Architect: General Contractor: Scope of Work: Phase of Work: Plans & Engineering $580,000 $580,000 Construction $8,005,000 $8,005,000 FFE $0 $0 Project Support Total $8,585,000 $8,585,000 $0 * FY19 Program Solley ES Crofton Woods ES Fiscal Data Approved Budget * Current Appropriation* Encumbered See following sheet for details See following sheet for details. Project Schedule Marley ES See following sheet for details. Current Status Additions - Various Schools Administrative Data Various Various On-going program to provide additions at various schools. Design and Construction 1 Construction Status October 2018
Transcript
Page 1: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

Architect:General Contractor:Scope of Work:

Phase of Work:

Plans & Engineering $580,000 $580,000Construction $8,005,000 $8,005,000FFE $0 $0Project Support Total $8,585,000 $8,585,000 $0* FY19 Program

Solley ES

Crofton Woods ES

Fiscal Data

Approved Budget *

Current Appropriation*

Encumbered

See following sheet for details

See following sheet for details.

Project Schedule

Marley ESSee following sheet for details.

Current Status

Additions - Various Schools

Administrative DataVariousVariousOn-going program to provide additions at various schools. Design and Construction

1 Construction Status October 2018

Page 2: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

School Project Description

Const. Cost Fiscal Year Ed Specs/ Schematic

Design Dev./ Const

Documents

Start Const.

Substantial Completion

Architect General Contractor

Current Status

6 Classroom Addition

$3,400,000 (Estimate)

FY 2020 Apr-18 Oct-18/ Dec-18 Jul-19 Jul-20Grimm &

ParkerTBD 25%

Gym/Program Addition

$6,843,850 FY 2019 Aug-17Nov-17/ Jan-18

Sep-18 Dec-19 SEI Tech Contracting

1%

4 Classroom Addition

$1,750,000 FY 2018 Apr-16/ Sept-16

Dec-16/ Feb-17

Oct-17 Oct-18 BWH Tech Contracting

99%

6 Classroom Addition

$2,331,200FY 2019/ FY 2020

Apr-16/ Sept-16

Dec-16/ Feb-17

Jul-18 Jul-19 BWH TMI 5%Solley ES

Underground utility installation is ongoing. Fencing and stormwater management devices have been installed to begin building slab grading.

Additions - Various Schools - continued

Schools in Design:

Marley ES

The General Contractor is completing site work and submitting closeout documentation.

Glen Burnie Park ES

Contract awarded at the Board of Education meeting on October 10, 2018.

Schools in Construction:

Crofton Woods ES

Design development approved at the Board of Education meeting on October 10, 2018. Documents are being prepared for State submission.

2 Construction Status October 2018

Page 3: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

Architect: Before AfterConstruction Manager: State Rated Capacity 456 565

Gross Square Footage 56,255 89,253

Phase of Work:

Percent Complete: 62%

Educational Specifications Sep-13 Sep-13 Nov-13Feasibility Study Nov-13 Mar-14 Mar-14Schematic Design Jul-14 Sep-15 Sep-15Design Development Nov-14 Dec-15 Sep-15Bid Award Jan-16 Jan-17 Jan-17Start Construction Apr-16 Apr-17 Apr-17Occupancy Aug-18 Aug-19

Plans & Engineering $3,271,000 $3,271,000 $3,271,000Construction $35,362,000 $35,362,000 $33,084,636FFE $2,104,000 $2,104,000 $33,669Project Support $1,366,000 $1,366,000 $985,931Total $42,103,000 $42,103,000 $37,375,236

The construction of a replacement school for Arnold Elementary School.

Arnold ES - Replacement

Administrative Data Vital StatisticsGWWO ArchitectsJacobs, Inc.

Scope of Work:

Construction

Current Status

Construction of the masonry/brick veneer and roof joists/decking have progressed to 98% complete. Roofing is 65% complete. Exterior windows are 100 % complete. Storefront installations have started and are 45% complete. Interior framing is ongoing.

Project Schedule

Approved EdSpec

Current Actual

Fiscal Data

Approved Budget

Current Appropriation

Encumbered

3 Construction Status October 2018

Page 4: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

Architect: Before AfterConstruction Manager: State Rated Capacity n/a 1,696Scope of Work: Gross Square Footage n/a 275,768

Phase of Work:

Percent Complete: 30%

Educational Specifications May-16 May-16 May-16Feasibility Study n/a n/a n/aSchematic Design Aug-16 Aug-16 Aug-16Design Development Dec-16 Nov-16 Oct-16Construction Documents Aug-17 Aug-17 Aug-17

Bid Award Dec-17 Site Aug-17 Bldg Oct-17

Aug-18

Start Construction Jan-18 Jan-18 Jan-18Occupancy Aug-20 Aug-20

Plans & Engineering $10,078,000 $10,078,000 $6,958,926Construction $114,304,000 $93,700,000 $95,977,462FFE $8,641,000 $5,185,000Project Support $1,812,000 $1,450,000 $113,971Total $134,835,000 $110,413,000 $103,050,359

Approved Budget

Current Appropriation

Encumbered

Fiscal Data

Project Schedule

Approved EdSpec

Current Actual

Construction

Current Status .

Phase 1 - Building site work is 60% complete. Building interior work continues along with plumbing and electrical rough-in activities. Phase 2 - Athletic field site work is 40% complete.

The construction of a new high school to serve Crofton and surrounding communities.

Crofton Area HS - New School

Administrative Data Vital StatisticsGWWO ArchitectsJacobs, Inc.

4 Construction Status October 2018

Page 5: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

Architect: Before AfterConstruction Manager: State Rated Capacity 455 669Scope of Work: Gross Square Footage 52,326 90,617

Phase of Work:

Percent Complete: 1%

Educational Specifications May-16 May-16 May-16Feasibility Study Nov-16 Nov-16 Oct-16Schematic Design Sep-17 Apr-17 May-17Design Development Jan-18 Aug-17 Sep-17Construction Documents Aug-18 Apr-18 Apr-18Bid Award Mar-19 Aug-18 Sep-18Start Construction Apr-19 Oct-18 Oct-18Occupancy Aug-21 Mar-21

Plans & Engineering $3,600,000 $3,600,000 $2,935,554Construction $37,989,000 $15,995,000 $13,332,817FFE $2,300,000Project Support $2,007,000 $803,000 $80,654Total $45,896,000 $20,398,000 $16,349,025

The design and construction for the revitalization of Edgewater Elementary School.

Edgewater ES - Revitalization

Administrative Data Vital StatisticsHord Coplan MachtJ. Vinton Schafer & Sons, Inc.

Construction

Current Status

Bids were opened on August 20, 2018. Contracts were awarded at the Board of Education meeting on September 12, 2018. Construction will start in October, 2018.

Project Schedule

Approved EdSpec

Current Actual

Fiscal Data

Approved Budget

Current Appropriation

Encumbered

5 Construction Status October 2018

Page 6: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

Architect: Before AfterConstruction Manager: State Rated Capacity 322 451

Scope of Work: Gross Square Footage 42,110 74,468

Phase of Work:

Percent Complete: 38%

Educational Specifications Sep-13 Sep-13 Nov-13Feasibility Study Nov-13 Mar-14 Mar-14Schematic Design Jul-14 Jun-16 Jul-16Design Development Nov-14 Oct-16 Oct-16Construction Documents Mar-15 Jan-17 Jan-17Bid Award Jan-16 Jul-17 Jul-17Start Construction Apr-16 Aug-17 Aug-17Occupancy Aug-18 Jan-20

Plans & Engineering $2,855,000 $2,855,000 $2,464,158Construction $30,541,000 $27,527,000 $28,012,595FFE $1,900,000 $1,140,000 $401,788Project Support $964,000 $744,000 $13,585Total $36,260,000 $32,266,000 $30,892,126

The revitalization of George Cromwell Elementary School.

George Cromwell ES - Revitalization

Administrative Data Vital StatisticsHord Coplan MachtOak Contracting, LLC

Construction

Current Status

George Cromwell ES is a 4 phase project. Phase 1, which includes the main entrance, classrooms, gym, cafeteria and kitchen, is 99% complete. Punch items being completed during non-school hours. Phase 2, which includes classroom renovation and a new media center is 25% complete. Mechanical, electrical and plumbing rough-in work is ongoing. Window installation has started and structural steel installation is continuing. Phases 3 and 4 have not started.

Project Schedule

Approved EdSpec

Current Actual

Fiscal Data

Approved Budget

Current Appropriation

Encumbered

6 Construction Status October 2018

Page 7: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

Architect: Before AfterConstruction Manager: State Rated Capacity 574 747Scope Of Work: Gross Square Footage 75,764 98,681

Phase of Work:

Percent Complete: 57%

Educational Specifications Jun-14 Jun-14 Jun-14Feasibility Study Sep-14 Sep-14 Sep-14Schematic Design Jan-14 Sep-15 Sep-15Design Development May-15 Dec-15 Dec-15Construction Documents Nov-15 Aug-16 May-16Bid Award Mar-16 Dec-16 Dec-16Start Construction Jun-16 Apr-17 Apr-17Occupancy Aug-18 Aug-19

Plans & Engineering $3,500,000 $3,500,000 $2,457,269Construction $33,801,000 $33,801,000 $34,400,236FFE $2,301,000 $2,301,000 $722,613Project Support $923,000 $923,000 $20,805Total $40,525,000 $40,525,000 $37,600,923

Approved Budget

Current Appropriation

Encumbered

Fiscal Data

Project Schedule

Approved EdSpec

Current Actual

Construction

Current Status

High Point ES is a 3 phase project that includes subphasing to allow construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during non-school hours. Phase 2A, which includes the new Administrative Suite, is 28% complete. Underground utility rough-ins are ongoing. Phase 2B, which includes the before- and after-care addition and existing kitchen renovation, is 60% complete. Phase 2C, 3A and 3B are anticipated to start in December 2018, Spring of 2019, and Summer of 2019, respectively.

The construction of the modernization of High Point Elementary School.

High Point ES - Modernization

Administrative Data Vital StatisticsSmolen, Emr, Ilkovitch & Associates (SEI)J. Vinton Schafer & Sons, Inc.

7 Construction Status October 2018

Page 8: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

Architect: Before AfterConstruction Manager: State Rated Capacity 435 782Scope of Work: Gross Square Footage 83,686 98,879

Phase of Work:

Percent Complete: 32%

Educational Specifications Sep-13 Sep-13 Nov-13Feasibility Study Nov-13 Mar-14 Mar-14Schematic Design Jul-14 Sep-15 Sep-15Design Development Nov-14 Dec-15 Dec-15Construction Documents Mar-15 Oct-16 Dec-16Bid Award Jan-16 Feb-17 Feb-17Start Construction Apr-16 Apr-17 Jun-17Occupancy Aug-18 Aug-19

Plans & Engineering $3,477,000 $3,477,000 $2,540,346Construction $41,632,000 $41,632,000 $32,441,884FFE $2,418,000 $2,418,000Project Support $982,000 $982,000 $244,900Total $48,509,000 $48,509,000 $35,227,130

Approved Budget

Current Appropriation

Encumbered

Fiscal Data

Project Schedule

Approved EdSpec

Current Actual

Construction

Current Status

The site work grading, utilities, concrete foundations, interior walls, steel erection, and roofing construction actives are ongoing. Wet soil conditions have impacted grading operations. Anne Arundel County Public School staff, the Department of Public Works, and the State Highway Administration are working collaboratively to finalize the design of an access driveway to MD 175.

The construction of a replacement school for Jessup Elementary School.

Jessup ES - Replacement

Administrative Data Vital StatisticsGrimm + Parker ArchitectsHeery International, Inc.

8 Construction Status October 2018

Page 9: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

Architect:General Contractor:Scope Of Work:

Phase of Work:

Plans & Engineering $600,000 $600,000Construction $6,250,000 $6,250,000FFE $450,000 $450,000Project Support $200,000 $200,000Total $7,500,000 $7,500,000 $0* FY19 Program

Maryland City ES

Current Status

Kindergarten Additions - Various Schools

Administrative DataVariousVariousOn-going program to provide kindergarten classroom additions at various schools. Design and Construction

See following sheet for details.

Project Schedule

See following sheet for details.

Fiscal Data Park ES

Approved Budget *

Current Appropriation *

Encumbered

See following sheet for details

Linthicum ES

9 Construction Status October 2018

Page 10: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

School Project Description Const. Cost Fiscal Year Ed Specs/ Schematic

Design Dev./ Const Cost

Start Const.

Substantial Completion

Architect General Contractor

Current Status

6 Classroom Addition$3,600,000 (Estimate)

FY 2020 Apr-18 Oct-18 Jul-19 Jul-20 TCA TBD 30%

4 Classroom Addition$2,800,000 (Estimate)

FY 2020 Apr-18 Oct-18 Jul-19 Jul-20 HCM TBD 30%

4 Classroom Addition $3,471,000 FY 2018 Apr-16/ Sept-16

Dec-16/ Feb-17

Jul-17 Jul-18 WRA Towson Mechanical

99%

6 Classroom Addition $2,422,300 FY 2018 Apr-16/ Apr-17

Dec-16/ Feb-17

Jul-17 Mar-18 TCA Tuckman Barbee

99%

4 Classroom Addition $2,513,180 FY 2018 Apr-17 Jul-17 Jul-18 Aug-19 WGMNorth Point

Builders10%

5 Classroom Addition $3,331,000 FY 2018Apr-17/ Sept-17

Oct-17 Jun-18 May-19 SEIWilliam F

Klingersmith25%

Riviera Beach ES

Maryland City ES

Millersville ES

Shady Side ES

The addition was occupied on March 15, 2018. The project is currently under warranty and in closeout.

Contractor is currently installing site utilities and building foundations.

Contractor is currently installing site utilities and building foundations.

Kindergarten Additions at Various Schools

Linthicum ES

Schools in Design:

Park ES

Schools in Construction:

Design development approved at Board of Education meeting on October 10, 2018. Documents being prepared for State submission.

Design development approved at Board of Education meeting on October 10, 2018. Documents being prepared for State submission.

Punch list items are being completed.

10 Construction Status October 2018

Page 11: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

Architect: Before AfterConstruction Manager: State Rated Capacity 529 454Scope Of Work: Gross Square Footage 72,267 70,934

Phase of Work:

Percent Complete: 60%

Educational Specifications Jun-14 Jun-14 Jun-14Feasibility Study Sep-14 Sep-14 Sep-14Schematic Design Jan-15 Jan-15 Sep-15Design Development May-15 May-15 Dec-15Construction Documents Nov-15 Aug-16 Dec-16Bid Award Mar-16 Jan-17 Jan-17Start Construction Jun-16 Apr-17 Apr-17Occupancy Aug-18 Aug-19

Plans & Engineering $2,962,000 $2,962,000 $1,821,691Construction $28,620,000 $28,620,000 $27,521,646FFE $1,926,000 $1,926,000 $845,962Project Support $891,000 $891,000 $31,284Total $34,399,000 $34,399,000 $30,220,583

Approved Budget

Current Appropriation

Encumbered

Fiscal Data

Project Schedule

Approved EdSpec

Current Actual

Manor View is a 6 phase project that includes subphasing to allow construction to continue during non-instructional periods of the year. Phase 1A- Pod 3/4 is 99% complete and occupied. Phase 1B-Main Corridor is 50% complete and will be ongoing until June 2019. Phase 2- Pod 5/6 is 99% complete. Punch list work is ongoing. Phase 3A- Pod 1/2 is 98% complete and occupied. Punch list work is ongoing. Phase 3B- Administrative Suite, Gym Addition are 90% complete. Phase 4- Administrative Suite interior, Cafeteria, Kitchen, Gym interior, courtyard Roof Demolition are 60% complete. Phase 5-Courtyard is 30% complete. Phase 6- Elective have anticipated a January 2019 start.

The revitalization of Manor View Elementary School.

Manor View ES - Revitalization

Administrative Data Vital StatisticsWGM Architects Whiting-Turner Construction Co.

Construction

Current Status

11 Construction Status October 2018

Page 12: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

Architect:General Contractor:Scope of Work:

Phase of Work:

Plans & Engineering $0 $0Construction $8,000,000 $8,000,000FFE $0 $0Project Support Total $8,000,000 $8,000,000 $0* FY19 Program

Current Status

Open Space Enclosures - Various Schools

Administrative DataVariousVarious

Provide full height walls, modification of ceilings, lighting systems, fire alarms, public address systems, and HVAC systems as required.

Design and Construction

See following sheet for details.

Project Schedule

See following sheet for details.

Fiscal Data Chesapeake Bay MS

Approved Budget*

Current Appropriation*

Encumbered

See following sheet for details

Brock Bridge ES

Chesapeake HS

12 Construction Status October 2018

Page 13: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

School Const. Cost Fiscal YearEd Specs/ Schematic

Design Dev./ Const Doc.

Start Const.

Substantial Completion

ArchitectGeneral

ContractorCurrent Status

$2,984,500 FY 2018Apr-16/ Feb-17

Dec-16/ Feb-17

Jul-17 Mar-19 TCABaltimore

Contractors66%

$6,569,888 FY 2018 Nov-15 Apr-18 Oct-18 Sep-20 WGMBaltimore

Contractors1%

$6,268,800 FY 2017 Jun-15 May-16 Aug-16 Aug-18 BWHE. Pikounis

Constr. Co. Inc. 99%

$2,892,000 FY 2018Apr-16/ Feb-17

Dec-16/ Feb-17

Jul-17 Aug-18 TCATuckman Barbee

96%Shady Side ES

Project is substantially complete and occupied.

Open Space Enclosures at Various Schools

Chesapeake HS

All 8 construction phases are complete; punchlist and closeout are progressing. Project was completed 9 months ahead of schedule.

Brock Bridge ES

Phases 1 and 2 of this 3 phase project are complete. Phase 3 started in late Summer 2018.

Chesapeake Bay MS

Contract awarded at the Board of Education meeting on October 10, 2018. Contractor is mobilizing.

Schools in Construction:

13 Construction Status October 2018

Page 14: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

Architect: Before AfterConstruction Manager: State Rated Capacity 479 509Scope of Work: Gross Square Footage 61,000 81,000

Phase of Work:

Percent Complete: 2%

Educational Specifications May-16 May-16 May-16Feasibility Study Oct-16 Oct-16 Oct-16Schematic Design Sep-17 Apr-17 May-17Design Development Dec-17 Jul-17 Sep-17Construction Documents Aug-18 Feb-18 Mar-18Bid Award Feb-19 Aug-18 Aug-18Start Construction Apr-19 Sep-18 Oct-18Occupancy Aug-21 Sep-20

Plans & Engineering $3,248,000 $3,248,000 $2,657,633Construction $33,401,000 $15,401,000 $11,991,987FFE $2,026,000Project Support $1,114,000 $446,000 $492,948Total $39,789,000 $19,095,000 $15,142,568

The design and construction for the revitalization of Richard Henry Lee Elementary School.

Richard Henry Lee ES - Revitalization

Administrative Data Vital StatisticsGrimm + Parker Architects Whiting-Turner Contracting Co.

Construction

Current Status

Anne Arundel County building and grading permits have been issued and asbestos abatement is ongoing. Construction contracts were awarded at the August 22, 2018 and September 12, 2018 Board of Education Meetings. Richard Henry Lee ES has begun its two year occupancy of the temporary swing spaces at Corkran MS & Oakwood ES.

Project Schedule

Approved EdSpec

Current Actual

Approved Budget

Current Appropriation

Encumbered

Fiscal Data

14 Construction Status October 2018

Page 15: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

Architect: Before AfterConstruction Manager: State Rated Capacity 1,805 2,141Scope of Work: Gross Square Footage 296,191 354,162

Phase of Work:

Percent Complete: 99%

Educational Specifications Jul-10 Jul-10 Jul-10Feasibility Study Jul-10 Feb-11 Feb-11Schematic Design Mar-12 Mar-12 Mar-12Design Development Sep-12 Oct-12 Oct-12Construction Documents Feb-13 May-13 May-13Bid Award May-13 Jan-14 Feb-14Start Construction Aug-13 May-14 Jun-14Occupancy Feb-16 Bldg Jan-17/Site Mar-18 Bldg Jan-17/Site Mar-18

Plans & Engineering $7,722,000 $7,722,000 $7,595,284Construction $107,314,000 $107,314,000 $105,980,979FFE $3,566,000 $3,566,000 $3,046,539Project Support $563,000 $563,000 $562,201Total $119,165,000 $119,165,000 $117,185,003

The construction of a replacement school for Severna Park High School.

Severna Park HS - Replacement

Administrative Data Vital StatisticsGWWOOak Contracting, LLC

Construction

Current Status

Phase 2 landscaping will continue this fall. Project is in closeout.

Project Schedule

Approved EdSpec

Current Actual

Approved Budget

Current Appropriation

Encumbered

Fiscal Data

15 Construction Status October 2018

Page 16: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

Architect:

General Contractor:

Scope of Work:

Phase of Work:

Plans & Engineering $1,400,000 $1,400,000Construction $15,794,000 $15,794,000FFEProject Support Total $17,194,000 $17,194,000 $0* FY19 Program

Current Status

Systemic Project - Various Schools - Building Systemics

Administrative DataVarious

Various

Building Systemics - Various Schools

Design and Construction

Project Schedule

See following sheet for details.

See following sheet for details.

See following sheet for details

Fiscal Data

Approved Budget*

Current Appropriation*

Encumbered

Arundel MS

Bodkin ES

Annapolis MS

16 Construction Status October 2018

Page 17: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

SchoolProject

DescriptionConst. Cost Fiscal Year Const. Doc. Start Const.

Substantial Completion

EngineerGeneral

ContractorCurrent Status

Roof Replacement $69,278 FY 2020 TBD TBD TBD Gale Associates TBD 0%

Roof Replacement $57,700 FY 2019 TBD TBD TBDFacility

EngineeringTBD 12%

Building Systemics - Various Schools

Maryland City ES

West Meade ES

Schools in Design:

17 Construction Status October 2018

Page 18: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

SchoolProject

DescriptionConst. Cost Fiscal Year Const. Doc. Start Const.

Substantial Completion

EngineerGeneral

ContractorCurrent Status

HVAC/Windows$18,939,300

(Estimate)FY 2019 Feb-18 Nov-18 Mar-20

James Posey Associates, Inc.

TBD 0%

Roof Replacement $3,182,000 FY 2019 Jan-18 Jun-18 Aug-19 Gail Associates Vatica 50%

Roof Replacement $1,189,990 FY 2018 Jan-17 Jun-17 Aug-18 Colmore. Inc Vatica 98%

HVAC $3,897,000 FY 2019 Jan-18 Jun-18 Aug-19Gannett -Fleming

Towson Mechanical

35%

Roof Replacement $1,534,000 FY 2018/2019 Sep-17 Jun-18 Aug-19 Gail Associates Vatica 45%

HVAC, Ceiling & Lights

$17,146,000 FY 2016 n/a Feb-16 Dec-18James Posey

Associates, Inc.Phillips Way,

Inc.99%

Windows & HVAC $3,529,000 FY 2017 Dec-15 Jun-16 Aug-17 JMTHeer Brothers,

Inc.99%

Roof Replacement $40,221,401 FY 2018 Feb-17 Jun-17 Aug-19 Gale Associates Vatica 85%

HVAC, Ceiling & Lights

$11,758,646 FY 2015 n/a Jun-14 Aug-17 JMTPhillips Way,

Inc.100%

HVAC Replacement

$3,739,000 FY 2018 Dec-16 Jun-17 Aug-18 JMT TMI 97%

HVAC Replacement

$4,302,134 FY 2018 Dec-16 Jun-17 Oct-18James Posey

Associates, Inc.Maryland

Mechanical85%

Building Systemics - Various Schools

Arundel MS

Project is in closeout.

Bodkin ES

Schools in Construction:

Phase 1 of 2 is complete, Phase 2 of 2 will resume in June 2019.

The new mechanical room walls and steel have been erected. Evening work continues throughout building.

Bid opening was on October 2, 2018. Construction is schedule to start in November 2018.

Annapolis MS

Broadneck ES

Wrapping up Phase 1 work during non-instructional hours. Phase 2 of 2 will resume in June 2019.

Belvedere ES

MacArthur MS

Commissioning is ongoing at 99%.

Millersville ES

Finalizing boiler conversion. Working on punchlist.

Woodside ES

Boiler start up scheduled. Chiller and enclosure installation is underway.

Maryland City ES

Project is in closeout.

Meade MS

Shingles and windows are complete. Metal and panel installation in progress. Phase 3 of 3 to resume in June 2019.

Meade HS

Final payment processed. This is the last report for this project.

18 Construction Status October 2018

Page 19: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

Architect:General Contractor:Scope of Work:

Phase of Work:

Plans & Engineering $70,000 $70,000Construction $429,000 $429,000FFEProject Support Total $499,000 $499,000 $0* FY19 Program

Broadneck HS

Four Seasons ES

Fiscal Data

Approved Budget*

Current Appropriation*

Encumbered

Broadneck ES

See following sheet for details

Project Schedule

See following sheet for details.

Current Status

See following sheet for details.

Systemic Project -TIMS Electrical Upgrades

Administrative DataVarious

Design and Construction

VariousElectrical system distribution upgrade projects at selected schools.

19 Construction Status October 2018

Page 20: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

SchoolProject

DescriptionConst. Cost Fiscal Year Const. Doc. Start Const.

Substantial Completion

EngineerGeneral

ContractorCurrent Status

TIMS $44,432 FY 2019 Feb-19 Jun-19 Aug-19 JMT N/A 10%

SchoolProject

DescriptionConst. Cost Fiscal Year Const. Doc. Start Const.

Substantial Completion

EngineerGeneral

ContractorCurrent Status

TIMS $137,000 FY 2018 Feb-18 Aug-18 Apr-19 BKM Action Electric 15%

TIMS $118,000 FY 2018 Feb-18 Aug-18 Apr-19 BKM Action Electric 90%

Installing branch circuits and panels.

Installing branch circuits and panels.

Broadneck HS

Design is underway.

TIMS Electric - Various Schools

Schools in Design:

Schools in Construction:

Broadneck ES

Four Seasons ES

20 Construction Status October 2018

Page 21: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

Architect: Before AfterConstruction Manager: State Rated Capacity 479 549Scope of Work: Gross Square Footage 45,813 84,896

Phase of Work:

Percent Complete: 1%

Educational Specifications May-16 May-16 May-16Feasibility Study Oct-16 Oct-16 Oct-16Schematic Design Sep-17 Apr-17 May-17Design Development Dec-17 Jul-17 Sep-17Construction Documents Aug-18 Jan-18 May-18Bid Award Feb-19 Aug-18 Sep-18Start Construction Apr-19 Oct-18Occupancy Aug-21 Dec-20

Plans & Engineering $3,464,000 $3,464,000 $3,229,300Construction $30,015,000 $15,007,000 $454,319FFE $2,137,000Project Support $1,481,000 $592,000 $32,592Total $37,097,000 $19,063,000 $3,716,211

The design and construction for the revitalization of Tyler Heights Elementary School.

Tyler Heights - Revitalization

Administrative Data Vital StatisticsTCAHeery International, Inc.

Construction

Current Status

Permit process is ongoing. Construction contracts were awarded at the Board of Education meeting on September 12, 2018.

Project Schedule

Approved EdSpec

Current Actual

Fiscal Data

Approved Budget

Current Appropriation

Encumbered

21 Construction Status October 2018

Page 22: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

MAJOR SUBDIVISIONS REVIEWED IN THE MONTHS OF JULY THRU SEPTEMBER, 2018

Project

Project Status

Number/Type of Units

Number of

Students

School

A Hanover Landing Sketch 93 TH 60 condos 747 Apts. (404 2+ BR)

101 58 63

Linthicum Elementary Lindale Middle North County High

B Chestnut Avenue Property

Final 64 TH 17 5 6

Jessup Elementary Meade Middle Meade High

B Shannon’s Glen Final 159 TH 364 Apts. (286 2-3 BR)

115 35 43

Jessup Elementary Meade Middle Meade High

C Parkside Final 110 TH

28 9 11

Meade Heights Elementary MacArthur Middle Meade High

D Sabrina Park, Phase 3

Final 18 SF

5 2 3

Oak Hill Elementary Severna Park Middle Severna Park High

E Creekstone Village, Sec. 3

Final/ Modification

216 Apt (151 2-3 BR)

28 10 14

Freetown Elementary Marley Middle Glen Burnie High

E Tanyard Preserve Final 25 SF 5 2 2

Freetown Elementary Marley Middle Glen Burnie High

F Enclave at Severna Park Sketch 12 SF

3 2 2

Folger McKinsey Elem. Severna Park Middle Severna Park High

F Robinson Landing SDP 8 SF (net 7)

2 1 1

Folger McKinsey Elem. Severna Park Middle Severna Park High

G McNamara Family Trust Prop.

Sketch 14 SF 2 1 2

Bodkin Elementary Chesapeake Bay Middle Chesapeake High

H 61 E. Joyce Ln. Subdivision

Sketch 29 SF (net 27)

5 3 4

Arnold Elementary Severn River Middle Broadneck High

I 839 Bestgate Road SDP 127 Apts. 59 2-3 BR

8 3 4

Rolling Knolls Elementary Bates Middle Annapolis High

I 2555 Riva Road Sketch 250 Apts. (112 2 BR)

16 6 7

Rolling Knolls Elementary Bates Middle Annapolis High

Page 23: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

J Magnolia Cove Final 4 SF 1 1 1

Hillsmere Elementary Annapolis Middle Annapolis High

Development Process (Project Status)

Sketch: Developer refines the concept drawing to include the location of housing units on a lot, streets, sidewalks, and public spaces. This is a topographic line drawing that receives in-depth comments from the County review team. School capacities and the student population likely to be attributable to this development are recalculated. Site Development Plan: Applies to properties that will not be subdivided into individual lots, principally commercial and multi-family projects such as condominiums and apartments. Used to address APFO conformity. School capacities and the student population likely to be attributable to this development are recalculated. Final: Developer submits a detailed plan that addresses all of the County review team comments. Once a developer receives Final Submission Approval, applications for waivers and permits are submitted.

Page 24: Additions - Various Schools · 2018. 10. 26. · construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during

D

Project Reviews for July—September 2018

Anne Arundel County Subdivision Review

A

B E

G

F

C

H

I

J


Recommended