Advanced Work Packaging & WorkFace Planning
Solutions for Project DeliveryA Global EPC Perspective
Hadi MasriVice President - CoSyn Technology (WorleyParsons)
CURRENT STATE
VALUEAWP
SOLUTIONCHALLENGES
WHY ARE WE HERE?
WHY ARE WE HERE?
RESULTS
GLOBALIZATIONCURRENT STATE
CURRENT STATE
CHANGE
CURRENT STATE
PREDICTABILITY
SAFETY
QUALITYOPERABILITY
VALUE
ENVIRONMENTALPREDICTABILITY
VALUE
MAINTAINABILITYCONSTRUCTABILITY
ADVANCED WORK PACKAGING
Advanced WorkPackaging
(AWP)?
THINKING WITH THE END IN MINDAT THE START
ADVANCED WORK PACKAGING
ADVANCED WORK PACKAGINGOWNER
ENGINEERING CONSTRUCTION
SUPPLYNETWORK
PROCUREMENT
MAINTENANCEOPERATIONS
OWNER
ENGINEERING CONSTRUCTION
ADVANCED WORKPACKAGING
ADVANCED WORK PACKAGING
SUPPLYNETWORK
AssetDefinition Operate Decommission
/mothballCompletions
Select1 IDENTIFY 2 EVALUATE
Deliver3 DEFINE 4 EXECUTE
Improve5 OPERATE
DetailedEngineeringFEEDConceptual
Development Construct
ADVANCED WORK PACKAGING
CII – IR 272, Advanced Work Packaging:Implementation Resource 272-2 version 3.0, Volume 2, Sect 1.1, Figure 1
Select1 IDENTIFY 2 EVALUATE
Deliver3 DEFINE 4 EXECUTE
Improve5 OPERATE
WHY WE DO IT?
INFLUENCE CURVE
Project Cum
ulative
Opp
ortu
nitie
s fo
r Sav
ings
Max
Min
100%
Concept Completion0%
AssetDefinition Operate Decommission
/mothballCompletionsDetailedEngineeringFEEDConceptual
Development Construct
Ability to influence
Cost
INTEGRATED TOOLSAND USE OFTECHNOLOGY
ADVANCED WORK PACKAGING
3D (Space)4D (time)5D (IMM)
6D (Ops/mtce)
Data IntegrationData Transfer
ADVANCED WORK PACKAGING
BUY‐IN
GLOBALIZATIONCULTURE
CONTRACTS
TECHNOLOGY
CHALLENGES
GLOBALIZATIONRESULT
RESULT
CHANGE
RESULT
PREDICTABILITY
RESULT
SYSTEMS
PEOPLESAFETY
TECHNOLOGY
OWNER
RESULT
Thank-you
QUESTIONS?