf ofTHE FIRST NORTHEAST ELECTRICENGINEERING CO.
Signed for and on behalf of. CHINA NATIONAL ELECTRIC
--~!f------------viName: Mr. ~ r'
~.'A ~., I.Title: 'v
3
Addendum 1 to ContractMeghnaghat Power Plant
3. Performance Data3.1 Guaranteed Performance
load Measurement Test HSDCondition tolerance Operation
Gross output at generator 1.00 % 106418terminals (kW)
"'0 Gross Heat Rate at generator 1.00 % 116550 Terminals (kJ/KWh)0~cv1/1 Exhaust Flow at Base load (x101\30 2.00% 1411co kg/hr)
Exhaust Temperature at Base6.0°C 542.4load (OC)
Gross Heat Rate at 80% load at1.00% 12055generator Terminals (kJ/KWh)
"'0
0 Gross Heat Rate at 60% load at0 1.00% 12965~ generator Terminals (kJ/KWh)+-'...0a...
Gross Heat Rate at 40% load atgenerator Terminals (kJ/KWh) 1.00% 15361
Gas Turbine Model PG9171
Heat Rate = Fuel Gas Consumption (LHV)/ Output (kW)
3.1.1 Basis for Unit PerformanceThe performance guarantees listed above are given at the generator terminals andbased on the scope of equipment supply as defined in the proposal and as stated for thefollowing operating conditions and parameters:
4
Addendum 1 to ContractMeghnaghat Power Plant
Measurement Value
Atmospheric pressure mbar 1013
Ambient temperature DC 32
Relative humidity % 85
Inlet system pressure drop mmH20 65
Outlet static pressure @ ISO condition mm 90H2O
HSD Fuel heating value (LHV) kJ/kg 42566
HSD Fuel Temperature DC 27
Combustion system type Conventional
Base load Water injection flow for HSD kg/h 12000
80% Load Water injection flow for HSD kg/h 6266
60% Load Water injection flow for HSD kg/h 3268
40% Load Water injection flow for HSD kg/h 3268
IGV angle at 80% load 86
IGV angle at 60% load 86
IGV angle at 40% load 67.5
Grid frequency Hz 50 Hz
Power factor 0.8
A. The liquid fuel is in compliance with Seller's Liquid Fuel Specification GEI-41047 last revision and with the design basis of this proposal.
B. Gas turbine is operating at steady state base load.C. Tests to demonstrate guaranteed performance shall be conducted in
accordance with the ASME Modified Performance Test Procedure asdefined in Seller's GEK-107551.
D. Gross performance is measured at the generator terminals and includesallowances for excitation power and the equipment shaft-driven by gasturbine normally in operation.
E. Guarantees are based on new and clean condition of the gas turbine. Newand clean condition is defined by the following:
The gas turbine has less than 650 fired hours for natural gas and/orHSD fuel.
The gas turbine has been subjected to an offline water/detergentwash within 25 hours of the performance test.
F. Performance tests shall be carried only for HSD.
5
Addendum 1 to ContractMeghnaghat Power Plant
G. Degradation curves on HSD shall be used as soon as the GT has beenswitched to HSD.
H. Performance curves such as ambient effects curves and generator losscurves will be provided after contract award. These curves along withcorrection factors such as fuel property corrections are to be used duringthe site performance test to correct performance readings back to the siteconditions at which the performance guarantees were provided.
I. Compressor air extraction from gas turbine = o.J. Guarantees are based on the calculated amount of diluent injection
shown in the above Design Basis table. The actual amount of diluentinjection as determined during the field compliance test may be different.which will have an effect on the output and heat rate.
6