AGENDA College-wide Technology & Capital Outlay Committee February 9, 2007 http://irt.austincc.edu/committees/cwtcoc/ 1:30 p.m. – 3:30 p.m. 1. FY07 Budget Update Items funded since last meeting: Roy Mosier a. Printer, PHOT/NRG $2936.07 b. Projector, COED/HBC $3780.09 c. Printer, COED/HBC $491 d. Printer, COED/HBC $803 e. Printer, IRT, $1324 f. Datatel License, INTE/SVC $26,290 (approved by e-vote) g. Printer, ENDG/NRG $3071 h. Printer, BUSE/SVC, $892 i. Printer, STDE/HBC, $612.56 j. Printer, HURE/HBC, $2883 k. CD Set, FIPR/TFA, $1750 l. Emission Detector, AUTE/RVS, $6500 (still being processed) m. Printer, SRO/HBC, $1904 n. Printer, SRO/HBC, $999 o. Printer, DILE/PIN, $803 p. Pressure Sealer, INTE/SVC, $10,395 q. Arms, NURS/CYP, $5053 r. (3) Printers, PHOT/NRG, $3810.21 s. Printer, DEHY/EVC, $1384 t. Poster Printer, CAMA/RVS, $4495 u. Network Cabling, COED/HBC, $1575 v. Projector, COIS/NRG, $1400 w. Network Cabling, AUTE/RVS, $597.60 x. Compressor, CULA/EVC, $3752.72 y. (13) Monitors, PHOT/NRG, $11,687 2. Requests requiring committee approval, see attachments: Requestor http://irt.austincc.edu/committees/cwtcoc/forms.htm a. #20 Laptop Replacement Plan, Available = $101,864.18 b. #21 Server Replacement Plan, Available = $1,030.28 c. #22 Network Printer Replacement Plan, Available = $4,365.16 d. #24 Network Wiring & Equipment for Existing Labs, Available = $27,827.40 e. #26 Special Needs Computer Replacement ,Available = $40,000 i. Gaming Lab-15 Workstations, COED/HBC, $15,000 ii. 23” Monitor, VICD/NRG, $899 f. #27 Emergency Repair/Replacement, Available = $268,435.20 i. ASL Digital Lab, HUSE/RGC, $32,729.50 ii. Bunker Coat & Pants, FIPR/TFA, $5223.75 iii. Scanner, AUTE/RVS, iv. Controller, ELEC/RVS, $14,000 v. Air Cylinders, FIPR/TFA, $10,200 vi. Densitometer, PHOT/NRG, $1581 vii. Tracking System, PURC/SVC, $2000 viii. Beds, ADN/CYP, $23,550 ix. Server, INTE/SVC, $6429.50 x. Service Agreement, BIOT/EVC, $7500 xi. -80 Freezer, BIOT/EVC, $8940 xii. Sonicator Cabinet, BIOT/EVC, $1200
Transcript

AGENDA College-wide Technology & Capital Outlay Committee February 9, 2007 http://irt.austincc.edu/committees/cwtcoc/ 1:30 p.m. – 3:30 p.m.

1. FY07 Budget Update Items funded since last meeting: Roy Mosier a. Printer, PHOT/NRG $2936.07 b. Projector, COED/HBC $3780.09 c. Printer, COED/HBC $491 d. Printer, COED/HBC $803 e. Printer, IRT, $1324 f. Datatel License, INTE/SVC $26,290 (approved by e-vote) g. Printer, ENDG/NRG $3071 h. Printer, BUSE/SVC, $892 i. Printer, STDE/HBC, $612.56 j. Printer, HURE/HBC, $2883 k. CD Set, FIPR/TFA, $1750 l. Emission Detector, AUTE/RVS, $6500 (still being processed) m. Printer, SRO/HBC, $1904 n. Printer, SRO/HBC, $999 o. Printer, DILE/PIN, $803 p. Pressure Sealer, INTE/SVC, $10,395 q. Arms, NURS/CYP, $5053 r. (3) Printers, PHOT/NRG, $3810.21 s. Printer, DEHY/EVC, $1384 t. Poster Printer, CAMA/RVS, $4495 u. Network Cabling, COED/HBC, $1575 v. Projector, COIS/NRG, $1400 w. Network Cabling, AUTE/RVS, $597.60 x. Compressor, CULA/EVC, $3752.72 y. (13) Monitors, PHOT/NRG, $11,687 2. Requests requiring committee approval, see attachments: Requestor

→ http://irt.austincc.edu/committees/cwtcoc/forms.htm a. #20 Laptop Replacement Plan, Available = $101,864.18 b. #21 Server Replacement Plan, Available = $1,030.28 c. #22 Network Printer Replacement Plan, Available = $4,365.16 d. #24 Network Wiring & Equipment for Existing Labs, Available = $27,827.40 e. #26 Special Needs Computer Replacement ,Available = $40,000 i. Gaming Lab-15 Workstations, COED/HBC, $15,000 ii. 23” Monitor, VICD/NRG, $899 f. #27 Emergency Repair/Replacement, Available = $268,435.20

i. ASL Digital Lab, HUSE/RGC, $32,729.50 ii. Bunker Coat & Pants, FIPR/TFA, $5223.75 iii. Scanner, AUTE/RVS, iv. Controller, ELEC/RVS, $14,000 v. Air Cylinders, FIPR/TFA, $10,200 vi. Densitometer, PHOT/NRG, $1581 vii. Tracking System, PURC/SVC, $2000 viii. Beds, ADN/CYP, $23,550 ix. Server, INTE/SVC, $6429.50 x. Service Agreement, BIOT/EVC, $7500 xi. -80 Freezer, BIOT/EVC, $8940 xii. Sonicator Cabinet, BIOT/EVC, $1200

3. Requests for Laptop Instead of Desktop Computer a. Donna Pauler, VICD/NRG b. David Tobey, VICD/NRG c. Luis Valera, KINE/NRG d. Haydee Suescum, ART/NRG e. Roberta Weston, ART/NRG f. Gary Webernick, ART/RGC g. Marcus McQuirter, DRAM/RGC h. Jerry Shepperd, SOCI/RGC i. (3 Recruiters) K.Leigh Hamm-Forell, SCCO/HBC j. Matthew Daude Laurents, PHIL/RGC k. Erika Domatti-Thomas, ESOL/RVS l. Don Lavigne, MATH/NRG m. Susan Alvarado, PHIL/EVC n. Lee Buentello, INTE/SVC

Richard Smith

4. Re-allocate 24” monitors Richard Smith

Future Meetings: All meetings are in HBC-201 from 1:30-3:30 unless noted:

♦ March 9 ♦ April 13 ♦ May TBA (annual budget meeting) ♦ June 8 ♦ July 13

Initiative Description Requestor AVP/Dean Total Budgeted / Dept Acct # REMAINING Expected Purchase Date

1 Datatel Training & Consulting IT IT 20,000$ 1,821.47$ July2 IT Maintenance - Records HW/SW IT IT 39,083$ -$ COMPLETE3 IT Maintenance - Datatel Software IT IT 327,529$ 51,629.00$ July4 IT Maintenance - IBM Hardware IT IT 123,497$ 1,290.80$ October5 IT Maintenance - Other Software/Hardware IT IT 101,251$ 40,397.80$ July6 Network Infrastructure Maintenance, (ACCNet & other) ACCNet IT 225,000$ 81,425.30$ July7 Telephone System Maintenance, on-going ACCNet IT 95,000$ 32,048.33$ July8 THENet, on-going ACCNet IT 37,800$ -$ COMPLETE9 GAATN Maintenance, on-going ACCNet IT 243,000$ -$ COMPLETE10 III Hardware/Software Maintenance, on-going LERS IRT 37,000$ -$ COMPLETE11 iNet Annual Fees IRT IRT 26,000$ -$ COMPLETE12 Media 100 Hardware/Software Maintenance IRT IRT 4,600$ 4,600.00$ 13 IVC Classroom Equipment & Smartlink Maintenance IRT IRT 100,000$ (3,847.91)$ 14 Blackboard Maintenance IRT IRT 55,000$ -$ COMPLETE15 Weaver Reading Efficiency Program DEWR VAA 32,000$ 23,000.00$ May16 Lexia Software Maintenance DEWR VAA 16,000$ 16,000.00$ May17 TECE Scanner Maintenance TECE CWTCOC 5,880$ -$ COMPLETE18 Non-TECE Scanner Maintenance CWTCOC CWTCOC 3,699$ -$ COMPLETE

Maintenance/Licensing/Consulting 1,492,339$ 248,365$ 19 Desktop Computer Replacement Plan CWTCOC CWTCOC 1,500,000$ 231,511.97$ July20 Laptop Replacement Plan CWTCOC CWTCOC 267,409$ 101,864.18$ July21 Server Replacement Plan CWTCOC CWTCOC 150,000$ 1,030.28$ January22 Network Printer Replacement Plan CWTCOC CWTCOC 40,000$ 3,249.16$ July23 IRT A/V Replacement Plan IRT IRT 210,000$ 130,311.00$ July

Capital Multi-Year Commitments 2,167,409$ 467,967$ 24 Network Wiring & Equipment for Existing Labs Dean/AVP CWTCOC 30,000$ 27,827.40$ July25 New Faculty/Staff Equipment Dean/AVP CWTCOC 120,000$ 28,359.74$ July26 Special Needs Computer Replacement Dean/AVP CWTCOC 40,000$ 40,000.00$ July27 Emergency Repair/Replacement Dean/AVP CWTCOC 400,000$ 268,435.20$ July

Infrastructure Upgrades/Maintenance 590,000 364,622

28 Damaged Firefighter Equipment (Page 3) TAFA DATM 38,750$ -$ COMPLETE29 Airway Management Trainers (Page 2) EMST DEHS 6,975$ -$ COMPLETE30 Extrication Equipment (Page 4) TAFA DATM 3,050$ -$ COMPLETE31 Annual Service Agreement for Lifepak12 ECGs (Page 1) EMST DEHS 9,000$ -$ COMPLETE32 Physics Lab Equipment (Page 17) PHYS DEMS 49,775$ -$ COMPLETE33 On-Car Brake Lathe (Page 58) AUTE DATM 7,850$ -$ COMPLETE34 Core Switch Upgrades (Page 82) ACSE INTE 107,600$ 19,375.10$ March35 Email Security Appliance (Page 95) INTE INTE 53,490$ -$ COMPLETE36 ArcGIS Site License (Page 11) GEOG DEMS 10,000$ -$ COMPLETE37 Fraction Collector Package (Page 14) BIOT DEMS 64,800$ -$ COMPLETE

http://www.austincc.edu/itconsult/fy07requestsinfo.pdf

Subtotal:

TECHNOLOGY AND CAPITAL OUTLAY BUDGETFOR FY2007

Updated: 02/02/2007

Subtotal:Details for the initiatives below can be found at the following website by referencing the PAGE # indicated.

Subtotal:

Updates available at:http://accweb.austincc.edu/itconsult/fy2007techplanupdate.xls Page 1 of 3

38 RGC Chemistry Lab Equipment (Page 41) CHEM DEMS 11,900$ -$ COMPLETE39 Digital Camera Replacement of Hasselblad Cameras (Page 65) PHOT DATM 65,706$ -$ COMPLETE40 Grand Piano (Page 57) MUSI DATM 27,000$ 27,000.00$ 41 SMAW Welding Machines (Page 62) WELD DATM 13,475$ -$ COMPLETE42 Ohaus Balances (Page 68) CHEM DEMS 10,200$ -$ COMPLETE43 Phase II & III LDAP Implementation (Page 97) INTE INTE 83,000$ 83,000.00$ May44 SAS Annual License Renewal (Page 98) AVPI AVPI 26,000$ -$ COMPLETE45 Digital Camera Equipment-Portrait (Page 64) PHOT DATM 40,776$ -$ COMPLETE46 Calibration and Maintence of PT Equipment (Page 77) PHTA DEHS 12,111$ 1,211.00$ May47 Focus On Grammar Site License: Ugrade 1.1 to 2.5 (Page 22) ENSL DEAH 4,000$ -$ COMPLETE48 Environmental Sampling Equipment (Page 23) ESTE DEMS 3,960$ -$ COMPLETE49 Autodesk Annual License Renewal (Page 27) ENDG DCSA 18,995$ -$ COMPLETE50 Cadence Annual License Renewal (Page 29) ENDG DCSA 4,500$ 4,500.00$ November51 Chemistry Centrifuges (Page 71) CHEM DEMS 5,760$ -$ COMPLETE52 Wireless Access Points in Library (Page 81) ACSE INTE 8,400$ 8,400.00$ May53 SVC Console Switches (Page 87) INTE INTE 26,310$ -$ COMPLETE54 SAN Switch (Page 88) INTE INTE 80,060$ -$ COMPLETE55 HBC Tape Library Upgrade (Page 91) INTE INTE 74,754$ -$ COMPLETE56 Skutt Electric Kiln, Model #1227 (Page 10) ARTS DEAH 3,170$ 3,170.00$ 57 HBC 103.6 IVC Upgrade (Page 47) DILE IRT 40,000$ 40,000.00$ 58 Hardware/Software Digital Editing Suite (Page 48) DILE IRT 16,000$ -$ COMPLETE59 Digital Cameras for Photojournalism Classes (Page 67) PHOT DATM 10,995$ -$ COMPLETE60 pH Meters (Page 70) CHEM DEMS 6,240$ -$ COMPLETE61 High-Low Treatment Table (Page 73) PHTA DEHS 3,500$ -$ COMPLETE62 Digital Mailing System (Page 7) PURC COOF 32,000$ -$ COMPLETE63 Whelan Press-Pro Press (Page 13) ARTS DEAH 6,895$ 6,895.00$ 64 Digital Camera (Page 19) MAPI MAPI 1,499$ -$ COMPLETE65 Tool Control Software Package (Page 21) AUTE DATM 1,600$ -$ COMPLETE66 Scan Tool Hardware/Software (Page 59) AUTE DATM 5,254$ -$ COMPLETE67 Vacuum Pumps (Page 69) CHEM DEMS 6,400$ -$ COMPLETE68 FTIR (Page 72) CHEM DEMS 13,000$ 13,000.00$ 69 Developer, Sealant Lights and Scalers (Page 80) DEHY DEHS 8,830$ 8,830.00$ 70 SVC SAN Expansion (Page 89) INTE INTE 49,101$ -$ COMPLETE71 POS System Upgrade (Page 100) CUAR DEBS 8,000$ -$ COMPLETE72 ATC Challenge 3.0 (Page 5) AUTE DATM 581$ -$ COMPLETE73 HBC Console Switch (Page 86) INTE INTE 8,770$ -$ COMPLETE74 Selectorized Leg Curl/Extension Machine (Page 24) KINE DEHS 800$ -$ COMPLETE75 3D Modeler Maintenance Contract Renewal (Page 30) ENDG DCSA 3,000$ -$ COMPLETE76 Weslaw Licenses (Page 63) LEAS DATM 2,053$ 2,053.00$ 77 Digital Camera Replacement of Bronica Cameras (Page 66) PHOT DATM 17,398$ -$ COMPLETE78 Mobile Hydrocollator (Page 74) PHTA DEHS 1,000$ -$ COMPLETE79 Exercise Pulley System (Page 75) PHTA DEHS 2,800$ -$ COMPLETE80 SNAP Survey Software License Renewal (Page 99) AVPI AVPI 2,500$ -$ COMPLETE81 Cargo Vans (Page 6) PURC COOF 75,000$ 75,000.00$ October82 Digital Cameras and Lenses (Page 15) ARTS DEAH 3,600$ 3,600.00$ 83 ProEngineer Annual License Renewal (Page 26) ENDG DCSA 2,500$ -$ COMPLETE84 Sage Software License (Page 45) BUCT DATM 1,000$ -$ COMPLETE85 Smarthinking Online Tutoring Service (Page 52) DILE IRT 7,500$ -$ COMPLETE86 SimuTech Software (Page 60) AICO DATM 4,675$ 4,675.00$

Updates available at:http://accweb.austincc.edu/itconsult/fy2007techplanupdate.xls Page 2 of 3

87 ChemStation Software (Page 78) CHEM DEMS 4,800$ 4,800.00$ 88 Delta Finishing Sander (Page 12) ARTS DEAH 1,000$ 1,000.00$ 89 SolidWorks Annual License Renewal (Page 28) ENDG DCSA 2,500$ -$ COMPLETE90 AV Switcher Upgrade (Page 49) DILE IRT 2,500$ 2,500.00$

New Department Capital Requests 1,224,658$ 309,009$ 91 Recouped Funds, to be reallocated -$ 40,707.11$

5,474,406$ 1,430,670$

26.1%% Remaining:

Subtotal:

Total Budget:Available Budget:

Updates available at:http://accweb.austincc.edu/itconsult/fy2007techplanupdate.xls Page 3 of 3

Information Technology

Replacement of Technology and Capital EquipmentRequestor: Department: Campus:

Phone: Email: GL Account #:

Funding Category: (See second page explanation of categories.) � Network Wiring & Equipment for Existing Labs � Emergency Repair/Replacement � Laptop Replacement � Networked Printer > $500 Replacement � Special Needs Computer Replacement � Server Replacement

Equipment to be Replaced: Quantity: Replacement Cost:Description:

Asset Number(s):

Location(room, campus):

Rationale: Number of students, classes and/or staff affected: Description of equipment use and current problem or need:

If problem existed prior to current fi scal year, explain why request was not included in the regular budgeting process:

Dept. personnel to attend CWTCOC and respond to questions:

Name: Phone: Email:

Department Chair/Manager Date VP/AVP/Dean Signature Date

Submittal Instructions: The VP/AVP/Dean may submit this request via email or intercampus mail to both Richard Smith ([email protected]) and Roy Mosier ([email protected]). Contact Roy Mosier at 223-1177 with any questions.

INTE.002.0906

Signatures not necessary if submitting electronically via email.

Linnea Fletcher Biotechnology EVC

223-5912 [email protected] 10-1-55506-7701-00

1 7500.00

MX4000 Service Agreement Contract

51687

9101, EVC

All Biotech and MLT classes

The company Stratagene wants to donate the Real-Time PCR machine ($35,000) but will not without ACC purchasingthe service agreement. The benefits are Hotel costs for Field Service Engineer, Local travel costs for Field ServiceEngineer (e.g. rental car), Airplane Ticket for Field Service Engineer, Hourly Rate of $230.00 door to door, includingflight time, All Instrument Parts required for repairs, Labor, Priority Service Arrangements, Unlimited Telephone Support.

Linnea Fletcher 223-5912 [email protected]

Information Technology

Replacement of Technology and Capital EquipmentRequestor: Department: Campus:

Phone: Email: GL Account #:

Funding Category: (See second page explanation of categories.) � Network Wiring & Equipment for Existing Labs � Emergency Repair/Replacement � Laptop Replacement � Networked Printer > $500 Replacement � Special Needs Computer Replacement � Server Replacement

Equipment to be Replaced: Quantity: Replacement Cost:Description:

Asset Number(s):

Location(room, campus):

Rationale: Number of students, classes and/or staff affected: Description of equipment use and current problem or need:

If problem existed prior to current fi scal year, explain why request was not included in the regular budgeting process:

Dept. personnel to attend CWTCOC and respond to questions:

Name: Phone: Email:

Department Chair/Manager Date VP/AVP/Dean Signature Date

Submittal Instructions: The VP/AVP/Dean may submit this request via email or intercampus mail to both Richard Smith ([email protected]) and Roy Mosier ([email protected]). Contact Roy Mosier at 223-1177 with any questions.

INTE.002.0906

Signatures not necessary if submitting electronically via email.

Linnea Fletcher Biotechnology EVC

223-5912 [email protected] 10-1-55506-7701-00

1 8939.83

-80 Freezer

7208

9101, EVC

All Biotech and MLT classes

Our current -80 freezer will not go below -61, we have tried to get it fixed but we have been told that because the freezerwas moved a couple of times we can't be repaired. A -80 freezer will be used in storing cell lines and holding otherreagents used in the new molecular diagnostics program and all biotechnology classes.

Linnea Fletcher 223-5912 [email protected]

Information Technology

Replacement of Technology and Capital EquipmentRequestor: Department: Campus:

Phone: Email: GL Account #:

Funding Category: (See second page explanation of categories.) � Network Wiring & Equipment for Existing Labs � Emergency Repair/Replacement � Laptop Replacement � Networked Printer > $500 Replacement � Special Needs Computer Replacement � Server Replacement

Equipment to be Replaced: Quantity: Replacement Cost:Description:

Asset Number(s):

Location(room, campus):

Rationale: Number of students, classes and/or staff affected: Description of equipment use and current problem or need:

If problem existed prior to current fi scal year, explain why request was not included in the regular budgeting process:

Dept. personnel to attend CWTCOC and respond to questions:

Name: Phone: Email:

Department Chair/Manager Date VP/AVP/Dean Signature Date

Submittal Instructions: The VP/AVP/Dean may submit this request via email or intercampus mail to both Richard Smith ([email protected]) and Roy Mosier ([email protected]). Contact Roy Mosier at 223-1177 with any questions.

INTE.002.0906

Signatures not necessary if submitting electronically via email.

Linnea Fletcher Biotechnology EVC

223-5912 [email protected] 10-1-55506-7701-00

1 1200.00

Sonicator Cabinet and Adapter

36352

9101, EVC

All Biotech classes

The Biotechnology Program often needs to disrupt cells in order to insert genes for new proteins, a sonicator isinstrumental tool for doing this and it requires a cabinet to be used correctly. The cabinet acts as a sound barrier for thesonic force distributed. We also currently have a small needle that is able to disrupt cells in smaller containers. Wecannot use it however without a adapter that combines it with the main tool.

Linnea Fletcher 223-5912 [email protected]


Recommended