AGENDARIOGALEÃO
TOM JOBIM INTERNATIONAL AIRPORT 01
NEW EXPERIENCETECHNOLOGY TO IMPROVE THE PASSENGER JOURNEY 02
RIO DE JANEIROFUTURE CHALLENGES 03
ESTIMATED CAPEX:
US$1,5BI
CONTRACT LENGTH:
25 years
CONTRIBUTION:
+
5%OF GROSS REVENUE
US$5,2BI
OPERATION, MAINTENANCE, AND EXPANSION
OF TOM JOBIM INTERNATIONAL AIRPORT
Aircraft maintenance station for Code C, D, E & F
First airport in the country authorized to operate Code F aircraft flights
2 independent runways with the longest runway in Brazil (4000 m)
Terminal 1 and 2 area: 316.175m²
Airport area of 17 MM m²
PAX in 2014
17MM
Yearly average
passenger growth
14% in the last 10 years
Dist. from downtown
20km
Cities served
50in more than 20 countries
Busiest international
airport in Brazil
2nd
Busiest domestic
airport in Brazil
Busiest cargo
airport in Brazil
4th
4th
THE AIRPORT WITH THE MOST VISIBILITY
DURING THE WORLD CUP AND OLYMPICS
TWO LARGE SCALE EVENTS
IN 2016
AUG 5-21 SEPT 7-18
ATHLETES FROM 206 NATIONS11,000
VOLUNTEERS45,000
ACCREDITED MEDIA PROFESSIONALS 25,000
ATHLETES FROM 178 NATIONS 4,500
VOLUNTEERS 25,000
ACCREDITED MEDIA PROFESSIONALS 7,000
BCBP – BAR CODE BOARDING
PASS AND AUTOMATED PASSPORT CONTROL
TOTAL COMMON USE
CUTE AND CUSS
BEACONS MOBILE APP(WAYFINDING,
INFO, SURVEYS, OFFERS, INSTANT
FEEDBACK...)
MAIN TECHNOLOGY
BASED INVESTMENTS FOR
THE PASSENGER EXPERIENCE
AUTOMATED APRON
CONTROL
AIRPORT MANAGEMENT
SYSTEM
INTEGRATED SECURITY AND SITUATIONAL AWERENESS
MAIN TECHNOLOGY
BASED INVESTMENTS FOR
OPERATIONAL EFFICIENCY
QUEUE MANAGEMENT
2017 to 2021
Construction of new independent
runway system expected
and beginning of Domestic East
Pier construction.
2022 to 2026
Expansion of east apron and
second phase of Domestic East
Pier construction.
2027 to 2031
Conclusion of east apron
expansion adding 20 new
apron stands
NEW CHALLENGES