+ All Categories
Home > Documents > Additional Information 22 Jan 15

Additional Information 22 Jan 15

Date post: 09-Apr-2017
Category:
Upload: kevin-barraclough
View: 75 times
Download: 4 times
Share this document with a friend
5
Additional Information I have been employed by Dickerman Overseas for over 7 years. DOCCL have been the preferred blasting and painting contractor for Exxon Mobil in the Zafrio Field in Equatorial Guinea since 2006. I have been responsible for the management and supervision and QA/QC of all blasting and painting programs on the Jade platform and FSPO Zafrio Producer for the majority of that time. The work scope over the years on these facilities has been working in hand with the facility Maintenance / Production departments. On the dedicated fabric Maintenance of all oil and gas production live plant flow line process piping, valves, flanges, vessels and associated module steelwork structures. These areas have included drain tanks and pumps, sewage treatment & glycol sump tanks, gas pig launchers, chemical storage modules, slug catcher, electrostatic, production , clean and test vessels, sea water injection pump piping and enclosures, water treating and injection piping. Also I have carried out blasting painting on external turbine generator enclosures, Dehumidifier units, water tanks, and vessel ballast tanks. Heli decks and structure and main deck areas While also carrying out further work scope for the Construction
Transcript
Page 1: Additional Information 22 Jan  15

Additional Information• I have been employed by Dickerman Overseas for over 7 years. DOCCL have been the

preferred blasting and painting contractor for Exxon Mobil in the Zafrio Field in Equatorial Guinea since 2006. I have been responsible for the management and supervision and QA/QC of all blasting and painting programs on the Jade platform and FSPO Zafrio Producer for the majority of that time.

• The work scope over the years on these facilities has been working in hand with the facility Maintenance / Production departments.

• On the dedicated fabric Maintenance of all oil and gas production live plant flow line process piping, valves, flanges, vessels and associated module steelwork structures. These areas have included drain tanks and pumps, sewage treatment & glycol sump tanks, gas pig launchers, chemical storage modules, slug catcher, electrostatic, production , clean and test vessels, sea water injection pump piping and enclosures, water treating and injection piping. Also I have carried out blasting painting on external turbine generator enclosures, Dehumidifier units, water tanks, and vessel ballast tanks. Heli decks and structure and main deck areas

• While also carrying out further work scope for the Construction Department of new fabrication and installation projects of piping, module steel work ,deck plating . Vessels and associated plant on various process areas and deck areas.

• Attached photos of various work carried out.

Page 2: Additional Information 22 Jan  15
Page 3: Additional Information 22 Jan  15
Page 4: Additional Information 22 Jan  15
Page 5: Additional Information 22 Jan  15

Recommended