  • 5/20/2018 Aecon Step

    1/15

    Project : 150 kV T/L ASAHIMAS MENES

    PAD-CHIMNEY & PILE FOUNDATION UPLIFT TEST

    UPLIFT TEST LOADING STEP CALCULATION

    MAIN BEAM WEIGHT

    IWF 700X300X13X24, L=7.6 m. = 185 x 7.6 = 1,406.00 kgStiff. PL 143X652x16mm., 14 Nos = 7850 x 0.143 x 0.652 x 0.016 x 14 = 163.95 kg

    Stiff. PL 143X652x12mm., 18 Nos = 7850 x 0.143 x 0.652 x 0.012 x 4 = 35.13 kg

    Main beam weight = 1,605.08 kg

    Additional force to cover self weight of main beam = 1605.07 x 0.5 = 802.54 kg

    Effective area of Hydraulic Jack = 11.81 in2

    Pressuremeter reading = 149.84 psi

    LOADING STEP FOR PAD-CHIMNEY FOUNDATION UPLIFT TEST

    Design Load = 25.92 tons (refer to BK/AM 2010/100)

    3750 3650

    Detail calculation for 25% design load :

    Jacking load = (Pile load x A) / (A+B)

    = ( 25% x 25.92 x 3750 ) / (3750+3650)

    = 3.28 tons

    = 7,240.74 pounds

    Pressuremeter reading = 7240.74/11.81

    = 613.10 psi

    Eff. Area Pressure

    % Load (ton) (in2) (psi)

    25% 6.48 11.81 613.10

    50% 12.96 11.81 1,226.21

    70% 18.14 11.81 1,716.69

    80% 20.74 11.81 1,961.93

    100% 25.92 11.81 2,452.41

    110% 28.51 12.81 2,487.06

    LOADING STEP FOR PILE FOUNDATION UPLIFT TEST

    Design Load = 14.47 tons (refer to BK/AM 2010/200)

    2550 2400

    Detail calculation for 25% design load :

    2,600.00

    2,700.00

    % of Design Load Pressure. Plus Weight Beam Pressure. Plus Weight Beam

    (psi)

    762.94

    (psi) (dibulatkan

    800.00

    1,866.53

    2,111.77

    2,602.25

    1,376.04 1,400.00

    1,900.00

    2,100.00

    2,636.90

    Pile Test Jack

    A B

    A B

  • 5/20/2018 Aecon Step

    2/15

    Detail calculation for 25% design load :A B

    Project : 150kV T/L Asahimas Menes

    Pile Descriptions :

    Pile Type : Bore Pile Dated Installed

    Length of Pile : 8.5 m. Date of Testing

    Diameter of Pile : 400 mm. Cut of Level ( -0

    Description of Test : Uplift Load Test Ground Level ( 0

    Loading System : Hydraulic Jack Founding Level

    Working Load : 14.47 tons Location

    Test Load : 28.94 tons Test Pile No.

    Step No. I

    Note : Pressuremeter reading already added by main bem self weight

    11.25 0 0 0 0 0

    11.25 0 3.62 500

    11.27 2 3.62 500

    11.29 4 3.62 500

    11.33 8 3.62 500

    11.40 15 3.62 500

    12.10 45 3.62 500

    Press.

    meter

    (psi)

    0.10 0.10

    0.07 0.10 0.10

    0.10 0.10 0.11

    0.05 0.08 0.08

    0.06 0.09 0.09

    0.07

    Dial 3

    0.00

    0.04 0.07

    0.00 0.00

    0.07

    UPLIFT LOADING

    25 60

    Dial No. 1

    RECORD OF PILE TEST

    Time

    % Of

    Design

    Load

    Load

    Duration

    (Minute)

    Time

    Reading

    (Minute)

    Test

    Load

    (Tons)

    Butt Movement Reading

    Dial 2

  • 5/20/2018 Aecon Step

    3/15

    Project : 150kV T/L Asahimas Menes

    Pile Descriptions :

    Pile Type : Bore Pile Dated Installed

    Length of Pile : 8.5 m. Date of Testing

    Diameter of Pile : 400 mm. Cut of Level ( -0

    Description of Test : Uplift Load Test Ground Level ( 0

    Loading System : Hydraulic Jack Founding Level

    Working Load : 14.47 tons Location

    Test Load : 28.94 tons Test Pile No.

    Step No. II

    Note : Pressuremeter reading already added by main bem self weight

    14.45 0 7.24 900

    14.47 2 7.24 900

    14.49 4 7.24 900

    14.53 8 7.24 900

    15.00 15 7.24 900

    15.05 20 7.24 900

    15.05 0 10.85 1,200

    Test

    Load

    (Tons)

    0.31 0.38 0.39

    0.49 0.58 0.58

    0.31 0.38 0.39

    0.31 0.38 0.38

    0.31 0.38 0.38

    0.31 0.38 0.38

    Dial No. 1 Dial 2 Dial 3

    0.30 0.37 0.38

    RECORD OF PILE TEST

    Time

    % Of

    Design

    Load

    Load

    Duration

    (Minute)

    Time

    Reading

    (Minute)

    Press.

    meter

    (psi)

    Butt Movement Reading

    UPLIFT LOADING

    50 20

  • 5/20/2018 Aecon Step

    4/15

    Project : 150kV T/L Asahimas Menes

    Pile Descriptions :

    Pile Type : Bore Pile Dated Installed

    Length of Pile : 8.5 m. Date of Testing

    Diameter of Pile : 400 mm. Cut of Level ( -0

    Description of Test : Uplift Load Test Ground Level ( 0

    Loading System : Hydraulic Jack Founding Level

    Working Load : 14.47 tons Location

    Test Load : 28.94 tons Test Pile No.

    Step No. II

    Note : Pressuremeter reading already added by main bem self weight

    17.05 0 10.85 1,200

    17.07 2 10.85 1,200

    17.09 4 10.85 1,200

    17.13 8 10.85 1,200

    17.20 15 10.85 1,200

    17.25 20 10.85 1,200

    17.25 0 7.24 900 0.73

    1.02

    0.98 1.06 1.02

    0.66 0.75

    0.98 1.06

    1.03

    0.99 1.06 1.03

    1.02

    0.98 1.06 1.02

    Dial No. 1 Dial 2 Dial 3

    75 20

    0.99 1.07

    0.98 1.06

    Test

    Load

    (Tons)

    Press.

    meter

    (psi)

    Butt Movement Reading

    RECORD OF PILE TEST

    UPLIFT LOADING

    Time

    % Of

    Design

    Load

    Load

    Duration

    (Minute)

    Time

    Reading

    (Minute)

  • 5/20/2018 Aecon Step

    5/15

    Project : 150kV T/L Asahimas Menes

    Pile Descriptions :

    Pile Type : Bore Pile Dated Installed

    Length of Pile : 8.5 m. Date of Testing

    Diameter of Pile : 400 mm. Cut of Level ( -0

    Description of Test : Uplift Load Test Ground Level ( 0

    Loading System : Hydraulic Jack Founding Level

    Working Load : 14.47 tons Location

    Test Load : 28.94 tons Test Pile No.

    Step No. III

    Note : Pressuremeter reading already added by main bem self weight

    18.45 0 7.24 900

    18.47 2 7.24 900

    18.49 4 7.24 900

    18.53 8 7.24 900

    19.00 15 7.24 900

    19.05 20 7.24 900

    19.05 0 14.47 1,600

    Test

    Load

    (Tons)

    0.52 0.59 0.58

    1.15 1.28 1.29

    0.52 0.58 0.58

    0.52 0.59 0.58

    0.51 0.57 0.56

    0.52 0.57 0.58

    Dial No. 1 Dial 2 Dial 3

    0.50 0.57 0.56

    RECORD OF PILE TEST

    Time

    % Of

    Design

    Load

    Load

    Duration

    (Minute)

    Time

    Reading

    (Minute)

    Press.

    meter

    (psi)

    Butt Movement Reading

    UPLIFT LOADING

    50 20

  • 5/20/2018 Aecon Step

    6/15

    Project : 150kV T/L Asahimas Menes

    Pile Descriptions :

    Pile Type : Bore Pile Dated Installed

    Length of Pile : 8.5 m. Date of Testing

    Diameter of Pile : 400 mm. Cut of Level ( -0

    Description of Test : Uplift Load Test Ground Level ( 0

    Loading System : Hydraulic Jack Founding Level

    Working Load : 14.47 tons Location

    Test Load : 28.94 tons Test Pile No.

    Step No. III

    Note : Pressuremeter reading already added by main bem self weight

    21.25 0 18.09 1,900

    21.27 2 18.09 1,900

    21.29 4 18.09 1,900

    21.33 8 18.09 1,900

    21.40 15 18.09 1,900

    21.45 20 18.09 1,900

    21.45 0 14.47 1,600 3.59

    3.70

    3.57 3.77 3.70

    3.50 3.67

    3.57 3.77

    3.70

    3.57 3.77 3.70

    3.70

    3.57 3.77 3.70

    Dial No. 1 Dial 2 Dial 3

    125 20

    3.57 3.77

    3.57 3.77

    Test

    Load

    (Tons)

    Press.

    meter

    (psi)

    Butt Movement Reading

    RECORD OF PILE TEST

    UPLIFT LOADING

    Time

    % Of

    Design

    Load

    Load

    Duration

    (Minute)

    Time

    Reading

    (Minute)

  • 5/20/2018 Aecon Step

    7/15

    Project : 150kV T/L Asahimas Menes

    Pile Descriptions :

    Pile Type : Bore Pile Dated Installed

    Length of Pile : 8.5 m. Date of Testing

    Diameter of Pile : 400 mm. Cut of Level ( -0

    Description of Test : Uplift Load Test Ground Level ( 0

    Loading System : Hydraulic Jack Founding Level

    Working Load : 14.47 tons Location

    Test Load : 28.94 tons Test Pile No.

    Step No. IV

    Note : Pressuremeter reading already added by main bem self weight

    23.25 0 7.24 900

    23.27 2 7.24 900

    23.29 4 7.24 900

    23.33 8 7.24 900

    23.40 15 7.24 900

    23.45 20 7.24 900

    23.45 0 14.47 1,600

    23.47 2 14.47 1,600

    23 49 4 14 4 1 600

    3.95

    3.92 4.07 4.01

    4 02

    2.73

    2.69 2.80 2.74

    3.87 4.00

    3 93 4 09

    2.69 2.80

    2.67

    2.66 2.77 2.71

    2.72

    2.69 2.80 2.73

    Dial No. 1 Dial 2 Dial 3

    50 20

    2.64 2.74

    2.66 2.77

    RECORD OF PILE TEST

    UPLIFT LOADING

    Time

    % Of

    Design

    Load

    Load

    Duration

    (Minute)

    Time

    Reading

    (Minute)

    Test

    Load

    (Tons)

    Press.

    meter

    (psi)

    Butt Movement Reading

  • 5/20/2018 Aecon Step

    8/15

    Project : 150kV T/L Asahimas Menes

    Pile Descriptions :

    Pile Type : Bore Pile Dated Installed

    Length of Pile : 8.5 m. Date of Testing

    Diameter of Pile : 400 mm. Cut of Level ( -0

    Description of Test : Uplift Load Test Ground Level ( 0

    Loading System : Hydraulic Jack Founding Level

    Working Load : 14.47 tons Location

    Test Load : 28.94 tons Test Pile No.

    Step No. IV

    Note : Pressuremeter reading already added by main bem self weight

    01.25 0 28.94 3,000

    01.27 2 28.94 3,000

    01.29 4 28.94 3,000

    01.33 8 28.94 3,000

    01.40 15 28.94 3,000

    02.10 45 28.94 3,000

    02.25 60 28.94 3,000

    02.45 80 28.94 3,000

    03 0 100 28 94 3 000

    14.39

    14.93 14.78 15.00

    15 25 15 10 15 32

    14.31 14.19

    13.30

    14.02 13.88 14.08

    13.27 13.13

    12.43

    12.44 12.33 12.49

    12.51

    12.87 12.71 12.89

    Dial No. 1 Dial 2 Dial 3

    25mm/hour)

    12.35 12.27

    12.47 12.36

    Test

    Load

    (Tons)

    Press.

    meter

    (psi)

    Butt Movement Reading

    RECORD OF PILE TEST

    UPLIFT LOADING

    Time

    % Of

    Design

    Load

    Load

    Duration

    (Minute)

    Time

    Reading

    (Minute)

  • 5/20/2018 Aecon Step

    9/15

    Project : 150kV T/L Asahimas Menes

    Pile Descriptions :

    Pile Type : Bore Pile Dated Installed

    Length of Pile : 8.5 m. Date of Testing

    Diameter of Pile : 400 mm. Cut of Level ( -0

    Description of Test : Uplift Load Test Ground Level (

    Loading System : Hydraulic Jack Founding Level

    Working Load : 14.47 tons Location

    Test Load : 28.94 tons Test Pile No.

    Step No. IV

    Note : Pressuremeter reading already added by main bem self weight

    13.25 0 25.32 2,600

    13.27 2 25.32 2,600

    13.29 4 25.32 2,600

    13.33 8 25.32 2,600

    13.40 15 25.32 2,600

    14.10 45 25.32 2,600

    14.25 60 25.32 2,600

    14.25 0 21.71 2,200

    17.35

    16.98 16.85 17.08

    17.34

    17.25 17.14 17.40

    17.20 17.06

    17.23 17.11

    17.39

    17.22 17.11 17.37

    17.35

    17.20 17.06 17.34

    Dial No. 1 Dial 2 Dial

    175 60

    17.23 17.12

    17.21 17.09

    Test

    Load

    (Tons)

    Press.

    meter

    (psi)

    Butt Movement Reading

    RECORD OF PILE TEST

    UPLIFT LOADING

    Time

    % Of

    Design

    Load

    Load

    Duration

    (Minute)

    Time

    Reading

    (Minute)

  • 5/20/2018 Aecon Step

    10/15

    10

    15

    20

    25

    30

    TestLoad

    (TON)

    GRAPH OF PILE UPLIFT AXIAL TENSILE LOAD TEST STE

  • 5/20/2018 Aecon Step

    11/15

    INDIVIDUAL PILE UNDER STATIC AXIAL TENSILE LOAD(ASTM D-3689)

    Project : 150 kV T/L Asahimas Menes

    Location : Gardu induk (G.I.) Menes

    Test No. : 1 (Uplift Pile Load Test)

    Elevation :

    Date of test :

    Type of pile : Bore Pile

    Date of Installation :

    Type of Hydraulick Jack : Enerpac CLSG 508

    Area of piston (AP) : 11.81 in

    Hydraulic Pump : Enerpac P-80

    Manometer : Enerpac G4039 L capacity 0-10.000 P

    Dial Gauge : Mitutoyo Analog Capacity 0 - 100 mm

    Accuracy/Resolution : 0.01 mm

    April 21-23, 2008

    March 19, 2008

    02468

    10121416182022

    24262830

    0 500 1000 1500 2000 2500 3000

    Load(Ton)

    Elapsed time (min)

    0.0

    3.0

    6.0

    9.0

    12.0

    15.0

    18.0

    0 500 1000 1500 2000 2500 3000

    Settlement(mm)

    Elapsed time (min)

    0.0

    3.0

    6.0

    9.0

    12.0

    15.0

    18.0

    0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30

    Settlement(mm)

    Load (Ton)

    Ultimate Load= 24 Ton

  • 5/20/2018 Aecon Step

    12/15

    si

  • 5/20/2018 Aecon Step

    13/15

    Elapsed time (minute) Load (Ton) LoadPr (Ton) Settlement (mm) Load_1 (Ton) Settlement_1 (mm)

    0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

    0 3.6 3.62 0.06 3.60 0.10 3.62 0.06 7.24 0.3

    2 3.6 3.62 0.07 7.70 0.32 3.62 0.07 7.24 0.3

    4 3.6 3.62 0.08 3.60 0.22 3.62 0.08 7.24 0.3

    8 3.6 3.62 0.09 0.00 0.08 3.62 0.09 7.24 0.3

    15 3.6 3.62 0.09 7.70 0.36 3.62 0.09 7.24 0.3

    45 3.6 3.62 0.10 10.90 0.58 3.62 0.10 7.24 0.3

    60 3.6 3.62 0.10 15.00 1.07 3.62 0.10 10.85 0.5

    62 7.7 7.24 0.27 10.90 1.02 7.24 0.27 10.85 0.5

    64 7.7 7.24 0.28 7.70 0.72 7.24 0.27 10.85 0.5

    68 7.7 7.24 0.28 0.00 0.13 7.24 0.28 10.85 0.5

    75 7.7 7.24 0.29 3.60 0.56 7.24 0.28 10.85 0.5

    105 7.7 7.24 0.32 15.00 1.33 7.24 0.29 10.85 0.5

    120 7.7 7.24 0.32 18.20 2.15 7.24 0.32 10.85 0.5

    122 3.6 3.62 0.22 21.30 3.68 7.24 0.32 14.47 0.9

    124 3.6 3.62 0.22 18.20 3.68 3.62 0.23 14.47 1.0128 3.6 3.62 0.22 15.00 3.58 3.62 0.22 14.47 1.0

    135 3.6 3.62 0.22 7.70 2.97 3.62 0.22 14.47 1.0

    140 3.6 3.62 0.22 0.00 1.96 3.62 0.22 14.47 1.0

    142 0.0 0.00 0.06 7.70 2.74 3.62 0.22 14.47 1.0

    144 0.0 0.00 0.06 15.00 4.03 3.62 0.22 14.47 1.0

    148 0.0 0.00 0.06 21.30 5.39 0.00 0.06 10.85 1.0

    155 0.0 0.00 0.06 25.50 7.81 0.00 0.06 10.85 1.0

    185 0.0 0.00 0.08 28.70 17.36 0.00 0.06 10.85 1.0

    200 0.0 0.00 0.08 25.50 17.23 0.00 0.06 10.85 1.0202 7.7 7.24 0.36 21.30 16.87 0.00 0.06 10.85 1.0

    204 7.7 7.24 0.36 15.00 15.94 0.00 0.08 10.85 1.0

    208 7.7 7.24 0.36 3.60 15.31 0.00 0.08 7.24 0.7

    215 7.7 7.24 0.36 0.00 6.33 7.24 0.7

    220 7.7 7.24 0.36 7.24 0.7

    222 10.9 10.85 0.57 7.24 0.7

    224 10.9 10.85 0.57 7.24 0.7

    228 10.9 10.85 0.58 7.24 0.7

    235 10.9 10.85 0.58 0.00 0.2

    265 10.9 10.85 0.58 0.00 0.

    280 10.9 10.85 0.58 0.00 0.

    282 15.0 14.47 1.03 0.00 0.

    284 15.0 14.47 1.04 0.00 0.

    288 15.0 14.47 1.05 0.00 0.

    295 15 0 14 47 1 06 0 00 0

    STEP 1 STEP 2

  • 5/20/2018 Aecon Step

    14/15

    PAD & CHIMNEY AXIAL TENSILE LOAD (IEC)

    Project : 150 kV T/L Asahimas Menes

    Location : Gardu induk (G.I.) Menes

    Test No. : 1 (Pad & Chimney Uplift Load Test)

    Elevation :

    Date of test :

    Type of Foundation : Pad and Chimney

    Date of Installation :

    Type of Hydraulick J : Enerpac CLSG 508

    Area of piston (AP) : 11.81 in

    Hydraulic Pump : Enerpac P-80

    Manometer : Enerpac G4039 L kapasitas 0-10.000 Psi

    Dial Gauge : Mitutoyo Analog Capacity 0 - 100 mm

    Accuracy/Resolution : 0.01 mm

    April 25, 2008

    March 18, 2008

    0

    2

    46

    8

    10

    12

    14

    16

    18

    20

    22

    24

    26

    28

    30

    0 1000 2000 3000 4000

    Load(Ton)

    Elapsed time (min)

    0.00

    0.05

    0.10

    0.15

    0.20

    0.25

    0.30

    0.35

    0.40

    0.45

    0 1000 2000 3000 4000

    Settlement(mm)

    Elapsed time (min)

    0.00

    0.50

    1.00

    1.50

    2.00

    2.50

    3.00

    0 10 20 30 40

    Settlement(mm)

    Load (ton)

    Ultimate Load > 30 Ton

  • 5/20/2018 Aecon Step

    15/15

    0

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    0 300 600 900 1200 1500 1800 2100 2400 2700 3000 3300 3600

    TestLoad

    (kP

    a)

    Time of Duration (Minute)

    GRAPH OF LOAD TEST CONCRETE BEAM STEP

    Stage 1(170 kg/m2)

    Stage 2 (340 kg/m2)

    Stage 3 (510 kg/m2)

    Stage 4 (680 kg/m2)

    Stage 5 (850 kg/m2)

    Pumping Stage/ Fill Water for Step 1

    Pumping Stage/ Fill Water for Step 2

    Pumping Stage/ Fill Water for Step 3

    Pumping Stage/ Fill Water for Step 4

    Pumping Stage/ Fill Water for Step 5

    Removing all Water

    Rebound Record


Recommended