  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT

    1/21

    AFFECTED COMMUNITIES DUETO UPPER KOTMALE HYDRO

    POWER PROJECT

    Dayarathna P.W.H.K.T.B. RU/E/2006/039

    Deepal H.T. RU/E/2006/042

    Dharmadasa M.D.V.S. RU/E/2006/044Liyanarachchi L.D.C RU/E/2006/099

    Uduweriya R.B.Y.B. RU/E/2006/182

    Perera S.V.A.D.R.R RU/E/2006/195

    Group 38

  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT

    2/21

    Introduction to the project

    Situated in the south central mountain slopes

    of sri lanka.

    Project covers arround 500km2 the upstream

    catchment of the present kotmale reservoir of the

    kotmale oya.

  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT

    3/21

    HEAD RACETUNNEL Talawakelle Intake

    Dam

    Hatton

    DevonOya

    Ko

    tma

    leO

    ya

    PundalOya

    Existing Kotmale P/S

    Mahawelle Ganga

    A7

    Project Layout

    Existing

    Kotmal

    eDam N

    Adit 2

    Adit 1

    Adit 6

    Adit 5

    Adit 4Power House

    Access Tunnel

    Cable Tunnel

    Tail race Tunnel

    TalawakelleTransmissionline

  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT

    4/21

    Need of the project

    To contribute to the national electricity

    supply due to increase of Annual demand

    for the electricity.

  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT

    5/21

    Problem statement

    Implementation of a larger scale project as

    UKHP will not eliminate the environmental and

    social impacts totally.

    Only optimum minimization can be done.

    In this process many problems may arise inthe community of the project area.

  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT

    6/21

    Affected communities

    1. People lived in inundated area of the upperkotmale reservoir (497 dwelling homes in

    10 different community clusters)

    2. Community that affected due to the re-

    arrangement of Common facilities

    3. People lived in downstream of the kotmaleOya

    4. Community that affected indirectly due to

    the UKHP

  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT

    7/21

    People lived in inundated area of

    the upper kotmale reservoir (dwellinghomes)

    Affected communities dueto the project

    No Affected Communities Affected Households

    ( No)

    01 Talawakelle Division 160

    02 CGR Quarters 05

    03 Walkers Quarters 30

    04 Kumaragama Settlement 60

    05 Urban Council Settlement 39

    06 Devsiripura Settlement 20

    07 Ratneelakelle Division 117

    08 Middleton Bazaar & Talawakelle Extension 25

    09 Nanu Oya Division 21

    10 Middleton Division 17

    11 Devon Intake Site 03

    Total 497

  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT

    8/21

    Community that affected due tothe re-arrangement of Common

    facilities

    No Affected Communities Affected

    ( No)

    01 Schools 01

    02 Kovils 0303 Churches 02

    04 Creches 03

    05 Libraries 02

    06 Muster Shed 01

    07 Volley Ball Courts 01

    08 Cattle Sheds 26

    09 Poultry Sheds 0310 Shops 25

    11 House Cum Shops 08

    12 Work Shops 07

    13 Garages 06

  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT

    9/21

    People lived in downstream of the

    kotmale Oya

    Community that affected indirectly due to

    the UKHP

    Affected communities..cnt..

  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT

    10/21

    Effects on the residences in the upstream

    inundated area

    Loss of pre-dwelling place due to inundati

    Loss of agricultural land

    Loss of house cum shops

    Effects on the communities

  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT

    11/21

    Some of Affected housesSome of Affected housesSome of Affected housesSome of Affected houses

  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT

    12/21

    Effects on the community due to shifting of other

    common structures

    Effects on the community in downstream area Effects to the existing water resources

    Effects on the communities

    Effects to tourismEffects on tea cultivation

    Loss of previous business premises

    Effects on the commercial community

  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT

    13/21

    St. Clair WaterfallsSt. Clair Waterfalls Devon FallsDevon Falls

    C id ti t i i i th

  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT

    14/21

    Consideration on resettlement done for

    upstream area

    All resettlement are done within Talawakelle Urban

    ...Council limits where closer to their pre-dwelling

    places

    Each individual sub-community should offered the...opportunity to resettle together in a clearly

    identified area

    Resettlement plan should be formulated through

    a ...process of consultation with the local

    Consideration to minimize the

    problem

  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT

    15/21

    It should be considered the Subcultural effects

    All households should be provided withhousing .and services that are betterthan their pre-.resettlement condition.

    Fair compensation should be made forthe .properties they lose

    Mixing of different backgrounds due to.resettlement should be avoided.

    S l ti f th d t

  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT

    16/21

    Adequate water supply system shouldbe provided with free of charge for theirbasic needs and extra arrangement

    should be design to provide water fortheir agricultural, commercial andindustrial purposes. Also there should

    be an adequate compensation for theagricultural lands.

    Solutions for the downstream

    community

    T i i i th i t th

  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT

    17/21

    Should provide fair compensation with suitablelocation to new establishment .

    Industrial based factory premises & workshops.

    (Electricity,water,infrastructure,employee,supportingservices)

    The shops and other commercial places.

    Hotels & restaurants which engaged with tourism

    (Natural aesthetic , Infrastructural)

    Estates, agricultural land and farm shops.

    (suitable fertilized lands)

    To minimize the impacts on the

    commercial community

    T i i i th ff t d t

  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT

    18/21

    Restoration of common facilities should meet

    certain requirement

    Preferable combination between them.

    Easy accessibility( infrastructural, location)

    Consideration to improvement of income level of

    resettled people(Income Generation Action Plan )

    Occupational Skill Development (OSD) Training

    Micro Credit Scheme

    Agricultural Extension Services

    To minimize the effect due to re

    arrangement of common facilities

  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT

    19/21

    Past living condition of the of the peoplelived in

    relevant area.

    Impact due toInundation of private property

    Loss of water in downstream

    resettlements

    relocation of common facilities

    Discussion

  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT

    20/21

    precautions and solutions and resettlementplan of the UKHP project

    present condition and conclusion

    Discussion

  • 8/9/2019 AFFECTED COMMUNITIES DUE TO UPPER KOTMALE HYDRO POWER PROJECT