ADVANCED INDUSTRIAL CONSTRUCTION TECHNIQUE
Transcript
Page 1: Advad.Ind.Const.Tech. Batch -3

ADVANCED INDUSTRIAL CONSTRUCTION TECHNIQUE

Page 2: Advad.Ind.Const.Tech. Batch -3

Presented byPRASANTH KUMAR DASUM.N.SIRISHAM.T.SULEKHAT.JAYA RAM

Under the guidance of Naomi Nischala.

Page 3: Advad.Ind.Const.Tech. Batch -3

WHAT IS FLY ASH SILO:

The fly ash silo is a massive structure in cement plants, which is used to store the fly ash in that structure to add the required amount of fly ash for cement manufacturing by using conveyers. Its is Generally circular in shape. Capacity of this silo is 40,000 tons.

OBJECTIVE: CONTRUCTION OF FLY ASH SILO

Page 4: Advad.Ind.Const.Tech. Batch -3

CONSTRUCTION OF FLY ASH SILO BY USING ADVANCED CONSTRUCTION

TECHNIQUE’S :

PILE FOUNDATION

SLIP FORM TECHNIQUE

POST TENSIONING

Page 5: Advad.Ind.Const.Tech. Batch -3

WHAT IS PILE FOUNDATION:

Deep foundations are employed when the soil strata immediately beneath the structure are not capable of supporting the load with tolerable settlement or adequate safety against any failure.

Pile foundations are relatively long, slender members that are driven into the ground or cast-in-situ.

Page 6: Advad.Ind.Const.Tech. Batch -3

TYPE OF FUNDATION USED PILE FOUNDATION.

Page 7: Advad.Ind.Const.Tech. Batch -3

A VISUAL ABOUT PILE FONDATION:

Page 8: Advad.Ind.Const.Tech. Batch -3

Bored cast in situ pile:Only concrete piles can be cast-in-situ. piles can be cast-in-situ. Holes are drilled and these are filled with concrete. These may be straight-bored piles or may be ‘under-reamed’ with one or more bulbs at intervals. Reinforcements may be used according to the requirements.

Type of pile:

Page 9: Advad.Ind.Const.Tech. Batch -3

No. of piles 65 Nos.

LAYOUT OF PILES

Page 10: Advad.Ind.Const.Tech. Batch -3

DETAIL OF PILE FOUNDATION:

Specifications followed as per IS:456-2000 Diameter of pile- 1.0 meter.

Reinforcement used 25 dia. 8 nos.

Stirrup of 12mm dia spacing 200 mm c/c.

Depth of pile 23.5 meters.

Page 11: Advad.Ind.Const.Tech. Batch -3

Specifications followed as per IS:456-2000 Concrete grade used is M25 (1:1:2)

Grade of steel.Fe 500.

Cover maintained for main reinforcement 75 mm.

Pile is to be embeded into the hard strata atleast 150 to 300mm.

Page 12: Advad.Ind.Const.Tech. Batch -3

SLIP FORM:

Its a Moving formwork.

A Continuously Moving form Moving at such a speed , when concrete

is completed its initial setting time and after getting hardened. It will

withstand lateral pressure caused by jack rod, wind pressure etc.

TYPE OF FORM WORK

Page 13: Advad.Ind.Const.Tech. Batch -3

PRINCIPLE OF SLIPFORM

SLIPFORM MEANS A CONTINUOUSLY MOVING FORM

MOVING AT SUCH A SPEED BY USING THE

HYDRAULIC PRESSURE GIVEN GRADUALLY TO THE

FORM WORK UP TO DESIRED HEIGHT.THE WHOLE

FORM WORK WILL BE MOVED BY SUPPORTING ON

CLIMBING ROD OR JACK ROD.

Page 14: Advad.Ind.Const.Tech. Batch -3

TYPES OF SLIPFORM

1. STRAIGHT SLIPFORM.

2. TAPERED SLIPFORM.

3. SLIPFORM FOR SPECIAL APPLICATIONS.

Page 15: Advad.Ind.Const.Tech. Batch -3

Straight slipformSilos

Chimneys (cylindrical)

Water towers

Central core for office blocks

Columns

Tapered slipform Chimneys (conical)

Ventilation stacks

APPLICATION OF SLIPFORM

Page 16: Advad.Ind.Const.Tech. Batch -3
Page 17: Advad.Ind.Const.Tech. Batch -3

WORKABILITY REQUIRED

A. Easy compaction

B. To cover and protect the reinforcement.

C. To have less friction on formwork shutters.

• A film of mortar is created by compaction at

the contact with the form panel.

• This mortar film avoids micro - cracks during

slipform lifting.

D. Provide smooth surface to wall.

Page 18: Advad.Ind.Const.Tech. Batch -3

THE ABOVE FACTORS DEPEND ON

- QUALITY OF CEMENT.

- NATURE & SHAPE OF AGGREGATES.

- WATER CEMENT RATIO

- COMPACTION.

- HARDENING TEMPERATURE.

MINIMUM CONCRETE STRENGTH FOR SLIPFORM

Page 19: Advad.Ind.Const.Tech. Batch -3

COMPONENT PARTS OF SLIPFORM

Page 20: Advad.Ind.Const.Tech. Batch -3

A VISUAL ABOUT SLIP FORM

Page 21: Advad.Ind.Const.Tech. Batch -3

Slipform assembly at (-)2.00m level

Page 22: Advad.Ind.Const.Tech. Batch -3

OPERATION OF JACK.

Page 23: Advad.Ind.Const.Tech. Batch -3

Slipform jack operation

Page 24: Advad.Ind.Const.Tech. Batch -3

Exposed concrete surface finishing from slipform platform

Page 25: Advad.Ind.Const.Tech. Batch -3

SILO UNDER PROGRESS

Page 26: Advad.Ind.Const.Tech. Batch -3

AT 30 METERS HEIGHT

Page 27: Advad.Ind.Const.Tech. Batch -3

MORE DETAILS ABOUT SILO

DIAMETER OF SILO 22 METERS. WALL THICKNESS OF SILO 800 MM

UP TO 16.5 METERS. 16.5 TO 57 MTS 350 MM THICK. INSERT PLATES FOR EQUIPMENTS

AND CONVEYORS FIXING.

Page 28: Advad.Ind.Const.Tech. Batch -3

• Accuracy

• Monolithic construction

• Lends itself to almost any shape in plan

• High quality surface finish

• Saves lot of workmanship.

• Saves staging materials

• Economical above a certain height.

• Produces aesthetically pleasing structures

ADVANTAGES OF SLIP FORM:

Page 29: Advad.Ind.Const.Tech. Batch -3

POST-TENSIONING

Introduction What is post-tensioning?

Post-tensioning- is a method of reinforcing (strengthening) concrete or other materials with high-strength steel strands called tendons.

Page 30: Advad.Ind.Const.Tech. Batch -3

Objective: Concrete is very strong in compression

but weak in tension, so as a tension

resistant member we provide tendons for

silo wall to strengthen the wall.

Page 31: Advad.Ind.Const.Tech. Batch -3

Structural elements that use post-tensioning:Many types of bridges

Elevated slabs.

Foundations.

Walls and columns.

Silos and chimneys.

Page 32: Advad.Ind.Const.Tech. Batch -3

COMPONENTSanchor

PT strand wedges

Page 33: Advad.Ind.Const.Tech. Batch -3

Methods and Materials PT strand - ASTM A416

– 7-wire treated carbon steel– Min. TY (yield) = 52.74 kips

– Min. TU (breaking) = 58.60 kips Anchors - ACI code

– Guaranteed up to 95% of the breaking strength TU.

Page 34: Advad.Ind.Const.Tech. Batch -3

Method of post-tensioning.

This is the hydraulic jack used for tensioning

Page 35: Advad.Ind.Const.Tech. Batch -3

GROUTING EQUIPMENT

Air Powered Grout Pump

Pumps cement grout only, no sand. 32 Gallon Mixing Tank. Mixes up to 2 sacks of material at once and allows for grout to be pumped during mixing or mixed without pumping.

Page 36: Advad.Ind.Const.Tech. Batch -3

Detailed method of post-tensioning

In slab-on-ground construction, unbonded tendons are typically prefabricated at a plant and delivered to the construction site, ready to install.

The tendons are laid out in the forms in accordance with installation drawings that are given.

After the concrete is placed and has reached its required strength, usually between 3000 and 3500 psi (“pounds per square inch”), the tendons are stressed and anchored.

Page 37: Advad.Ind.Const.Tech. Batch -3

The tendons, like rubber bands, want to return to their original length but are prevented from doing so by the anchorages.

The fact the tendons are kept in a permanently stressed(elongated) state causes a compressive force to act on the concrete.

The compression that results from the post-tensioning counteracts the tensile forces created by subsequent applied loading.

This significantly increases the load-carrying capacity of the concrete.

Page 38: Advad.Ind.Const.Tech. Batch -3

Bonded post-tensioned concrete is the descriptive term for a method of applying compression after pouring concrete and the curing process (in situ).

The concrete is cast around a plastic, steel or aluminium curved duct, to follow the area where otherwise tension would occur in the concrete element.

A set of tendons are fished through the duct and the concrete is poured. Once the concrete has hardened, the tendons are tensioned by hydraulic jacks.

Page 39: Advad.Ind.Const.Tech. Batch -3

When the tendons have stretched sufficiently, according to the design specifications they are wedged in position and maintain tension after the jacks are removed, transferring pressure to the concrete.

The duct is then grouted with cement to protect the tendons from corrosion. This method is commonly used to create homogeneity in load transmission.

Page 40: Advad.Ind.Const.Tech. Batch -3

ADVANTAGES OF POST-TENSIONINGADVANTAGES OF POST-TENSIONING• Longer clear spans Longer clear spans • Thinner slabsThinner slabs• Lesser floor-to-floor heightsLesser floor-to-floor heights• Shorter building heightShorter building height• Lesser weightLesser weight• Improved seismic performanceImproved seismic performance• Faster construction cycleFaster construction cycle

Page 41: Advad.Ind.Const.Tech. Batch -3

Post-tensioned structures can be designed to have minimal deflection and cracking, even under full load.

Post-tensioning tendons, on the other hand, are considered “active” reinforcing.

Page 42: Advad.Ind.Const.Tech. Batch -3

DISADVANTAGES OF DISADVANTAGES OF POST-TENSIONINGPOST-TENSIONING

The main disadvantage over post- tensioning is the fact that a cable can distress itself and burst out of the slab if damaged (such as during repair on the

slab).

Page 43: Advad.Ind.Const.Tech. Batch -3

THANKYOU

Page 44: Advad.Ind.Const.Tech. Batch -3

ANY QUERIE’S?