L-1 Light Fixture Assembly Simulation Worksheet AGC’s LEAN CONSTRUCTION EDUCATION PROGRAM LIGHT FIXTURE ASSEMBLY SIMULATION WORKSHEET: TRACKING SHEET Fill out using the steps described below Eight-Piece Batch Simulation Four-Piece Batch Simulation One-Piece Batch Simulation Number of Completed Fixtures Number of Fixtures in Progress Number of Completed Special- Order Fixtures Cash Flow +$150 for Completed – $50 for WIP At the end of each round of the simulation you should record the results for your group. Note the number of completed batches Note the number of fixtures completed { Count each fixture completed within the batches individually Note the number of fixtures in progress { Count each fixture in progress within the batches individually Note the number of completed special-order fixtures Calculate the cash flow for the project { For each completed fixture, give your group $150 { For each fixture in progress, subtract $50 from your total
Transcript
Page 1: AGC’s LEAN CONSTRUCTION EDUCATION PROGRAM LIGHT FIXTURE …

L-1Light Fixture Assembly Simulation Worksheet

AGC’s LEAN CONSTRUCTION EDUCATION PROGRAM

LIGHT FIXTURE ASSEMBLY SIMULATION WORKSHEET: TRACKING SHEET Fill out using the steps described below

Eight-Piece Batch Simulation

Four-Piece Batch Simulation

One-Piece Batch Simulation

Number of Completed Fixtures

Number of Fixtures in Progress

Number of Completed Special-Order FixturesCash Flow +$150 for Completed – $50 for WIP

At the end of each round of the simulation you should record the results for your group.

• Note the number of completed batches

• Notethenumberoffixturescompleted

{ Counteachfixturecompletedwithinthebatchesindividually

• Notethenumberoffixturesinprogress

{ Counteachfixtureinprogresswithinthebatchesindividually

• Notethenumberofcompletedspecial-orderfixtures

• Calculatethecashflowfortheproject

{ Foreachcompletedfixture,giveyourgroup$150

{ Foreachfixtureinprogress,subtract$50fromyourtotal

Page 2: AGC’s LEAN CONSTRUCTION EDUCATION PROGRAM LIGHT FIXTURE …

L-2Light Fixture Assembly Simulation Worksheet

AGC’s LEAN CONSTRUCTION EDUCATION PROGRAM

LIGHT FIXTURE ASSEMBLY SIMULATION WORKSHEET: TIMEKEEPER Asthetimekeeper,youstartandstopthesimulations.Eachsimulationlastsexactlyfiveminutes.Youwillalertthefacilitatorattwominutes,atthreeminutes,andagainatfourminutessothefacilitatorcanintroducethespeciallyorderedfixtures.Youmustalsonotethetimewhenthefirstbatchoflightfixturesiscompleted.

Foreachsimulation,followthesesteps:

1. Start the simulation.

2. Attwominutes,alertthefacilitator.

3. Atthreeminutes,alertthefacilitator.

4. Atfourminutes,alertthefacilitator.

5. Notethetimewhenthefirstbatchcompletes.

6. Atfiveminutes,stopthesimulation.

Page 3: AGC’s LEAN CONSTRUCTION EDUCATION PROGRAM LIGHT FIXTURE …

L-3Light Fixture Assembly Simulation Worksheet

AGC’s LEAN CONSTRUCTION EDUCATION PROGRAM

LIGHT FIXTURE ASSEMBLY SIMULATION WORKSHEET: FACILITATOR Asthefacilitator,yourroleistointroduceonespeciallyorderedfixturewhenalertedbythetimekeeperattwo,three,andfourminutes.Todothis,youwillgotothefixtureassemblyapprentice and introduce a colored piece of paper.

Yourroleisnottoaffectproductionqualityorspeed,butsimplytoplacethespeciallyorderedfixturesintheprocess.Takeyourtime.Thespeciallyorderedfixturemusttravelwiththebatchin which it was introduced.

Foreachsimulation,followthesesteps:

1. Whenthetimekeeperindicatestwominutes,provideanewspeciallyorderedfixtureattheassemblyoperationtouseinplaceofastandardfixture.

2. Whenthetimekeeperindicatesthreeminutes,introduceanewspeciallyorderedfixtureat the assembly operation.

3. Whenthetimekeeperindicatesfourminutes,introduceanewspeciallyorderedfixtureat the assembly operation.

Page 4: AGC’s LEAN CONSTRUCTION EDUCATION PROGRAM LIGHT FIXTURE …

L-4Light Fixture Assembly Simulation Worksheet

AGC’s LEAN CONSTRUCTION EDUCATION PROGRAM

LIGHT FIXTURE ASSEMBLY SIMULATION WORKSHEET: APPRENTICE — ASSEMBLY Astheapprentice,yourroleistobeginthelightfixtureassemblyoperation,knowingyourperformancewillbejudgedonhowmanyassembliesyoucomplete.

Foreachsimulation,followthesesteps:

1. 1.Takeasinglesheetofpaperfromthestack.

• Fromtimetotime,thefacilitatorwillprovideaspecialsheetofpapertouseinplace of the standard paper within your batch.

2. Write the batch number on the paper.

• Note:Eachbatchwillcontainthenumberoffixturesequaltothebatchsizeyouareinstructedtouse.So,foraneight-piecebatchsimulation,thereareeightlightfixturesinBatch#1andinBatch#2andsoon.

3. Drawstraightlinesjoiningthediagonalcornersofeachsheetofpaper,asshowninthebelow.

• Repeattheprocessuntilthebatchsizeisreached.

4. Use the paper clip to combine the batch of papers into one package.

5. Passontothejourneyworkerresponsibleforinstalling.

6. Repeatstepsonethroughfive,withanewbatchnumber,untiltimerunsout.

Page 5: AGC’s LEAN CONSTRUCTION EDUCATION PROGRAM LIGHT FIXTURE …

L-5Light Fixture Assembly Simulation Worksheet

AGC’s LEAN CONSTRUCTION EDUCATION PROGRAM

LIGHT FIXTURE ASSEMBLY SIMULATION WORKSHEET: JOURNEYWORKER — INSTALLATION Asthefirstjourneyworker,yourroleistocompletetheinstallationoperationofthelightfixtureproductionprocess,knowingyourperformancewillbejudgedonhowmanyinstalledassemblies you complete.

YourworkwillstartwhenyoureceiveBatch#1.Thepaperswillhavediagonallinesalreadymarked each sheet.

Foreachsimulation,followthesesteps:

1. Removethepaperclip.

2. Takeasinglesheetofpaper.

3. Drawdottedlinesjoiningthemidpointsofoppositesidesofthepaper,asshowninthefigurebelow.(Previouslymarkedlinesappearingray.)

4. Fold the paper in half along its longer side.

5. Repeatuntilallpapersinthebatchhavebeenmarkedappropriatelyandfolded.

6. Onceallthepapersinthebatchhavethelinesandarefolded,combinethemintoabatch,againusingthepaperclip.

7. Passontothejourneyworkerresponsibleforwiringandclipping.

8. Repeatstepsonethroughsevenforeachbatch.

Page 6: AGC’s LEAN CONSTRUCTION EDUCATION PROGRAM LIGHT FIXTURE …

L-6Light Fixture Assembly Simulation Worksheet

AGC’s LEAN CONSTRUCTION EDUCATION PROGRAM

LIGHT FIXTURE ASSEMBLY SIMULATION WORKSHEET: JOURNEYWORKER — WIRE AND CLIP Asthesecondjourneyworker,yourroleistocompletethewire-and-clipoperationofthelightfixtureproductionprocess,knowingyourperformancewillbejudgedonhowmanywire-and-clip assemblies you complete.

YourworkwillstartwhenyoureceiveBatch#1.Thepaperswillbefolded,havediagonallinesjoiningthecornersanddottedlinesjoiningthemidpointsofoppositesides.

Foreachsimulation,followthesesteps:

1. Removethepaperclip.

2. Takeasinglepaperatatime,unfoldingeachonetoexecutetheoperation.

3. Drawstraightlinestojointhemidpointofalladjacentsides,asshowninthefigurebelow.(Previouslymarkedlinesappearingray.)

4. Refold each paper as before.

5. Repeatuntilallpapersinthebatchhavebeenmarkedappropriatelyandfolded.

6. Combine the papers into the batch using the paper clip.

7. Passontothejourneyworkerresponsibleforlampandfinish.

8. Repeatstepsonethroughsevenforeachbatch.

Page 7: AGC’s LEAN CONSTRUCTION EDUCATION PROGRAM LIGHT FIXTURE …

L-7Light Fixture Assembly Simulation Worksheet

AGC’s LEAN CONSTRUCTION EDUCATION PROGRAM

LIGHT FIXTURE ASSEMBLY SIMULATION WORKSHEET: JOURNEYWORKER — LAMP AND FINISH Asthethirdjourneyworker,yourroleistocompletethelampandfinishoperationofthelightfixtureproductionprocess,knowingyourperformancewillbejudgedonhowmanylampandfinishassembliesyoucomplete.

YourworkwillstartwhenyoureceiveBatch#1.Thepaperswillbefolded,havediagonallinesjoiningthecornersandadjacentsidesofthepaper,anddottedlinesjoiningthemidpointsofopposite sides.

Foreachsimulation,followthesesteps:

1. Removethepaperclip.

2. Takeasinglepaperatatime,unfoldingeachtoexecutetheoperation.

3. Drawasolidlineovereachdottedline.

4. Drawstraightlinesparalleltothelongersideofthepapertodividethepaperintofourequalcolumns,asshowninthefigurebelow.(Previouslymarkedlinesappearingray.)

5. Refold the paper.

6. Repeatuntilallpapersinthebatchhavebeenmarkedappropriatelyandfolded.

7. Combine the papers into the lot using the paper clip.

8. Theproductiscomplete.