Administrative Visiting CommitteeAdministrative Visiting Committee
Administrative Peer ReviewAdministrative Peer Review
Aug. 29 – Aug. 31, 2007Aug. 29 – Aug. 31, 2007
.
FY2007 Administrative Peer Review
The LaboratoryBruce Chrisman
Fermilab
August 29, 2007
.
FY2007 Administrative Peer Review
LABORATORY MISSION
Fermi National Accelerator Laboratory advances the understanding of the fundamental nature of matter and energy by providing leadership and resources for qualified researchers to conduct basic research at the frontiers of high energy physics and related disciplines.
.
FY2007 Administrative Peer Review
LABORATORY ORG CHART
.
LABORATORY STAFFING & SWF BUDGET (FY07 Act)
Staff Exempt 1,188 Non-Exempt 722
Total 1,910
SWF Budget SWF $207,391k
FY2007 Administrative Peer Review
.
LABORATORY STAFFING & TOTAL BUDGET (FY07 Act)
Budget SWF $207,391k Elec. Power 24,375k GPP & UIP 8,600k Management Fee/OH 3,907k
Other M&S 103,348k Total $347,621k
FY2007 Administrative Peer Review
.
DIRECTORATE - MISSION
LEAD FERMILAB INTO THE FUTURE
FY2007 Administrative Peer Review
.
DIRECTORATE STAFFING & SWF BUDGET (FY07 Act)
Staff Exempt 29 Non-Exempt 4 Total 37
SWF Budget SWF $4,477k
FY2007 Administrative Peer Review
.
• DIRECTORATE STAFFING & TOTAL BUDGET (FY07 Act)
Budget SWF $4,477k Elect. Power 24,375k GPP & UIP 8,600k Management Fee/OH 3,907k Other M&S 3,022k Total $44,381k
FY2007 Administrative Peer Review
.
DIRECTORATE - OVERVIEW
Directors & immediate support staff ES&H OQBP
• EG&G Legal Office Public Affairs Program Planning Project Office - - - - - - - - - - - - - - - - - - - - - - - - Internal Audit
FY2007 Administrative Peer Review
.
• FY06 SELECTED PEER REVIEW RECOMMENDATIONS
EMS• Continue to embrace and react to emerging security
threats relayed to the laboratory by the DOE-Chicago Counterintelligence Office.
FY2007 Administrative Peer Review
.
FY06 PEER REVIEW RECOMMENDATIONS
Cross-Cut Issues• Readiness to deliver the ILC –Ideas Out of the Box• Cultural Change – People in the Box• Leadership – Hold the Course• Service – A Way of Life
FY2007 Administrative Peer Review
.
FY06 PEER REVIEW RECOMMENDATIONS
HIGHEST PRIORITY RECOMMENDATIONS• Finalize the necessary FLSA changes immediately• Complete corrective actions to address weaknesses in
procurement file documentation, contract administration, and use of appropriate clauses
• Solve the Foreign Travel Problem
FY2007 Administrative Peer Review
.
Selected Proposal Initiatives (12 of 28)
Implement and Organization and Human Asset Plan (OHAP) Create FNAL-ANL Laboratory Collaboration Council Implement Strategic Planning process under leadership of
Deputy Director Design and Implement a process to resource load the Lab’s
WBS Document roles , responsibilities accountabilities and
authorities at all levels.
FY2007 Administrative Peer Review
.
Selected Proposal Initiatives (12 of 28)
Implement a space- utilization and facilities reuse program Implement a Management and Decision Support Dashboard
to allow DOE and managers to monitor performance in near-real time.
Create Office of Quality and Best Practices (OQBP) Enhance QA program to provide robust program based on
DOE O414.1C
FY2007 Administrative Peer Review
.
Selected Proposal Initiatives (12 0f 28)
• Establish Director’s Council on Integrated Assurance to include requirements of DOE O 226.1 and DEAR 970.5203-1
• Establish Director’s Council on Diversity• Initiate planning to obtain certification under OHAS
18001(Safety and Health) and ISO 14001(Environmental)
.
CHIEF
OPERATING
OFFICER
FY2007 Administrative Peer Review
.
Roles & Responsibilities
Chief Operating Officer
Integrate all Lab Support Elements Chair Lab Safety Committee Emergency Director Submit ORPS* Reports when Necessary Accept DOE Orders for Contract Mods
* see list of acronyms
FY2007 Administrative Peer Review
.
Roles & Responsibilities (cont)
Chief Operating Officer
Counterintelligence POC PMA POC Misc. Directorate Activities
• Lab. Cultural Activities• Dir. IT Support
FY2007 Administrative Peer Review
.
Associate Lab
Director
Operations Support
FY2007 Administrative Peer Review
.
Roles & Responsibilities
ALD Ops Support
Line Responsibility for Business Services, Workforce Development and Services, and Facilities Engineering Services Sections
ORTA
FY2007 Administrative Peer Review
.
MISSION
Provide the Laboratory’s technical organizations with required support in a safe, effective, and efficient manner within the FRA/DOE constraints.
FY2007 Administrative Peer Review
.
DESIRED OUTCOMES
Operate Support Functions with a target of zero injuries.
Obey the Law
Support scientific research in an effective and economical manner
Communicate regulatory and legal requirements in simple yet effective manner
Where possible relieve technical staff of administrative burdens.
FY2007 Administrative Peer Review
.
RISKS & CHALLENGES
One Deep in Several Areas Increase Cross Training
Budget
Security Contract
New DOE Orders e.g. Conference Man, QA, etc.
FY2007 Administrative Peer Review
.
RISKS & CHALLENGES
Unpredictable/Fixed Costs e.g. Medical, Legal/Phones, Postage, Software Lic
Visas Employees, Users, Foreign Travel
Infrastructure
Weakness ORTA (accepted)
FY2007 Administrative Peer Review
.
CUSTOMER COMMUNICATIONS
Employees
DOE• Weekly Program Office Telecom• FSO & Directors Office meet every Tues.• Member Standing DOE & Lab Councils
– NLIC (founding chair)– SC COO Group
Staff Meetings
FY2007 Administrative Peer Review
.
List of Acronyms
FSO - Fermi Site Office GPP - General Plant Project NLIC - Nat. Lab. Improvement Council OH - Overhead ORPS - Occurrence Reporting and Processing System ORTA - Office of Research & Tech Asses. PMA - Presidents Management Agenda POC - Point of Contact SC - DOE Office of Science UIP - Utility Incentive Program WBS - Work Breakdown Structure
FY2007 Administrative Peer Review
.
Chief Financial OfficerCindy Conger
Fermilab
August 29, 2007
FY2007 Administrative Peer Review
.
FY2007 Administrative Peer Review
FINANCE SECTION OVERVIEW
Our mission is to provide safe, effective, efficient financial operations in support of the Laboratory’s high energy physics program in accordance with all laws, regulations, and DOE requirements.
The Finance organization consists of three groups: Accounting Budget Office Management Information Systems (MIS)
Finance organization formed April 1, 2006; CFO appointed June 1, 2006.
.
FY2007 Administrative Peer Review
Organization Chart
.
FY2007 Administrative Peer Review
Breakdown of 4.6 FTE increase in FY07:
New positions in Budget Office and MIS 2.0
Transfer from Directorate – CFO & Admin 2.0
FRA Accountant - Accounting .4
Increase part-time employee - Accounting .2
Finance Staffing Overview
.
FY2007 Administrative Peer Review
3 open positions (1 new, 1 retirement, 1 release)
3 positions reclassified to weekly in FY07 FLSA review
FY07 Finance Staffing by Category
.
FY2007 Administrative Peer Review
Finance Budget Overview
.
FY2007 Administrative Peer Review
Finance Budget – FY07 M&S
.
FY2007 Administrative Peer Review
Communications with DOE
Weekly meeting with DOE-FSO Site Manager (with COO)
Biweekly meeting with DOE-FSO Business Manager Weekly Director’s teleconference with DOE Office of
HEP Monthly CFO teleconference with Program/Budget
Officers at DOE Office of HEP CFO represents Lab on FMSIC (DOE CFO/Contractor
Financial Management Systems Improvement Council)
.
FY2007 Administrative Peer Review
Internal Lab Communications
Weekly Lab Scheduling Meeting Weekly Director’s Senior Management Meeting Monthly Field Financial Manager Meetings Biweekly Finance Department Head Meeting Biweekly meetings with individual department heads ~Quarterly CFO column in Fermilab Today
.
FY2007 Administrative Peer Review
Risks and Challenges
Increased DOE requirements / expectations, e.g.• OMB Circular A-123 controls documentation,
assessment, testing, and remediation requirements (FY06)
• Acceleration of monthly close due date (noon on second work day) increases estimates needed and heightens peak load
• Increasing number of funding categories and subcategories
• More financial performance measures in contract
.
FY2007 Administrative Peer Review
Risks and Challenges
Cybersecurity and PII compliance• Increased security threats especially with the growth of
web, mobile & wireless based applications.• Increased frequency of vendor provided security
patches:– CIAC and US-CERT advisories
– Quarterly Oracle Critical Patch Updates (CPUs)
– Monthly Microsoft updates
– Monthly Linux updates
– Others (e.g., AV, firewall, etc.)• Need to constantly evaluate business IT risk
.
FY2007 Administrative Peer Review
Risks and Challenges (cont.)
Continuous new system implementations: • Oracle Financials: Project Accounting (’03) and Accounts Receivable
(’04)• PeopleSoft Self-service (’04 -’06)• Deltek Cost & Schedule Control (’04 -’06)• Project Tracking (’05)• PWC TeamMate Audit Working Papers (’06)• Assurance Council Issues Tracking (’07)• Conference Travel Management (’07)• Time & Labor in progress• Management Dashboard up next• Automated Travel system sorely needed
Continuous upgrade of financial system software: Oracle eBS; PeopleSoft 8.9, Deltek, TeamMate in FY07
Application servers increased 5-fold (from 5 in ’04 to 26 in ‘07)
.
FY2007 Administrative Peer Review
Risks and Challenges (cont.)
Maintain and improve IT infrastructure• Funding limitations slow implementation of needed
technology replacements Increased oversight, FRA & DOE:
• Extensive Cost Allowability audit every year (FY05 ->)• Expanded external audit procedures post-Enron (KPMG)• Federal Grants audit required (OMB A-133) • Expanded DOE requirements at 3rd quarter• FISMA, General IT controls audits and reviews• Increased risk of findings and need for remediation
thereof• Active, involved Board of Directors
.
FY2007 Administrative Peer Review
Risks and Challenges (cont.)
Increasing complexity of financial environment, e.g.• DOE’s STARS system implementation (FY05)• Program Support indirect pools (FY07) to comply with CAS• Increasing international activity, primarily CERN (cost
allowability & tax withholding/reporting risks), also Auger and ILC
Keeping focus on Safety in low-risk office environment Delayed fiscal year budgets; operating under Continuing
Resolutions One-deep staffing in some key areas Contract transition was significant strain on Finance in FY07.
.
FY2007 Administrative Peer Review
Status of FY06 URA Visiting Committee Recommendations - Finance
Recommendation: Resolve Management Information Systems (MIS) Issues
• 1) Limited access to software during the year-end close– Communication will be improved in the future. Access to the system has always
been available to the financial managers upon request during the few days that general system access is restricted to make maximum resources available to the close activities. Some FFM's were not aware.
• 2) Software difficulties in tracking spares in AD– This is a longstanding issue, the resolution of which will be led by Accounting.
The Lab's processes in this area need improvement; however, controls are adequate and financial impact is low (less than 1% of cost activity). Accounting and MIS resources are being expended on higher priority activities at this time.
• 3) A conference management system is needed– Conference Travel Management was implemented on 12/14/06.
.
OQBPBob Grant
Fermilab
August 29, 2007
FY2007 Administrative Peer Review
.
FY2007 Administrative Peer Review
Office of Quality and Best Practices
Part of Bid Strategy Funding Staffing QA Program
.
FY2007 Administrative Peer Review
Current Projects
QA Manual & Program Interim Management Issues Tracking LHC Triplet Root Cause Analysis Dashboard Work Scheduling & Maintenance Assurance Council
.
WD&R SectionKay Van Vreede
Fermilab
August 29, 2007
FY2007 Administrative Peer Review
.
FY2007 Administrative Peer Review
Agenda
Workforce Development and Resources Section
Mission
Organization Chart
Staffing Level and Budget
2006 Peer Review Recommendations and Outcomes
Additional FY07 Accomplishments
Major FY08 Initiatives
.
FY2007 Administrative Peer Review
Workforce Development and Resources Section Mission
Our mission is to: provide vital services to Laboratory employees and users in
support of the research mission of Fermilab, and improve national science education through teacher, student,
and public programs.
.
FY2007 Administrative Peer Review
Section Office
Kay Van Vreede
Benefits
Administration
Mary Todd
Benefits
Planning
Wilma Cardona
HR Services
Borys Jurkiw
Equal Opportunity
Dianne Engram
Employment/ Employee Relations
Juanita Frazier
Education Office
Marge Bardeen
Office for Professional/ Organization Development
Barbara Brooks
WDRS Org Chart
.
FY2007 Administrative Peer Review
Staffing Level & Budget
Departments Staffing Level Budget
Benefits/Children’s Center 7/12 747,000*
Education 14 1,619,000
Employment/Employee Relations 3/3 712,000
Equal Opportunity 2 530,000
HR Services 10 832,000
Section Office 3 935,000
Office for Prof/Org Development 2 210,000
TOTAL 56 5,585,000
* Children’s Center self funded
.
FY2007 Administrative Peer Review
2006 PEER REVIEW RECOMMENDATIONS
.
FY2007 Administrative Peer Review
FY2006 Peer Review Recommendations Summary
1. Finalize FLSA changes immediately.
2. Change the name of Laboratory Services Section (LSS).
3. Develop an Organization and Human Asset Plan (OHAP).
4. Drive all hiring processes including scientific hiring.
5. Apply proactive change management principles to every major initiative.
.
FY2007 Administrative Peer Review
2006 PEER REVIEW RECOMMENDATION
OUTCOMES
.
FY2007 Administrative Peer Review
2006 Peer Review Recommendation #1
Finalize the necessary FLSA changes immediately.
• 146 positions were reclassified as of 12/1/06
.
FY2007 Administrative Peer Review
2006 Peer Review Recommendation #2
Change the name of Laboratory Services Section (LSS) to reflect the importance of people and education to the Laboratory.
• On 1/1/07 Laboratory Services Section (LSS) was changed to: Workforce Development and Resources Section (WDRS)
.
FY2007 Administrative Peer Review
2006 Peer Review Recommendation #3
Organization and Human Asset Plan (OHAP) tools and processes (which will include succession planning) should be developed by Human Resources.
• Tools and processes were developed and are owned by the Directorate
• Phase 1: Functional skills were identified • Phase 2: Skill requirements were projected through 2012
.
FY2007 Administrative Peer Review
2006 Peer Review Recommendation #4
Human Resources should drive all hiring processes, including scientific, as soon as possible.
• Director approved change• HR completed recommendations for process
changes• Committee of scientists was formed to collaborate
with HR in developing final processes and procedures
.
FY2007 Administrative Peer Review
2006 Peer Review Recommendation #5
Proactive change management principles, especially sponsorship and communication, should be applied to every major initiative, whether in this support Section or others
• Implementation of the FY08 Compensation Salary Review process illustrates how these principles were used. . .
.
FY2007 Administrative Peer Review
2006 Peer Review Recommendation #5
(cont’d)
FY08 Salary Review Process
• Director was Sponsor
• Senior Management team provided input
• Director communicated changes in Fermilab Today
.
FY2007 Administrative Peer Review
2006 Peer Review Recommendation #5 (cont’d)
FY08 Salary Review Process
• Training was developed
• Feedback from two pilots resulted in the final training design
• 284 Supvs/Mgrs completed training
• On-line training was developed and town hall meetings were
held for all employees
.
FY2007 Administrative Peer Review
In addition. . .
A customized training program on effective implementation of change and innovation was developed for HR and delivered to all HR managers and professional staff.
.
FY2007 Administrative Peer Review
ADDITIONAL FY07 ACCOMPLISHMENTS
.
FY2007 Administrative Peer Review
Additional FY07 Accomplishments
Met all FRA Transition Milestones
Completed Benefit Value and Cost studies
Conducted 3 employee focus groups on health and welfare plans. Three areas were identified for in-depth analysis in FY08:
• Use of flexible spending debit card• A separate vision plan• Increased awareness of legal services via the EAP and availability
of employee paid legal plans
.
FY2007 Administrative Peer Review
Additional FY07 Accomplishments
280 Supvs/Mgrs completed core leadership development courses via Fermilab Management Practices (FMP) Seminar
Total number of training participants increased from 1,151 to 1,867 or 62%
Total number of mgmt/computing/professional/technical courses increased from 74 to 105 or 42%
.
FY2007 Administrative Peer Review
Additional FY07 Accomplishments
Refined Annual Salary Review process and communicated changes to all employees
Completed significant milestones on the Compensation Action Plan required for DOE Compensation Certification
Developed and presented a feasibility study on the operation of the Children’s Center
.
FY2007 Administrative Peer Review
Additional FY07 Accomplishments
Developed and implemented Vacation Donation Program
Implemented a pilot program for Alternative Work Schedules in FESS and WDRS
Directorate approved Diversity Council proposal. Implementation is in progress
Recognized for HR practices by being selected as one of Chicago’s 101 Best & Brightest Companies to Work For
.
FY2007 Administrative Peer Review
Additional FY07 Accomplishments
The QuarkNet cosmic ray study reached several milestones:
• over 300 teacher accounts on the e-Lab • over 600 student group accounts • over 12,000 days of data uploaded• over 250 detectors at schools across the U.S. and in 5
other countries.
Completed the first summer of the DOE ACTS Program for Middle School Teachers
.
FY2007 Administrative Peer Review
MAJOR FY08 INITIATIVES
.
FY2007 Administrative Peer Review
Major FY08 Initiatives
In collaboration with the Directorate, implement the Diversity Council Committees
Identify and implement processes that incorporate scientific hiring into HR practices
Request DOE Compensation Certification
.
FY2007 Administrative Peer Review
Major FY08 Initiatives
Analyze data from the current Pharmaceutical Benefit Program and determine if there is a more cost effective vendor
Research and make recommendations regarding the following Benefits Plan initiatives:
• Use of flexible spending debit card• A separate vision plan• Increased awareness of legal services via the EAP and
availability of employee paid legal plans
.
FY2007 Administrative Peer Review
Major FY08 Initiatives
Develop and implement expatriate policies
Implement the University of Chicago Strategic Laboratory Leadership Program
Continue to develop core competency leadership skills of new and experienced Supervisors/Managers via FMP
.
FY2007 Administrative Peer Review
Major FY08 Initiatives
Prepare QuarkNet teachers and students for turn-on of LHC:
On the Horizon of Discovery
Plan the move of the Education Office Professional Development Programs to a permanent location in the Training Center
.
FY2007 Administrative Peer Review
Summary
WDRS continues to maintain efficient and effective service levels with a limited number of personnel.
We have made significant progress with a number of initiatives and once again anticipate a very challenging agenda in FY08.
.
Business Services SectionDave Carlson
Fermilab
August 29, 2007
FY2007 Administrative Peer Review
.
FY2007 Administrative Peer Review
BUSINESS SERVICES SECTIONMISSION
Deliver Efficient, Effective, and Responsive Business Systems, Services and Resources that Enable the
Successful Achievement of the Laboratory Mission(s).
.
FY2007 Administrative Peer Review
BUSINESS SERVICES SECTION MISSION – OPERATIONAL OBJECTIVES
Internal – Use business practices that are safe, efficient, cost-effective, timely and accurate.
Lab-wide – Provide business systems, services and resources that allow staff and users to accomplish their work with administrative ease.
External – Conduct business operations in compliance with the prime contract and applicable laws, rules and regulations.
.
FY2007 Administrative Peer Review
BUSINESS SERVICES SECTION SECTION HEAD – ROLES AND RESPONSIBILITIES
Line Responsibility for Business Services Elements Delegated Authority to Commit the Laboratory DOE National Laboratories Improvement Council Liaison to DuPage National Technology Park
.
FY2007 Administrative Peer Review
n = 143.15 FTE’s
BUSINESS
SERVICES SECTION
Procurem ent [19]Joe C o llins, M anager
Inform ation Resources [7.75]H eath O 'C onne ll, M anager
Transportation Services [31.8]G eorge Davidson, M anager
B rian N iesm an, Assistan t M gr.
Accomm odations [7.6]Jack H aw kins, M anager
Property & Inventory Control [23]Jack Ke lly, M anager
Telecomm unications [5]N anette Larson, M anager
Security [15]B ill F laherty, Security C h ief
Visual Media Services [7]Fred U llrich, M anager
Fire Departm ent [19]Jack S te inho ff, F ire C h ief
Travel [3]M ala Seshadri, M anager
Business Services Section Office [4]D avid Carlson - H ead
Jeff Irv in - D eputy H ead Frank C esarano - M gm t. Asst. M ari M endez - Adm in . Support
Associate Laboratory Director for Operations SupportBruce C hrism an
SSO [1]Greg Mitchell
.
FY2007 Administrative Peer Review
SectionOffice
Transpor-tation
InformationResources
Accommo-dations
Property &InventoryControl.
Shipping&
Receiving
Traffic
FoodServices
Housing
UsersCenter &
Chez Leon
Procure-ment
Telecom-munications
VisualMedia
Services
VehicleMaint. &
Fleet Mgmt.
Mailroom
Distribution& Taxi
Library
Archives
RecordsMgmt.
WebSupport
PropertyMgmt.
Supply
Stockroom
Construct.,Fabrication,
Services
Computing&
Services
Electronics&
MRO
Travel SecurityFire
Department
SiteSecurity
Comm.Center
Key & ID
Photo-graphy/
Duplicating
Video/Streaming/AV/Comp
Graphics
BUSINESS SERVICES SECTION
n = 143.15 FTE’s
SSO
.
FY2007 Administrative Peer Review
BUSINESS SERVICES SECTION – BUDGET
High Energy PhysicsSWF $10,220 KM&S 1,976Total $12,196 K
Safeguards & Security (includes funds transferred to DOE)
SWF $ 562 KM&S 1,788Total $ 2,350 K
.
FY2007 Administrative Peer Review
BUSINESS SERVICES SECTION
Administration & Management 45.75
Computer Professionals 2.00
Clerical & Admin 31.80
Service Workers 46.60
Skilled Trades 13.00
Technicians 4.00
Total 143.15
FTE's by Job Category
.
FY2007 Administrative Peer Review
BUSINESS SERVICES SECTION HIGHEST PRIORITY RECOMMENDATIONS
Complete corrective actions to address weaknesses in procurement file documentation, contract administration, and use of appropriate clauses
Solve the Foreign Travel Problem
.
FY2007 Administrative Peer Review
BUSINESS SERVICES SECTION HIGHEST PRIORITY RECOMMENDATIONS
Complete corrective actions to address weaknesses in procurement file documentation, contract administration, and use of appropriate clauses.
• Balanced Scorecard FY2007 expected result = 97% +1% -5%, vs. FY2006 score of 89%. Improvement is attributable to training and surveillance of staff; emphasis on active administration of service subcontracts; increased effort on file documentation, organization and presentation; and customer satisfaction survey results.
• Hired one admin. support assistant (ASA); promoted an ASA to buying responsibility; hired construction administrator.
.
FY2007 Administrative Peer Review
BUSINESS SERVICES SECTION HIGHEST PRIORITY RECOMMENDATIONS Solve the Foreign Travel Problem
• July, 2006 – Hired Travel Manager (20+ years experience, most recently at Argonne National Laboratory).
• August, 2006 – Summer student retained as part-time, On-Call employee.
• December, 2006 – Implemented Domestic Conference Management System.
– Replaced multiple e-mails and paper system with a centralized database (thanks, FI/MIS).
– Everyone can see what’s going on.• Process Improvements:
– Early processing of trips.– Process trips early and quickly, then hold.– Reduced copying of paperwork.– Reduced “send-backs” – centralized fixing in Travel Office.
(continued)
.
FY2007 Administrative Peer Review
BUSINESS SERVICES SECTION HIGHEST PRIORITY RECOMMENDATIONS Solve the Foreign Travel Problem (continued)
• Trained and advised division/section travel coordinators.– December, 2006 – Trained administrators and travel coordinators in
FTMS.
– Subsequently held series of smaller meetings with admins & TC’s.
– August, 2007 – Focused Directorate training.• Customer Survey (results follow).• August, 2007 – Hired experienced travel administrator.• August, 2007 – Foreign conferences being tested in
Conference Management System.
.
FY2007 Administrative Peer Review
1 2 3 4 5 N/ A
1. The courtesy of the staff 1 1 15
2. Knowledge and ability to answer questions 2 15
3. Thoroughness of our work 4 13
4. Response to corrections and revisions 2 2 12 1
5. Our response to meet emergency needs 3 13 1
6. Timely communication by email/phone 2 4 11
How would you rate our service in the following areas in FTMS
Securing Cables: (Country Clearance) 2 7 8
Trip Approval: 6 8 3
Effectiveness of FTMS closeout: 5 8 4
Fermilab Travel Survey Results, 2007 (Scale of 1 to 5 with 1 being the lowest and 5 the highest. )
Sent out 35 surveys to Administrators, Travel Coordinators and Users; Received 17 responses.
.
FY2007 Administrative Peer Review
Travel Survey Comments: Improved dramatically in the last few months. Closeouts of foreign travel
better managed. Accommodate trip request submitted late, especially for conference Travel office handles request efficiently. Travel office is easier to work with. Understanding with problems. Paper work is processed faster. Very happy with service provided. Never had a problem with travel. Finds it difficult to deal with staff on FT trip revisions. (1) Travel office does not respond to emails in a timely manner. (1) Conference requests are required too far in advance. Sometimes website
does not have information. (1) Difficult survey. Some services are good. Problems with conference
processing , delay in checking trips that are sent to the foreign travel office. Requirements change just before submission deadlines. Very poor communication of changes
Hard to understand when contacted by phone. (1)
.
FY2007 Administrative Peer Review
BUSINESS SERVICES SECTION RISKS & CHALLENGES Security Subcontract Transition to DOE. NOA and ILC Procurement Planning and Execution. Recertify Property System under new DOE Order (due
for Property Evaluation Review Team evaluation). Recertify Procurement System (due for Procurement
Evaluation Review Team evaluation). Records Management (New plans to be coordinated
with OQBP and QA program implementation).
.
ES&H SectionBill “Griff” Griffing
Fermilab
August 30, 2007
FY2007 Administrative Peer Review
.
FY2007 Administrative Peer Review
ES&H MISSION
Primarily: To provide leadership and technical support in the
development and implementation of an integrated ES&H management system that achieves continuous improvement in ES&H performance.
Secondarily: To provide assurance to the Director that ES&H compliance is
being achieved & that line organizations are carrying out their ES&H duties responsively.
.
ES&H SECTION ORGANIZATION CHART
Bill GriffingES&H Director
42 Employees (42.2 FTEs)
Mary LogueSafety & Environmental
Protection
17 Employees (17 FTEs)
Don CossairtRadiation Protection
14 Employees (14 FTEs)
Tim MillerMedical & Admin Support
10 Employees (10.2 FTEs)
.
FY2007 Administrative Peer Review
ES&H Director
Safety & EnvironmentalProtection
Radiation Protection Medical & Admin Support
Sr. Safety Officers• Environmental Officers
• Radiation Safety Officers
Key to our success in implementing an effective integrated ES&H Management System are the ES&H professionals embedded within the line organizations. The Senior Safety Officer employed by each line organization has a dotted line reporting relationship to the Safety Director.
ES&H ORG CHART
.
ES&H SECTION STAFFING & SWF BUDGET (FY07 Act)
Staffing Exempt 26 Non-Exempt 16
Total 42
SWF Budget SWF $4,366k
FY2007 Administrative Peer Review
.
LABORATORY STAFFING & TOTAL BUDGET (FY07 Actual)
Budget SWF 4,366k (~85%) M&S 766k (~15%) Total $5,132k
FY2007 Administrative Peer Review
.
ES&H SECTION - OVERVIEW Report directly to Lab Director Security & Fire Fighting responsibilities transferred to BSS Retain Emergency Planning & Fire Protection Engineering All S&H Traditional Program Responsibilities Environmental Program Responsibilities Environmental Surveillance/Monitoring & Permitting NEPA Coordination with DOE Radiation Protection Program Responsibilities Maintain FESHM & Work Smart Set Facilitate & track ES&H Self Assessment activities ES&H (Lab-wide) Training Analytical laboratory Instrument laboratory Centralized Dosimetry Manage Workers’ Compensation Program & EEOICPA Principal contact for all ES&H compliance activities (with DOE & Reg. Agencies) Coordinate work of various ES&H Subcommittees & facilitate LSC operations Assist with oversight issues at labs in Argentina, New Mexico, Minnesota, Europe ES&H Communication (in various forms)
FY2007 Administrative Peer Review
.
FY06 PEER REVIEW RECOMMENDATIONS
ES&H Recommendations Implement all action items in the report of the Director’s Panel on Injury
Reduction as soon as possible.• 11 recommendations accepted by Director; All closed but two.
Devote continued attention to subcontractor & user safety initiatives• Ongoing process; training/supervision
Ensure that the Annual Safety Plan is embraced uniformly in all Divisions & Sections
• Good progress; each year getting better; 92 actions this year Seize opportunities for more comprehensive reporting, analyzing, &
disseminating findings• Lots of evidence; lessons learned, discussion of injuries & near misses,
Introduction of HPI, frequent communications
FY2007 Administrative Peer Review
.
FY06 PEER REVIEW RECOMMENDATIONS
EMS Recommendations Explore opportunities to schedule emergency drills that involve local
police, fire departments, and other authorities to exercise response scenarios requiring outside intervention.
• Considered doing a drill; overcome by real events; two instances in the last year where we had incidents requiring police to search our site for personnel thought to be carrying weapons. These events gave us an opportunity to test our emergency readiness.
• Each year offsite responders go through familiarization tours of Site 55 and training in mine rescue. Our FD participates in off-site drills. Our emergency planner is a member of 2 LEPC’s and works with county EMA.
FY2007 Administrative Peer Review
.
Contract Proposal Initiatives
Initiate planning to obtain certification under OHSAS 18001(Safety and Health) and ISO 14001(Environmental)
• Achieved ISO 14001 Certification in late July 2007• On target to achieve OHSAS Certification by July 2008, as scheduled
in our contract proposal
FY2007 Administrative Peer Review
.
RISKS & CHALLENGES
One Deep in Several Areas• For several years have been cross training personnel in our Section• Across the lab, insufficient funds to bring in young professionals & mentor them; will
likely lead to accidents eventually Budget
• Ever increasing percentage of budget is consumed by SWF• Will require a bump in M&S this year to avoid reduction in services
Aging Workforce• Impacts us in various ways:
– Getting tasks done without injury to ourselves– Several people retiring in next few years– Costs to our medical department rising
Reduction in Electrical Safety Expertise• In past six months; 2 retired, one passed away, another facing personal medical issues
FY2007 Administrative Peer Review
.
FY2007 Administrative Peer Review
Major Accomplishments in past year
Fire Protection Review Hoisting & Rigging Review ISO 14001 Review Triennial Assessment of Radiation Protection Program Introduction of Human Performance Initiative (HPI) Recycling Initiative FESHM Updates Lab Director’s Panel to Reduce Injuries – actions taken 851 Worker Safety Plan Submission Contract Transition Met almost all of PEMP goals for ES&H & EMS
.
CUSTOMER COMMUNICATIONS
Employees (directly or anonymously) Line Organizations (D/S Head via SSO or direct) DOE
• Weekly Program Office Telecom• FSO & Directors Office meet every Tues.• ES&H leadership meets each month over lunch
Staff Meetings
FY2007 Administrative Peer Review
.
FESS SectionRandy Ortgiesen
Fermilab
August 30, 2007
FY2007 Administrative Peer Review
.
FY2007 Administrative Peer Review
FESS Mission Statement
To Establish and Maintain a Dependable Base To Establish and Maintain a Dependable Base from which Particle Physics and other Fermilab from which Particle Physics and other Fermilab Programs can be Safely Accomplished without Programs can be Safely Accomplished without InterruptionInterruption
.
FY2007 Administrative Peer Review
Infrastructure Inventory
6800 acres 354 buildings
• 2.4 million square feet 78 trailers
• 89 thousand square feet Infrastructure
• Electric system – power received at 345kV from utility grid at 2 primary substations, 241 secondary substations, 115 miles of cable (80 miles underground)
• Industrial cooling water – 21 miles of piping• Domestic water system – 19 miles of distribution piping • Sanitary system – 12 miles of sewer collection piping• Pond water system – 16 ponds with return and supply channels• Natural gas system – 14 miles of underground piping• Roads & Lots – 36 miles & 42 acres
.
FY2007 Administrative Peer Review
ENGINEERING
E. Crumpley
OPERATIONS
B. Shull
ADMINISTRATION
R. Ortgiesen, Head
SITE SERVICES
K. Collins
BUDGET OFFICE ES&H Office
P. Lesiak M. Bonkalski, SSO
R. Walton, EO
O. Jurkiw, Admin. Support
Bruce L. ChrismanAssociate Director for Operations Support
3
2
31
2
74.8
130.8 FTE’s
17
V. Kuchler
ILC
1
(Includes 8 open positions) (Includes 2 open positions)
(Includes 12 open positions)
(Includes 2 open positions)
FESS Organization Chart
.
FY2007 Administrative Peer Review
FESS Resources
Operating budget $17.1M• SWF $9.5M• M&S $7.6M
Contract support• Time and Materials labor contracts• Specialty contracts• Janitorial
.
FY2007 Administrative Peer Review
FESS Operations Department
Preventive, corrective and predictive maintenance and repair support for site facilities, equipment and infrastructure
Provides engineering support for maintenance and operational activities
Manages several service contracts to support in-house maintenance services including specialized mechanical equipment, cranes and high voltage electrical support
Operations of the Central Utility Building Pond water management
.
FY2007 Administrative Peer Review
FESS Engineering Department
Design and construction of all on-site and limited off-site facilities
Pre-conceptual design services for proposed future laboratory projects
Manages several A/E service contracts to supplement in-house design services
Construction coordination and task management services as requested
Develop and administer Geographical Information System (GIS)
.
FY2007 Administrative Peer Review
FESS Site Services Department
In-House services Include Wilson Hall Building Management, Roads and Grounds maintenance, and FESS IT system management
Subcontracted services include Time & Material services for construction trades, elevator maintenance, custodial services, trash pickup and recycling, and pest control
Management of site infrastructure systems and condition assessments for buildings and infrastructure systems
DOE Real Property interface
.
FY2007 Administrative Peer Review
FESS CY07 ES&H Performance
4-Recordable; 2-DART; 13-First-Aid Management & Union Committee established and active for
improved safety performance and HVAC best practices FY07 ES&H plan
• Demonstrate Management Commitment• Provide safe work environment that promotes ES&H• Improve Communication• Waste Management and Pollution prevention
.
FY2007 Administrative Peer Review
Energy and Utility Management
Executive Order 13423 DOE Transitional Energy Action Management (TEAM)
initiative• Aggressive goals• Plan to implement by end of FY2008
National Laboratory Improvement Council (NLIC)• Working group to propose a corporate portfolio
approach
Electricity procurement using Dollar Cost Averaging• Manage volatile market risk • DESC and DOE procurement; lab support
.
FY2007 Administrative Peer Review
DOE Initiatives
Science Laboratory Infrastructure (SLI) initiative • Fermilab project nominations included
– Industrial Cooling Water Upgrades ($20.8M) FY11-13– High Voltage Electrical Upgrades ($14.1M) FY11-13– Industrial Facilities Consolidation ($33.8M) FY14-17
Real Property Asset Management• FIMS validation• Maintenance Investment levels
– Tunnels and Accelerators • Deferred Maintenance Reduction
.
20202000
SLI $34.9MICW & Electrical
UESC 2000-2011 = $57M or $5.7M per year
Warrenville Water $1MSLI $33.8MIndustrial FacilitiesBatavia Electrical $5M
& annual maintenance
$6M$6M$6M$6M $6M$6M$3M$8M$5M$4M$3M $2M$1M$3M
General Plant Projects
Fermilab’s Commitment to General Infrastructure, 2000+
FY2007 Administrative Peer Review
.
FY2007 Administrative Peer Review
Batavia Initiative Pi-pole replacement
Scope:• Replace 19 wooden 345 kV Pi-pole structures• Circuit switchers to improve 345kV outage
coordination• Maintenance of DOE 345kV lines by Batavia
Cost avoidance of $5M in project cost Reduction of $5M in deferred maintenance Underway and scheduled for completion 9/30/07 Eliminate lab’s biggest infrastructure vulnerability
.
FY2007 Administrative Peer Review
FY2006 Recommendations Measure 7.0
Develop GPP plans consistent with TYSP • Programmatic vs. Conventional scopes • Changing Dynamics
Institute formal process for customer communications• Daily work activities to building managers • Discussions with D/S facility managers• Section head briefings on FESS direction• Weekly scheduling meetings• Monthly coordination meetings with accelerator ops
.
FY2007 Administrative Peer Review
Contract Initiative
Implement a space-utilization and facilities reuse program• Directors Policy 36• Dependent on future mission decisions• Building use matrix vs. mission projection
– Space Planning integrated with Strategic Planning
.
Closeout SlidesThe Committee
August 31, 2007
FY2007 Administrative Peer Review