+ All Categories
Home > Documents > ads 3 panel 1

ads 3 panel 1

Date post: 30-Mar-2016
Category:
Upload: jaevon-liew
View: 217 times
Download: 1 times
Share this document with a friend
Description:
ads 3 panel 1
Popular Tags:
1
REGENERATIVE TOPOLOGY_ads:air2012 Our design theme concerns with lightweight materials along with complex truss system which would articulate the site landscape. We hope to create a point of contact for the community of Wyndham and the landscape to create fur- ther emphasis on Wyndham’s greater growth as a city. The analogy between the natural context and that has been portrayed in the cladding, which is texturized to depict vari- ous recycled materials and would involve cooperation of the community at Wyndham to construct. FREEWAY ROAD WEST PRINCES FREEWAY ROAD WEST SITE A PRINCES FREEWAY ROAD WEST PRINCES FREEWAY ROAD WEST SITE A FREEWAY WESTS ROAD WEST PRINCES FREEWAY ROAD WEST ROAD SITE A 16 15 16 18 17 18 15 17 17 16 15 18 16 15 16 18 15 17 17 18 site plan 1:2000 SITE ANALYSIS TOPOGRAPHYPHY ACCESS/TRAFFIC SOLAR LEVEL ANALYSIS 8:00 12:00 16:00 18:00 FREEWAY ROAD WEST PRINCES FREEWAY ROAD WEST SITE A DESIGN DEVELOPMENT 1.FIRST ITERATION-BANQ RESTAURANT 2.SECOND ITERATION- REFINING DEFINITION 3.THIRD ITERATION-FORM EXPERIMENTATION 4.FORTH ITERATION-REFINED DESIGN 1 2 3 4 SUN PATH
Transcript
Page 1: ads 3 panel 1

REGENERATIVE TOPOLOGY_ads:air2012

Our design theme concerns with lightweight materials along with complex truss system which would articulate the site landscape. We hope to create a point of contact for the community of Wyndham and the landscape to create fur-ther emphasis on Wyndham’s greater growth as a city.

The analogy between the natural context and that has been portrayed in the cladding, which is texturized to depict vari-ous recycled materials and would involve cooperation of the community at Wyndham to construct.

FREEWAY

ROAD

WEST

PRINCES

FREEW

AY

ROAD

WEST

SITE A

PRINCES FREEWAY

ROAD

WEST

PRINCES

FREEW

AY

ROAD

WEST

SITE A

FREEWAY

WESTS ROAD

WEST

PRINCES

FREEW

AY

ROAD

WESTROAD

SITE A

16

15

16

18

17

18

15

17

171615

18

1615

16

18

15

1717

18

site plan1:2000

SITE ANALYSIS

TOPOGRAPHYPHY ACCESS/TRAFFIC

SOLAR LEVEL ANALYSIS

8:0012:00 16:00 18:00

FREEWAY

ROAD

WEST

PRINCES

FREEW

AY

ROAD

WEST

SITE A

DESIGN DEVELOPMENT

1.FIRST ITERATION-BANQ RESTAURANT2.SECOND ITERATION- REFINING DEFINITION3.THIRD ITERATION-FORM EXPERIMENTATION4.FORTH ITERATION-REFINED DESIGN1 2

3 4

SUN PATH

Recommended