MDOT SHA District 3 Access/Utility/Sidewalk/Special Event Permit Planned Lane Closure Update for Prince George’s and Montgomery Counties for the Period Starting September 4 (Additional lane closure times and hours may be necessary to expedite all phases of work to keep all projects on schedule; all work performed weather permitting. Real-time traffic information available at www.md511.org or 1-855-466-3511.) Montgomery County Purple Line related utility work-for information on construction activities, schedules and other updates, please visit www.purplelinemd.com/construction. For immediate construction concerns, please email us at [email protected] or call the construction hotline at 240-424-5325. •Washington Gas asphalt work at various locations in Montgomery County through late summer 2020. (Contact: Kevin Bates, 571-327- 6656) (UP) (3234)
Transcript
Page 1: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

MDOT SHA District 3

Access/Utility/Sidewalk/Special Event Permit

Planned Lane Closure Update for

Prince George’s and Montgomery Counties

for the Period Starting September 4

(Additional lane closure times and hours may be necessary to expedite

all phases of work to keep all projects on schedule; all work performed

weather permitting. Real-time traffic information available at

www.md511.org or 1-855-466-3511.)

Montgomery County

• Purple Line related utility work-for information on construction

activities, schedules and other updates, please visit

www.purplelinemd.com/construction. For immediate construction

concerns, please email us at [email protected] or call the

construction hotline at 240-424-5325.

•Washington Gas asphalt work at various locations in Montgomery

County through late summer 2020. (Contact: Kevin Bates, 571-327-

6656) (UP) (3234)

Page 2: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

• MD 28 (Darnestown Road) at MD 124 (Quince Orchard Road).

Water main installation. Single lane closures and north side sidewalk

closures, overnight, Tuesday through Friday 9 p.m. 5 a.m. through

summer 2020. (Contact: Ed Duafala, 202-689-9309) (UP)

• MD 28 (Montgomery Avenue) between Wisconsin Avenue and

Waverly Street. Utility work. Eastbound full lane closures, Monday

through Friday 9 a.m. to 5 p.m. through summer 2020. Jones Bridge

Road will be utilized as one of the detours. (Contact: Anna Nazarova

at [email protected] or 202-437-2702) (UP)

• MD 97 (Georgia Avenue) from Reedie Drive to Price Avenue.

Verizon lambert work. Northbound single lane closures, overnight, 9

p.m. to 5 a.m. Sunday through Thursday through summer 2020.

(Contact: Carl Scheider, 443-750-0653) (UP) (SHA-3-MO-3232-18)

• MD 97 (Georgia Avenue) from Hewitt Avenue to Ralph Road. WSSC

water main replacement. Southbound double lane closures Monday

through Friday 24 hours a day through summer 2020. (Contact: Carlos

Costa, 240-462-8788) (UP)

• MD 108 (Olney Laytonsville Road) at 3415 Olney Laytonsville Road.

Sidewalk and WSSC sewer upgrades. 24/7 sidewalk closures on MD

108 from MD 97 (Georgia Avenue) to the Courts at Olney Commercial

Complex through late summer 2020. (Contact: Geremy Chelius, 631-

827-2838) (UP)

• MD 115 (Muncaster Mill Road) from Redland Road to Jacob Court.

Instillation of DIP and tie-in’s. Eastbound double lane closures,

overnight, 9 p.m. to 5 a.m. Sunday through Thursday through fall 2020.

(Contact: Bijan Haghtalab, 301-933-2249) (UP)

Page 3: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

• MD 118 (Germantown Road) from Aircraft Drive to I-270 Exit Ramp.

Pavement Improvements. Southbound single lane closures, 9 a.m. to 3

p.m. and 8 p.m. to 6 a.m. Saturday through Sunday through summer

2020. (Contact: James Kisner, 240-372- 1733) (UP)

•MD 185 (Connecticut Avenue) southbound and I 495 outer loop of the

beltway at various locations. Drainage, slope repair, concrete, and

asphalt work. Single lane closures Sunday through Saturday 24 hrs

through summer 2020. (Contact: Ryan Graham, 301-252-3574)

(MO1865177) (UP)

• MD 187 (Old Georgetown Road) from Executive Boulevard to

Nicholson Lane. Verizon conduit installation. Northbound and

southbound triple lane closures Sunday through Thursday, overnight, 9

p.m. to 5 a.m. through summer 2020. (Contact: Kyle Kern, 301-343-

5493) (UP) (MO-006-19-DO)

• MD 187 (Old Georgetown Road) from Auburn Avenue to Old

Georgetown Road. Sewer Main Replacement. Southbound single lane

closures overnight 9 p.m. to 5 a.m. through fall 2020. (Contact: Paul

Callahan, 301-304-2008) (UP) (SHA-3-MO-029620)

• MD 187 (Old Georgetown Road) from Executive boulevard to Tilden

Lane. Water valve replacement. Southbound single lane closure,

overnight, 9 p.m. to 5 a.m. Friday through Saturday through summer

2020. (Contact: Leroy Bright, 202-580-9776) (UP) (SHA-3-3235-18)

• Intersections at MD 187 (Old Georgetown Road) and Commerce Lane

and MD 187 (Old Georgetown Road) and Woodmont Avenue. Bruce

and Merrilees slotted conduit installation and water valve operation.

Northbound single lane closures overnight from 9 p.m. to 5 a.m. and

during the day 9 a.m. to 3 p.m. Sunday through Thursday through

summer 2020. (Contact: Joe Fowler (day shift supervisor) 443-299-

7235; George Covert (night shift supervisor) 724-714-9763) (UP)

(MO8695285)

Page 4: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

• MD 190 (River Road) from Gary Road to Chapel Road. Water main

replacement. Eastbound single lane closures, overnight, 9 p.m. to 5

a.m. Sundays through summer 2020. (Contact: Will Kennedy, 785-

341-8760) (UP) (MO-1097-18)

• MD 190 (River Road) at Keokuk Street. Emergency PEPCO work.

Eastbound and westbound single lane closures, 24 hours a day, Monday

through Friday through summer 2020. (Contact: Tami Watkins, 202-

872-3590, [email protected]) (UP)

• MD 190 (River Road) at MD 189 (Falls Road). WSSC excavation to

repair valve. Eastbound single lane closure, overnight, 10 p.m. to 5

a.m. Thursday through Friday through summer 2020. (Contact: Tim

Riddle, 301-575-7953) (UP) (3-3235-18)

• MD 192 (Metropolitan Avenue) from 10542 Metropolitan Avenue to

10500 Saint Paul Street. Utility Upgrade installation. Full closures

with local access only through late summer 2020. (Contact: Paul

Lavanish, 334-221-3225, [email protected]) (UP)

• MD 193 (University Boulevard West) from MD 586 (Veirs Mill Road)

to Valley View Avenue. Building demolition. Westbound single lane

closures and sidewalk closures, 7 a.m. to 4 p.m. Monday through Friday

through late summer 2020. (Contact: Steve Lukaczer, 240-627-9431)

(AP) (SHA-3-MO-0889-19-DO)

• MD 193 (Greenbelt Road) at Cherrywood Lane. Sewer manhole

repair. Westbound double lane closures, overnight, 9 p.m. to 5 a.m.

Monday through Friday through fall 2020. (Contact: Carlton Barnes,

410-206-6031) (UP) (3-3235-18)

• MD 198 (Fort Mead Road) at Layfayette Road. Water main

installation. Eastbound and westbound triple lane closures, overnight,

Monday through Friday, 9 p.m. to 5 a.m. through summer 2020.

(Contact: Hossein Pezeshkan, 301-933-2249) (UP) (PG-0033-18)

Page 5: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

• MD 320 (Piney Branch Drive) from Barron Street to Kodiak Drive.

Rod and underground ID placement. Eastbound single lane closures,

overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

2020. (Contact: James Curtin, 301-356-3893) (UP) (SHA-3-MO-

0096-20)

• MD 355 (Rockville Pike) between Cedar Lane and Jones Bridge Road.

Montgomery County BRAC project. Weekdays between 9 a.m. and 3

p.m., overnight Sunday through Thursday 8 p.m. to 5 a.m. and

occasional weekend lane closures, Friday at 8 p.m. through Monday at 5

a.m. through late 2021. The dedicated right turn lane on westbound

Jones Bridge Road to northbound Rockville Pike will be closed 24/7

through summer 2020. (Contact: Frank Kingsley, MCDOT BRAC

Coordinator [email protected], 240-372-

9949)

• MD 355 (Rockville Pike) from Tuckerman Lane to I-495. Inspection

of aerial utilities. Northbound and southbound double lane closures,

overnight, Sunday through Thursday 9 p.m. to 5 a.m. through summer

2020. (Contact: Raymond Boissonneault, 410-227-6122) (UP) (MO-

1198-19-DO)

• MD 355 (Rockville Pike) from South of King Charles Way to Pooks

Hill Road. WMATA work. Southbound single lane closure at

WMATA track access point, overnight, 9 p.m. to 5 a.m., Saturday

through Sunday through summer 2020) (Contact: Wardell Brown,

202-304-8380) (UP) (13-AD-MO-040-15)

• MD 355 (Rockville Pike) from Beall Avenue to Veirs Mill Road.

Innerduct placement between existing Verizon manholes.

Southbound single lane closures Sunday through Thursday, overnight, 9

p.m. to 5 a.m. through summer 2020. (Contact: Carl Schneider, 443-

750-0653) (UP) (MO-1070-18)

Page 6: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

• MD 355 (Rockville Pike) from Pookes Hill Road to Tuckerman Lane.

WMATA work. Northbound and southbound single lane closures,

overnight, 9 p.m. to 5 a.m. Monday through Friday through late summer

2020. (Contact: Dustin Schicpp, 443-466-7742) (UP)

• MD 355(Rockville Pike) from Church Street to Veirs Mill Road.

Directional Boring Operation. Northbound and southbound double

lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday

through summer 2020. (Contact: Wayne Bradshaw, 301-748-7828)

(SHA-3-MO-0902) (UP)

• MD 355 (N Frederick Avenue) from Chestnut Street to Montgomery

Avenue. Verizon lambert work. Northbound double lane closures,

overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

2020. (Contact: Randy Belmont, 301-356-2524) (UP) (3-3232-18)

• MD 355 (N Frederick Avenue) from MD 117 (West Diamond Avenue)

to North Westland Drive. Sanitary sewer pipe work. Northbound and

southbound double lane closures, overnight, 9 p.m. to 5 a.m. Monday

through Friday through fall 2020. (Contact: Jacob Levine, 443-850-

5523) (UP) (SHA-3-MO-0103-19)

• MD 355 (N Frederick Avenue) at Odendhal Avenue. Paving tie-ins at

interestions of Whetstone Drive and Frederick Avenue. Northbound

double lane closures, overnight, 9 p.m. to 5 a.m. Monday through Friday

through fall 2020. (Contact: Bijan Haghtalab, 301-933-2249) (UP)

(SHA-3-MO-1126-15)

• MD 355 (N Frederick Road) from W Guide Drive to E Guide Drive.

Verizon work. Northbound single lane closures, overnight, 9 p.m. to 5

a.m. Sunday through Thursday through summer 2020. (Contact: Carl

Schneider, 443-750-0653) (UP) (SHA-3-MO-3232-18)

Page 7: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

• MD 355 (S Frederick Avenue) from Cedar Avenue to Frederick

County line. Deep inlet cleaning. Northbound and southbound double

lane closures, overnight, 9 p.m. to 5 a.m. Monday through Friday

through summer 2020. (Contact: Floyd Ford, 443-734-4317) (UP)

(437P31421)

• MD 355 (S Frederick Avenue) from Deer Park Road to North

Westland Drive. Sanitary sewer work. Southbound double lane

closures, overnight, 6 p.m. to 5 a.m. Monday through Friday through fall

2020. (Contact: Jacob Levine, 443-850-5523) (UP) (SHA-3-MO-

0103-19)

• MD 355 (North Frederick Road) project related utility work at

various locations along entire roadway. Northbound and southbound

single lane closures, overnight, 7 p.m. to 6 a.m. Monday through Friday

through summer 2020. (Contact: Jose Sandoval, 301-599-1008)

(UR4MO536)

• MD 355 (Frederick Road) from Cool Brooke Lane to Stringtown Road.

Water line installation and tie-in. Northbound and southbound double

lane closures, overnight, Sunday through Thursday 9 p.m. to 5 a.m.

through summer 2020. (Contact: Dominic Pope, 410-833-9822) (UP)

(SHA-3-MO-0891-19-DO)

• MD 355 (Frederick Road) from Greenbrook Road to Millstone Manor

Lane. Placing maintenance of traffic/traffic markings. Northbound

and southbound single lane closures, overnight, 7 p.m. to 5 a.m. Monday

through Saturday through summer 2020. (Contact: John Carver, 410-

984-0637) (AP) (09-AP-MO-002-17)

• MD 355 (Frederick Road) from Shady Grove Road to Paramount

Drive. Verizon work. Southbound single lane closures, overnight, 9

p.m. to 5 a.m. Sunday through Thursday through summer 2020.

(Contact: Carl Schneider, 443-750-0653) (UP) (SHA-3-MO-3232-18)

Page 8: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

• MD 355 (Rockville Pike) at Rosemont Drive. Waterline

replacement. Northbound left and center lane closures and southbound

left turn lane closures (only close two lanes in one direction at a time),

overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

2020. (Contact: Carlos Batista 703-929-2114) (UP) (MO0004-17)

• MD 355 (Rockville Pike) from Tuckerman Lane to Grosvenor Lane.

Verizon work. Northbound single lane closures, overnight, 9 p.m. to 5

a.m. Sunday through Thursday through late summer 2020. (Contact:

Carl Schneider, 443-750-0653) (SHA-3-MO-3232-18) (UP)

• MD 355 (Rockville Pike) from Park Lane to Beall Avenue. Test

pitting for utilities. Northbound lanes and shoulder closure, overnight,

9 p.m. through 5 a.m. Sunday through Thursday through summer 2020.

(Contact: Michael Markis 571-437-1201) (UP) (MO0149-18)

• MD 355 (Frederick Avenue) at Rosemont Drive. Water line

replacement. Southbound single lane closures, overnight, 9 pm to 5 am

Sunday through Thursday through summer 2020. (Contact: Carlos

Batista, 703-929-2114) (UP) (MO-0004-17)

• MD 355 (Wisconsin Avenue) at 7900 Wisconsin Avenue. Installation

of new crosswalks and sidewalks. West sidewalk and single right lane

closure on Wisconsin Avenue between Chase Avenue and Maple

Avenue through fall 2020. (Contact: James Herbert, 202-590-7352,

[email protected]) (UP)

• MD 355 (Wisconsin Avenue) at Montgomery Avenue. Utility related

asphalt work. Northbound and southbound single lane closures,

overnight, 8 p.m. to 5 a.m. through fall 2020. (Contact: Chris

Fairbanks, 240-398-9109) (UP) (3235)

Page 9: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

• MD 355 (Wisconsin Avenue) between MD 187 (Old Georgetown

Road) and Montgomery Avenue. Crane operation. Single southbound

lane closure, overnight, 9 p.m. to 9 a.m. Saturday through Sunday

through summer 2020. (Contact: Shon Thomas, 240-302-3099) (AP)

• MD 355 (Wisconsin Avenue) from 7351 Wisconsin Avenue to 7359

Wisconsin Avenue. Access permit related work. Right turn lane and

sidewalk closure through summer 2020. All pedestrian traffic will be

directed through overhead protection located in the turn lane. (Contact:

Chris Smith, [email protected], 301-321-3202) (AP)

• MD 355 (Wisconsin Avenue) from Commerce Lane to Middleton

Lane. Long term sidewalk and curb lane closures through summer 2020.

(Contact: Alex Paschalides, 410-365-4466) (UP) (MO-0896-18-DO)

• MD 355 (Wisconsin Avenue) between Elm Street and Bethesda

Avenue. Carr Properties building construction. Southbound single

right lane closures through winter 2019. Sidewalk closures from Elm

Street to 7220 Wisconsin Avenue through summer 2020. (Contact:

David Chaconas, 202-303-3089) (AP)

• MD 355 (Rockville Pike) from Edmonston Drive to Talbot Street.

Aerial Crossing work. Full northbound and southbound lane closures,

overnight, Sunday through Thursday 9 p.m. to 5 a.m. through summer

2020. (Contact: Randy Belmout 301-356-2524) (UP) (MO0487-18)

• MD 355 (Rockville Pike) from Wilson Drive to South Drive.

Roadway Construction. Southbound double lane and shoulder

closures, overnight, from 9 p.m. to 5 a.m. Sunday through Thursday

through summer 2020. (Contact: Sara McAllimer 301-974-2478)

(AP) (MO040-15)

Page 10: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

•MD 355 (Frederick Road) at Brink Road. Private/commercial

intersection reconstruction project. Intermittent single lane closures

on both roads with a flagging operation, weekdays, Monday through

Friday, 9 p.m. to 3 p.m. through summer 2020. (Contact: Mark

Levendusky, Beazer Homes, 301-356-7909,

[email protected]) (09 AP MO 002 17)

•MD 355 (Frederick Road) from West Old Baltimore Road to Brink

Road. Aerial road crossing and shoulder work. Southbound and

northbound double lane closures, overnight, Monday through Friday 9

p.m. to 5 a.m. through summer 2020. (Contact: John Leshinski, 301-

305-3474) (UP) (MO-0703-18)

•MD 355 (Frederick Road) from MD 124 (Montgomery Village

Avenue) to Christopher Avenue. Air vacuum utility test pits.

Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday

through Thursday through summer 2020. (Contact: David Padgett,

443-378-8838) (UP) (MO-0176-19)

•MD 355 (Frederick Road) from Central Avenue to Peony Drive.

Sanitary sewer rehabilitation. Northbound and southbound double

lane closures, overnight, Sunday through Thursday 9 pm to 5 am

through summer 2020. (Contact: Jacob Pierce, 301-325-0678) (UP)

(MO-1034-15)

• MD 355 (Wisconsin Avenue) at Rosemont Drive. Water line

replacement. Southbound double lane closures, overnight, 9 p.m. to 5

a.m. through summer 2020. (Contact: Carlos Batista 703-929-2114)

(UP) (MO0004-17)

• MD 355 (Rockville Pike) from Beall Avenue to Veirs Mill Road.

Innerduct placement between existing Verizon manholes.

Southbound single lane closures, Sunday through Thursday, overnight, 9

p.m. to 5 a.m. through summer 2020. (Contact: Carl Schneider, 443-

952-7009) (UP) (MO-1070-18)

Page 11: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

• MD 650 (New Hampshire Avenue) from Madre Street to Tunis Road.

Aerial pipe placement. Northbound and southbound triple lane

closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday 9 p.m. to

5 a.m. through summer 2020. (Contact: Ronneshia Sheriff, 240-320-

5535) (UP) (SHA-MO-0199-20)

• MD 650 (New Hampshire Avenue) at Poplar Avenue. Sewer manhole

rehabilitation. Northbound double lane closures, overnight, 10 p.m. to

5 a.m. Sunday through Thursday through summer 2020. (Contact:

Alvan Smith, 301-204-4480) (UP) (SHA-3-3235-18)

• MD 650 (New Hampshire Avenue) from US 29 (Columbia Pike) to E

Randolph Road. PEPCO overhead utility maintenance. Northbound

double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through

Thursday through fall 2020. (Contact: Ingrid Reyes, 240-355-2031)

(UP) (SHA-3-3221-18)

• US 29 (Colesville Road) from MD 97 (Georgia Avenue) to Mansion

Drive. Verizon lambert work. Northbound single lane closures,

overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

2020. (Contact: Carl Schneider, 443-750-0653) (UP) (SHA-3-MO-

3232-18)

• US 29 (Colesville Road) from Spring Street to Fenton Street. Tie-in’s

at intersections of Fenton Street and Spring Street and Colesville

Road. Northbound and southbound double lane closures, overnight, 9

p.m. to 5 a.m. Monday through Wednesday late summer 2020.

(Contact: Bijan Haghtalab, 301-300-8535) (UP) (SHA-3-MO-0017)

• US 29 (Colesville Road) at Spring Street. Pepco underground repair

work. Southbound single lane closures 9 a.m. to 3 p.m. Saturdays

through late summer 2020. (Contact: Tami Watkins, 202-872-3590,

[email protected]) (UP)

Page 12: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

• US 29 (Colesville Road) at Fenton Street. Bus pad work.

Northbound single lane closures, overnight, 9 p.m. to 5 a.m. Sunday

through Thursday through summer 2020. (Contact: Mike Hagan, 301-

252-0970) (UP) (18-AP-MO-013-19)

• US 29 (Colesville Road) from Granville Drive to Brewster Avenue.

WSSC water work. Multi lane closures, overnight, 9 p.m. to 5 a.m.

Monday through Friday through summer 2020. (Contact: Enrrique

Lopez, 240-564-5243) (UP)

• US 29 (Colesville Road) from Spring Street to MD 97 (Georgia Avenue). Full lane closures, 9 a.m. to 5 p.m. and 9 p.m. to 5 a.m. Saturday through Sunday through summer 2020. WSSC

work. (Contact: Melanie Deggins, 301-206-8192) (UP) (UR4PG854)

• I-270 from ramp 5 I-270 southbound to Ramp 4 I-270 northbound.

Aerial duct overlash. Northbound and southbound full lane closures 12

a.m. to 12:20 a.m. Sundays through summer 2020. (Contact: Derek

Thomas, 443-277-2589) (MO-0096-17) (UP)

• I-270 at MD 28. Cable crossing for a utility project. Northbound

and southbound 15-minute full lane closures Mondays starting at 12 a.m.

through summer 2020. Maryland State Police will be on site to assist.

(Contact: Derek Thomas, 443-277-2598) (UP)

• I-270 at MD 28 (Montgomery Avenue) from southbound Ramp 5 to

Northbound Ramp 4. Aerial duct overlash. 20-minute full lane

closures starting at 12 a.m. Monday through Friday through summer

2020. (Contact: Derek Thomas, 443-277-2589) (UP) (MO-0096-18)

• I-270 from MD 28 (Montgomery Avenue) to I-370. Geotechnical

Drilling Investigation. Northbound single lane closures, overnight, 9

p.m. to 5 a.m. Monday through Thursday through summer 2020.

(Contact: Ryan Laver, 717-441-2218) (UP) (SHA-3-MO-1093-19-DO

Page 13: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

Prince George’s County

• MD 193 (Enterprise Road) from Kings Valley Drive to MD 214

(Central Avenue). PEPCO Upgrading poles from wood to steel.

Eastbound and westbound multi lane closures Monday through Friday,

overnight, 1 a.m. to 5 a.m. through summer 2020. (Contact: Monica

Kangas, 443-715-2148) (UP) (PG-0532-18)

• MD 193 (Greenbelt Road) from University Boulevard to Rhode Island

Avenue. PEPCO overhead work. Westbound single lane closures

Saturday through Sunday, overnight, 9 p.m. to 5 a.m. through summer

2020. (Contact: John Keller, 301-599-6600) (UP) (3-3221-18)

• MD 201 (Kenilworth Avenue) from MD 410 (East-West Highway) to

Riverdale Road. Gas main replacement. Northbound double lane

closures, overnight, from 9 p.m. to 5 a.m. through summer 2020.

(Contact: Albert Lawrence, 571-359-2436) (UP) (3234-18)

• MD 201 (Kenilworth Avenue) from Sunnyside Avenue to Bever Dam

Road. Aerial Road Crossing. Northbound and southbound double lane

closures, overnight, 1 a.m. to 5 a.m. Sunday through Thursday through

summer 2020. Maryland State Police will be on site to assist. (Contact:

James Curtin, 301-356-3893) (UP) (SHA-3-PG-0840-19)

• MD 201 (Kenilworth Avenue) from the intersection of US 1 and Ikea

Center Boulevard for 200 feet northbound. Hopkins and Wayson, Inc.

construction work. Sidewalk closures through summer 2020.

(Contact: Preston King 443-404-3927) (AP) (PG-028-16)

• MD 201 (Kenilworth Avenue) from MD 193 West (Greenbelt Road) to

MD 193 East (Greenbelt Road). Fiber optic cable installation along

aerial poles. Eastbound and westbound triple lane closures, overnight, 1

a.m. to 5 a.m. Wednesday through Thursday through summer 2020.

(Contact: Heather Zanti, 443-715-2148) (UP) (SHA-3-PG-0126-20)

Page 14: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

• MD 201 (Kenilworth Avenue) from Patterson Street to Riverdale

Road. Sewer work. Southbound single lane closures, overnight,

Sunday through Thursday 9 p.m. to 5 a.m. through summer 2020.

(Contact: Larry Brown, 240-416-5445) (UP) (SHA-3-3235-18)

• MD 202 (Landover Road) from Matthew Henson Avenue to Prospect

Street. Utility pole replacement. Eastbound single lane closures,

overnight, 9 p.m. to 5 a.m. Monday through Friday through summer

2020. (Contact: Alston Pryor, 410-490-6818) (SHA-3-PG-0811-19)

(UP)

• MD 202 (Landover Road) at Arena Drive. Milling and paving.

Southbound single lane closures, overnight, 9 p.m. to 5 a.m. Sunday

through Thursday through summer 2020. (Contact: Matt

Goldsborough, 301-609-3896) (UP) (PG-0201-19)

• MD 202 (Landover Road) on ramp from westbound MD 214 (Central

Avenue). Utility wire pull. Full closure of the ramp, overnight, Sunday

through Monday through summer 2020. A detour will be in place that

will direct motorists from northbound MD 202 onto Campus Way South

for access to MD 202. (Contact: Heather Zanti, 443-715-2148) (UP)

(SHA-3-PG-0529-18) (UP)

• MD 212 (Riggs Road) at Amherst Road. Gas line replacement.

Northbound and southbound double lane closures, overnight, 9 a.m. to 5

a.m. Sunday through Thursday through summer 2020. (Contact:

Albert Lawrence, 571-359-2436) (UP) (SHA-3-PG-0621-18)

• MD 212 (Riggs Road) from Metzerott Road to MD 410 (East-West

Highway). Rodding underground conduit. Northbound and

southbound single lane closures, overnight, Sunday through Thursday 9

p.m. to 5 a.m. through summer 2020. (Contact: James Curtin, 301-

356-3893) (UP) (SHA-3-3232-19)

Page 15: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

• MD 212 (Riggs Road) from Norton Road to Red Top Road. Placing

aerial pipe. Eastbound and westbound triple lane closures, overnight, 9

p.m. to 5 a.m. Sunday through Thursday through summer 2020.

(Contact: Ronneshia Sheriff, 240-320-5535) (UP) (SHA-3-PG-1191-

19)

• MD 212 (Riggs Road) at Beechwood Road. Gas replacement.

Northbound and southbound double lane closures, overnight, 9 p.m. to 5

a.m., Sunday through Thursday through late summer 2020. (Contact:

Bradley Swint, 571-220-2452) (UP) (SHA-3-PG-0074-19)

• MD 212 (Powder Mill Road) from Glenmore Drive to Beltsville Drive.

Water main installation. Southbound double lane closures Monday

through Friday 9 a.m. to 3 p.m. and overnight, Monday through Friday,

8 p.m. to 5 a.m. through summer 2020. (Contact: Douglas Ayala 240-

533-6223) (UP) (PG-0592-16)

• MD 214 (Central Avenue) from Gentry Lane to Stanton Drive.

Upgrading wood poles with new steel poles. Eastbound and westbound

triple lane closures, overnight, 1 a.m. to 5 a.m. Monday through Friday

through summer 2020. (Contact: Monica Kangas, 443-715-2148)

(UP) (PG-0532-18)

• MD 214 (Central Avenue) from Shady Glen Drive to Addison Road.

Utility pole upgrade work. Eastbound and westbound full lane

closures Monday through Friday, overnight, 1 a.m. to 5 a.m. through

summer 2020. (Contact: Monica Kangas, 443-715-2148) (UP) (PG-

0532-18)

• MD 214 (Central Avenue) to Harry S Truman Drive over I-495

(Capital Beltway). Construction of aerial utilities. Full beltway

closures for 20-minute periods, overnight, from 5 p.m. to 1 a.m. through

summer 2020. (Contact: Cheikh Goumbala, 301-669-7526) (UP)

(PG-0285-18)

Page 16: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

• MD 295 (Baltimore-Washington Parkway) ramps at MD 295 and I-495

intersections. Mill and pave. Full ramp closures, overnight, Monday

through Sunday 9 p.m. to 5 a.m. through summer 2020. (Contact:

Chad Brown, 703-371-5009) (693C7-19-C-000018)

• MD 337 (Allentown Road) at Suitland Road. Installation of electric

conduit. Eastbound and westbound multi lane closures, overnight,

Monday through Sunday through summer 2020. (Contact: Rich

Rapolla, 301-444-8181) (UP) (SHA-3-PG-1075-18)

• MD 337 (Allentown Road) at Suitland Road. Utility mill and overlay.

Northbound and southbound multi lane closure 5 a.m. to 7 p.m. Saturday

through Sunday through summer 2020. (Contact: Adam Allen, 240-

304-8773) (UP) (SHA-3-PG-1075-18)

• MD 337 (Allentown Road) at I-95 (exit ramp 9). Red light camera

power conduit work. Southbound single lane closures, overnight, 9:30

p.m. to 4:30 a.m. Thursday through Monday through summer 2020.

(Contact: Gary Panclone, 202-498-4280) (UP) (BW313MB3)

• MD 4 (Pennsylvania Avenue) at Suitland Parkway. Gas line

construction. Northbound and southbound double lane closures,

overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

2020. (Contact: Albert Lawrence, 571-359-2436) (SHA-3-PG-0897-

17) (UP)

• MD 410 (East-West Highway) from Baltimore Avenue to 44th Place.

Rodding conduits. Eastbound double lane closures, overnight, Sunday

to Thursday 9 p.m. to 5 a.m. through fall 2020. (Contact: Ronneshia

Sheriff, 240-320-5535) (UP) (SHA-3-3232-20)

• MD 414 (Oxon Hill Road) from Livingston Road to John Hanson

Lane. PEPCO utility work. Eastbound single lane closures, overnight,

9 p.m. to 5 a.m. through summer 2020. (Contact: John Keller, 301-

599-6600) (UP) (SHA-3-3221-18)

Page 17: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

• MD 450 (Annapolis Road) from 62nd Avenue to 64th Avenue. Gas

main replacement. Westbound multi-lane closures, overnight, 9 p.m.

to 5 a.m. Sunday through Thursday through summer 2020. (Contact:

Rick Stewart, 301-638-7690) (UP) (SHA-3-PG-1017-18)

• MD 501 (Chillum Road) from Burgess Road to Sargent Road.

Private/commercial resurfacing. Single and double eastbound and

westbound lane closures, overnight, Sunday through Thursday, 9 p.m. to

5 a.m. through summer 2020. (Contact: Elmer Sosa, 703.906.4602)

(AP/UP/WGL 3234)

• MD 650 (New Hampshire Avenue) from Ray Road to Eastern Avenue.

Underground transmission line installation. Northbound multi-lane

closures, overnight, Monday through Friday 8 p.m. to 6 a.m. through late

summer 2020. (Contact: [email protected] or 1-833-227-4743)

(UP) (SHA-3-PG-0375-20)

• MD 704 (Martin Luther King Jr. Highway) from Lottsford Vista Road

to MD 450 (Annapolis Road). Storm drain installation. Double lane

closures in both directions and sidewalk closures, Monday through

Friday 9 a.m. to 5 p.m. through summer 2020. (Contact: Juan

Machado, 301-852-3642) (UP) (12appg03718)

• MD 704 (Martin Luther King Jr. Highway) from MD 450 (Annapolis

Road) to Business Parkway. Storm drain installation. Eastbound and

westbound multi lane closures, overnight, 9 p.m. to 5 a.m. Monday

through Friday through summer 2020. (Contact: Osmin Ramirez, 703-

329-2989) (UP) (12APPG03718)

• US 1 (Baltimore Avenue) from Hollywood Road to Lackawanna

Street. Private/commercial asphalt work. Single northbound and

southbound lane closures, overnight, Sunday through Thursday, 9 p.m.

to 5 a.m. through summer 2020. (Contact: Bill Stutzman,

443.468.2555) (AP) (PG-025-14)

Page 18: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

• US 1 (Baltimore Avenue) from Berwyn House Road to Quebec Street.

Sewer work. Southbound single lane closures, overnight, Sunday

through Thursday 9 p.m. to 5 a.m. through summer 2020. (Contact:

Larry Brown, 240-416-5445) (UP) (2-25-2020)

• US 1 (Baltimore Avenue) at Contee Road. Private/commercial

paving work. Single and double southbound lane closures, overnight,

Sunday through Thursday, 8 p.m. to 5 a.m. through summer 2020. (AP)

• US 1 (Baltimore Avenue) from Madison Street to Riverdale Road.

Gas main replacement. Northbound double lane closures, overnight, 7

p.m. to 5 a.m. Sunday through Thursday through fall 2020. (Contact:

Bradley Swint, 571-220-2452) (UP) (SHA-3-PG-0842-19)

• US 1 (Baltimore Avenue) between College Avenue and Melbourne

Place. Verizon utility relocation work. Northbound and southbound

double lane closures Sunday through Thursday 8 p.m. to 11 a.m.,

Monday through Friday 10:00 a.m. to 4:00 p.m., Sunday through

Thursday 7:00 p.m. to 6:00 a.m., and 24 hours a day Saturday through

Sunday through summer 2020. (Contact: Keith Davis, 703-546-0734)

(UR4PG624)

• US 1 (Baltimore Avenue) between MD 193 (University Boulevard)

and Lakeland Road. Gas main replacement. Northbound and

southbound single lane closures, overnight, 7 p.m. to 6 a.m. through

summer 2020. (Contact: Don Weller, 571-364-2048) (PG-0919-18)

• US 1 (Baltimore Avenue) from Lakeland Road to Cherry Hill Road.

Rodding conduits. Northbound single lane closures, overnight,

Monday through Thursday 9 p.m. to 5 a.m. through summer 2020.

(Contact: Lakia Harrison, 443-477-2241) (UP) (SHA-3-PG-0152-20)

Page 19: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

• US 1 (Baltimore Avenue) from Arundel Place to Crittenden Street.

Gas main installation. Northbound single lane closures, overnight, 9

p.m. to 5 a.m. Monday through Friday through summer 2020. (Contact:

Rick Stewart, 301-638-7693) (UP) (PG-1021-18)

• US 1 (Baltimore Avenue) between MD 198 (Gorman Avenue/ Fort

Meade Road) and Bowie Road. Sidewalk repair operation.

Northbound far left lane on US 1 and sidewalk will be closed through

summer 2020. A flagging operation and signage will direct motorists

and pedestrians. (Contact: Eric Sugrue 703-323-1424) (AP) (PG-

0660-18-DO)

• US 1 (Baltimore Avenue) at IKEA Center Boulevard. Water and

sewer installation. Northbound and southbound triple lane closures

Monday through Friday, overnight, 9 p.m. to 5 a.m. through summer

2020. (Contact: Todd Slacum, 443-250-4414) (UP) (14APPAD2816)

• US 1 (Rhode Island Avenue NW) from Farragut Street to Gallatin

Street. Sewer house connection repair. Northbound and southbound

multi lane closures, overnight, from 9 p.m. to 5 a.m. Monday through

Friday through summer 2020. (Contact: Hossein Pezeshkan, 301-379-

5074) (UP) (PG-0721-18)

• US 1 (Washington Boulevard) from Main Street to Prince George’s

Street. New water service installation. Southbound double lane

closures, overnight, from 9 pm to 5 am Tuesday through Thursday

through summer 2020. (Contact: Roger Hunter, 240-625-6469) (UP)

(PG-0744-18)

• US 1(Baltimore Avenue) from IKEA Way to Edgewood Road.

Clipping wire above I-495. Northbound and southbound single lane

closures Monday through Friday, overnight, 10 p.m. to 5 a.m. through

summer 2020. (Contact: Claudio Santos, 717-728-6634) (UP) (3PG-

0877-18)

Page 20: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

• US 1 (Baltimore Avenue) at I-495. Bridge Deck patching.

Southbound double lane closure, overnight, 9 p.m. to 5 a.m. Sunday

through Thursday through summer 2020. (Contact: Fredy Esquivel,

240-480-8441) (AX0647314)

• US 50 (John Hanson Highway) from exit ramp to MD 3 northbound to

on ramp from Melford Drive to MD 3 northbound. Slope failure

improvements. Eastbound single lane closures, overnight, Sunday

through Saturday 9 p.m. to 5 a.m. through summer 2020. (Contact:

Bob Knutson, 443-986-1175)

• US 301 (Crain Highway) at the MD 214 ramps

Patching/milling/paving. Northbound and southbound single lane

closures, overnight, 9 p.m. to 5 a.m. Sunday through Friday through

summer 2020. (Contact: William Certeza, 410-977-9101) (UP)

(UR4PG837)

• US 301 (Crain Highway) from Queen Bridge Road to Central Avenue.

Verizon utility repair. Northbound and southbound full lane closures,

overnight on weekends through summer 2020. (Contact: David Belisle,

410-746-7404) (3230) (UP)

• US 301 (Crain Highway) at Village Drive W. Excavation for gas

work. Southbound double lane closures 24 hours a day 7 days a week

through summer 2020. (Contact: Greg Jensen, 910-303-1548) (UP)

(SHA-3-PG-0403)

• I-95 at MD 212 (Riggs Road) Overhead camera replacement.

Double eastbound lane closures, overnight, from 9 p.m. through 5 a.m.

through summer 2020. (Contact: Mo Gould 443-783-3088) (UP)

(1913)

Page 21: (Additional lane closure times and hours may be necessary ......Verizon lambert work. Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer

• I-95/I-495 (Capital Beltway) outer loop ramp to US 1 (Baltimore

Avenue/X25). Private/commercial water line replacement project.

Intermittent single left and right lane closures, weekdays, 9 a.m. to 3

p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through

summer 2020. (UP) (835/PG0218-16)

• I-95/I-495 (Capital Beltway) from Stansfield Road to Sandy Spring

Road. Inspection of gas line under bridge. Northbound and

southbound double lane closures, overnight, Sunday through Tuesday

through late summer 2020. (Contact: Vincent Kauders, 410-590-

3906) (UP) (SHA-3-3202-18)

• I-95/I-495 (Capital Beltway) outer loop mile marker 0.00 to 1.0.

Paving operation. Northbound double lane closures, overnight, 9 p.m.

to 5 a.m. Sunday through Monday through summer 2020. (Contact:

Watler Sandoval, 571-216-0863) (UP) (08335-WWB BIMS)

• I-95/I-495 (Capital Beltway) Inner Loop at exits 36 and 33.

Inspection of WMATA bridge over I-495. Double right lane closures,

overnight, 9 p.m. to 5 a.m. Monday through Friday through summer

2020. (Contact: Dustin Schicpp, 443-466-7742) (UP)

• I-95/I-495 (Capital Beltway) at Exit 4A (Oxon Hill Road). Bridge

deck patching. Double left lane and right lane closure Sunday through

Friday, 9 p.m. to 5 a.m. through summer 2020. (Contact: Erik Gedoy,

240-426-0696) (UP) (AX0647314)

• I-95/I-495 (Capital Beltway) from MD 295 to MD 414. Pothole

repairs. Northbound and southbound double lane closures Monday

through Friday, overnight, 9 a.m. to 5 a.m. through summer 2020.

(Contact: Walter Sandoval, 571-216-0863) (UP) (08335-

WWBTAMS)