11
1 LANDFRM Delivery of SuDS standards, design criteria and tools 29/03/12 Claire Underhill - Innovyze InfoNet as a tool for managing and maintaining SuDS Claire Underhill Client Service Manager Agenda 1. Introduction 2. Managing data 3. SuDS Maintenance 4. Data Analysis
Transcript
Page 1: Agenda - CIRIA1 LANDF RM – Delivery of SuDS – standards, design criteria and tools 29/03/12 Claire Underhill - Innovyze InfoNet as a tool for managing and maintaining SuDS Claire

1

LANDFRM – Delivery of SuDS – standards, design criteria

and tools

29/03/12

Claire Underhill - Innovyze

InfoNet as a tool for managing and

maintaining SuDS

Claire Underhill

Client Service Manager

Agenda

1. Introduction

2. Managing data

3. SuDS Maintenance

4. Data Analysis

Page 2: Agenda - CIRIA1 LANDF RM – Delivery of SuDS – standards, design criteria and tools 29/03/12 Claire Underhill - Innovyze InfoNet as a tool for managing and maintaining SuDS Claire

2

LANDFRM – Delivery of SuDS – standards, design criteria

and tools

29/03/12

Claire Underhill - Innovyze

Introduction

Where are the developments located?

What stage are they at ie Plan, approve, build, adopt?

Documentation store for the developments? Infiltration Design Drawings etc

Regular surveys and maintenance

Useful Sources of Information

Environment Agency http://www.geostore.com/environment-agency/WebStore?xml=environment-agency/xml/application.xml

Areas susceptible to Surface Water Flooding

Areas susceptible to Ground Water Flooding

Flood Map, Flood Map for Surface Water, Property flood likelihood

British Geological Society http://www.bgs.ac.uk/science/landUseAndDevelopmenturban_geoscience/suds/research.html

Infiltration SuDS Summary

Infiltration Constraints

Infiltration SuDS Drainage Potential

Planning Portal Planning outlines

Infiltration Tests

Can be displayed

as background

WMS, Tab or Shp

files.

Update zones in

InfoNet with

Information from

SHP files

Attach

documentation to

Zone

Page 3: Agenda - CIRIA1 LANDF RM – Delivery of SuDS – standards, design criteria and tools 29/03/12 Claire Underhill - Innovyze InfoNet as a tool for managing and maintaining SuDS Claire

3

LANDFRM – Delivery of SuDS – standards, design criteria

and tools

29/03/12

Claire Underhill - Innovyze

1. Introduction

2. Managing data

3. SuDS Maintenance

4. Data Analysis

Tools for managing the process InfoNet

Schedule Work Orders

InfoNet Mobile

Field Device

InfoNet is off the shelf software (not web based) which forms a centralised data store with a GIS interface.

Flexible import of data and many standard formats are supported eg STC25, MSCC XML

Tools enable easy validation, manipulation and analysis of data

Engineering decisions can be made by the best utilisation of that data

.

Transfer of data between the field and

InfoNet Work Order Scheduling Mapping new assets Data entered into simple and customisable forms Validation checks No internet connection required Direct transfer of photos to InfoNet No requirement for new hardware

Server

Connection (3G,

WIFI,docking)

Page 4: Agenda - CIRIA1 LANDF RM – Delivery of SuDS – standards, design criteria and tools 29/03/12 Claire Underhill - Innovyze InfoNet as a tool for managing and maintaining SuDS Claire

4

LANDFRM – Delivery of SuDS – standards, design criteria

and tools

29/03/12

Claire Underhill - Innovyze

What can I store in InfoNet?

1. Assets –

Links - Pipes, Culverts, Rising Mains, Ancillaries (incl Orifice, Vortex object),

Connection pipes, Channel, Defence Structure

Points – Nodes (manholes, gullies etc), Connection Nodes, Outlet, General Asset

Polygon – Zone, Properties, Pumping Station, Flood Defence Area, Storage Area

2. Surveys – GPS, CCTV, Manhole, dye tests, smoke tests, drain tests, Cross Section Surveys, General Survey, Fats Oil Grease,

Time Varying

3. Incidents – Flooding, customer complaint, pollution, blockage, collapse, general, odour

4. Repairs – General maintenance, pipe repair, pipe clean, manhole repair

Reason for reactive

maintenance

Water Quality Monitoring?

InfoNet Interface

GIS Interface

Background mapping

Shp,Tab,jpeg,tiff,DWG,wms

Page 5: Agenda - CIRIA1 LANDF RM – Delivery of SuDS – standards, design criteria and tools 29/03/12 Claire Underhill - Innovyze InfoNet as a tool for managing and maintaining SuDS Claire

5

LANDFRM – Delivery of SuDS – standards, design criteria

and tools

29/03/12

Claire Underhill - Innovyze

Scale

Regional Analysis

Site analysis

Regional Analysis

Define planning boundaries using Zones

Document control Documents, photos Can be attached to each zone object

Customisable

Page 6: Agenda - CIRIA1 LANDF RM – Delivery of SuDS – standards, design criteria and tools 29/03/12 Claire Underhill - Innovyze InfoNet as a tool for managing and maintaining SuDS Claire

6

LANDFRM – Delivery of SuDS – standards, design criteria

and tools

29/03/12

Claire Underhill - Innovyze

Site Analysis

Individual SuDS components

1. Introduction

2. Managing data

3. Surveys and Maintenance

4. Data Analysis

Page 7: Agenda - CIRIA1 LANDF RM – Delivery of SuDS – standards, design criteria and tools 29/03/12 Claire Underhill - Innovyze InfoNet as a tool for managing and maintaining SuDS Claire

7

LANDFRM – Delivery of SuDS – standards, design criteria

and tools

29/03/12

Claire Underhill - Innovyze

Surveys and Maintenance

SuDS Type Surveys Maintenance

Filter Strips Monthly inspections Mowing at least twice a year

Swales Monthly inspections

Mowing at least twice a year

Filter Drains Monthly inspections

Replace clogged material.(

Typically every 10 years)

Pervious Surfaces Monthly for clogging and water

ponding

Vacuum sweeping twice a year.

Every 15-40 years fabric

replacement and silt removed

Infiltration Device Six monthly inspections of silt

traps.

Removal of sediments in silt

traps and observation well.

Basins, ponds and wetlands Monthly inspections Mowing at least twice a year

Green Roofs Six monthly inspections Replacement of bare patches.

Irrigation in early stages

Underground storage eg

modular plastic tank

Six monthly inspections Removal of silt and blockages

Office scheduling and field data

collection

Surveys and general maintenance associated

with;

The Zone Each individual SuDS object

Page 8: Agenda - CIRIA1 LANDF RM – Delivery of SuDS – standards, design criteria and tools 29/03/12 Claire Underhill - Innovyze InfoNet as a tool for managing and maintaining SuDS Claire

8

LANDFRM – Delivery of SuDS – standards, design criteria

and tools

29/03/12

Claire Underhill - Innovyze

Customisable fields

Eg. General Maintenance

Field Data Collection Scheduled Surveys

New surveys can be created

By clicking on the mapping

Photographs Sketches

Page 9: Agenda - CIRIA1 LANDF RM – Delivery of SuDS – standards, design criteria and tools 29/03/12 Claire Underhill - Innovyze InfoNet as a tool for managing and maintaining SuDS Claire

9

LANDFRM – Delivery of SuDS – standards, design criteria

and tools

29/03/12

Claire Underhill - Innovyze

Database Updated with Field Data

Field data updates InfoNet

1. Introduction

2. Managing data

3. SuDS Maintenance

4. Data Maintenance and Quality Control

5. Data Analysis

Page 10: Agenda - CIRIA1 LANDF RM – Delivery of SuDS – standards, design criteria and tools 29/03/12 Claire Underhill - Innovyze InfoNet as a tool for managing and maintaining SuDS Claire

10

LANDFRM – Delivery of SuDS – standards, design criteria

and tools

29/03/12

Claire Underhill - Innovyze

Data Analysis

Update zone with last

survey and maintenance

using an SQL.

Summary

Still in early stages with SuDS

This method completes the circle of survey and maintenance scheduling

Field Data collection is simple and efficient.

Data analysis is essential on the survey and maintenance tasks.

Thank you for the site data:

“ACO project to determine practical SuDS implementation techniques on large commercial sites”

Please contact [email protected] if you would like to receive a copy of the case study once completed and verified.

Page 11: Agenda - CIRIA1 LANDF RM – Delivery of SuDS – standards, design criteria and tools 29/03/12 Claire Underhill - Innovyze InfoNet as a tool for managing and maintaining SuDS Claire

11

LANDFRM – Delivery of SuDS – standards, design criteria

and tools

29/03/12

Claire Underhill - Innovyze

Any Questions?

[email protected]