+ All Categories

Agenda

Date post: 06-Jan-2016
Category:
Upload: bandele
View: 32 times
Download: 0 times
Share this document with a friend
Description:
Agenda. Each proposal has a presentation time followed by a dedicated discussion. Introductions. 1 st session: 2 proposals. break. 2 nd session: 2 proposals. Discussion/wrap-up. HiRadMat - Status. Adrian Fabich HiRadMat Technical Board CERN , 15 th July 2014. Overview. - PowerPoint PPT Presentation
Popular Tags:
13
Agenda 15/7/2014 A. Fabich 1 Introductions st session: 2 proposals 2 nd session: 2 proposals break Each proposal has a presentation time followed by a dedicated discussion. Discussion/ wrap-up
Transcript
Page 1: Agenda

A. Fabich 1

Agenda

15/7/2014

Introductions

1st session: 2 proposals

2nd session: 2 proposals

break

Each proposal has a presentation time followed by a dedicated discussion.

Discussion/wrap-up

Page 2: Agenda

HiRadMat - Status

Adrian Fabich

HiRadMat Technical BoardCERN, 15th July 2014

Page 3: Agenda

A. Fabich 3

Overview

• Report from HiRadMat experiments in 2012

• Shut-down work

• Summary of 2014 proposals

15/7/2014

Page 4: Agenda

A. Fabich 4

2012 experiments

• 9 experiments completed• On average 4 weeks between 2 experiment– Partially grouped

15/7/2014

Page 5: Agenda

A. Fabich 5

2012 - Protons to HiRadMat

• Total: 1.4*1016 protons• About 48 hours of SPS cycling for HiRadMat

– Preparation, waiting and extractions– Similar time span in 2011 for commissioning

15/7/2014

Page 6: Agenda

A. Fabich 6

Experiments in 2012

• RIB target R&D • LHC transfer collimator (2x)• BLM validation• RP benchmarking• Crystal collimation

PhDs completed:Juan Blanco, Nov. 2013

Nikos Charitonidis, March 201415/7/2014

Beam tunneling(HRMT12)

TE/MPER. Schmidt et al.

Powder target(HRMT10)C. Densham et al.

Page 7: Agenda

A. Fabich 7

TPSG4 - 2012

15/7/2014

Page 8: Agenda

A. Fabich 8

Shut-down work

• Installation of additional cabling– Mainly for vacuum and HQ signal

• Removal of experiments from – Remainders in TNC:

• LPROT (HRMT12): follow-up required• TISD (HRMT01): removal delayed by availability of class-A lab

• Removal of WNAF collimator blocks– Minimum advancement– lengthy preparations for and discussions with authorities

15/7/2014

Page 9: Agenda

A. Fabich 9

New Proposals in 2014

• 12 applications– Named 14xx (year 2014 + running number)– Running number in the order of reception

• 9 invited for presentation/discussion

• 3 proposals to be discussed “offline”“placing them on the radar screen”– TPGS4 (1402): repetition with slightly higher intensity– Supra Magnet (1406): later availability– Microphone (1411): purely parasitic

15/7/2014

Page 10: Agenda

A. Fabich 10

Beam parameter space

15/7/2014

Page 11: Agenda

A. Fabich 11

Time frame

• One experiment interested in ion operation• Half the user groups are interested in TA (Transnational Access)

15/7/2014

Page 12: Agenda

A. Fabich 12

Future beam slots

• 2014: 3 slots

15/7/2014

• 2015:8(+1) slots)

Page 13: Agenda

A. Fabich 13

Aim of TodayReview the proposals

In view of • Technical feasibility• Operational• Safety• Radiation-protection• Schedule

• Follow-up: Written report on the view by the HRM Technical Board• Schedule future meeting – October 2014

15/7/2014


Recommended