Page 1: Affordable Homes Programme 2011-2015 Framework for Package Proposals.
Page 2: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Affordable Homes Programme 2011-2015

Framework for Package Proposals

Page 3: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Contents

Outline of model and drivers Products deliverable under the programme Working in a local context Conversion of existing properties Package offers Assessment and negotiations Contracts and review Next steps

Page 4: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Affordable homes – Spending Review outcome

Government investing over £6.5bn in housing over the next 4 years, including over £2bn to make existing social homes decent and £4.5bn to fund new affordable homes. Target to deliver up to 150,000 homes over 4 year period (incl est. 60,000 from commitments). Forecast of £2.3b related to existing commitments

£4.5bn includes provision for:- Affordable Rent- Bringing empty homes back into use- Mortgage Rescue- Places of Change- Gypsy and Traveller sites

Majority (c.£2b) directed to the delivery of homes for Affordable Rent (including empty homes) option of Low Cost Home Ownership allowed for.

Page 5: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

The Delivery Model for new supply of affordable housing ‘Something for something’ deal with providers Provider package proposals will cover both delivery of new homes, and

conversion of existing homes:- Proposals for conversions of existing stock to affordable rent (plus

shared ownership or market sale)- Information on capacity generated through conversions, contributions

from own resources and other sources (e.g. RCGF) being applied todeliver new homes

- Proposals for a 4 year programme of new homes and HCA investment being sought. Covering identified schemes (initial years) and

indicative numbers for the future years. Following assessment and negotiation of offers, delivery of agreed

packages will operated on a framework basis. Flexibilities will be built into the frameworks. HCA acting as co-investor, alongside delivery partners.

An ‘across programme’ approach, moving away from scheme by scheme. Close collaborative working with local authorities, for both the HCA and

providers will be critical.

Page 6: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Products deliverable under the programme

Affordable Rent will be the principle element But will also include:

Affordable Home OwnershipMortgage RescueHostel provision through the Places of Change schemeGypsy and Traveller sites, and Empty Homes packages(using product options offered for temporary and permanent solutions)

Social Rent in exceptional circumstance – e.g. supported housing, family homes (where issues of benefit caps) or regeneration schemes involving relocation of existing social tenants. A strong case needed.

Page 7: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Affordable Rent

A form of social housing Let at up to 80% of market rent (inclusive of service charges) Must be provided by Registered Provider, subject to TSA

regulations. Revised tenancy standard being developed. Not subject to the rent restructuring policy for social rented housing Fixed term or Assured tenancies, according to needs. A minimum of

2 years tenancy, up to lifetime (older people, vulnerable leaseholds and families)

Maximum rent level assessed to reflect individual property characteristics, using RICS valuation method.

Annual increases of up to RPI + 0.5%, with rebasing of the rent on each new tenancy

Page 8: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Affordable Rent continued

80% of market rent a maximum, not a fixed requirement. But providers expected to maximise financial capacity by working to 80%

HCA would need to understand how any proposal to charge lower rents would help to meet particular needs.

May be circumstances where this is appropriate e.g. to keep rents within the Local Housing Allowance or fragile local rented market.

At end of tenancy, if provider does not issue a further tenancy, it will be required to offer reasonable advice and assistance to the tenant to find alternative accommodation

Option of selling the property to tenant on shared ownership terms About flexibility

Page 9: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Affordable Rent continued

Affordable rent is intended to allow greater flexibility, focus state support on those in greatest need for as long as they need it and

secure greater value for money for available investment.

Page 10: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Other Products

Affordable Home Ownership:

- will consider proposals including affordable home

ownership as part of overall mix for schemes –

supported by Local Authority and fitting local housing

market

- value for money important

- proposals that only include affordable home ownership

will not be considered

- strong presumption against subsidising on S106 sites

- two options of shared ownership or equity loans

(branded as Home Buy)

- no Rent to Home Buy or Intermediate Market Rent

Page 11: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Other Products continued

Affordable Home Ownership:

- No change to eligibility requirement (up to £60k household income) clear priority for assisting existing social tenants

- targeting and marketing plans

- Shared Ownership including HOLD and Older Persons Shared Ownership. Same terms of 25% to 75% equity purchase, and rent of 2.75% on unsold equity (cap of 3%)

- Equity Loans – 85% of purchase price

Page 12: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Other Products continued

Supported Housing:- where case proven may be at social rent- HCA funding only for provision or improvement of accommodation, cannot fund other services- providers to gather information at appropriate stage re:

local strategic prioritisation;details of service(s);intended outcomes;identified revenue funding source; and exit plans or alternative uses

HCA may request information to support firm proposals. Covered in Quarterly Reviews as proposals are firmed up.

Page 13: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Other Products continued

Mortgage Rescue:

- Funding available 2011/12 and 2012/13, small amount in 2013/14 for applications in the pipeline (no new applications in Spring 2013.

- Will discuss with RPs whether part of syndicate to support mortgage rescue. Expecting existing lead providers to continue their role.

- Seeking greater value for money

- Lead providers to work with local authorities to determine likely levels of Mortgage Rescue cases over the period.

- A finite programme requiring careful management, and prioritisation

Page 14: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Other Products continued.

Empty Homes- £100m indicative budget- LAs lead in determining local empty property strategies- Providers expected to respond as part of package proposals- Options for short term affordable rent or permanent affordable rent or home ownership solutions- Value for money a key consideration- LAs encouraged to use HCA resources alongside own resources as part of Empty Homes Strategy- Potential use of income from New Homes Bonus

Page 15: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Other Products continued

Places of Change programme:

- Proposals invited from providers to develop new hostels or improve existing, inadequate hostel provision for homeless people

- Accommodation will be the priority for funding but expect to see proposals for joined up provision of services and

accommodation.

- Not just about accommodation

- But large-scale non-accommodation proposals will not be considered

Page 16: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Other Products continued

Gypsies and Travellers sites:

- Value for money a key consideration

- Funding for new sites and additional pitches one existing sites will be given priority over refurbishment proposals

- Permanent (up to at least ten years), temporary or transit sites considered

- Interested in new solutions – including RPs buying land for local community groups to build and manage sites or

shared ownership proposals

High level ‘indicative’ expressions of interest in participating in Places of Change and/or Gypsies and Travellers programmes, as part of package, where specific proposals not yet worked up.

Page 17: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Other Products continued

Works to Existing Stock

- Will also consider proposals for re-improvements or major repairs to existing stock;

e.g. remodelling supported or older persons stock

extensions or loft conversions to provide additional accommodation

- Funding of repairs exceptional

Home Ownership for social tenants

- we will continue to fund Right to Acquire and Social Home Buy on an as needs basis.

Page 18: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Providers must work closely with local authorities in putting forward packages and developing proposals, to ensure fit with priorities

HCA will seek information on discussions with LA(s) (pre and post submission of proposals)

HCA will work closely with LAs in investing in new supply – express LA support will be sought (as proposals firm up).

HCA will work with LAs on on-going basis (building on existing work and relationships) in delivering the packages– to accommodate LIP priorities, – to act as enabler between LAs and providers receiving investment to

allow LA priorities to be delivered – Where requested, supporting LAs through our wider enabling role to

bring forward new supply– Incorporating LA land and resources to meet needs through the 4 year

programme using commissioning opportunities as appropriate.

Working in a local context

Page 19: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Critical element in generating additional financial capacity. Agreement to convert only given where RPs commit to use extra

capacity for new supply Will consider package offers which include a range of conversion

and/or disposal options, including conversion to shared ownership, market rents or outright sale.

Expect proposals for conversion/disposal to reflect a strategic approach to local asset management consistent with local housing needs, providers to have consulted LA partners on their approach.

Scope to generate development capacity through conversions will not be uniformally distributed between areas, and may not match areas with opportunities for new supply

We recognise that ring fencing capacity for re-investment in new supply in a narrow area is unlikely to enable the new model to work in practice

Conversion of Existing Properties:

Page 20: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Conversion of Existing Properties: continued

But we will encourage providers to aim to reinvest in new supply within the same broad LIP areas.

Investment Partners are invited to consider whether they wish to offer conversions of existing 2008/11 AHP commitments for Social Rent to Affordable Rent

Providers should also actively consider converting Intermediate Market Rent/Rent to Buy properties at relet, to affordable home ownership

Unlikely that 100% conversion of relets in a location will be acceptable.

Page 21: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Package Offers

No groups of providers prevented from submitting proposals – but will need existing stock to convert or access to other resources to minimise HCA investment

Want providers with capacity to participate and for existing partnerships to continue in developing consortia bids, and provide a route for smaller rural and community based providers to access resources

Overall offer– Indicative quantum of new supply– How capacity generated

Level of detail sufficient to establish:– that offers are credible– that proposals meet identified needs and address priorities– broad impact and geographical spread of the proposals– comparisons between providers, particularly of value for money

Page 22: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Package Offers continued

Recognise that it will not be possible to be precise about all details of the 4 year programme. On-going engagement will be needed

Understand need for flexibility (eg volume and location of re-lets in any area)

Contract captures at high level proposals and delivery intention Review (all aspects) on open book basis Adjust parameters, across the range of variables, based on

progress

Page 23: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Package offers – information requirements

New Supply: Quantum of new homes to be delivered Indicative location – by LIP area and LA (if known) Anticipated mix of homes, covering for example:

larger homesnumber of homes in rural areasanticipated delivery of supported housing and homes for the elderly

Anticipated tenure of homes Timing of delivery (anticipated outputs by year) Estimated average and aggregate scheme costs (for each HCA

administrative area) New HCA investment requested (for each HCA administrative area) Anticipated income from net rental stream of new homes proposed Affordable home ownership – estimated aggregate and average

sales values, and anticipated average contribution from purchaser

Page 24: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Provider offers – information requirements continued

New Supply: Estimated provider contribution from existing capacity Anticipated quantum of homes delivered at nil grant through S106

agreements. Outline of draw down requirements for new investment by year and HCA

administrative area (payment at completion) Outline of firm schemes and indicative proposals Outline of design and quality standardsConversion of existing stock: Estimate of indicative number of re-lets to be converted to Affordable Rent,

and proportion of total relets this is anticipated to represent Estimated number of re-lets to be converted to other tenures Indicative location of anticipated conversions by LIP area (and LA if known) Anticipated annual rate of conversions Estimated average rent levels (and service charge) Estimate of additional borrowing capacity generated from re-let conversion.

Page 25: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Package Offers (general aspects)

Achieving procurement efficiencies – procurement statement required

No need for providers to maximise delivery pipelines in a way which drives up costs

Expect providers to maximise S106 agreements which can be delivered at nil grant. Reserve the right to test economics of individual schemes through delivery appraisal model. Will make the model available to local authorities to use in negotiations on S106 sites

Supplementary information required for affordable home ownership proposals outlining individual targeting and marketing plans to maximise purchase of properties by existing social tenants.

Skills and employment statement

Page 26: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Assessment/negotiation

Single set of negotiations per provider or consortia led by an Agency ‘lead investor’ team

How do offers meet identified needs? How do offers deliver local priorities identified in LIPs? Will verify fit

with LAs Is provider maximising capacity within proposals

– Volume, proportion and income from conversions– Rationale for charging less than 80% of market rents (if

applicable)– Assessment of broad balance across proposed areas between

capacity generated by conversion and new supply, and the efficient use of that capacity

Test realism of proposals

Page 27: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Assessment/negotiation continued

Value for money (comparative)– Costs and investment – aggregate value for money – across

high and low cost areas– Number of conversions required to support new supply– Payment profiling requirements– Nil grant/s106 delivery– Use of RCGF and DPF– Driving costs down/not competing for early delivery

Assessment of capacity/impact on viability (regulator)

Page 28: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Assessment/negotiation continued

National aggregation and moderation to assure the consistency of assessment and overall extent that need is matched to supply. Will consider:- Degree to which need is met and areas of potential under and

over supply- Aggregate value for money- Payment terms- Comparison ratio of voids conversion to new supply- Comparison of rent levels across areas between providers- Proposals for use of RCGFKey objective of considering aggregate impact of proposals against need to ensure it does not lead to over supply, or conversely areas of need not being addressed.May require reviews to proposals before a package is agreed.

Page 29: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Contracts and review

Standard Form framework contract covering delivery of new homes and conversion of existing to new tenures

Covering defined schemes (for early delivery) and indicative proposals for latter stages of programme

Recording aggregate costs, levels of investment, outline delivery forecasts and parameters and range of flexibilities which will be considered within frameworks, an open review process

Will require local authority active support prior to our investment in new schemes

Page 30: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Contracts and review continued Annexes covering:

New Homes- amount of investment to deliver specified number of homes- broad locations of new homes- broad mix- average anticipated costs- indicative number to be delivered through S106 at nil grant- amounts of RCGF to be applied- outline of payment terms for new supply

Existing Homes- proportions of voids to be converted to affordable rent or other tenure, and anticipated total number- anticipated timescales for conversions- outline locations at sub-regional (LIP) level- investment capacity generated

Page 31: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Contracts and review continued

Quarterly and open book, comparing assumptions with actual delivery

Look back at actuals and look forward to forecast delivery, for conversions and new supply

Agree flexibilities and variations to contract as required Variation could require increased levels of conversions, reduced

HCA investment or increased affordable housing supply Will consider:

Pace and volume of conversions and comparison to starts against milestonesIncome generated from conversions, impact on ability to deliverDelivery of outputs – starts and completionsCosts of deliveryEvidence of need and LA support as schemes are firmed up

Page 32: Affordable Homes Programme 2011-2015 Framework for Package Proposals.

Affordable rent – next steps

Developing programme framework Stakeholder and provider engagement Framework and information requirements – January/February Partner offers and negotiations – February to April/May? First contracts – May/June?