3 AePP Brief (New ACL) 2/27’02 What is AePP Advanced eProcurement Portal a Web-based eProcurement application Purpose A real time, single window platform To enhances the efficiency of communication and collaboration between Wistron and trading partners over internet Scope Include all Supplier and internet ready Include Wistron WW Site and internet ready Include all Buyer and all item Overview
20
AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager
Transcript
Page 1: AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager.

AePP Briefwith New ACL

Allan Yeh 3/01’2002

Purchasing Manager

Page 2: AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager.

2AePP Brief (New ACL) 2/27’02

Agenda

•ACL Function and Operation•Work Flow of PO System•AePP Rule•Others

•ACL: Access Control List•VI: View & Logo, Acer Wistron

Page 3: AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager.

3AePP Brief (New ACL) 2/27’02

• What is AePPAdvanced eProcurement Portal a Web-based eProcurement application • PurposeA real time, single window platformTo enhances the efficiency of communication and

collaboration between Wistron and trading partners over internet

• ScopeInclude all Supplier and internet readyInclude Wistron WW Site and internet readyInclude all Buyer and all item

Overview

Page 4: AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager.

4AePP Brief (New ACL) 2/27’02

AePP Equipment Requirement

• Enter IP in Browser : hitech.wistron.com• Enter UID and Password to enter AePP• Browser must be IE5.0 (or above)• H/W Requirement

– P2 450MHz CPU– 128M Memory– 5M HDD Space

• Internet Bandwidth 56K (or above)

Page 5: AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager.

5AePP Brief (New ACL) 2/27’02

Purchase Order Process Flow

大型電腦WistronERP

AePP

Supplier

2. Send to AePP 3. Confirm PO

5. Buyer Accept PO and feedback to ERP5a. If Buyer does not accept PO, change the Req, repeat step 3、 4

4. Response PO

Buyer

1. Buyer release PO

Page 6: AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager.

6AePP Brief (New ACL) 2/27’02

Log in AePP

• IP : hitech.wistron.com (Test : hitech-test.wistron.com)• Enter User ID and Password, click “log in” to enter AePP

1.

3. 2.

Page 7: AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager.

7AePP Brief (New ACL) 2/27’02

Log in – the 1st time log-in AePP

• 1st log-in, have to change Password• Choice Membership and click change Password• Input Old Pwd, New Pwd and reCFM, click “Save ”

Page 8: AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager.

8AePP Brief (New ACL) 2/27’02

Ordering Function

1. Waiting Confirm PO2. Change PO Data3. Pass Due PO Report4. PO Data Report5. Open PO Report

Page 9: AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager.

9AePP Brief (New ACL) 2/27’02

Operation Step - Confirm PO

Click Purchase Order, Ordering and Waiting Confirm POClick the PO No. to CFM the PO

Page 10: AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager.

10AePP Brief (New ACL) 2/27’02

3. “Save”

4. Add Remark (If)

1. Change the CFM date.2. Split the PO (If)

Operation Step - Confirm PO

Page 11: AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager.

11AePP Brief (New ACL) 2/27’02

Operation Step - Split

“Split” the line, Total Qty must = Req Qty

Page 12: AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager.

12AePP Brief (New ACL) 2/27’02

Operation Step – Change PO

Enter PO Number, click “Query” and “PO_Number”

Page 13: AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager.

13AePP Brief (New ACL) 2/27’02

Operation Step – Change PO

Click “CHK” then click “Save”

4. Add Remark (If)

Page 14: AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager.

14AePP Brief (New ACL) 2/27’02

Operation Step – Change PO

Click “CHK” then click “Save”

4. Add Remark (If)

Page 15: AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager.

15AePP Brief (New ACL) 2/27’02

Operation Step – Pass Due Report

Page 16: AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager.

16AePP Brief (New ACL) 2/27’02

Operation Step – Pass Due Report

Page 17: AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager.

17AePP Brief (New ACL) 2/27’02

Operation Step – PO Data Report

Page 18: AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager.

18AePP Brief (New ACL) 2/27’02

Operation Step – PO Data Report

Page 19: AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager.

19AePP Brief (New ACL) 2/27’02

AePP P/O Rule - 1AePP P/O Rule - 1• Buyer is a key for AePP survive• PO CFM should within 48 Working Hrs• PO Qty can’t increase, should release new line or

new PO• PO can’t be cancelled(deleted), only Qty ==> 0• PO change (Qty, Req. Date, Price) have to get

Vendor reCFM then update ERP• Vendor check AePP PO data twice a day• Pass Due PO must be revised daily, couldn’t leave

PO reCFM passed.• One PO contain 10 ~ 20 lines (better operation)• Feedback the problem in eMail have better

describe with screen hard copy

Page 20: AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager.

20AePP Brief (New ACL) 2/27’02

AePP P/O Rule - 2AePP P/O Rule - 2• PO changed should add reason in Remark• PO Released, Vendor not yet responded or Buyer

not yet accepted, will be locked and RT can‘t be gen’d• if Vendor split PO, AePP PO line <> ERP

• PO changed in AePP, ERP PO line will be locked and RT can‘t be gen’d

• PO changed, can’t do another change before other one responded.

• Vendor split the PO only one time if Buyer didn't do any change.

• Ps. Time out on 30 min if no any operation in AePP


Recommended