5/20/2018 Aecon Step
1/15
Project : 150 kV T/L ASAHIMAS MENES
PAD-CHIMNEY & PILE FOUNDATION UPLIFT TEST
UPLIFT TEST LOADING STEP CALCULATION
MAIN BEAM WEIGHT
IWF 700X300X13X24, L=7.6 m. = 185 x 7.6 = 1,406.00 kgStiff. PL 143X652x16mm., 14 Nos = 7850 x 0.143 x 0.652 x 0.016 x 14 = 163.95 kg
Stiff. PL 143X652x12mm., 18 Nos = 7850 x 0.143 x 0.652 x 0.012 x 4 = 35.13 kg
Main beam weight = 1,605.08 kg
Additional force to cover self weight of main beam = 1605.07 x 0.5 = 802.54 kg
Effective area of Hydraulic Jack = 11.81 in2
Pressuremeter reading = 149.84 psi
LOADING STEP FOR PAD-CHIMNEY FOUNDATION UPLIFT TEST
Design Load = 25.92 tons (refer to BK/AM 2010/100)
3750 3650
Detail calculation for 25% design load :
Jacking load = (Pile load x A) / (A+B)
= ( 25% x 25.92 x 3750 ) / (3750+3650)
= 3.28 tons
= 7,240.74 pounds
Pressuremeter reading = 7240.74/11.81
= 613.10 psi
Eff. Area Pressure
% Load (ton) (in2) (psi)
25% 6.48 11.81 613.10
50% 12.96 11.81 1,226.21
70% 18.14 11.81 1,716.69
80% 20.74 11.81 1,961.93
100% 25.92 11.81 2,452.41
110% 28.51 12.81 2,487.06
LOADING STEP FOR PILE FOUNDATION UPLIFT TEST
Design Load = 14.47 tons (refer to BK/AM 2010/200)
2550 2400
Detail calculation for 25% design load :
2,600.00
2,700.00
% of Design Load Pressure. Plus Weight Beam Pressure. Plus Weight Beam
(psi)
762.94
(psi) (dibulatkan
800.00
1,866.53
2,111.77
2,602.25
1,376.04 1,400.00
1,900.00
2,100.00
2,636.90
Pile Test Jack
A B
A B
5/20/2018 Aecon Step
2/15
Detail calculation for 25% design load :A B
Project : 150kV T/L Asahimas Menes
Pile Descriptions :
Pile Type : Bore Pile Dated Installed
Length of Pile : 8.5 m. Date of Testing
Diameter of Pile : 400 mm. Cut of Level ( -0
Description of Test : Uplift Load Test Ground Level ( 0
Loading System : Hydraulic Jack Founding Level
Working Load : 14.47 tons Location
Test Load : 28.94 tons Test Pile No.
Step No. I
Note : Pressuremeter reading already added by main bem self weight
11.25 0 0 0 0 0
11.25 0 3.62 500
11.27 2 3.62 500
11.29 4 3.62 500
11.33 8 3.62 500
11.40 15 3.62 500
12.10 45 3.62 500
Press.
meter
(psi)
0.10 0.10
0.07 0.10 0.10
0.10 0.10 0.11
0.05 0.08 0.08
0.06 0.09 0.09
0.07
Dial 3
0.00
0.04 0.07
0.00 0.00
0.07
UPLIFT LOADING
25 60
Dial No. 1
RECORD OF PILE TEST
Time
% Of
Design
Load
Load
Duration
(Minute)
Time
Reading
(Minute)
Test
Load
(Tons)
Butt Movement Reading
Dial 2
5/20/2018 Aecon Step
3/15
Project : 150kV T/L Asahimas Menes
Pile Descriptions :
Pile Type : Bore Pile Dated Installed
Length of Pile : 8.5 m. Date of Testing
Diameter of Pile : 400 mm. Cut of Level ( -0
Description of Test : Uplift Load Test Ground Level ( 0
Loading System : Hydraulic Jack Founding Level
Working Load : 14.47 tons Location
Test Load : 28.94 tons Test Pile No.
Step No. II
Note : Pressuremeter reading already added by main bem self weight
14.45 0 7.24 900
14.47 2 7.24 900
14.49 4 7.24 900
14.53 8 7.24 900
15.00 15 7.24 900
15.05 20 7.24 900
15.05 0 10.85 1,200
Test
Load
(Tons)
0.31 0.38 0.39
0.49 0.58 0.58
0.31 0.38 0.39
0.31 0.38 0.38
0.31 0.38 0.38
0.31 0.38 0.38
Dial No. 1 Dial 2 Dial 3
0.30 0.37 0.38
RECORD OF PILE TEST
Time
% Of
Design
Load
Load
Duration
(Minute)
Time
Reading
(Minute)
Press.
meter
(psi)
Butt Movement Reading
UPLIFT LOADING
50 20
5/20/2018 Aecon Step
4/15
Project : 150kV T/L Asahimas Menes
Pile Descriptions :
Pile Type : Bore Pile Dated Installed
Length of Pile : 8.5 m. Date of Testing
Diameter of Pile : 400 mm. Cut of Level ( -0
Description of Test : Uplift Load Test Ground Level ( 0
Loading System : Hydraulic Jack Founding Level
Working Load : 14.47 tons Location
Test Load : 28.94 tons Test Pile No.
Step No. II
Note : Pressuremeter reading already added by main bem self weight
17.05 0 10.85 1,200
17.07 2 10.85 1,200
17.09 4 10.85 1,200
17.13 8 10.85 1,200
17.20 15 10.85 1,200
17.25 20 10.85 1,200
17.25 0 7.24 900 0.73
1.02
0.98 1.06 1.02
0.66 0.75
0.98 1.06
1.03
0.99 1.06 1.03
1.02
0.98 1.06 1.02
Dial No. 1 Dial 2 Dial 3
75 20
0.99 1.07
0.98 1.06
Test
Load
(Tons)
Press.
meter
(psi)
Butt Movement Reading
RECORD OF PILE TEST
UPLIFT LOADING
Time
% Of
Design
Load
Load
Duration
(Minute)
Time
Reading
(Minute)
5/20/2018 Aecon Step
5/15
Project : 150kV T/L Asahimas Menes
Pile Descriptions :
Pile Type : Bore Pile Dated Installed
Length of Pile : 8.5 m. Date of Testing
Diameter of Pile : 400 mm. Cut of Level ( -0
Description of Test : Uplift Load Test Ground Level ( 0
Loading System : Hydraulic Jack Founding Level
Working Load : 14.47 tons Location
Test Load : 28.94 tons Test Pile No.
Step No. III
Note : Pressuremeter reading already added by main bem self weight
18.45 0 7.24 900
18.47 2 7.24 900
18.49 4 7.24 900
18.53 8 7.24 900
19.00 15 7.24 900
19.05 20 7.24 900
19.05 0 14.47 1,600
Test
Load
(Tons)
0.52 0.59 0.58
1.15 1.28 1.29
0.52 0.58 0.58
0.52 0.59 0.58
0.51 0.57 0.56
0.52 0.57 0.58
Dial No. 1 Dial 2 Dial 3
0.50 0.57 0.56
RECORD OF PILE TEST
Time
% Of
Design
Load
Load
Duration
(Minute)
Time
Reading
(Minute)
Press.
meter
(psi)
Butt Movement Reading
UPLIFT LOADING
50 20
5/20/2018 Aecon Step
6/15
Project : 150kV T/L Asahimas Menes
Pile Descriptions :
Pile Type : Bore Pile Dated Installed
Length of Pile : 8.5 m. Date of Testing
Diameter of Pile : 400 mm. Cut of Level ( -0
Description of Test : Uplift Load Test Ground Level ( 0
Loading System : Hydraulic Jack Founding Level
Working Load : 14.47 tons Location
Test Load : 28.94 tons Test Pile No.
Step No. III
Note : Pressuremeter reading already added by main bem self weight
21.25 0 18.09 1,900
21.27 2 18.09 1,900
21.29 4 18.09 1,900
21.33 8 18.09 1,900
21.40 15 18.09 1,900
21.45 20 18.09 1,900
21.45 0 14.47 1,600 3.59
3.70
3.57 3.77 3.70
3.50 3.67
3.57 3.77
3.70
3.57 3.77 3.70
3.70
3.57 3.77 3.70
Dial No. 1 Dial 2 Dial 3
125 20
3.57 3.77
3.57 3.77
Test
Load
(Tons)
Press.
meter
(psi)
Butt Movement Reading
RECORD OF PILE TEST
UPLIFT LOADING
Time
% Of
Design
Load
Load
Duration
(Minute)
Time
Reading
(Minute)
5/20/2018 Aecon Step
7/15
Project : 150kV T/L Asahimas Menes
Pile Descriptions :
Pile Type : Bore Pile Dated Installed
Length of Pile : 8.5 m. Date of Testing
Diameter of Pile : 400 mm. Cut of Level ( -0
Description of Test : Uplift Load Test Ground Level ( 0
Loading System : Hydraulic Jack Founding Level
Working Load : 14.47 tons Location
Test Load : 28.94 tons Test Pile No.
Step No. IV
Note : Pressuremeter reading already added by main bem self weight
23.25 0 7.24 900
23.27 2 7.24 900
23.29 4 7.24 900
23.33 8 7.24 900
23.40 15 7.24 900
23.45 20 7.24 900
23.45 0 14.47 1,600
23.47 2 14.47 1,600
23 49 4 14 4 1 600
3.95
3.92 4.07 4.01
4 02
2.73
2.69 2.80 2.74
3.87 4.00
3 93 4 09
2.69 2.80
2.67
2.66 2.77 2.71
2.72
2.69 2.80 2.73
Dial No. 1 Dial 2 Dial 3
50 20
2.64 2.74
2.66 2.77
RECORD OF PILE TEST
UPLIFT LOADING
Time
% Of
Design
Load
Load
Duration
(Minute)
Time
Reading
(Minute)
Test
Load
(Tons)
Press.
meter
(psi)
Butt Movement Reading
5/20/2018 Aecon Step
8/15
Project : 150kV T/L Asahimas Menes
Pile Descriptions :
Pile Type : Bore Pile Dated Installed
Length of Pile : 8.5 m. Date of Testing
Diameter of Pile : 400 mm. Cut of Level ( -0
Description of Test : Uplift Load Test Ground Level ( 0
Loading System : Hydraulic Jack Founding Level
Working Load : 14.47 tons Location
Test Load : 28.94 tons Test Pile No.
Step No. IV
Note : Pressuremeter reading already added by main bem self weight
01.25 0 28.94 3,000
01.27 2 28.94 3,000
01.29 4 28.94 3,000
01.33 8 28.94 3,000
01.40 15 28.94 3,000
02.10 45 28.94 3,000
02.25 60 28.94 3,000
02.45 80 28.94 3,000
03 0 100 28 94 3 000
14.39
14.93 14.78 15.00
15 25 15 10 15 32
14.31 14.19
13.30
14.02 13.88 14.08
13.27 13.13
12.43
12.44 12.33 12.49
12.51
12.87 12.71 12.89
Dial No. 1 Dial 2 Dial 3
25mm/hour)
12.35 12.27
12.47 12.36
Test
Load
(Tons)
Press.
meter
(psi)
Butt Movement Reading
RECORD OF PILE TEST
UPLIFT LOADING
Time
% Of
Design
Load
Load
Duration
(Minute)
Time
Reading
(Minute)
5/20/2018 Aecon Step
9/15
Project : 150kV T/L Asahimas Menes
Pile Descriptions :
Pile Type : Bore Pile Dated Installed
Length of Pile : 8.5 m. Date of Testing
Diameter of Pile : 400 mm. Cut of Level ( -0
Description of Test : Uplift Load Test Ground Level (
Loading System : Hydraulic Jack Founding Level
Working Load : 14.47 tons Location
Test Load : 28.94 tons Test Pile No.
Step No. IV
Note : Pressuremeter reading already added by main bem self weight
13.25 0 25.32 2,600
13.27 2 25.32 2,600
13.29 4 25.32 2,600
13.33 8 25.32 2,600
13.40 15 25.32 2,600
14.10 45 25.32 2,600
14.25 60 25.32 2,600
14.25 0 21.71 2,200
17.35
16.98 16.85 17.08
17.34
17.25 17.14 17.40
17.20 17.06
17.23 17.11
17.39
17.22 17.11 17.37
17.35
17.20 17.06 17.34
Dial No. 1 Dial 2 Dial
175 60
17.23 17.12
17.21 17.09
Test
Load
(Tons)
Press.
meter
(psi)
Butt Movement Reading
RECORD OF PILE TEST
UPLIFT LOADING
Time
% Of
Design
Load
Load
Duration
(Minute)
Time
Reading
(Minute)
5/20/2018 Aecon Step
10/15
10
15
20
25
30
TestLoad
(TON)
GRAPH OF PILE UPLIFT AXIAL TENSILE LOAD TEST STE
5/20/2018 Aecon Step
11/15
INDIVIDUAL PILE UNDER STATIC AXIAL TENSILE LOAD(ASTM D-3689)
Project : 150 kV T/L Asahimas Menes
Location : Gardu induk (G.I.) Menes
Test No. : 1 (Uplift Pile Load Test)
Elevation :
Date of test :
Type of pile : Bore Pile
Date of Installation :
Type of Hydraulick Jack : Enerpac CLSG 508
Area of piston (AP) : 11.81 in
Hydraulic Pump : Enerpac P-80
Manometer : Enerpac G4039 L capacity 0-10.000 P
Dial Gauge : Mitutoyo Analog Capacity 0 - 100 mm
Accuracy/Resolution : 0.01 mm
April 21-23, 2008
March 19, 2008
02468
10121416182022
24262830
0 500 1000 1500 2000 2500 3000
Load(Ton)
Elapsed time (min)
0.0
3.0
6.0
9.0
12.0
15.0
18.0
0 500 1000 1500 2000 2500 3000
Settlement(mm)
Elapsed time (min)
0.0
3.0
6.0
9.0
12.0
15.0
18.0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
Settlement(mm)
Load (Ton)
Ultimate Load= 24 Ton
5/20/2018 Aecon Step
12/15
si
5/20/2018 Aecon Step
13/15
Elapsed time (minute) Load (Ton) LoadPr (Ton) Settlement (mm) Load_1 (Ton) Settlement_1 (mm)
0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
0 3.6 3.62 0.06 3.60 0.10 3.62 0.06 7.24 0.3
2 3.6 3.62 0.07 7.70 0.32 3.62 0.07 7.24 0.3
4 3.6 3.62 0.08 3.60 0.22 3.62 0.08 7.24 0.3
8 3.6 3.62 0.09 0.00 0.08 3.62 0.09 7.24 0.3
15 3.6 3.62 0.09 7.70 0.36 3.62 0.09 7.24 0.3
45 3.6 3.62 0.10 10.90 0.58 3.62 0.10 7.24 0.3
60 3.6 3.62 0.10 15.00 1.07 3.62 0.10 10.85 0.5
62 7.7 7.24 0.27 10.90 1.02 7.24 0.27 10.85 0.5
64 7.7 7.24 0.28 7.70 0.72 7.24 0.27 10.85 0.5
68 7.7 7.24 0.28 0.00 0.13 7.24 0.28 10.85 0.5
75 7.7 7.24 0.29 3.60 0.56 7.24 0.28 10.85 0.5
105 7.7 7.24 0.32 15.00 1.33 7.24 0.29 10.85 0.5
120 7.7 7.24 0.32 18.20 2.15 7.24 0.32 10.85 0.5
122 3.6 3.62 0.22 21.30 3.68 7.24 0.32 14.47 0.9
124 3.6 3.62 0.22 18.20 3.68 3.62 0.23 14.47 1.0128 3.6 3.62 0.22 15.00 3.58 3.62 0.22 14.47 1.0
135 3.6 3.62 0.22 7.70 2.97 3.62 0.22 14.47 1.0
140 3.6 3.62 0.22 0.00 1.96 3.62 0.22 14.47 1.0
142 0.0 0.00 0.06 7.70 2.74 3.62 0.22 14.47 1.0
144 0.0 0.00 0.06 15.00 4.03 3.62 0.22 14.47 1.0
148 0.0 0.00 0.06 21.30 5.39 0.00 0.06 10.85 1.0
155 0.0 0.00 0.06 25.50 7.81 0.00 0.06 10.85 1.0
185 0.0 0.00 0.08 28.70 17.36 0.00 0.06 10.85 1.0
200 0.0 0.00 0.08 25.50 17.23 0.00 0.06 10.85 1.0202 7.7 7.24 0.36 21.30 16.87 0.00 0.06 10.85 1.0
204 7.7 7.24 0.36 15.00 15.94 0.00 0.08 10.85 1.0
208 7.7 7.24 0.36 3.60 15.31 0.00 0.08 7.24 0.7
215 7.7 7.24 0.36 0.00 6.33 7.24 0.7
220 7.7 7.24 0.36 7.24 0.7
222 10.9 10.85 0.57 7.24 0.7
224 10.9 10.85 0.57 7.24 0.7
228 10.9 10.85 0.58 7.24 0.7
235 10.9 10.85 0.58 0.00 0.2
265 10.9 10.85 0.58 0.00 0.
280 10.9 10.85 0.58 0.00 0.
282 15.0 14.47 1.03 0.00 0.
284 15.0 14.47 1.04 0.00 0.
288 15.0 14.47 1.05 0.00 0.
295 15 0 14 47 1 06 0 00 0
STEP 1 STEP 2
5/20/2018 Aecon Step
14/15
PAD & CHIMNEY AXIAL TENSILE LOAD (IEC)
Project : 150 kV T/L Asahimas Menes
Location : Gardu induk (G.I.) Menes
Test No. : 1 (Pad & Chimney Uplift Load Test)
Elevation :
Date of test :
Type of Foundation : Pad and Chimney
Date of Installation :
Type of Hydraulick J : Enerpac CLSG 508
Area of piston (AP) : 11.81 in
Hydraulic Pump : Enerpac P-80
Manometer : Enerpac G4039 L kapasitas 0-10.000 Psi
Dial Gauge : Mitutoyo Analog Capacity 0 - 100 mm
Accuracy/Resolution : 0.01 mm
April 25, 2008
March 18, 2008
0
2
46
8
10
12
14
16
18
20
22
24
26
28
30
0 1000 2000 3000 4000
Load(Ton)
Elapsed time (min)
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0 1000 2000 3000 4000
Settlement(mm)
Elapsed time (min)
0.00
0.50
1.00
1.50
2.00
2.50
3.00
0 10 20 30 40
Settlement(mm)
Load (ton)
Ultimate Load > 30 Ton
5/20/2018 Aecon Step
15/15
0
1
2
3
4
5
6
7
8
9
10
0 300 600 900 1200 1500 1800 2100 2400 2700 3000 3300 3600
TestLoad
(kP
a)
Time of Duration (Minute)
GRAPH OF LOAD TEST CONCRETE BEAM STEP
Stage 1(170 kg/m2)
Stage 2 (340 kg/m2)
Stage 3 (510 kg/m2)
Stage 4 (680 kg/m2)
Stage 5 (850 kg/m2)
Pumping Stage/ Fill Water for Step 1
Pumping Stage/ Fill Water for Step 2
Pumping Stage/ Fill Water for Step 3
Pumping Stage/ Fill Water for Step 4
Pumping Stage/ Fill Water for Step 5
Removing all Water
Rebound Record