Date post: | 30-Dec-2015 |
Category: |
Documents |
Upload: | branden-fitzpatrick |
View: | 33 times |
Download: | 1 times |
Advisory Committee of CERN Users (ACCU) A. Di CiaccioUniversita’ di Roma Tor Vergata e INFNCSN1, Napoli, 19 settembre 2005
CSN1,Napoli, 19 settembre 2005 2Anna Di Ciaccio
ACCU IL Comitato ACCU del CERN e’ stato proposto dal
Committee del Council il 24 August 1977 come un Advisory Committee of CERN Users.
La prima riunione e’ avvenuta nel Novembre 1977 Mandato:
The task of ACCU is to advise the DG on the practical measures to be taken and administrative internal arrangements to be made by the CERN Management for the utilization of the CERN facilities for research.
This concerns in particular the working conditions and the arrangements for technical support to the CERN Users for their activity at the CERN Laboratory.
Questions dealing with the scientific programme of CERN do not fall under these terms of reference.
CSN1,Napoli, 19 settembre 2005 3Anna Di Ciaccio
Informazioni generali Pagina web:http://ph-dep.cern.ch/ph-dep/ACCU/
Composizione Agenda Verbali Presentazioni
Riunioni : Quattro l’anno (tipicamente la settimana prima del
Council); Nel 2005: 9 marzo, 8 giugno, 7 settembre, 7 dicembre
CSN1,Napoli, 19 settembre 2005 4Anna Di Ciaccio
Composizione Due utenti appartenenti ai Paesi
Membri piu’ grandi : Francia, Germania, Gran
Bretagna,Italia Un utente degli altri Paesi
Membri; Quatto utenti dei Paesi non-
Membri. Due Staff CERN Il Chairman e’ eletto ogni 2 anni
tra i membri del Comitato
Chairman attuale: F.L. Navarria
IL CERN Management e’ attualmente representato all’ ACCU da:
J. Engelen (Deputy DGl) , A. Naudi (HR/FI DR) J.J.Blaising (Deputy EP) C.Onions (Head of User’s
Office) M.Pepe-Altarelli (Human
Resources Division) M.Goossens (CERN Staff
Association ).
CSN1,Napoli, 19 settembre 2005 5Anna Di Ciaccio
Composizione (2) Fino al 2003 era presente alle riunioni :
Il Direttore Generale (oggi occasionalmente), un direttore della ricerca, il direttore dell’amministrazione, il responsabile delle relazioni con gli Stati Membri.
Inoltre il Chairman dell’ACCU partecipava alle riunioni dell’Executive Board del CERN (DG+Direttori di Ricerca)
ACCU aveva un ruolo piu’ rilevante
Il Comitato ACCU rappresenta tutti gli Users, staff e visitatori, appartenenti a tutti i dipartimenti
CSN1,Napoli, 19 settembre 2005 6Anna Di Ciaccio
Rappresentanti degli Users in altri comitati del CERN
Il Cern ha 48 Comitati (il numero e’ stato fortemente ridotto dal nuovo DG) e in cinque di essi e’ prevista la presenza di un delegato ACCU in rappresentanza di tutti gli Utenti:
Academic Training Committee F. Navarria (I)
Desktop Forum A.Di Ciaccio (I) (C.Onions)
Housing Fund Comm. J.Wilson (GB) (C.Onions)
Restaurants’ Supervisory Comm. C.Martinez-Rivero(ES)
Scientific Information Policy Board K. Freudenreich (CH), F.Navarria(I)
CSN1,Napoli, 19 settembre 2005 7Anna Di Ciaccio
CERNCERN
ACCUChair:F.Navarria
ACCUChair:F.Navarria
USERSAgencies
USERSAgencies
DFDF
HFCHFC
RSCRSC
SIPBSIPB
ATCATC
UO
CSN1,Napoli, 19 settembre 2005 8Anna Di Ciaccio
Agenda tipica (7 sett 2005)
1. Chairman's remarks 2. Adoption of the agenda 3. Minutes of the previous meeting 4. Matters arising 5. News from the CERN Management 6. Logistic at Cern 7. The CERN Web Page 8. Reports from ACCU representatives on other Committees 9. Users' Office news 10. Any Other Business 11. Agenda for the next meeting • Un verbale riassuntivo viene spedito da F.Navarria e/o A.Di Ciaccio
ai membri della CSN1,Giunta esecutiva,Responsabili nazionali ad ogni riunione
Action items
Rapporto di un servizio del CERN
CSN1,Napoli, 19 settembre 2005 9Anna Di Ciaccio
Alcuni argomenti in agenda nell’ultimo anno
Nuova Organizzazione del CERN management Sicurezza dei computer al CERN Nuovo dosimetro Open Access per le pubblicazioni CERN Nuova organizzazione corsi per la sicurezza al
CERN Costruzione di un nuovo Foyer
CSN1,Napoli, 19 settembre 2005 10Anna Di Ciaccio
Nuova struttura organizzativa del CERN (Dic. ’04) Tre soli membri del Direttorato
R.Aymar (Direttore Generale) J.Engelen(Direttore
scientifico) A.Naudi (Direttore finanze e
risorse umane) Un Direttore generale dei servizi
(M.Metzger) 5 Linee di Progetto
LHC->prioritario LCG,EGEE,CNGS,CLIC
7 Dipartimenti HR,FI,AB,AT,TS,IT,PH
CSN1,Napoli, 19 settembre 2005 11Anna Di Ciaccio
2002 2003 2004 Incident Type
31 31 366 System compromised (intruder has control) users installed trojan code (download, attachment) security holes in software (e.g. Windows, IE, ssh, kernel, web, CVS)
25 32 24 Compromised CERN accounts sniffed or guessed passwords
21 429 330 Serious Viruses and worms PCs on CERN’s network found spreading infections
21 143 356 Unauthorised use of file servers and P2P software insufficient access controls, P2P file-sharing, Skype
9 6 2 Miscellaneous security alertse.g. CERN PC targeted for a DoS attack
123 643 1078 Total Incidents (until 30 Nov 2004)
Sicurezza dei Computer al CERN
CSN1,Napoli, 19 settembre 2005 12Anna Di Ciaccio
Use managed systems Experts manage applications, patches, anti-virus, password rules
Ensure protection when away from “home” E.g. Firewall protection, automated patch and anti-virus updates
Use secure working methods Applications gateways, e.g. WebMail, WebDAV (files), WTS (Windows
Terminal Services), SSH via LXPLUS Use good passwords and keep them secret (http://cern.ch
/security/passwords) Become Cyber wise
Don’t read suspected SPAM or open unexpected attachments Don’t visit un-trusted web sites (browsers regularly have holes) Don’t copy files from untrusted sources Only install trusted applications with managed updates
Respect the rules and follow security advice http://cern.ch/ComputingRules http://cern.ch/security
Regole generali per evitare incidenti
Regole da seguire
CSN1,Napoli, 19 settembre 2005 13Anna Di Ciaccio
Desktop Forum(Linux,Windows)
Retirement of CERN Linux 7.3 this year for lxplus and lxbatch
Almost all HEP sites use Scientific Linux 3 now
SLC4 certification Test-version Sept : 2005
SLC5 release fine 2006 Red-Hat Enterprise LINUX
5/Scientific Linux 5 Troppo tardi per LHC??
W2000 no longer supported at CERN (Microsoft will support it until 2009)
XP SP2 the recommended OS
There will be no forced migration
Heavily used PCs > 4 years old should be replaced
CSN1,Napoli, 19 settembre 2005 14Anna Di Ciaccio
Affitto PC al CERN
No new rental agreements(Already frozen 2 DTFs ago)
Send proposals to buy-out (by completing capital repayment) or return Immediately (rather than wait for next contract
renewal)
CSN1,Napoli, 19 settembre 2005 15Anna Di Ciaccio
Introduzione di un nuovo dosimetro Film dosimeter fails to fulfil
requirements of CH dosimetry ordinance (1999): linearity in dose, energy detection threshold
New dosimeter: Fast Neutron dosimeter
annual delivery and evaluation by PSI
Gamma/Beta dosimeter RADOS DIS-1 instantaneous reading
CSN1,Napoli, 19 settembre 2005 16Anna Di Ciaccio
RADOS DIS-1 Dosimeter
Measurement principle: Ionisation chamber Physical storage of charge User triggers conversion to
dose in reader station
Floating Gate
Source Drain
User evaluates dosimeter
Dose information from reader to central database via network
dosimeters remain with user for 1 year
A lost or damaged dosimeter has to be paid at the real cost (approx. CHF 350).
CSN1,Napoli, 19 settembre 2005 17Anna Di Ciaccio
Pubblicazioni in Open Access (1)
It deals with any matters related to policies and strategies of Scientific Information Services to the High Energy Physics community,
The Chairman of the Board is appointed by the DG, and should be a leader of one of the research divisions.
Presentazione all’ACCU di un documento del Comitato SIPB (chairman G.Altarelli) di invito all’ Open Access delle informazioni/pubblicazioni scientifiche
Il CERN ha stabilito gia’ da tempo (Nov. ’03) e recentemente ribadito che tutte le pubblicazioni CERN devo essere disponibili su Web.
CSN1,Napoli, 19 settembre 2005 18Anna Di Ciaccio
Pubblicazioni in Open Access(2) Nuovo modello di
pubblicazione dei dati scientifici: Giornale elettronico con
sistema di review degli articoli
Esempio:JHEP (Journal of high energy physics) iniziato alla SISSA(Trieste). Per pubblicare richiesta di solo una sottoscrizione .
altissimo Impact Factor OA e basso costo
Organizzazione di una giornata sull’OA al CERN il 16 settembre
CSN1,Napoli, 19 settembre 2005 19Anna Di Ciaccio
Basic safety course
Present organisation 2 courses in French every Tuesday morning 2 courses in English every Tuesday afternoon Duration of the course : 1.30 hour
There is no registration to the course in advance
The basic safety course is also available in :Italian and Russian
Organised in 3 levels. Necessary to follow all to work in the LHC pit
CSN1,Napoli, 19 settembre 2005 20Anna Di Ciaccio
Basic safety course organisation : new procedure
A video projected building 55 Course available every day at 14.00 and at 15.00 in English Duration of the video : 50 minutes Content of the course : same slides as used today + video on real situations Available in French before the end of the year
The individuals will validate their attendance to the course immediatelyat the end of the course (card reader)
CSN1,Napoli, 19 settembre 2005 21Anna Di Ciaccio
Discussione sull’opportunita’ di costruire un nuovo Foyer al CERN Nel Nov ‘04 fa gli utenti del CERN sono stati chiamati a riempire un
questionario sulla effettiva necessita’ di costruire un terzo foyer al CERN e i riportare sulle risposte nella riunione ACCU di dicembre.
Il problema di come raccogliere in maniera efficiente e veloce informazioni sui piu’ di 1000 utenti italiani e’ stato messo in agenda dal nostro Presidente e discusso nella riunione di CSN1 di Novembre.
F.Murtas ha proposto e realizzato in tempi brevissimi un DB che ci ha permesso di raccogliere e analizzare nel giro di un paio di settimane le risposte degli utenti italiani
Siamo stati la Comunita’ che ha fornito le maggiori risposte 414/1078 utenti registrati
Risultato finale: Il 46% delle richieste di alloggio degli utenti italiani sono rifiutate poiche’ il Foyer era occupato
April ’05 :Documento ACCU:42% rifiuti->convincimento da parte del Management del CERN a costruire il 3° Foyer
CSN1,Napoli, 19 settembre 2005 22Anna Di Ciaccio
Visite al CERN degli Utenti italiani
Number of visits to CERN
0
20
40
60
80
100
120
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32
Visits at CERN
Pe
op
le
Average Visits at CERN =7.6
Days at CERN
0
10
20
30
40
50
60
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95100
105110
115120
125130
135140
145150
>150
Days
Pe
op
le
Average Days at CERN=36.8
Valori medi:
•7.6 visite al CERN/anno
•36.8 giorni/anno
CSN1,Napoli, 19 settembre 2005 23Anna Di Ciaccio
Statistiche sulla presenza al Foyer del CERN
Visits in the Hostel
0
10
20
30
40
50
60
70
80
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Visits
Peo
ple
Average number of visits=4.1
Number of visits when the hostel was occupied
0
10
20
30
40
50
60
70
80
90
100
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Visits P
eo
ple
Average number = 3.5
Valori medi:
•4.1 permanenze al Foyer/anno
•3.5 permanenze fuori Foyer /anno poiche’ occupato!!!
•46% di rifiuti!!
CSN1,Napoli, 19 settembre 2005 24Anna Di Ciaccio
Tappe per la costruzione
Costo ~7MFCH, finanziato con un prestito da ripagare in 10 anni
98 stanze,108 letti Progetto finalizzato entro il 15 settembre 2005 Partenza della gara : 24 ottobre 2005 Approvazione del Comitato Finanze; 15 Marzo 2006 Inizio costruzione: Aprile 2006 Inagurazione: primavera del 2007, prima della partenza
di LHC confermata per l’estate del 2007!!!
CSN1,Napoli, 19 settembre 2005 25Anna Di Ciaccio
Foyer n.3-
CSN1,Napoli, 19 settembre 2005 26Anna Di Ciaccio
Collocazione del 3° Foyer
CSN1,Napoli, 19 settembre 2005 27Anna Di Ciaccio
Tipi di stanze
CSN1,Napoli, 19 settembre 2005 28Anna Di Ciaccio
Conclusioni
Il successo dell’operazione Foyer dimostra che l’ ACCU svolge una sua funzione a patto che i suoi delegati fanno sentire il peso delle Comunita’ che rappresentano: Importante che ci segnalate i problemi Necessita’ di vostro riscontro sulle varie iniziative
Altri piccoli successi ACCU degli ultimi anni: Supporto alla piattaforma MacOSX (Nov 2003) Wireless nel nuovo foyer (build 39), da settembre anche nel
Buid.38 Navetta per l’aeroporto alle ore 17