AFRICAN DEVELOPMEMENT BANK SIERRA LEONE FREETOWN LAND SLIDE & FLOODS IMPACT ALLEVIATION EMERGENCY RESPONSE - PHASE I RDGW/COSL/PGCL DEPARTMENT September 2017 Public Disclosure Authorized Public Disclosure Authorized
Transcript
Page 1: AFRICAN DEVELOPMEMENT BANK · PDF fileAFRICAN DEVELOPMEMENT BANK ... The land slide and flooding situation caused extensive damage to ... This sis also in view of the fact that the

AFRICAN DEVELOPMEMENT BANK

SIERRA LEONE

FREETOWN LAND SLIDE & FLOODS IMPACT ALLEVIATION

EMERGENCY RESPONSE - PHASE I

RDGW/COSL/PGCL DEPARTMENT

September 2017

Pu

blic

Dis

clo

sure

Au

tho

rize

d

P

ub

lic D

iscl

osu

re A

uth

ori

zed

Page 2: AFRICAN DEVELOPMEMENT BANK · PDF fileAFRICAN DEVELOPMEMENT BANK ... The land slide and flooding situation caused extensive damage to ... This sis also in view of the fact that the

Language: English

Original: English

AFRICAN DEVELOPMEMENT BANK

PROJECT : FREETOWN LAND SLIDE & FLOODS IMPACT

ALLEVIATION EMERGENCY RESPONSE - Phase I

COUNTRY : SIERRA LEONE

Date: August 2017

Appraisal Team

Task

Managers:

Mr. Rogers Lubunga – Principal Water and Sanitation

Engineer RDGW2/COSL, Ext. 6271 (Team Leader)

Mr. Sandy Jambawai- Principal Social Development

Officer- RDGW 2/ COSL, Ext. 6272

Team

Members:

Mr. Shiaka Momoh, Senior Procurement Officer –

SNFI/COSL , Extension 6269

Mr. Farah K. Koroma, Senior Financial Management

Specialist – SNFI/COSL Extension 6273

Director General (RDGW) : Mr. Kpourou Janvier Litse Extension 2705

Division Manager (RDGW.2) : Mr. Mouldi Tarhouni (OIC) Extension 2571

Country Manager (COSL) : Ms. Khadidia Diabi (OIC) - Extension 2705

Page 3: AFRICAN DEVELOPMEMENT BANK · PDF fileAFRICAN DEVELOPMEMENT BANK ... The land slide and flooding situation caused extensive damage to ... This sis also in view of the fact that the

TABLE OF CONTENTS

Acronyms ....................................................................................................................................................... i

Executive Summary ...................................................................................................................................... ii

Project Logical Framework .......................................................................................................................... iii

1. BACKGROUND AND JUSTIFICATION FOR EMERGENCY ASSISTANCE ................................... 1

1.1 Background – Floods and the Emergency Crisis in Sierra Leone ................................................ 1

1.2 Justification for Emergency Assistance .......................................................................................... 2

2. OVERVIEW OF THE APPEAL FOR EMERGENCY ASSISTANCE ................................................... 2

3. THE PROPOSED EMERGENCY ASSISTANCE OPERATION ........................................................... 2

3.1 Objectives and Description of the Emergency Assistance ............................................................. 2

3.2 Project Cost and Source of Finance .......................................................................................... 3

3.3 Implementation Arrangements and Schedule ................................................................................ 4

3.4 Procurement Arrangements............................................................................................................. 5

3.5 Financial Management, Disbursement and Audit ......................................................................... 5

4. CONCLUSION AND RECOMMENDATIONS ...................................................................................... 7

Annex I : Government Request ................................................................................................................ I

Annex II : Detailed Costs ........................................................................................................................ II

Annex III : Map of Sierra Leone - Affected Areas in Freetown .............................................................. IV

Page 4: AFRICAN DEVELOPMEMENT BANK · PDF fileAFRICAN DEVELOPMEMENT BANK ... The land slide and flooding situation caused extensive damage to ... This sis also in view of the fact that the

i

Acronyms

AfDB African Development Bank

COSL Country Office Sierra Leone

DFID United Kingdom Department for International Development

FAO Food and Agricultural Organization

FCC Freetown City Council

FM Financial Management

RoSL Republic of Sierra Leone

IDP Internally Displaced Persons

IPAU Integrated Projects Administration Unit

IsDB Islamic Development Bank

MACC Military Assistance to Civilian Communities

MoFED Ministry of Finance and Economic Development

MOU Memorandum of Understanding

MSWGCA Ministry of Social Welfare Gender and Children Affairs

NA Not Available

NFI Non Food Items

NGO Non-Governmental Organization

ONS Office of National Security

SLRCS Sierra Leone Red Cross Society

SRF Special Relief Fund

NSSG National Situation Strategic Group

WASH Water Supply Sanitation and Hygiene

RoSL Republic of Sierra Leone

UN United Nations

UNDAC United Nations Disaster Assessment and Coordination

UNOCHA United Nation Office for the Coordination of Humanitarian Affairs

USD United States Dollars

Page 5: AFRICAN DEVELOPMEMENT BANK · PDF fileAFRICAN DEVELOPMEMENT BANK ... The land slide and flooding situation caused extensive damage to ... This sis also in view of the fact that the

ii

Executive Summary

Project: Freetown Land Slide & Floods Impact Alleviation Emergency Response Project - Phase I

Project

Overview

Project Background: On the night of 13 August 2017, the city of Freetown and its outskirts

experienced torrential rains and landslides that continued well into the morning of 14 August

2017. The magnitude of the rainfall is yet to be determined. As at 19 August, the Office of

National Security (ONS) confirmed that 497 people have died as a result of flooding and

landslides, with many still reported missing. The figures are expected to rise. United Nations

Interagency Rapid Response Team indicate that a total of 1,049 households from several

locations have been affected by the floods and landslides. Disaggregated data on the affected

is not available with registration still ongoing led by government institutions supported by

partners. Project Objective: The objective of the Bank Group Emergency Relief Assistance to the

GoSL is to contribute to the on-going efforts of the Government and other humanitarian

partners to ameliorate the impact of the landslide and floods to the residents of Freetown,

especially those living in the affected area

Expected Outputs: .Improved Sanitation Measures provided to IDPs and affected

communities by eventually restoring the lives to normalcy Overall Timeframe: Six (6) months from the date of signature Grant Amount: USD One Million from the Special Relief Fund (SRF) plus Bank

administered co-financing of USD0.28 million from the Islamic Development Bank (IsDB). Project Direct Beneficiaries: Estimated 1,049 households affected by the mud and landslide

in Freetown, Sierra Leone.

Needs

Assessment

The present Emergency Assistance proposal is in accordance with the Bank Group Policy

Guidelines and is consistent with the current Bank Group provisions under the Revised Policy

Guidelines for Emergency Relief Assistance, and General Regulations of the Special Relief

Fund (ADB/BDIWP/2008/211). The request falls under emergency criteria item (iii) as it

aims for the adoption of reasonable measures to alleviate the risk of further impact to the

victims of the land and mudslide in Freetown, Sierra Leone.

Justification of

the Grant

The land slide and flooding situation caused extensive damage to several communities in

Freetown. Preliminary assessment results from the United Nations show that the flooding

left an estimated 1,040 households without homes and now considered internally displaced

persons (IDPs). Search and rescue operations and rapid assessments are still underway to

determine the number of homes destroyed and disaggregated needs of the affected persons

and communities.

Implementation

Arrangements

Execution of the Bank’s emergency humanitarian relief assistance will be undertaken by the

Office of National Security (ONS) with general mandate for disaster preparedness and

management in Sierra Leone and specific responsibility to coordinate and manage the disaster

response process sanctioned by the President. Sierra Leone Red Cross Society will be

contracted as the service provider through an MOU. Fiduciary oversight will be provided by

the Integrated Project Administration Unit (IPAU) of the Ministry of Finance and Economic

Development.

Page 6: AFRICAN DEVELOPMEMENT BANK · PDF fileAFRICAN DEVELOPMEMENT BANK ... The land slide and flooding situation caused extensive damage to ... This sis also in view of the fact that the

iii

Project Logical Framework

Country and Project Name: Freetown Landslide and Flood Impact Alleviation Emergency response – Phase I

RESULTS CHAIN PERFORMANCE INDICATORS MEANS OF

VERIFICATION

RISK/MITIGATION

MEASURES Indicator Baseline Aug

2017

Target by 30 Nov 2017

IMP

AC

T

Contribute towards

improving the living conditions

of the population affected by the

floods

No of affected Households (HH) for which the

Government request emergency assistance

1039 HH Nil ONS-NSSG Daily Report Risk: Unaffected persons

claiming support

Mitigation: Clear criteria

established; and registration and

verification supported by UN

Agencies & ONS.

OU

TC

OM

ES

1. Vulnerability of Affected

Persons is Minimised

1.1 # Affected HH acknowledging emergency

support

1.2 % increase in incidence of water and

sanitation related diseases (Cholera, Typhoid &

Diarrhea)

1.1 Nil

1.2 NN/a

1.1 1000 HH

1.2 0%

Weekly Implementation

Agency Reports

ONS-NSSG Daily Reports

UN-OCHA Reports

Risk: Failure of other partners to

deliver on their promises.

Mitigation: Emergency

assistance divided in two phase.

Second phase to address

shortfalls, if any.

OU

TP

UT

S

1. Improved WASH for IDPs

and affected communities

2. Alleviation of Living

Conditions of the 1.039

registered Affected families

1.1 # of Portable toilets erected

1.2 Kingtom Faecal Sludge Treatment Site

rehabilitated

1.3 Roof Rainwater Harvesting improved

1.4 Quantity of Solid Waste Evacuated on a

daily basis

2.1 # of assorted Non Food Items (Blankets,

Mosquito net, Cooking Sets, WASH kits)

2.2 # of Waste management kits distributed

(Waste bags)

2.3 Hygiene Kits distributed (Large veronica

Bucket, Buckets without covers, Soap,

Hand Sanitizers, Aqua tabs,)

2.4 IEC Campaigns

N/A

1.1 42 Portable toilets

1.2.1Two(2) FS Ponds &

drying beds

1.3.1 2200sq.m. of roofed

shades constructed

1.3.2 530m of collection

gutters and pipework fixed

1.3.2 50*10,000l storage

tanks complete with

platform & taps

1.4 1*200 garbage bikes

evacuated daily

2.1. 1120 Packs of

Assorted NFIs

2.2 5000 Waste Bags

2.3 At least 1500 Kits

2.4.1At least 2500

Educative Posters

displayed in affected

communities.

2.4.2 90% Positive

beneficiary feedback

on IEC Campaigns

Field Inspection

Monthly Progress Reports

Signed (HH & waste

Collector)Waste

Collection Calendar

ONS Monitoring Reports

Registration and

distribution lists

Interviews with

beneficiaries

Field Visits

Risk: Delivery of equipment/Kit

may take a long time due to

procurement delays.

Mitigation: Procurement

procedures of the Service

Provider to be utilised.

Risk: Beneficiaries acceptance

of communal measures &

Availability of Land for Toilets

and water facilities

Mitigation: Complementary

Mobilization activities by other

emergency response partners &

ONS Liaison Officers stationed

within the affected communities

KEY ACTIVITIES

1) Measures to Improve Sanitation (Construction of Toilets, RWH systems, FS Pond)

2) Procurement and Distribution of Non-Food Items (NFI)

3) Support to ONS Coordination

Inputs: Source of Finance:

Water Supply Sanitation & Hygiene (WASH) activities USD 966,000 SRF = USD1.00m

Non-Food Items (NFI) USD 239,000 IsDB Grant = USD0.28m

Coordination and Management activities USD 75,000

Page 7: AFRICAN DEVELOPMEMENT BANK · PDF fileAFRICAN DEVELOPMEMENT BANK ... The land slide and flooding situation caused extensive damage to ... This sis also in view of the fact that the

1

1. BACKGROUND AND JUSTIFICATION FOR EMERGENCY ASSISTANCE

1.1 Background – Floods and the Emergency Crisis in Sierra Leone

1.1.1 On the night of 13 August 2017, the city of Freetown and its outskirts experienced torrential

rains and landslides that continued well into the morning of 14 August 2017. The magnitude of

the rainfall is yet to be determined. As at 15 August, the Ministry of Information and

Communication has confirmed that 297 people have died (105 adult males, 83 women and 109

children, as a result of flooding and landslides, with many still reported missing. The figures are

expected to rise. United Nations Interagency Rapid Response Team indicate that a total of 1,039

households from several locations have been affected by the floods and landslides. Disaggregated

data on the affected is not available. The registration of affected persons is ongoing led by

government institutions supported by partners. Due to the destructive impact of the floods on the

communities, the GoSL has declared a Military Assistance to Civilian Communities (MACC) and

activated a Level 3 emergency in Freetown. The Government declared a seven days mourning

period which ended on 20th August 2017.

1.1.2 The response is being coordinated by the Office of National Security (ONS) with the support

of other government ministries and other humanitarian partners. A National Strategic Situation

Group has been constituted comprising government and donor institutions. The group meets twice

a day for daily updates. A UN Disaster Assessment and Coordination (UNDAC) team was

deployed on Friday 18 August 2017 for an initial period of three weeks to support the ongoing

assessments, coordination and reporting efforts. The NGO Consortium Disaster Emergency

Committee (DEC) has indicated that, among its member organizations, ActionAid, IFRC, Oxfam,

World Vision, Christian Aid and Care International have started responding to the most pressing

needs. The government has identified 9 key pillars to which partners should align their assistance

and support. These include: Social Protection; Health and Burial; Logistics; Security and Safety;

Food and Nutrition; WASH; Non Food Items; Agriculture and Registration. A key area of concern

is the potential threat of Cholera outbreak due to damaged water points and water contamination

due to flood water. This sis also in view of the fact that the country is only midway through the

rainy season and more rains are expected.

1.1.3 This proposal for emergency assistance for the victims of the floods in affected communities

in Freetown is justified as it fulfills the three criteria required to qualify for Bank Group assistance

in that: (i) the emergency situation is of a scale which is clearly beyond the capacity of the

Government of Sierra Leone to handle alone; (ii) the proposed activities can be carried out

expeditiously and effectively within the required time frame; and (iii) the emergency relief

assistance aims at restoring a degree of normalcy in both the social and economic life of the

affected populations as quickly as possible and addresses corrective measures for future flood

related disasters. The proposal is thus in compliance with the provisions of the Revised Policy

Guidelines and Procedures for Emergency Relief Assistance, and General Regulations of the

Special Relief Fund(ADB/BD/2008/211/Rev.1)

Page 8: AFRICAN DEVELOPMEMENT BANK · PDF fileAFRICAN DEVELOPMEMENT BANK ... The land slide and flooding situation caused extensive damage to ... This sis also in view of the fact that the

2

1.2 Justification for Emergency Assistance

1.2.1 The land slide and flooding situation caused extensive damage to several communities in

Freetown. Work is underway to ascertain the exact number of affected households; current results

show that the flooding left an estimated 1,040 households without homes and now considered

Internally Displaced Persons (IDPs). Search and rescue operations and rapid assessments are still

underway to determine the number of homes destroyed and disaggregated needs of the affected

persons and communities.

1.2.2 Most of the affected people especially in the affected slum areas and squatters in Freetown

were already suffering from extreme poverty and deprivation before the disaster. Addressing the

media, President Ernest Bai Koroma said the devastation “was overwhelming us”. “Entire

communities have been wiped out,” Koroma said. “We need urgent support now.” As the

Government of Sierra Leone is seriously constrained by lack of available resources to address most

of the development challenges in the country, he made an international appeal to donors and

development partners for timely support and assistance to respond to the disaster and avert further

human suffering.

2. OVERVIEW OF THE APPEAL FOR EMERGENCY ASSISTANCE

2.1. From the onset of the floods, the GoSL took the leadership in coordinating the response, and

in mobilizing resources at its disposal as a response to the emergency in the floods devastated

areas. The ONS chaired by the Vice President was designated by the President to coordinate the

humanitarian relief response on behalf of Government.

2.2 Several partners including UN Agencies and NGOs have provided initial emergency support

The Government already has resource constraints and is therefore seriously handicapped to

effectively respond to the disaster. In this regard, the GoSL, on August 18th 2017, submitted to the

African Development Bank, Sierra Leone Country Office (COSL), a request for humanitarian

assistance.

3. THE PROPOSED EMERGENCY ASSISTANCE OPERATION

3.1 Objectives and Description of the Emergency Assistance

3.1.1 The objective of the proposed Bank Group Emergency Relief Assistance to the Republic of

Sierra Leone (RoSL) is to contribute to the on-going efforts of the Government and other

humanitarian partners to alleviate the impact of the landslide and floods to the residents of

Freetown, especially those living in the affected areas. Bank’s assistance will target the landslide

and flood hotspots as well as the downstream impact within the context of ensuring that the

affected persons and communities enjoy dignified daily living during the difficult period, in

addition to ensuring that the risk of water and sanitation related diseases in minimized.

3.1.2 The Bank will contribute USD 1 million (One Million United States Dollars) in response to

the appeal of the GoSL channeled towards providing critical humanitarian relief assistance geared

towards sustaining and maintaining the dignity of the flood affected persons and also facilitating

Page 9: AFRICAN DEVELOPMEMENT BANK · PDF fileAFRICAN DEVELOPMEMENT BANK ... The land slide and flooding situation caused extensive damage to ... This sis also in view of the fact that the

3

their return to normalcy. Bank’s support will be directed towards two main components of the

emergency response, i.e. Water Sanitation and Hygiene (WASH) and provision of non-food items

to facilitate maintenance of an acceptable level of personal hygiene and dignity of individuals, viz

Component Activities Estimated

Cost(USD)

Water Sanitation and

Hygiene (WASH)

Interventions

Fabrication and installation of 42 portable

toilets completed with wash rooms;

Procurement and distribution of 5000 kits for

solid water management, Rehabilitation of

one faecal sludge treatment pond; Erection of

22 rainwater harvesting and ustilisation

amenities each including 100sq.m roof, 10m

of roof gutter, 20,000litre storage tanks, 14m

of collection and drainage pipework, and

soak away pit subject to limitations of

existing conditions; and Support for safe

collection and disposal of faecal sludge and

solid waste.

966,000

Non Food Items Procurement and distribution of 2620 sets of

assorted Non Food Items (including hygiene

kits and other general household essentials)

239,000

Support to ONS

Coordination

Logistics including vehicle O&M and Office

Supplies as well as Monitoring

75,000

Grand Total 1,280,000

3.2 Project Cost and Source of Finance

3.2.1 The total emergency assistance contribution to the RoSL will be USD1,280,000. The funds

provided by the Bank are restricted and earmarked for urgent humanitarian assistance to the

affected populations. The costs by component and by expenditure category and source of finance

are indicated in Table 3.1 and Table 3.2 below. Details of the estimate are provided in Annex II.

Table 3.1: Cost by Component Amount

Component

Sierra Leonean Leone

(SLL) million

United Stated Dollars

(USD) '000

%

Foreign

Exch.

%

Total

Costs

Local Foreign Total Local Foreign Total

A. WASH Facilities 6,138 679 6,817 822.00 91.00 913.00 10 78

B. Non-Food Items 1,695 90 1,785 227.00 12.00 239.00 5 14.5

C. ONS Coordination 956 - 956 128.00 - 128.00 - 7.5

Total PROJECT COSTS 8,789 769 9,558 1177.00 103.00 1,280.00 8.5 100

Page 10: AFRICAN DEVELOPMEMENT BANK · PDF fileAFRICAN DEVELOPMEMENT BANK ... The land slide and flooding situation caused extensive damage to ... This sis also in view of the fact that the

4

Table 3.2: Cost by Category and Source of Finance (USD ‘000)

Category

Source

A.

Works

B.

Goods

C.

Services

D.

Operating

Costs

Total

PROJECT

COSTS

SRF Grant 740.00 170.00 15.00 75.00 1,000.00

IsDB Grant 125.00 117.00 38.00 - 280.00

Total 865.00 287.00 53.00 75.00 1,280.00

3.3 Implementation Arrangements and Schedule

3.3.1 According to the Bank’s Revised Policy Guidelines and Procedures for Emergency Relief

Assistance and General Regulations of the SRF (ADB/BD/WP/2008/211/Rev.1 and

ADF/BD/WP/2008/173/Rev.1) (the “Guidelines”), implementation of emergency humanitarian

relief assistance will be entrusted to the Office of National Security (ONS) as the Executing

Agency. The ONS has a general mandate for disaster preparedness and management in Sierra

Leone and specific responsibility to coordinate and manage the disaster response process

sanctioned by the President. The Ministries of Finance and Economic Development, Water

Resources, Health and Sanitation, Social Welfare and Gender will support ONS in the

implementation of the project. The Ministry of Finance and Economic Development (MoFED),

through the Integrated Projects Administrative Unit (IPAU) will be responsible for implementation

and fiduciary management. The sector ministries will provide policy and technical guidance.

3.3.2 The Bank has an existing MoU with IsDB for general cooperation in common

countries. The Islamic Development Bank (IsDB) will make a contribution of approximately USD

280,000 to the Republic of Sierra Leone to be disbursed to IPAU, in a pooled Special Account, for

joint co-financing of this emergency operation with AfDB. The IsDB, in agreement with GoSL

has requested the Bank to monitor the utilization of the IsDB contribution. The parties -IsDB,

RoSL and AfDB will enter into a tripartite Letter of Agreement which will outline their respective

roles and responsibilities. Whereas AfDB will monitor the utilization of the IsDB funds, it will

not assume fiduciary responsibility over the administration of these funds.

3.3.3 Sierra Leone Red Cross Sciety (SLRCS) has been identified as the Service Provider. The

NGO has been identified and selected in consultation with the Office of National Security from

database of NGOs and institutions that worked with ONS to respond to previous flood in

September, 2015 and are currently actively engaged in response efforts to the recent flood disaster.

SLRCS would be contracted as the Service Provider and will sign a Memorandum of

Understanding (MOU) that will clearly highlight their obligations, role and responsibilities and

form the basis for the release of funds by the Integrated Project Administration Unit (IPAU) of the

Ministry of Finance and Economic Development.

3.3.4 The Guidelines and Procedures stipulate that emergency humanitarian relief assistance is

typically a short-term operation, lasting a few months. Consequently, a period of 6 months from

the date of signature is provided for implementing the proposed activities and closing for this

emergency relief assistance. Funds not disbursed after this period will be cancelled.

Page 11: AFRICAN DEVELOPMEMENT BANK · PDF fileAFRICAN DEVELOPMEMENT BANK ... The land slide and flooding situation caused extensive damage to ... This sis also in view of the fact that the

5

3.4 Procurement Arrangements

3.4.1 The procurement of goods, works & services will be carried out in accordance with the

Bank’s procurement policy framework as stipulated in paragraphs 8.5, and 8.6 of the Bank’s

procurement policy and section 5 annex 3 of the Methodology. The Office of National Security

with fiduciary support from integrated project administration unit (IPAU) of the Ministry of

Finance and Economic Development is in the process of single sourcing a Non-governmental

Organization (Sierra Leone Red Cross Society) who possess the relevant experience in flood

disaster response related activities including delivery of emergency Water Sanitation and Hygiene

(WASH) services and the procurement & distribution of non-food items. IPAU has acquired

experience on the Bank procurement processes and procedures through the implementation of

current and previous institutional support projects. The NGO engaged will use their internal

processes and procedures to implement response related activities but ONS must ensure that the

business processes of the Service Provider are aligned with acceptable best practices.

3.5 Financial Management, Disbursement and Audit

3.5.1 The Ministry of Finance and Economic Development (MoFED), Integrated Project

Administration Unit (IPAU) would be responsible for financial management of the proposed

emergency operation. IPAU has adequate FM system and qualified staff to carry out FM work

required for the proposed project and will continue to use its existing institutional arrangement to

closely collaborate with the Office of National Security (ONS) project management team to drive

the project objectives. IPAU has experience in Bank procedures and FM performance for ongoing

projects is satisfactory with moderate residual risk. Therefore, no additional staff, would be

required for the administration of the emergency program.

3.5.2 Disbursement and Funds Flow: Since the project component outputs are the same for

with regard to each financier, a pool Special Account would be established for the project and

disbursement to the Special Account would be preceded by approval of the project’s specific

activity costs and schedule by the AfDB. Disbursement request highlighting separately funds due

from AfDB and IsDB along with the approved Work Plan and Budget will be submitted to AfDB

by GoSL for disbursement. The AfDB Country Office Sierra Leone, will process and clear the

request directly for IsDB disbursement. The project quarterly Interim unaudited Financial Reports

approved by AFDB would be used as a basis for justifying funds advanced to the Special Account.

Each financier will disburse the entire amount in a single tranche to the project pool Special

Account specifically opened for the project managed by IPAU. Opening of the special account is

a condition for disbursement. At the end of the project, any unutilized funds would be shared and

returned in proportion of the financiers’ contribution as per the Letter of Agreement referred to

above in Section 3.3.2.

3.5.3 Since the emergency activities will be primarily implemented by a Service Provider and

relevant associates, IPAU will process payment request from ONS in accordance with the

approved work program and MOU with the Service Provider for payment from the project Special

Account. Disbursement triggers to the Service Provider will be in accordance with the specific

milestones accomplished under the MOU terms of payment. Regarding administrative cost support

for ONS coordination, disbursement would be conducted on an imprest basis, monthly, based on

appropriate retirement of advances received. For the day to day operations of the special account,

the approved tripartite MOU (ONS/IPAU/Service Provider) will be a condition for defraying

expenses for approved activities.

Page 12: AFRICAN DEVELOPMEMENT BANK · PDF fileAFRICAN DEVELOPMEMENT BANK ... The land slide and flooding situation caused extensive damage to ... This sis also in view of the fact that the

6

3.5.4 Reporting: IPAU through MoFED, will report progress on a quarterly basis to the African

Development Bank showing specific progress on activities implemented and financial utilization

reports. The Interim unaudited financial reports duly certified by senior Ministry of Finance

officials showing sources and usage of funds will be prepared in USD and submitted to the Bank

within 30 days after the end of the quarter. This will ensure a coordinated response and dialogue

on the support. A final report, containing an operational and a financial section including an audit

report, will also be provided upon completion of the operation and financial closure of the project.

This final report should be submitted to the Bank within four months after the completion of the

program. The AFDB will share all reports and outcome of AfDB review with IsDB. Compliance

with reporting requirements was below expectation with respect to the previous emergency

operation which was implemented by UNICEF for supporting the 2015 flood victims; an informal

draft report was received during the second last week of August 2017, and formal submission of

the final report is likely to be delayed beyond the due date of 31st August 2017.

3.5.5 Audit: The Audit Service Act 2014, mandated the Auditor General, Audit Service Sierra

Leone (ASSL), to subject all public funds to an audit; thus, no additional cost would be required

for ASSL to conduct the audit. ASSL has previously conducted and produced audit reports for

ongoing Bank financed projects satisfactorily. Therefore, ASSL will audit the project at the end of

its operation with the audit report submitted to the Bank on or before four months following the

end of the project. The AfDB will share the audit report and outcome of AfDB review with IsDB.

ASSL has conducted three successive special audits on implementation of EBOLA funds for 2014,

2015 and 2016. The 2014 and 2015 audit were concluded and submitted to Parliament (and

published) as per Audit Service Act 2014, while 2016 audit is in progress. However,

implementation of audit recommendations has been a challenge across the board. To mitigate this

challenge, the Bank together with other development partners on the Multi-donor Budget Support

framework, are discussing the possibility of revising indicators including implementation of an

agreed percentage of audit recommendations achieved over the period of the current budget

support framework. In general, compliance with Bank’s requirement regarding submission of

Page 13: AFRICAN DEVELOPMEMENT BANK · PDF fileAFRICAN DEVELOPMEMENT BANK ... The land slide and flooding situation caused extensive damage to ... This sis also in view of the fact that the

7

Project Audit Reports has significantly improved with timely submission currently recorded at

80%. The Bank’s Country Office in Sierra Leone will continue to provide the necessary support

and monitor the execution of this operation and ensure timely submission of the required reports

by IPAU.

4. CONCLUSION AND RECOMMENDATIONS

4.1 Conclusion In the aftermath of the 13th – 14th August floods, the Government of Sierra Leone is faced with

the huge challenges of providing support to the communities and individuals affected by the floods.

This has prompted support to the Government by the international cooperating partners to provide

relief to the affected communities. The Bank’s Grant of USD 1.00 million will address strategic

areas and components of the early humanitarian relief assistance, in this case, the provision of

WASH facilities and much needed NFIs for affected persons to support good hygiene practices

and maintenance of suitable living conditions to facilitate their recovery.

4.2 Recommendations It is recommended that the Board of Directors (i) approve a USD1.00 million grant from the

Special Relief Fund (SRF) for Emergency Assistance to the Republic of Sierra Leone to support

the provision of basic services for vulnerable populations that were severely affected by floods in

Freetown; (ii) approve the Bank’s monitoring of the Islamic Development Bank’s grant of

approximately USD 0.28 million to the Republic of Sierra Leone, to be utilized for financing joint

activities under the Project; and (iii) waive, exceptionally, the application of the Bank Group’s

Rules and Procedures for Procurement, and authorize the application of the internal procedures of

the selected Service Provider (Sierra Leone Red Cross Society). The grant resources will be

disbursed in one tranche, to the Republic of Sierra Leone subject to the fulfilment of the following

conditions:

i. Signature of the Letter of Agreement between the Bank, the IsDB and the Republic of

Sierra Leone;

ii. Opening of a special account in a bank acceptable to the Bank; and,

iii. Submission of a signed Tripartite MOU (ONS/IPAU/Sierra Leone Red Cross Society)

acceptable to the Bank.

Page 14: AFRICAN DEVELOPMEMENT BANK · PDF fileAFRICAN DEVELOPMEMENT BANK ... The land slide and flooding situation caused extensive damage to ... This sis also in view of the fact that the

I

Annex I Government Request

Page 15: AFRICAN DEVELOPMEMENT BANK · PDF fileAFRICAN DEVELOPMEMENT BANK ... The land slide and flooding situation caused extensive damage to ... This sis also in view of the fact that the

II

Annex II Detailed Costs

Community

No of Affected

Households

No. Of Affected

persons

No of Sanitation

Facility Unit Rate (USD) AMOUNT (USD) Qty of Schemes

Unit Rate

(USD) AMOUNT (USD)

No of RAIN

Water

Havesting

Facility Unit Rate (USD) AMOUNT (USD) Unit Rate (USD) AMOUNT (USD)

Unit Rate

(USD)

AMOUNT

(USD)

GeorgeBrook/Dwor

zak/New England 67 108 2 5,573.97 11,147.95 36 23.29 838.36 1 8,586.30 9,273.21 1 457,000.00 457,000.00 1 47,945.21 47,945.21

0 -

Kamayama/Pentago

n 116 500 5 5,573.97 27,869.86 167 23.29 3,889.04 2 8,586.30 17,172.60

0 -

Kaningo 191 1000 8 5,573.97 44,591.78 334 23.29 7,778.08 3 8,586.30 25,758.90

0 -

Juba Bridge/Lumley 75 375 3 5,573.97 16,721.92 125 23.29 2,910.96 2 8,586.30 17,172.60

0 -

Sugar/Regent/Mort

omeh 254 1438 10 5,573.97 55,739.73 85 23.29 1,979.45 4 8,586.30 34,345.21

0 -

Mountain Cut 20 100 1 5,573.97 5,573.97 33 23.29 768.49 1 8,586.30 8,586.30

0 -

Culvert 150 750 8 5,573.97 44,591.78 250 23.29 5,821.92 2 8,586.30 17,172.60

0 -

Kissy Brook 42 210 3 5,573.97 16,721.92 70 23.29 1,630.14 1 8,586.30 8,586.30

0 - -

Wellington 40 200 2 5,573.97 11,147.95 67 23.29 1,560.27 1 8,586.30 8,586.30

42 -

100 234,106.85 27,176.71 17 146,654.03 457,000.00 47,945.21

ITEM DESCRIPTION AMOUNT

1

WASH

intervention 912,882.79

2

Non Food

Items 238,880.00

Overheads 128,000

1,279,762.79

HYGIENE

EDUCATION/PROMOTION

GRAND SUMMARY SHEET

GRAND TOTAL

CONSTRUCTION OF MAKESHIFT LATRINES AND PROVISION OF

SANITARY MATERIALS SOLID WASTE MANAGEMENT CONSTRUCTION OF RAIN WATER HARVESTING SYSTEM

REHABILITATION OF LIQUID WASTE SLUDGE POOL

AT KINGTOM

No. Items Descriptions Quantity Unit Frequency cost Le Total Le Total USD =Le 7,500

1.1 Blankets 2 blankets to every family 2100 4 per Family Head 120,000.00 252,000,000.00 33,600.00

1.2 Mosquito net 4 Nets to every family 2100 4 per Family Head 50,000.00 105,000,000.00 14,000.00

1.3 Cooking Sets 1 Set to every famaily heads 1120 1 per Family Head 55,000.00 61,600,000.00 8,213.33

1.4 Tapaulins 1 Tapaulin to every famaily head 1120 1 per Family Head 100,000.00 112,000,000.00 14,933.33

1.5 Shelter kits 1 Kit to every famaily heads 1120 1 per Family Head 250,000.00 280,000,000.00 37,333.33

1.6 Foam Matress (4x6) 1 Matress to every family head 700 2 per Family Head 300,000.00 210,000,000.00 28,000.00

1.7 Rain Gears 4 set of rain gears to every family 700 4 per Family Heads 150,000.00 105,000,000.00 14,000.00

1.8 Distribution Mobilisation of Volunteers to distribute items 120 Volunteers/day 30 80,000.00 288,000,000.00 38,400.00

1.9 Vehicle and Transport Vehicle and Transportation of items for 2 months 4 Trucks/day 30 2,500,000.00 300,000,000.00 40,000.00

2.00 Supervision of work Supervisionand monitoring of Distribution 2 Months 10 29,000,000.00 58,000,000.00 7,733.33

4.1 Rentage for warehousing 2 Months 10,000,000.00 20,000,000.00 2,666.67

1,791,600,000.00 238,880.00 Sub Total

Details of Non-Food Items

Page 16: AFRICAN DEVELOPMEMENT BANK · PDF fileAFRICAN DEVELOPMEMENT BANK ... The land slide and flooding situation caused extensive damage to ... This sis also in view of the fact that the

III

A

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

i

Construction of Makeshift

Latrines six compartment,

including two for shower Nr 1.00 28,000,000.00 28,000,000.00

ii

Provision of 66 liters Storage

tanks for emptying purposes Nr 12.00 120,000.00 1,440,000.00

iii

Operation and Management of

makeshift Laterines per trip Months 2.00 5,000,000.00 10,000,000.00

iv

Provision of Soaps for two

months Crtns 1.00 500,000.00 500,000.00

v

Provision of 40 liters Hand

Washing Buckets Nr 4.00 75,000.00 300,000.00

vi

Provision of 20 liters plastic

buckets for household use. 2

persons per bucket Nr 15.00 30,000.00 450,000.00

40,690,000.00

TOTAL IN USD 5,573.97

B SOLID WASTE MANAGEMENT

i

Provision of Empty rice bags

for collection of solids waste. 2

Bags per 3 person Nr 2.00 5,000.00 10,000.00

ii

Collection, transporting and

depositing of solid waste to

dump site per bag 4 times per

month for three months Nr 1.00 160,000.00 160,000.00

TOTAL-SOLID WASTE MANAGEMENT 170,000.00

TOTAL IN USD 23.29

PORTABLE TOILETS/WASH ROOM

Details Costs - WASH Interventions

TOTAL-Construction of Latrine and provision of sanitary

D

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

i

Provision of 10,000 liters Milla

Storage Tanks Nr 2.00 12,000,000.00 24,000,000.00

ii

construction of Raised

platform tanks stand/support

with solid snadcrete blockwork

as walls and mass concrete

floor slab C25 (1:3:6-16mm

aggregate) plastered to a

smooth finish and painted with

enemael paint Nr 1.00 7,500,000.00 7,500,000.00

iii

Provide and install stand post

and connection materials from

storage tanks to Public stand

post Nr 1.00 2,500,000.00 2,500,000.00

iv

Construct roof over storage

tanks (10m x 10m ) laid to a

single fall with a 100mm

diameter Galvanised settl post

as roof support, timber roof

mebers and roof covering of 28

Guage (2400mm long) fix unto

timber roof members by

naining with roofing nails and

225mm wide wooden fascial

board nailed unto the face of

rafters item 1.00 20,000,000.00 20,000,000.00

v

Provide and install rain water

collection system PVC roof

gutters, Clips, Elbows, 100mm

diameter down pipes, 100mm

control valves complete with

other necessary fittings item 1.00 8,000,000.00 8,000,000.00

vi

Provide and stall inline water

filters + provision of 5 spare

cartridges Nr 2.00 340,000.00 680,000.00

TOTAL-RAIN WATER HARVESTING SYSTEM 62,680,000.00

TOTAL IN USD 8,586.30

RAIN WATER HARVESTING SYSTEM

Page 17: AFRICAN DEVELOPMEMENT BANK · PDF fileAFRICAN DEVELOPMEMENT BANK ... The land slide and flooding situation caused extensive damage to ... This sis also in view of the fact that the

IV

Annex III Map of Sierra Leone - Affected Areas in Freetown

Kaningo

Sugar/Regent

Mountain Cut Kissy Brook

Culvert

Juba Bridge Wellington


Recommended