advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)
Transcript
Page 1: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)

advanced digestion technology

Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure

Dorian Harrison, Technical Director (Monsal)

Page 2: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)

advanced digestion technologyadvanced digestion technology

Project Brief

• Develop AD Assets / Strategy in Scotland for Biowaste• Plant 1 - 30,000 tpa (Cumbernauld)• Plant 2 - 40,000 tpa (Prestwick)• Plant 3 - 40,000 tpa (Johnstone)

• Merchant Site

• Category 3 Material

• Separate Packaged Feed Materials

• Produce High Quality (PAS110) Product

• Maximise Revenue from Energy Generation

• Integrate into Existing Facility

Page 3: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)

advanced digestion technologyadvanced digestion technology

Project Procurement & Team

• Initial OJEC Notice (short list 6 bidders)

• Phase 1 – Permit Design Development

• Phase 2 – Detail Design Development

• Phase 3 – Construction Phase

Page 4: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)

advanced digestion technologyadvanced digestion technology

Project Overview

• Existing Open Windrow and IVC Composting Facility• Mixed green waste• Catering waste• Slurries (Odour)

• Current Capacity 40,000 tpa

• New Biowaste AD – Additional 30,000 tpa• Kerbside collection (source segregated)• Packaged food waste• Category 3• Commercial and industrial (C&I)• Slurries

• 1MWe Generation

Page 5: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)

advanced digestion technologyadvanced digestion technology

Cumbernauld - Site History

• Site History• Operated as Deerdykes STW• Converted to open windrow composting facility (2003)• In vessel composting completed (2008)• Merchant AD facility (2010)

Page 6: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)

advanced digestion technologyadvanced digestion technology

Integration Issues – WwTW Upgrade to Biowaste

• Difficulties• Traffic management• Electrical Connection • Discharge Consent • Permit Modification• Planning Permission• Product (PAS110 / Waste Exemption License)

• Benefits• Dilution Effluent• Existing Discharge to Sewer / Liquor Treatment?• Existing Logistics• Trained Operations Staff• Grid Connection / Generating Capacity

Page 7: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)

advanced digestion technologyadvanced digestion technology

Permitting Issues

• Odour at boundary 1.5OUe• NOx, SOx emissions • Noise• Effluent (liquor treatment)• Normal operation• Abnormal operation• Best Available Technology

• Environmental risk assessment integral with design risk assessment• Modelling of emissions (noise, NOx, SOx, odour)• Design to minimise emissions• Environmental HAZOP to look at risks • Visit working sites to familiarise• Define BAT

Page 8: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)

advanced digestion technologyadvanced digestion technology

Commercial Viability

• Revenue Streams (Maximise!)• Gate fee• Power• Product

• Opex Costs (Minimise!)• Parasitic power• Fuel costs• Manpower• Product?

• Infrastructure Cost • Minimise development costs (phased contract)• Biowaste AD asset specification• Development support

Page 9: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)

advanced digestion technologyadvanced digestion technology

30,000 Biowaste plant– Short Mass Balance

Pre-Processing AD plant Biogas CHP

Waste

30,000 tpa Power

1 MWe

Compost

16,600 tpa

Makeup Water40 - 90 m3/d

Biogas production

439 m3/hWaste Water

36 m3/d

Page 10: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)

advanced digestion technologyadvanced digestion technology

Monsal Biowaste Flowsheet

Page 11: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)

advanced digestion technologyadvanced digestion technology

Feed Preparation for Digestion

• Up to 20% Contamination

• Solids 20% to 40%

• This is what we get

• What we Want• Solids ~ 10% by weight• Contamination < 0.25% in feed

Page 12: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)

advanced digestion technologyadvanced digestion technology

Cleaning up Biowaste – how it works

Page 13: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)

advanced digestion technologyadvanced digestion technology

Ideal Feed to Digester

• Liquified Slurry Feed (Wet Digestion)

• 10% DS

• 12mm screened

• Low Contaminants

• PAS110 req <0.5% by Weight

• Digestion Concentrates Contamination• 0.25% Feed = 0.5% Cake

Page 14: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)

advanced digestion technologyadvanced digestion technology

Required Product

• Contamination < 0.5%• PAS110 compliant• Product• 25 – 35% dry solids

Page 15: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)

advanced digestion technologyadvanced digestion technology

Conclusions

• Co-development of Biowaste AD with WW assets minimises development costs & programme

• Planning• Permitting• Synergises – liquors, power, infrastructure, staff.

• Water industry pedigree of client and technology provider ensures robust quality and professional project delivery

• Biowaste asset standard optimised to deliver good commercial IRR

• Model can be expanded rapidly across Scotland (Plants 2 & 3) delivering:• 110,000 tpa capacity

• 4 MWe + renewable energy• Valuable compost for recycling

Page 16: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)

advanced digestion technology

Acknowledgments

• Scottish Water Horizons• Donald MacBrayne• Helen Gillard• Kristine Leitch

• Enviros• Jonty Olufsen• Joe Short

• HBS• Andrew Russell• Bill Taylor

• SEPA

• WRAP (demonstrator program)

Page 17: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)

advanced digestion technology

Thank You

Dorian HarrisonTechnical Director (Monsal)

Page 18: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)
Page 19: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)

advanced digestion technologyadvanced digestion technology

Magnetic Separation (for source segregated?)

Page 20: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)

advanced digestion technologyadvanced digestion technology

Waste Dissolvers

• Liquify Organic Material

• Separate out Heavy Contaminants

• Float Light Contaminants

Page 21: Advanced digestion technology Integration of New Biowaste Facilities on Waste Water Treatment Infrastructure Dorian Harrison, Technical Director (Monsal)

advanced digestion technologyadvanced digestion technology

Animal By-Products

• Category 1• Incineration

• Category 2

• Rendering• 133oC for 20 minutes as a batch• 3 bar pressure• No Disposal to Agricultural Land

• Category 3• 70oC for 1 hour as a batch

• <12mm in one plane

• Catering Waste (UK)• Meat Excluded• Biogas - 57C for 5 hour as a batch• <50mm in one plane• 18 days storage