Architect:General Contractor:Scope of Work:
Phase of Work:
Plans & Engineering $580,000 $580,000Construction $8,005,000 $8,005,000FFE $0 $0Project Support Total $8,585,000 $8,585,000 $0* FY19 Program
Solley ES
Crofton Woods ES
Fiscal Data
Approved Budget *
Current Appropriation*
Encumbered
See following sheet for details
See following sheet for details.
Project Schedule
Marley ESSee following sheet for details.
Current Status
Additions - Various Schools
Administrative DataVariousVariousOn-going program to provide additions at various schools. Design and Construction
1 Construction Status October 2018
School Project Description
Const. Cost Fiscal Year Ed Specs/ Schematic
Design Dev./ Const
Documents
Start Const.
Substantial Completion
Architect General Contractor
Current Status
6 Classroom Addition
$3,400,000 (Estimate)
FY 2020 Apr-18 Oct-18/ Dec-18 Jul-19 Jul-20Grimm &
ParkerTBD 25%
Gym/Program Addition
$6,843,850 FY 2019 Aug-17Nov-17/ Jan-18
Sep-18 Dec-19 SEI Tech Contracting
1%
4 Classroom Addition
$1,750,000 FY 2018 Apr-16/ Sept-16
Dec-16/ Feb-17
Oct-17 Oct-18 BWH Tech Contracting
99%
6 Classroom Addition
$2,331,200FY 2019/ FY 2020
Apr-16/ Sept-16
Dec-16/ Feb-17
Jul-18 Jul-19 BWH TMI 5%Solley ES
Underground utility installation is ongoing. Fencing and stormwater management devices have been installed to begin building slab grading.
Additions - Various Schools - continued
Schools in Design:
Marley ES
The General Contractor is completing site work and submitting closeout documentation.
Glen Burnie Park ES
Contract awarded at the Board of Education meeting on October 10, 2018.
Schools in Construction:
Crofton Woods ES
Design development approved at the Board of Education meeting on October 10, 2018. Documents are being prepared for State submission.
2 Construction Status October 2018
Architect: Before AfterConstruction Manager: State Rated Capacity 456 565
Gross Square Footage 56,255 89,253
Phase of Work:
Percent Complete: 62%
Educational Specifications Sep-13 Sep-13 Nov-13Feasibility Study Nov-13 Mar-14 Mar-14Schematic Design Jul-14 Sep-15 Sep-15Design Development Nov-14 Dec-15 Sep-15Bid Award Jan-16 Jan-17 Jan-17Start Construction Apr-16 Apr-17 Apr-17Occupancy Aug-18 Aug-19
Plans & Engineering $3,271,000 $3,271,000 $3,271,000Construction $35,362,000 $35,362,000 $33,084,636FFE $2,104,000 $2,104,000 $33,669Project Support $1,366,000 $1,366,000 $985,931Total $42,103,000 $42,103,000 $37,375,236
The construction of a replacement school for Arnold Elementary School.
Arnold ES - Replacement
Administrative Data Vital StatisticsGWWO ArchitectsJacobs, Inc.
Scope of Work:
Construction
Current Status
Construction of the masonry/brick veneer and roof joists/decking have progressed to 98% complete. Roofing is 65% complete. Exterior windows are 100 % complete. Storefront installations have started and are 45% complete. Interior framing is ongoing.
Project Schedule
Approved EdSpec
Current Actual
Fiscal Data
Approved Budget
Current Appropriation
Encumbered
3 Construction Status October 2018
Architect: Before AfterConstruction Manager: State Rated Capacity n/a 1,696Scope of Work: Gross Square Footage n/a 275,768
Phase of Work:
Percent Complete: 30%
Educational Specifications May-16 May-16 May-16Feasibility Study n/a n/a n/aSchematic Design Aug-16 Aug-16 Aug-16Design Development Dec-16 Nov-16 Oct-16Construction Documents Aug-17 Aug-17 Aug-17
Bid Award Dec-17 Site Aug-17 Bldg Oct-17
Aug-18
Start Construction Jan-18 Jan-18 Jan-18Occupancy Aug-20 Aug-20
Plans & Engineering $10,078,000 $10,078,000 $6,958,926Construction $114,304,000 $93,700,000 $95,977,462FFE $8,641,000 $5,185,000Project Support $1,812,000 $1,450,000 $113,971Total $134,835,000 $110,413,000 $103,050,359
Approved Budget
Current Appropriation
Encumbered
Fiscal Data
Project Schedule
Approved EdSpec
Current Actual
Construction
Current Status .
Phase 1 - Building site work is 60% complete. Building interior work continues along with plumbing and electrical rough-in activities. Phase 2 - Athletic field site work is 40% complete.
The construction of a new high school to serve Crofton and surrounding communities.
Crofton Area HS - New School
Administrative Data Vital StatisticsGWWO ArchitectsJacobs, Inc.
4 Construction Status October 2018
Architect: Before AfterConstruction Manager: State Rated Capacity 455 669Scope of Work: Gross Square Footage 52,326 90,617
Phase of Work:
Percent Complete: 1%
Educational Specifications May-16 May-16 May-16Feasibility Study Nov-16 Nov-16 Oct-16Schematic Design Sep-17 Apr-17 May-17Design Development Jan-18 Aug-17 Sep-17Construction Documents Aug-18 Apr-18 Apr-18Bid Award Mar-19 Aug-18 Sep-18Start Construction Apr-19 Oct-18 Oct-18Occupancy Aug-21 Mar-21
Plans & Engineering $3,600,000 $3,600,000 $2,935,554Construction $37,989,000 $15,995,000 $13,332,817FFE $2,300,000Project Support $2,007,000 $803,000 $80,654Total $45,896,000 $20,398,000 $16,349,025
The design and construction for the revitalization of Edgewater Elementary School.
Edgewater ES - Revitalization
Administrative Data Vital StatisticsHord Coplan MachtJ. Vinton Schafer & Sons, Inc.
Construction
Current Status
Bids were opened on August 20, 2018. Contracts were awarded at the Board of Education meeting on September 12, 2018. Construction will start in October, 2018.
Project Schedule
Approved EdSpec
Current Actual
Fiscal Data
Approved Budget
Current Appropriation
Encumbered
5 Construction Status October 2018
Architect: Before AfterConstruction Manager: State Rated Capacity 322 451
Scope of Work: Gross Square Footage 42,110 74,468
Phase of Work:
Percent Complete: 38%
Educational Specifications Sep-13 Sep-13 Nov-13Feasibility Study Nov-13 Mar-14 Mar-14Schematic Design Jul-14 Jun-16 Jul-16Design Development Nov-14 Oct-16 Oct-16Construction Documents Mar-15 Jan-17 Jan-17Bid Award Jan-16 Jul-17 Jul-17Start Construction Apr-16 Aug-17 Aug-17Occupancy Aug-18 Jan-20
Plans & Engineering $2,855,000 $2,855,000 $2,464,158Construction $30,541,000 $27,527,000 $28,012,595FFE $1,900,000 $1,140,000 $401,788Project Support $964,000 $744,000 $13,585Total $36,260,000 $32,266,000 $30,892,126
The revitalization of George Cromwell Elementary School.
George Cromwell ES - Revitalization
Administrative Data Vital StatisticsHord Coplan MachtOak Contracting, LLC
Construction
Current Status
George Cromwell ES is a 4 phase project. Phase 1, which includes the main entrance, classrooms, gym, cafeteria and kitchen, is 99% complete. Punch items being completed during non-school hours. Phase 2, which includes classroom renovation and a new media center is 25% complete. Mechanical, electrical and plumbing rough-in work is ongoing. Window installation has started and structural steel installation is continuing. Phases 3 and 4 have not started.
Project Schedule
Approved EdSpec
Current Actual
Fiscal Data
Approved Budget
Current Appropriation
Encumbered
6 Construction Status October 2018
Architect: Before AfterConstruction Manager: State Rated Capacity 574 747Scope Of Work: Gross Square Footage 75,764 98,681
Phase of Work:
Percent Complete: 57%
Educational Specifications Jun-14 Jun-14 Jun-14Feasibility Study Sep-14 Sep-14 Sep-14Schematic Design Jan-14 Sep-15 Sep-15Design Development May-15 Dec-15 Dec-15Construction Documents Nov-15 Aug-16 May-16Bid Award Mar-16 Dec-16 Dec-16Start Construction Jun-16 Apr-17 Apr-17Occupancy Aug-18 Aug-19
Plans & Engineering $3,500,000 $3,500,000 $2,457,269Construction $33,801,000 $33,801,000 $34,400,236FFE $2,301,000 $2,301,000 $722,613Project Support $923,000 $923,000 $20,805Total $40,525,000 $40,525,000 $37,600,923
Approved Budget
Current Appropriation
Encumbered
Fiscal Data
Project Schedule
Approved EdSpec
Current Actual
Construction
Current Status
High Point ES is a 3 phase project that includes subphasing to allow construction to continue during non-instruction periods of the year. Phase 1 is 99% complete. Punch items are being completed during non-school hours. Phase 2A, which includes the new Administrative Suite, is 28% complete. Underground utility rough-ins are ongoing. Phase 2B, which includes the before- and after-care addition and existing kitchen renovation, is 60% complete. Phase 2C, 3A and 3B are anticipated to start in December 2018, Spring of 2019, and Summer of 2019, respectively.
The construction of the modernization of High Point Elementary School.
High Point ES - Modernization
Administrative Data Vital StatisticsSmolen, Emr, Ilkovitch & Associates (SEI)J. Vinton Schafer & Sons, Inc.
7 Construction Status October 2018
Architect: Before AfterConstruction Manager: State Rated Capacity 435 782Scope of Work: Gross Square Footage 83,686 98,879
Phase of Work:
Percent Complete: 32%
Educational Specifications Sep-13 Sep-13 Nov-13Feasibility Study Nov-13 Mar-14 Mar-14Schematic Design Jul-14 Sep-15 Sep-15Design Development Nov-14 Dec-15 Dec-15Construction Documents Mar-15 Oct-16 Dec-16Bid Award Jan-16 Feb-17 Feb-17Start Construction Apr-16 Apr-17 Jun-17Occupancy Aug-18 Aug-19
Plans & Engineering $3,477,000 $3,477,000 $2,540,346Construction $41,632,000 $41,632,000 $32,441,884FFE $2,418,000 $2,418,000Project Support $982,000 $982,000 $244,900Total $48,509,000 $48,509,000 $35,227,130
Approved Budget
Current Appropriation
Encumbered
Fiscal Data
Project Schedule
Approved EdSpec
Current Actual
Construction
Current Status
The site work grading, utilities, concrete foundations, interior walls, steel erection, and roofing construction actives are ongoing. Wet soil conditions have impacted grading operations. Anne Arundel County Public School staff, the Department of Public Works, and the State Highway Administration are working collaboratively to finalize the design of an access driveway to MD 175.
The construction of a replacement school for Jessup Elementary School.
Jessup ES - Replacement
Administrative Data Vital StatisticsGrimm + Parker ArchitectsHeery International, Inc.
8 Construction Status October 2018
Architect:General Contractor:Scope Of Work:
Phase of Work:
Plans & Engineering $600,000 $600,000Construction $6,250,000 $6,250,000FFE $450,000 $450,000Project Support $200,000 $200,000Total $7,500,000 $7,500,000 $0* FY19 Program
Maryland City ES
Current Status
Kindergarten Additions - Various Schools
Administrative DataVariousVariousOn-going program to provide kindergarten classroom additions at various schools. Design and Construction
See following sheet for details.
Project Schedule
See following sheet for details.
Fiscal Data Park ES
Approved Budget *
Current Appropriation *
Encumbered
See following sheet for details
Linthicum ES
9 Construction Status October 2018
School Project Description Const. Cost Fiscal Year Ed Specs/ Schematic
Design Dev./ Const Cost
Start Const.
Substantial Completion
Architect General Contractor
Current Status
6 Classroom Addition$3,600,000 (Estimate)
FY 2020 Apr-18 Oct-18 Jul-19 Jul-20 TCA TBD 30%
4 Classroom Addition$2,800,000 (Estimate)
FY 2020 Apr-18 Oct-18 Jul-19 Jul-20 HCM TBD 30%
4 Classroom Addition $3,471,000 FY 2018 Apr-16/ Sept-16
Dec-16/ Feb-17
Jul-17 Jul-18 WRA Towson Mechanical
99%
6 Classroom Addition $2,422,300 FY 2018 Apr-16/ Apr-17
Dec-16/ Feb-17
Jul-17 Mar-18 TCA Tuckman Barbee
99%
4 Classroom Addition $2,513,180 FY 2018 Apr-17 Jul-17 Jul-18 Aug-19 WGMNorth Point
Builders10%
5 Classroom Addition $3,331,000 FY 2018Apr-17/ Sept-17
Oct-17 Jun-18 May-19 SEIWilliam F
Klingersmith25%
Riviera Beach ES
Maryland City ES
Millersville ES
Shady Side ES
The addition was occupied on March 15, 2018. The project is currently under warranty and in closeout.
Contractor is currently installing site utilities and building foundations.
Contractor is currently installing site utilities and building foundations.
Kindergarten Additions at Various Schools
Linthicum ES
Schools in Design:
Park ES
Schools in Construction:
Design development approved at Board of Education meeting on October 10, 2018. Documents being prepared for State submission.
Design development approved at Board of Education meeting on October 10, 2018. Documents being prepared for State submission.
Punch list items are being completed.
10 Construction Status October 2018
Architect: Before AfterConstruction Manager: State Rated Capacity 529 454Scope Of Work: Gross Square Footage 72,267 70,934
Phase of Work:
Percent Complete: 60%
Educational Specifications Jun-14 Jun-14 Jun-14Feasibility Study Sep-14 Sep-14 Sep-14Schematic Design Jan-15 Jan-15 Sep-15Design Development May-15 May-15 Dec-15Construction Documents Nov-15 Aug-16 Dec-16Bid Award Mar-16 Jan-17 Jan-17Start Construction Jun-16 Apr-17 Apr-17Occupancy Aug-18 Aug-19
Plans & Engineering $2,962,000 $2,962,000 $1,821,691Construction $28,620,000 $28,620,000 $27,521,646FFE $1,926,000 $1,926,000 $845,962Project Support $891,000 $891,000 $31,284Total $34,399,000 $34,399,000 $30,220,583
Approved Budget
Current Appropriation
Encumbered
Fiscal Data
Project Schedule
Approved EdSpec
Current Actual
Manor View is a 6 phase project that includes subphasing to allow construction to continue during non-instructional periods of the year. Phase 1A- Pod 3/4 is 99% complete and occupied. Phase 1B-Main Corridor is 50% complete and will be ongoing until June 2019. Phase 2- Pod 5/6 is 99% complete. Punch list work is ongoing. Phase 3A- Pod 1/2 is 98% complete and occupied. Punch list work is ongoing. Phase 3B- Administrative Suite, Gym Addition are 90% complete. Phase 4- Administrative Suite interior, Cafeteria, Kitchen, Gym interior, courtyard Roof Demolition are 60% complete. Phase 5-Courtyard is 30% complete. Phase 6- Elective have anticipated a January 2019 start.
The revitalization of Manor View Elementary School.
Manor View ES - Revitalization
Administrative Data Vital StatisticsWGM Architects Whiting-Turner Construction Co.
Construction
Current Status
11 Construction Status October 2018
Architect:General Contractor:Scope of Work:
Phase of Work:
Plans & Engineering $0 $0Construction $8,000,000 $8,000,000FFE $0 $0Project Support Total $8,000,000 $8,000,000 $0* FY19 Program
Current Status
Open Space Enclosures - Various Schools
Administrative DataVariousVarious
Provide full height walls, modification of ceilings, lighting systems, fire alarms, public address systems, and HVAC systems as required.
Design and Construction
See following sheet for details.
Project Schedule
See following sheet for details.
Fiscal Data Chesapeake Bay MS
Approved Budget*
Current Appropriation*
Encumbered
See following sheet for details
Brock Bridge ES
Chesapeake HS
12 Construction Status October 2018
School Const. Cost Fiscal YearEd Specs/ Schematic
Design Dev./ Const Doc.
Start Const.
Substantial Completion
ArchitectGeneral
ContractorCurrent Status
$2,984,500 FY 2018Apr-16/ Feb-17
Dec-16/ Feb-17
Jul-17 Mar-19 TCABaltimore
Contractors66%
$6,569,888 FY 2018 Nov-15 Apr-18 Oct-18 Sep-20 WGMBaltimore
Contractors1%
$6,268,800 FY 2017 Jun-15 May-16 Aug-16 Aug-18 BWHE. Pikounis
Constr. Co. Inc. 99%
$2,892,000 FY 2018Apr-16/ Feb-17
Dec-16/ Feb-17
Jul-17 Aug-18 TCATuckman Barbee
96%Shady Side ES
Project is substantially complete and occupied.
Open Space Enclosures at Various Schools
Chesapeake HS
All 8 construction phases are complete; punchlist and closeout are progressing. Project was completed 9 months ahead of schedule.
Brock Bridge ES
Phases 1 and 2 of this 3 phase project are complete. Phase 3 started in late Summer 2018.
Chesapeake Bay MS
Contract awarded at the Board of Education meeting on October 10, 2018. Contractor is mobilizing.
Schools in Construction:
13 Construction Status October 2018
Architect: Before AfterConstruction Manager: State Rated Capacity 479 509Scope of Work: Gross Square Footage 61,000 81,000
Phase of Work:
Percent Complete: 2%
Educational Specifications May-16 May-16 May-16Feasibility Study Oct-16 Oct-16 Oct-16Schematic Design Sep-17 Apr-17 May-17Design Development Dec-17 Jul-17 Sep-17Construction Documents Aug-18 Feb-18 Mar-18Bid Award Feb-19 Aug-18 Aug-18Start Construction Apr-19 Sep-18 Oct-18Occupancy Aug-21 Sep-20
Plans & Engineering $3,248,000 $3,248,000 $2,657,633Construction $33,401,000 $15,401,000 $11,991,987FFE $2,026,000Project Support $1,114,000 $446,000 $492,948Total $39,789,000 $19,095,000 $15,142,568
The design and construction for the revitalization of Richard Henry Lee Elementary School.
Richard Henry Lee ES - Revitalization
Administrative Data Vital StatisticsGrimm + Parker Architects Whiting-Turner Contracting Co.
Construction
Current Status
Anne Arundel County building and grading permits have been issued and asbestos abatement is ongoing. Construction contracts were awarded at the August 22, 2018 and September 12, 2018 Board of Education Meetings. Richard Henry Lee ES has begun its two year occupancy of the temporary swing spaces at Corkran MS & Oakwood ES.
Project Schedule
Approved EdSpec
Current Actual
Approved Budget
Current Appropriation
Encumbered
Fiscal Data
14 Construction Status October 2018
Architect: Before AfterConstruction Manager: State Rated Capacity 1,805 2,141Scope of Work: Gross Square Footage 296,191 354,162
Phase of Work:
Percent Complete: 99%
Educational Specifications Jul-10 Jul-10 Jul-10Feasibility Study Jul-10 Feb-11 Feb-11Schematic Design Mar-12 Mar-12 Mar-12Design Development Sep-12 Oct-12 Oct-12Construction Documents Feb-13 May-13 May-13Bid Award May-13 Jan-14 Feb-14Start Construction Aug-13 May-14 Jun-14Occupancy Feb-16 Bldg Jan-17/Site Mar-18 Bldg Jan-17/Site Mar-18
Plans & Engineering $7,722,000 $7,722,000 $7,595,284Construction $107,314,000 $107,314,000 $105,980,979FFE $3,566,000 $3,566,000 $3,046,539Project Support $563,000 $563,000 $562,201Total $119,165,000 $119,165,000 $117,185,003
The construction of a replacement school for Severna Park High School.
Severna Park HS - Replacement
Administrative Data Vital StatisticsGWWOOak Contracting, LLC
Construction
Current Status
Phase 2 landscaping will continue this fall. Project is in closeout.
Project Schedule
Approved EdSpec
Current Actual
Approved Budget
Current Appropriation
Encumbered
Fiscal Data
15 Construction Status October 2018
Architect:
General Contractor:
Scope of Work:
Phase of Work:
Plans & Engineering $1,400,000 $1,400,000Construction $15,794,000 $15,794,000FFEProject Support Total $17,194,000 $17,194,000 $0* FY19 Program
Current Status
Systemic Project - Various Schools - Building Systemics
Administrative DataVarious
Various
Building Systemics - Various Schools
Design and Construction
Project Schedule
See following sheet for details.
See following sheet for details.
See following sheet for details
Fiscal Data
Approved Budget*
Current Appropriation*
Encumbered
Arundel MS
Bodkin ES
Annapolis MS
16 Construction Status October 2018
SchoolProject
DescriptionConst. Cost Fiscal Year Const. Doc. Start Const.
Substantial Completion
EngineerGeneral
ContractorCurrent Status
Roof Replacement $69,278 FY 2020 TBD TBD TBD Gale Associates TBD 0%
Roof Replacement $57,700 FY 2019 TBD TBD TBDFacility
EngineeringTBD 12%
Building Systemics - Various Schools
Maryland City ES
West Meade ES
Schools in Design:
17 Construction Status October 2018
SchoolProject
DescriptionConst. Cost Fiscal Year Const. Doc. Start Const.
Substantial Completion
EngineerGeneral
ContractorCurrent Status
HVAC/Windows$18,939,300
(Estimate)FY 2019 Feb-18 Nov-18 Mar-20
James Posey Associates, Inc.
TBD 0%
Roof Replacement $3,182,000 FY 2019 Jan-18 Jun-18 Aug-19 Gail Associates Vatica 50%
Roof Replacement $1,189,990 FY 2018 Jan-17 Jun-17 Aug-18 Colmore. Inc Vatica 98%
HVAC $3,897,000 FY 2019 Jan-18 Jun-18 Aug-19Gannett -Fleming
Towson Mechanical
35%
Roof Replacement $1,534,000 FY 2018/2019 Sep-17 Jun-18 Aug-19 Gail Associates Vatica 45%
HVAC, Ceiling & Lights
$17,146,000 FY 2016 n/a Feb-16 Dec-18James Posey
Associates, Inc.Phillips Way,
Inc.99%
Windows & HVAC $3,529,000 FY 2017 Dec-15 Jun-16 Aug-17 JMTHeer Brothers,
Inc.99%
Roof Replacement $40,221,401 FY 2018 Feb-17 Jun-17 Aug-19 Gale Associates Vatica 85%
HVAC, Ceiling & Lights
$11,758,646 FY 2015 n/a Jun-14 Aug-17 JMTPhillips Way,
Inc.100%
HVAC Replacement
$3,739,000 FY 2018 Dec-16 Jun-17 Aug-18 JMT TMI 97%
HVAC Replacement
$4,302,134 FY 2018 Dec-16 Jun-17 Oct-18James Posey
Associates, Inc.Maryland
Mechanical85%
Building Systemics - Various Schools
Arundel MS
Project is in closeout.
Bodkin ES
Schools in Construction:
Phase 1 of 2 is complete, Phase 2 of 2 will resume in June 2019.
The new mechanical room walls and steel have been erected. Evening work continues throughout building.
Bid opening was on October 2, 2018. Construction is schedule to start in November 2018.
Annapolis MS
Broadneck ES
Wrapping up Phase 1 work during non-instructional hours. Phase 2 of 2 will resume in June 2019.
Belvedere ES
MacArthur MS
Commissioning is ongoing at 99%.
Millersville ES
Finalizing boiler conversion. Working on punchlist.
Woodside ES
Boiler start up scheduled. Chiller and enclosure installation is underway.
Maryland City ES
Project is in closeout.
Meade MS
Shingles and windows are complete. Metal and panel installation in progress. Phase 3 of 3 to resume in June 2019.
Meade HS
Final payment processed. This is the last report for this project.
18 Construction Status October 2018
Architect:General Contractor:Scope of Work:
Phase of Work:
Plans & Engineering $70,000 $70,000Construction $429,000 $429,000FFEProject Support Total $499,000 $499,000 $0* FY19 Program
Broadneck HS
Four Seasons ES
Fiscal Data
Approved Budget*
Current Appropriation*
Encumbered
Broadneck ES
See following sheet for details
Project Schedule
See following sheet for details.
Current Status
See following sheet for details.
Systemic Project -TIMS Electrical Upgrades
Administrative DataVarious
Design and Construction
VariousElectrical system distribution upgrade projects at selected schools.
19 Construction Status October 2018
SchoolProject
DescriptionConst. Cost Fiscal Year Const. Doc. Start Const.
Substantial Completion
EngineerGeneral
ContractorCurrent Status
TIMS $44,432 FY 2019 Feb-19 Jun-19 Aug-19 JMT N/A 10%
SchoolProject
DescriptionConst. Cost Fiscal Year Const. Doc. Start Const.
Substantial Completion
EngineerGeneral
ContractorCurrent Status
TIMS $137,000 FY 2018 Feb-18 Aug-18 Apr-19 BKM Action Electric 15%
TIMS $118,000 FY 2018 Feb-18 Aug-18 Apr-19 BKM Action Electric 90%
Installing branch circuits and panels.
Installing branch circuits and panels.
Broadneck HS
Design is underway.
TIMS Electric - Various Schools
Schools in Design:
Schools in Construction:
Broadneck ES
Four Seasons ES
20 Construction Status October 2018
Architect: Before AfterConstruction Manager: State Rated Capacity 479 549Scope of Work: Gross Square Footage 45,813 84,896
Phase of Work:
Percent Complete: 1%
Educational Specifications May-16 May-16 May-16Feasibility Study Oct-16 Oct-16 Oct-16Schematic Design Sep-17 Apr-17 May-17Design Development Dec-17 Jul-17 Sep-17Construction Documents Aug-18 Jan-18 May-18Bid Award Feb-19 Aug-18 Sep-18Start Construction Apr-19 Oct-18Occupancy Aug-21 Dec-20
Plans & Engineering $3,464,000 $3,464,000 $3,229,300Construction $30,015,000 $15,007,000 $454,319FFE $2,137,000Project Support $1,481,000 $592,000 $32,592Total $37,097,000 $19,063,000 $3,716,211
The design and construction for the revitalization of Tyler Heights Elementary School.
Tyler Heights - Revitalization
Administrative Data Vital StatisticsTCAHeery International, Inc.
Construction
Current Status
Permit process is ongoing. Construction contracts were awarded at the Board of Education meeting on September 12, 2018.
Project Schedule
Approved EdSpec
Current Actual
Fiscal Data
Approved Budget
Current Appropriation
Encumbered
21 Construction Status October 2018
MAJOR SUBDIVISIONS REVIEWED IN THE MONTHS OF JULY THRU SEPTEMBER, 2018
Project
Project Status
Number/Type of Units
Number of
Students
School
A Hanover Landing Sketch 93 TH 60 condos 747 Apts. (404 2+ BR)
101 58 63
Linthicum Elementary Lindale Middle North County High
B Chestnut Avenue Property
Final 64 TH 17 5 6
Jessup Elementary Meade Middle Meade High
B Shannon’s Glen Final 159 TH 364 Apts. (286 2-3 BR)
115 35 43
Jessup Elementary Meade Middle Meade High
C Parkside Final 110 TH
28 9 11
Meade Heights Elementary MacArthur Middle Meade High
D Sabrina Park, Phase 3
Final 18 SF
5 2 3
Oak Hill Elementary Severna Park Middle Severna Park High
E Creekstone Village, Sec. 3
Final/ Modification
216 Apt (151 2-3 BR)
28 10 14
Freetown Elementary Marley Middle Glen Burnie High
E Tanyard Preserve Final 25 SF 5 2 2
Freetown Elementary Marley Middle Glen Burnie High
F Enclave at Severna Park Sketch 12 SF
3 2 2
Folger McKinsey Elem. Severna Park Middle Severna Park High
F Robinson Landing SDP 8 SF (net 7)
2 1 1
Folger McKinsey Elem. Severna Park Middle Severna Park High
G McNamara Family Trust Prop.
Sketch 14 SF 2 1 2
Bodkin Elementary Chesapeake Bay Middle Chesapeake High
H 61 E. Joyce Ln. Subdivision
Sketch 29 SF (net 27)
5 3 4
Arnold Elementary Severn River Middle Broadneck High
I 839 Bestgate Road SDP 127 Apts. 59 2-3 BR
8 3 4
Rolling Knolls Elementary Bates Middle Annapolis High
I 2555 Riva Road Sketch 250 Apts. (112 2 BR)
16 6 7
Rolling Knolls Elementary Bates Middle Annapolis High
J Magnolia Cove Final 4 SF 1 1 1
Hillsmere Elementary Annapolis Middle Annapolis High
Development Process (Project Status)
Sketch: Developer refines the concept drawing to include the location of housing units on a lot, streets, sidewalks, and public spaces. This is a topographic line drawing that receives in-depth comments from the County review team. School capacities and the student population likely to be attributable to this development are recalculated. Site Development Plan: Applies to properties that will not be subdivided into individual lots, principally commercial and multi-family projects such as condominiums and apartments. Used to address APFO conformity. School capacities and the student population likely to be attributable to this development are recalculated. Final: Developer submits a detailed plan that addresses all of the County review team comments. Once a developer receives Final Submission Approval, applications for waivers and permits are submitted.
D
Project Reviews for July—September 2018
Anne Arundel County Subdivision Review
A
B E
G
F
C
H
I
J