Advanced Flood Alarming System Presented by Nasimullah Jan 15-IED-!Sc-E"P# -1$ Salahuddin # ari% 15-IED-!Sc-E"P#-&'  ()air A*ram 15-IED-!Sc-E"P# -&'
Transcript
Page 1: Advanced Flood Alarming System

8/18/2019 Advanced Flood Alarming System

http://slidepdf.com/reader/full/advanced-flood-alarming-system 1/18

Advanced FloodAlarming System

Presented by

•Nasimullah Jan 15-IED-!Sc-E"P#-1$

•Salahuddin #ari% 15-IED-!Sc-E"P#-&'• ()air A*ram 15-IED-!Sc-E"P#-&'

Page 2: Advanced Flood Alarming System

8/18/2019 Advanced Flood Alarming System

http://slidepdf.com/reader/full/advanced-flood-alarming-system 2/18

Programs, Data, Devices andmethods Required 

Page 3: Advanced Flood Alarming System

8/18/2019 Advanced Flood Alarming System

http://slidepdf.com/reader/full/advanced-flood-alarming-system 3/18

Purpose of the project

1) To predict the ood in the earliestpossible time

2) To minimize the ood by making proper

strategies3) And to store ater in our reser!oirs to the

ma" safe le!els

#) And to e!acuate and displace people ine"treme cases before any life loss$

Page 4: Advanced Flood Alarming System

8/18/2019 Advanced Flood Alarming System

http://slidepdf.com/reader/full/advanced-flood-alarming-system 4/18

%o the ood can bepredicted

&ollecting data related to the ri!er or 'allah (asin i$e$ Total area slop roughness in*ltration factor and minater carrying capacity of the ri!er at the critical point$

• +ined ma" o ,uantity and the min time for ma" aterconcentration by multiplying area of the basin by the

rainfall intensity hile considering other factors in!ol!ed• +ind the accurate rain fall intensity and transmit data to

the point of obser!er using ad!anced rain gauge

• Predict the situation automatically by comparing the ma"ater o and the ma" capacity of ri!er-'allah using ./

e"cel by using already feed data and transmitted data• 0eporting safe hen the o ,uantity is less then the

ma" capacity of ri!er otherise ring the bell of threat$

Page 5: Advanced Flood Alarming System

8/18/2019 Advanced Flood Alarming System

http://slidepdf.com/reader/full/advanced-flood-alarming-system 5/18

&ollection of data using oogle earth pro

Page 6: Advanced Flood Alarming System

8/18/2019 Advanced Flood Alarming System

http://slidepdf.com/reader/full/advanced-flood-alarming-system 6/18

&ollection of data using oogleearth pro

Page 7: Advanced Flood Alarming System

8/18/2019 Advanced Flood Alarming System

http://slidepdf.com/reader/full/advanced-flood-alarming-system 7/18

&ollection of data using oogle earth pro

Page 8: Advanced Flood Alarming System

8/18/2019 Advanced Flood Alarming System

http://slidepdf.com/reader/full/advanced-flood-alarming-system 8/18

 Total catchment area

 Total catchment area ##$4 s,$5 

Page 9: Advanced Flood Alarming System

8/18/2019 Advanced Flood Alarming System

http://slidepdf.com/reader/full/advanced-flood-alarming-system 9/18

&ollection of data using oogleearth pro

Page 10: Advanced Flood Alarming System

8/18/2019 Advanced Flood Alarming System

http://slidepdf.com/reader/full/advanced-flood-alarming-system 10/18

 Time T1

Page 11: Advanced Flood Alarming System

8/18/2019 Advanced Flood Alarming System

http://slidepdf.com/reader/full/advanced-flood-alarming-system 11/18

&ollection of data using oogle earth pro

Page 12: Advanced Flood Alarming System

8/18/2019 Advanced Flood Alarming System

http://slidepdf.com/reader/full/advanced-flood-alarming-system 12/18

Findingvelocity

Page 13: Advanced Flood Alarming System

8/18/2019 Advanced Flood Alarming System

http://slidepdf.com/reader/full/advanced-flood-alarming-system 13/18

 Time T1

&alculating and 6sing!alues as

 /7238#9:89#)-8 ; 92<$28=9

 P<$# ; 92<2112 ft A2112 ; 2#22# sft 0A-P 2  n $<# >1 1$#8-$<#; 2 ; $28=9 32$2 ft -sec T1?1->18 ; 92<-32$21#49$4 sec

%ence T1 1#49$4 sec @0 T1 29 min

2-3

1-2

Page 14: Advanced Flood Alarming System

8/18/2019 Advanced Flood Alarming System

http://slidepdf.com/reader/full/advanced-flood-alarming-system 14/18

&alculating min time for ma" &oncentration• (sing the method

mentioned in the

+revious ,e canned #. #$ as ,ell

 T2 3$98"92<-114$=min

 T3 1<$="92<-1= 9min

 

 Total time

 T29191<1 min

Page 15: Advanced Flood Alarming System

8/18/2019 Advanced Flood Alarming System

http://slidepdf.com/reader/full/advanced-flood-alarming-system 15/18

 The 0ate of 0ain fal l BBB

•  Total Cuantity of raining ater

Cty A7(asin) ; h70ate of rain fall in ft or m)

 Cty ##41199 " <$<<1 ##411 cum-min

 And Total Cuantity of oing ater through a stream

Cty >7!elocity of ater) ; A7area of o)

Cty 1=-3$21 ; =<<<<-1<$4= ; =< 14=4924 cum - min

 Total ,uantity of ater fall

Page 16: Advanced Flood Alarming System

8/18/2019 Advanced Flood Alarming System

http://slidepdf.com/reader/full/advanced-flood-alarming-system 16/18

0ain auge

Page 17: Advanced Flood Alarming System

8/18/2019 Advanced Flood Alarming System

http://slidepdf.com/reader/full/advanced-flood-alarming-system 17/18

%o the rain gauge orks

Page 18: Advanced Flood Alarming System

8/18/2019 Advanced Flood Alarming System

http://slidepdf.com/reader/full/advanced-flood-alarming-system 18/18

(ene*ts•  Through prediction of ood e ill be

able to plan our reser!oirs and headork accordingly

• ?isplace or e!acuate people in caseof e"treme situations

• De may also pro!ide temporarysafety raising banks of the streams

before hitting• De may also delay some ater

through blasting in a non populated

!alley