28 Sin Ming Lane
#07-136, Midview City
Singapore 573972
(65) 6396 5671
(65) 6396 5672
www.aerostar.com.sg
Aerostar Corporation
Aerostar Corporation Pte Ltd
Aerostar Engineering Pte Ltd
Aerostart Resources Pte Ltd
Aerostar Construction Sdn Bhd
Aerostar LLC
P. T. Aerostar
ENGINEERINGSOLUTIONS PROVIDER
www.aerostar.com.sg
As you progress, Aerostar stands by you
Aerostar has been supporting high-profile projects for the marine & onshore, pharmaceutical and energy industries since 1994.
Our clients shape the world’s economy. We lend a hand in building their achievements.
At Aerostar, we protect your interests. As you delve into new energy resources, world-class industrial standards and greater
commercial endeavours, we grow our services to support you better. We support what you do with structural steel and heavy
equipment installation, process plant maintenance, civil engineering work, tubular scaffolding, protective coating and thermal
insulation solutions.
Today, our established firms - Aerostar Corporation, Aerostar Engineering, Aerostar Construction, PT Aerostar and our new
subsidiary Aerostar LLC, are involved in industry game-changing projects worldwide.
It takes teamwork
Aerostar sets its sights on making your critical operations a winning success.
Only through a combined team effort can incident-free man hours, on-target completion and reputable project quality be
achieved. Every individual in our skilled and trained workforce shares this undivided goal. Every day, our people working on the
ground collaborate closely with partner and client to make this possible.
PAGE 02
Introduction
COMPANY PROFILE
Our Services
Passive Fire ProtectionAerostar understands the stringent importance of fire safety in extreme
environments. We have been entrusted to perform fireproofing works for
many power and industrial plants belonging to major oil refinery and
petrochemical clients.
Equipment & Steel Structure Erection/Installation
Nothing is too big or complex.
Moving heavy equipment and steel structures requires extensive onsite
coordination that is attentive and absolutely focused on secure deploy-
ment. From welding and fitting to erection and dismantling, Aerostar
makes sure you have everything in place wherever you need it, be it vessel
moving for a shipyard or rigging works for onshore applications. At
Aerostar, every site worker and coordinator is pledged to ensure your
project is in safe hands and able to proceed without delay.
Thermal Insulation
Precise temperature control and safety
Be reassured of work environment safety and superior energy-efficiency
with our insulation solutions. We can help you procure the right insulation
material, fabricate and install it to specific requirements for a variety of
hot, cold or acoustic applications. From safe and reliable temperature
control in industrial piping to extreme heat insulation in incinerators and
reactors, you can count on Aerostar for support in optimizing and
accident-proofing your operations.
PAGE 03 OUR SERVICES
On-site Blasting/Painting & Thermal Spray
Aerostar is ready to take on any surface protection challenge. We guard
your critical assets against corrosion, extreme temperatures, harsh chemi-
cals and abrasive conditions while using automated spray equipment to
save you time and money. We meet international standards and have
completed coating jobs for structures onsite, topside equipment and oil
rigs.
Chamber Blasting/Painting & Thermal Spray
Our protective coating solutions make sure your operations consistently
perform in the harshest of industry conditions. We are certified to perform
blasting, painting and TSA services to the highest safety and quality
standards expected by our clients. Our controlled blasting and painting
facility prevents surface contamination and is equipped to carry out all
types of projects with ease.
Tubular ScaffoldingAdapts to every project.
The magnitude and complexity of your capital projects require a
safe-to-work environment where your workers can achieve the highest
efficiency on the job. We have built tubular scaffolding systems support-
ing our clients’ maintenance, construction and repair works for structures
of immense sizes and diverse needs. Designed with zero-incident safety
in mind, speedy assembly and user-friendly durability, our skilled workers
and supervisors will collaborate with you to move your project swiftly
along in every phase.
Our Services
PAGE 04 OUR SERVICES
Process Plant MaintenanceEnsuring critical uptime, together.
Your reputation and millions worth in revenue ride on every hour, every
minute your operations are kept going without incident. Aerostar under-
stands how the safety and future efficiency of your plants depend on
effectively managed and routinely necessary maintenance works. Our
close-knit team of qualified and skilled workers are contracted by
long-time major clients to perform daily plant cleaning, inspections and
repairs servicing.
Prevent unwanted breakdowns with laser-guided alignment
Almost 50 percent of rotating equipment breakdown costs can be traced
back to shaft misalignment. Misaligned shafts, belts or pulleys can lead to
premature equipment breakdowns and damaged seals and couplings,
ultimately resulting in costly unplanned downtimes. Such problems can
only be fixed by correcting the misalignment. However, the best course of
action is prevention with regular equipment alignment maintenance.
General Building WorksTransforming public infrastructure, improving quality of life
Whether you are expanding the local transport network or upgrading
public utilities, you need a civil construction partner who has your project’s
success at heart. At Aerostar, we understand how important it is for civil
projects to go smoothly with as little disruption as possible, and as much
safety and efficiency to complete work on time. This is why when our
clients win contracts, we put our best effort forward to make that success
a reality.
Be it drainage, road works, general building or deep piling foundation
works, our team is behind you every step of the way. One of the projects
we are involved in is the expansion of underground transport infrastruc-
ture. We supplied the design and installation of ventilation exhaust
systems and M&E cabling to facilitate a safe and productive working
environment during underground construction.
Our Services
PAGE 05 OUR SERVICES
Project References
SLNG Terminal Phase 3– Expansion Project
SLNG Terminal Project, Heavy lifting and
installation of equipment works in year
2013 (6 months)
PAGE 06 PROJECT REFERENCES
Civil Works
We performed underground construction
of a 6 meters high covered drain.
Mogas Cogen Project - SRC
Scaffolding completed for SRC project in
year 2013 ( 6 months) and year 2013.
ZADCO Project Shell – Bukom BDSSU - Fuel Tank Project
Ivar Aasen Field Develop-ment
Project structure, Process, Drilling and
Quarters platform consisting of 13700T
(70men)
Erha, Nigeria FPSO Erha
Project structure 13 X FPSO Topslide
Modules of total weight 22,000T and Hull
size 285m L X 66m W X 32.3m H
Bohai Bay, China FPSO Hai Yang Shi You 117
Project structure 22 X FPSO Topsides
modules of total weight 32000T and Hull
size 323mL X 63mW X 32mH
Zawtika Phase 1A Development
Blasting and painting works, and Thermal Spray Aluminium works. Process Quarters
platform consisting of Topside 16,500MT including 128 man lioving quarters module of
1360MT, 105m flare, Jacket 15,400MT, Piles 8,300MT and bridge 440MT (2012 to 2014).
Project References
PAGE 07 PROJECT REFERENCES
Chevron Oronite,Carboxylate Project
Culzean Project
Project structure Central processing
facilities, CPF – WHP bridge, CPF – ULQ
bridge, Wellhead platform, Utility and living
quarters (140 men). Total weight 24,002MT
Tankstore Phase 5 ProjectEkofisk 2/4L Accommodation Topsides
Chamber Blasting and Painting, Onsite blasting, Pipe Internal coating, Clean and dry
implementation and Repair works. We achieved 810,000 man hours without incident
(March 2010 to June 2013)
Halfdan B Phase IV DevelopmentBlasting and Painting in Chamber. Electrical works, Pipe Internal lining using Ceramic
coating and Thermal spray aluminium works for structure HBD platform, consisting of
Topside 9,500T, Jacket 3,800T, Piles 300T, Flare 293T and 3 X bridge 828T / 770T /105T
(June 2008 to July 2010).