+ All Categories
Home > Documents > Aerostar Corporationaerostar.com.sg/wp-content/uploads/2018/01/layout.pdf · Only through a...

Aerostar Corporationaerostar.com.sg/wp-content/uploads/2018/01/layout.pdf · Only through a...

Date post: 04-Feb-2021
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
8
28 Sin Ming Lane #07-136, Midview City Singapore 573972 (65) 6396 5671 (65) 6396 5672 [email protected] www.aerostar.com.sg Aerostar Corporation
Transcript
  • 28 Sin Ming Lane

    #07-136, Midview City

    Singapore 573972

    (65) 6396 5671

    (65) 6396 5672

    [email protected]

    www.aerostar.com.sg

    Aerostar Corporation

  • Aerostar Corporation Pte Ltd

    Aerostar Engineering Pte Ltd

    Aerostart Resources Pte Ltd

    Aerostar Construction Sdn Bhd

    Aerostar LLC

    P. T. Aerostar

    ENGINEERINGSOLUTIONS PROVIDER

    www.aerostar.com.sg

  • As you progress, Aerostar stands by you

    Aerostar has been supporting high-profile projects for the marine & onshore, pharmaceutical and energy industries since 1994.

    Our clients shape the world’s economy. We lend a hand in building their achievements.

    At Aerostar, we protect your interests. As you delve into new energy resources, world-class industrial standards and greater

    commercial endeavours, we grow our services to support you better. We support what you do with structural steel and heavy

    equipment installation, process plant maintenance, civil engineering work, tubular scaffolding, protective coating and thermal

    insulation solutions.

    Today, our established firms - Aerostar Corporation, Aerostar Engineering, Aerostar Construction, PT Aerostar and our new

    subsidiary Aerostar LLC, are involved in industry game-changing projects worldwide.

    It takes teamwork

    Aerostar sets its sights on making your critical operations a winning success.

    Only through a combined team effort can incident-free man hours, on-target completion and reputable project quality be

    achieved. Every individual in our skilled and trained workforce shares this undivided goal. Every day, our people working on the

    ground collaborate closely with partner and client to make this possible.

    PAGE 02

    Introduction

    COMPANY PROFILE

  • Our Services

    Passive Fire ProtectionAerostar understands the stringent importance of fire safety in extreme

    environments. We have been entrusted to perform fireproofing works for

    many power and industrial plants belonging to major oil refinery and

    petrochemical clients.

    Equipment & Steel Structure Erection/Installation

    Nothing is too big or complex.

    Moving heavy equipment and steel structures requires extensive onsite

    coordination that is attentive and absolutely focused on secure deploy-

    ment. From welding and fitting to erection and dismantling, Aerostar

    makes sure you have everything in place wherever you need it, be it vessel

    moving for a shipyard or rigging works for onshore applications. At

    Aerostar, every site worker and coordinator is pledged to ensure your

    project is in safe hands and able to proceed without delay.

    Thermal Insulation

    Precise temperature control and safety

    Be reassured of work environment safety and superior energy-efficiency

    with our insulation solutions. We can help you procure the right insulation

    material, fabricate and install it to specific requirements for a variety of

    hot, cold or acoustic applications. From safe and reliable temperature

    control in industrial piping to extreme heat insulation in incinerators and

    reactors, you can count on Aerostar for support in optimizing and

    accident-proofing your operations.

    PAGE 03 OUR SERVICES

  • On-site Blasting/Painting & Thermal Spray

    Aerostar is ready to take on any surface protection challenge. We guard

    your critical assets against corrosion, extreme temperatures, harsh chemi-

    cals and abrasive conditions while using automated spray equipment to

    save you time and money. We meet international standards and have

    completed coating jobs for structures onsite, topside equipment and oil

    rigs.

    Chamber Blasting/Painting & Thermal Spray

    Our protective coating solutions make sure your operations consistently

    perform in the harshest of industry conditions. We are certified to perform

    blasting, painting and TSA services to the highest safety and quality

    standards expected by our clients. Our controlled blasting and painting

    facility prevents surface contamination and is equipped to carry out all

    types of projects with ease.

    Tubular ScaffoldingAdapts to every project.

    The magnitude and complexity of your capital projects require a

    safe-to-work environment where your workers can achieve the highest

    efficiency on the job. We have built tubular scaffolding systems support-

    ing our clients’ maintenance, construction and repair works for structures

    of immense sizes and diverse needs. Designed with zero-incident safety

    in mind, speedy assembly and user-friendly durability, our skilled workers

    and supervisors will collaborate with you to move your project swiftly

    along in every phase.

    Our Services

    PAGE 04 OUR SERVICES

  • Process Plant MaintenanceEnsuring critical uptime, together.

    Your reputation and millions worth in revenue ride on every hour, every

    minute your operations are kept going without incident. Aerostar under-

    stands how the safety and future efficiency of your plants depend on

    effectively managed and routinely necessary maintenance works. Our

    close-knit team of qualified and skilled workers are contracted by

    long-time major clients to perform daily plant cleaning, inspections and

    repairs servicing.

    Prevent unwanted breakdowns with laser-guided alignment

    Almost 50 percent of rotating equipment breakdown costs can be traced

    back to shaft misalignment. Misaligned shafts, belts or pulleys can lead to

    premature equipment breakdowns and damaged seals and couplings,

    ultimately resulting in costly unplanned downtimes. Such problems can

    only be fixed by correcting the misalignment. However, the best course of

    action is prevention with regular equipment alignment maintenance.

    General Building WorksTransforming public infrastructure, improving quality of life

    Whether you are expanding the local transport network or upgrading

    public utilities, you need a civil construction partner who has your project’s

    success at heart. At Aerostar, we understand how important it is for civil

    projects to go smoothly with as little disruption as possible, and as much

    safety and efficiency to complete work on time. This is why when our

    clients win contracts, we put our best effort forward to make that success

    a reality.

    Be it drainage, road works, general building or deep piling foundation

    works, our team is behind you every step of the way. One of the projects

    we are involved in is the expansion of underground transport infrastruc-

    ture. We supplied the design and installation of ventilation exhaust

    systems and M&E cabling to facilitate a safe and productive working

    environment during underground construction.

    Our Services

    PAGE 05 OUR SERVICES

  • Project References

    SLNG Terminal Phase 3– Expansion Project

    SLNG Terminal Project, Heavy lifting and

    installation of equipment works in year

    2013 (6 months)

    PAGE 06 PROJECT REFERENCES

    Civil Works

    We performed underground construction

    of a 6 meters high covered drain.

    Mogas Cogen Project - SRC

    Scaffolding completed for SRC project in

    year 2013 ( 6 months) and year 2013.

    ZADCO Project Shell – Bukom BDSSU - Fuel Tank Project

    Ivar Aasen Field Develop-ment

    Project structure, Process, Drilling and

    Quarters platform consisting of 13700T

    (70men) 

    Erha, Nigeria FPSO Erha

    Project structure 13 X FPSO Topslide

    Modules of total weight 22,000T and Hull

    size 285m L X 66m W X  32.3m H

    Bohai Bay, China FPSO Hai Yang Shi You 117

    Project structure 22 X FPSO Topsides

    modules of total weight 32000T and Hull

    size 323mL X  63mW X 32mH

  • Zawtika Phase 1A Development

    Blasting and painting works, and Thermal Spray Aluminium works. Process Quarters

    platform consisting of Topside 16,500MT including 128 man lioving quarters module of

    1360MT, 105m flare, Jacket 15,400MT, Piles 8,300MT and bridge 440MT (2012 to 2014).

    Project References

    PAGE 07 PROJECT REFERENCES

    Chevron Oronite,Carboxylate Project

    Culzean Project

    Project structure Central processing

    facilities, CPF – WHP bridge, CPF – ULQ

    bridge, Wellhead platform, Utility and living

    quarters (140 men). Total weight 24,002MT

    Tankstore Phase 5 ProjectEkofisk 2/4L Accommodation Topsides

    Chamber Blasting and Painting, Onsite blasting, Pipe Internal coating, Clean and dry

    implementation and Repair works. We achieved 810,000 man hours without incident

    (March 2010 to June 2013)

    Halfdan B Phase IV DevelopmentBlasting and Painting in Chamber. Electrical works, Pipe Internal lining using Ceramic

    coating and Thermal spray aluminium works for structure HBD platform, consisting of

    Topside 9,500T, Jacket 3,800T, Piles 300T, Flare 293T and 3 X bridge 828T / 770T /105T

    (June 2008 to July 2010).


Recommended