+ All Categories
Home > Documents > AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid...

AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid...

Date post: 06-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
82
MONTECITO FIRE PROTECTION DISTRICT AGENDA FOR THE REGULAR MEETING OF THE BOARD OF DIRECTORS Montecito Fire Protection District Headquarters 595 San Ysidro Road Santa Barbara, California October 23, 2017 at 2:00 p.m. Agenda items may be taken out of the order shown. 1. Public comment: Any person may address the Board at this time on any non-agenda matter that is within the subject matter jurisdiction of the Montecito Fire Protection District. (30 minutes total time allotted for this discussion.) 2. Recognition of Lifesaver Award. (Strategic Plan Goal 7.3) 3. That the Board of Directors approve and authorize the President to execute Side Letter Agreement amending Section 42 of the Memorandum of Understanding between the Montecito Firefighter’s Association and the Montecito Fire Protection District regarding the probationary period for newly promoted employees. (Strategic Plan Goal 7.3) 4. That the Board of Directors approve and authorize the Fire Chief to execute a contract with Best Contracting Services in the amount of $238,755 for the removal and replacement of the roof underlayment system at District Fire Station 1. (Strategic Plan Goal 6.1) 5. Discussion item: Report on Fire Danger Signs presented by Ad-Hoc Committee. (Strategic Plan Goal 3.3) 6. Review and approve financial statements of August and September 2017. (Strategic Plan Goal 9.1) 7. Review PARS OPEB Trust Program statement for June and July 2017. (Strategic Plan Goal 9.1) 8. Approval of Minutes of the September 25, 2017 Regular Meeting. 9. Fire Chief’s report. 10. Board of Director’s report. 11. Suggestions from Directors for items other than regular agenda items to be included for the November 27, 2017 Regular Board meeting. Reg Pg. 1 October 23, 2017
Transcript
Page 1: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

MONTECITO FIRE PROTECTION DISTRICT

AGENDA FOR THE REGULAR MEETING

OF THE BOARD OF DIRECTORS

Montecito Fire Protection District Headquarters

595 San Ysidro Road

Santa Barbara, California

October 23, 2017 at 2:00 p.m.

Agenda items may be taken out of the order shown.

1. Public comment: Any person may address the Board at this time on any non-agenda matter

that is within the subject matter jurisdiction of the Montecito Fire Protection District. (30

minutes total time allotted for this discussion.)

2. Recognition of Lifesaver Award. (Strategic Plan Goal 7.3)

3. That the Board of Directors approve and authorize the President to execute Side Letter

Agreement amending Section 42 of the Memorandum of Understanding between the

Montecito Firefighter’s Association and the Montecito Fire Protection District regarding

the probationary period for newly promoted employees. (Strategic Plan Goal 7.3)

4. That the Board of Directors approve and authorize the Fire Chief to execute a contract with

Best Contracting Services in the amount of $238,755 for the removal and replacement of

the roof underlayment system at District Fire Station 1. (Strategic Plan Goal 6.1)

5. Discussion item: Report on Fire Danger Signs presented by Ad-Hoc Committee. (Strategic

Plan Goal 3.3)

6. Review and approve financial statements of August and September 2017. (Strategic Plan

Goal 9.1)

7. Review PARS OPEB Trust Program statement for June and July 2017. (Strategic Plan Goal

9.1)

8. Approval of Minutes of the September 25, 2017 Regular Meeting.

9. Fire Chief’s report.

10. Board of Director’s report.

11. Suggestions from Directors for items other than regular agenda items to be included for the

November 27, 2017 Regular Board meeting.

Reg Pg. 1

October 23, 2017

Page 2: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 2

October 23, 2017

Page 3: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Agenda Item #3

Reg Pg. 3

October 23, 2017

Page 4: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 4

October 23, 2017

Page 5: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Side Letter Agreement

To the Memorandum of Understanding between the

Montecito Firefighter’s Association and the

Montecito Fire Protection District

October 23, 2017

This side letter of agreement shall replace the entirety of Section 42 of the Memorandum of

Understanding between the Montecito Firefighter’s Association and the Montecito Fire

Protection District dated June 29, 2016.

Probationary Period of Newly Promoted Employees

The probationary period of newly promoted employees shall begin on the official date of

appointment.

Each newly promoted employee shall serve a probationary period of twelve (12) months in the

new position. Upon completion of the probationary period, the employee shall receive a written

evaluation of their job performance.

Montecito Firefighters Association Montecito Fire Protection District

_____________________________ _____________________________

Alex Broumand Peter vanDuinwick

President President

_____________________________ ______________________________

Aaron Briner Chip Hickman

Treasurer Fire Chief

Reg Pg. 5

October 23, 2017

Page 6: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 6

October 23, 2017

Page 7: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Agenda Item #4

Reg Pg. 7

October 23, 2017

Page 8: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 8

October 23, 2017

Page 9: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

STAFF REPORT Prepared for: Montecito Fire Protection District Board of Directors Prepared by: Chief Hickman, Fire Chief Date: October 23, 2017 Topic: Bid Award; Fire Station 1 Roof Replacement

Summary

The District solicited bids for the removal and replacement of the roof underlayment system at Fire Station 1 in September 2017 in accordance with the Public Contract Code Section 20813. Background

The roof at Fire Station 1 leaked significantly in several locations during the winter of 2017. These leaks caused interior damage and should be repaired prior to the coming winter. Discussion

Request for proposals were solicited for this project. Project description, scope of work, and submission information was posted on the District website, direct mailed to contractors, and published in the Santa Barbara News Press. A public bid opening was conducted at Fire Station 1 on October 11, 2107. Three bids were received and evaluated. The lowest, responsive bidder was Best Contracting Services; their bid was $238,755. Conclusion

Staff recommends that the Board authorize the Fire Chief to enter into a contract with Best Contracting Services, the lowest, responsive bidder, in the amount of $238,755 for the removal and replacement of the roof underlayment system at Fire Station 1. Strategic Plan Reference

Strategic Plan Goal #6: Strengthen our Infrastructure

Reg Pg. 9

October 23, 2017

Page 10: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

RequestforCompetitiveSealedBids

TheMontecitoFireProtectionDistrict(MFPD)invitationtobidfor:

ITB#2017-001Removal&ReplacementofRoofUnderlaymentSystemat

FireStation1

PROJECTDESCRIPTION–

Duringthewinterstormsof2017,MontecitoFireStation1at595SanYsidroRoadexperiencedmultiplesignificantleaksfromtheroofinseveralareasthroughouttheentirebuilding.Duetotheageoftheroofandthewidespreadleakissue,MFPDisseekingbidsfromqualifiedlicensedcontractorstofurnishandinstallanewunderlaymentsystemontheentireroofstructureatFireStation1.

ScopeofWork:

Provideallnecessarymaterials,laborandequipmenttocompleteinstallationofanewroofunderlaymentsystemundertheclaytileroofatFireStation1.

- Removeexistingtilesascarefullyaspossiblefromtheroofareatoreinstalllater.- Removeunderlaymenttosheathingandhaulawayalldebris.- InspectSheathingforpossiblewoodrotordamage,ifanynotifyMFPD.- Installanappropriatenewunderlaymentsystemequivalenttoorimprovingon

theexisting.- Installanappropriatenewtwistedtiewiresystemtomatchexisting.- Installnewcopperdripedgetomatchexisting.- Installnewcoppervalleymetaltomatchexisting.- Installnewcoppersheetmetalflashingtomatchexisting.(Existingz-bar,

chimneycapsandgutterstoremain.)- Reinstallexistingtilematchingtheoriginalinstallationasclosetoexisting

conditionsaspossibleandsecurewithappropriatetie-wiretomatchexisting.

Reg Pg. 10

October 23, 2017

Page 11: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

- Installtwo(2)flashingsperpipepenetration.- Workcompletewithatleast5-yearwarranty(fromdateofcompletion)on

workmanshipagainstleakage.- Jobsitewillbefreeandclearofalldebrisuponcompletion.

SubmissionInformation:

Biddersmustcomplywiththefollowingsubmissionprocedures:

1. Sealedbidsshallbesubmittedmarked“FireStation1–RoofReplacementBid”ontheoutsideoftheenvelope,addressedto:

MontecitoFireDepartmentAttn:AlanWidling,BattalionChief

595SanYsidroRoadSantaBarbara,CA93108

Bidswillbeaccepteduntil4:00PMOctober9,2017.Bidsreceivedafterthistimewillbereturnedunopened.Faxedbidswillnotbeaccepted.

2. WITHDRAWALOFBID:Abidderwillbepermittedtowithdrawtheirbidunopenedafterithasbeendepositedifsuchrequestisreceivedinwritingpriortothetimespecifiedfortheopeningofthebids.

3. OPTIONALSITEVISIT:AnyprospectivebiddermayrequestatourofthepropertybycontactingMFPDat(805)969-2537andrequestingtheirnameandphonenumberbeplacedonacallbacklist.Subsequently,adesigneeoftheMFPDwillmakecontactandscheduleasitetour.Prospectivebiddersshallnotenterthesitewithoutreceivingpriorpermission.

4. RESERVATIONOFRIGHTS:MFPDreservestherighttorejectanybids,towaivetechnicalorlegaldeficiencies,andtoacceptanybidthatitdeemstobeinthebestinterestofMFPD.

5. WARRANTY:Thecontractorshallsubmitacopyofmanufacturer’swarrantyindicatingdurationofsaidwarrantyandinstallallproductsaccordingtomanufacturer’sinstructions.

6. SPECIFICATIONS:Thebiddershallfurnishinformationrelatedtothespecificationsoftheproductsbeingused.

7. PREVAILINGWAGE:Thisprojectshalladheretoalllawsandrequirementspertainingtoprevailingwage.TheawardedlicensedcontractormustbeproperlyregisteredandqualifiedwiththeDepartmentofIndustrialRelations(DIR).

Reg Pg. 11

October 23, 2017

Page 12: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

8. COST/SCHEDULE:Thebiddershallfurnishacostproposalandscheduleaspart

ofthepackage.ThecontractorshallcompletetheworkbyDecember22,2017.

9. SEPARABILITY:MFPDwillacceptonlyfullpackagesforallrequestedelements.Bidssubmittedwithoutallscopeofworkitemsincludedshallbedisqualified.

10. Acopyofapplicableinsurancecertificate(s)mustaccompanybids.Minimumcoverageis$1,000,000peroccurrence,$2,000,000aggregateongeneralliability,andWorker’sCompensationcoverageincompliancewithStateLaw.

AwardofBid:

ApublicbidopeningwillbeheldonOctober11,2017at4:00PMintheconferenceroomatMontecitoFireStation1,595SanYsidroRoad,SantaBarbara.TheBoardofDirectorswillapprovethecontractatthefollowingscheduledboardmeetingorifdeemednecessary,aspecialmeetingwillbenoticedandconvenedtofacilitatetimelycompletionoftheproject.ThecontractwillbeawardedtothelowestresponsiblebidderinaccordancewiththecompetitivebidproceduressetoutinthePublicContractCodesection20813.

Reg Pg. 12

October 23, 2017

Page 13: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Sealed Bid Opening - ITB# 2017-001Removal & Replacement of Roof Underlayment System Fire Station 1DATE BIDDER BID AMOUNT

10/11/2017 Best Contracting Services, Inc. $238,755.00

10/11/2017 WRS, Inc. $285,000.00

10/11/2017 Craig Roofing $256,115.00

Reg Pg. 13

October 23, 2017

Page 14: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 14

October 23, 2017

Page 15: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Agenda Item #6

Reg Pg. 15

October 23, 2017

Page 16: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 16

October 23, 2017

Page 17: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Fund 3650 Fund 3651 Fund 3652 Fund 3653

General Pension Obl. Capital Res. Land & Bldg All Funds

Cash Balance at 8/1/17 4,107,369.02 102,976.06 2,659,745.58 5,361,192.92 12,231,283.58

Income:

Tax Revenue - - - - -

Interest income - - - - -

Other:N/A - - - - -

- - - - -

Expenses:

Warrants and Claims (94,281.74) - - (945.00) (95,226.74)

Payroll (1,150,745.60) - - - (1,150,745.60)

Other:Reimbursed expenses* - - - - -

(1,245,027.34) - - (945.00) (1,245,972.34)

Cash Balance at 8/31/17 2,862,341.68 102,976.06 2,659,745.58 5,360,247.92 10,985,311.24

Cash in Treasury per Balance Sheet 3,472,886.23 102,976.06 2,659,745.58 5,361,192.92 11,596,800.79

Difference to reconcile 610,544.55 - - 945.00 611,489.55

Reconciliation:Outstanding payroll payments

CalPERS retirement contribution (9/1) 83,189.29 - - - 83,189.29

Mass Mutual contribution (9/1) 20,215.00 - - - 20,215.00

Net payroll checks 285.16 - - - 285.16 Payroll deposit 404,312.95 - - - 404,312.95

EFT Payable (Acct 1015)

Scott Chapman 609.00 - - - 609.00

Anchor Air Systems 238.87 - - - 238.87

Frontier 1,261.87 - - - 1,261.87

Collings & Associates LLC 655.00 - - - 655.00

Freedom Signs 315.00 - - - 315.00

Joy Equipment Protection 625.00 - - - 625.00

Montecito Firefighter's Association 7,130.00 - - - 7,130.00

Price, Postel & Parma 2,694.00 - - 945.00 3,639.00

CalPERS retirement contribution (8/16) 85,151.34 - - - 85,151.34

Safety Kleen Corp 355.34 - - - 355.34

Sansum Clinic 1,258.00 - - - 1,258.00 Accounts Payable (Acct 1210) 2,248.73 - - - 2,248.73

610,544.55 - - 945.00 611,489.55

MONTECITO FIRE PROTECTION DISTRICTCASH RECONCILIATION - ALL FUNDS

August 31, 2017

Reg Pg. 17

October 23, 2017

Page 18: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Fund 3650 Fund 3651 Fund 3652 Fund 3653

General Pension Obl. Capital Res. Land & Bldg All Funds

Cash Balance at 9/1/17 2,862,341.68 102,976.06 2,659,745.58 5,360,247.92 10,985,311.24

Income:

Tax Revenue - - - - -

Interest income - - - - -

Other:CSFD Dispatch Services 22,325.00 - - - 22,325.00

22,325.00 - - - 22,325.00

Expenses:

Warrants and Claims (188,878.01) - - - (188,878.01)

Payroll (1,138,053.76) - - - (1,138,053.76)

Other:Reimbursed expenses* 3,444.50 - - - 3,444.50

(1,323,487.27) - - - (1,323,487.27)

Cash Balance at 9/30/17 1,561,179.41 102,976.06 2,659,745.58 5,360,247.92 9,684,148.97

Cash in Treasury per Balance Sheet 1,751,607.80 102,976.06 2,659,745.58 5,360,247.92 9,874,577.36

Difference to reconcile 190,428.39 - - - 190,428.39

Reconciliation:Outstanding payroll payments

CalPERS retirement contribution (9/29) 85,155.70 - - - 85,155.70

Accounts Payable (Acct 1210)

CalPERS retirement contribution (9/15) 85,057.69 - - - 85,057.69 Mass Mutual contribution (9/29) 20,215.00 - - - 20,215.00

190,428.39 - - - 190,428.39

* Summary of reimbursed expenses: SB County Fire - Reimb. For AP Triton EMS Report, $3,444.50

MONTECITO FIRE PROTECTION DISTRICTCASH RECONCILIATION - ALL FUNDS

September 30, 2017

Reg Pg. 18

October 23, 2017

Page 19: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Payee Description AmountFund 3650 - GeneralADP Inc ADP fees, 7/31/17 299.56

Aflac Employee paid insurance, July 2017 1,781.50

AFSS Southern Division Admin. Fire Services Section: A. Gil, FY 17-18 50.00

AFSS Southern Division Admin. Fire Services Section: J. Reed, FY 17-18 50.00

AGS Rebuilders Inc Starter repair, E91 420.71

AGS Rebuilders Inc Starter for engines: E91, E92, E93 491.22

Airgas West Oxygen refills 242.11

American Hotel Register Co Household supplies 301.70

Amsoil Inc Oil/filter supplies for vehicle maintenance 429.88

Anchor Air Systems Semi-Annual maintenance; Sta 2 499.58

Andrew Seybold Inc Service calls for command channels 1,465.75

AP Triton EMS system study, Phase I (County Fire Chiefs) 20,667.00

Boone Printing & Graphics MFD letterhead, blank sheets, envelopes, notepads 1,325.88

Bound Tree Medical Patient medical supplies 82.50

Burtons Fire Inc (2) Hinges, E93; Mechanic stock parts, E92 196.43

Carquest Auto Parts Wipers: SQ 91, Blades: E93 77.54

Carquest Auto Parts Air filter: OES317, Brake parts: BC915 570.99

Chevron Business Card Services Gasoline charges (fire assignments) 271.34

Chevron Business Card Services Gasoline charges (fire assigments) 261.40

Collings & Associates LLC Fire sprinkler review services: Miramar Hotel 655.00

Consolidated Overhead Door E91 bay door repair 863.49

Cox Communications - Business CAD connectivity & Internet 2,742.21

Department of Justice LiveScan fingerprint screening (1) 49.00

DFND Technologies PPE: Fire defend uniform shirts 5,067.00

EAN Services LLC M. Juarez/Widling: Colorado staff ride rental car 340.80

Freedom Signs Logo and lettering removal, old PT 92 315.00

Frontier Phone services, 2 months 2,562.90

Fuel Smart Gasoline charge, 7/11-8/15/2017 433.63

Governmentjobs.Com Neo Gov annual license fee, 9/15/17-9/14/18 2,949.52

Impulse Internet Services Phone services, 8/25-9/24/17 1,883.95

Informaco Emend Billing Service IT support, August 2017 4,600.00

JDL Mapping Mapping services, July 687.50

John Badaracco J. Badaracco Reimb: STF Preposition asgmt meals 396.00

Johnson Equipment Co Charger/inverter, E91 2,685.01

Johnson Equipment Co Inverter, USAR 91 157.07

Joy Equipment Protection Annual fire extinguishers/sprinklers service 625.00

Juan O's Mobile Repair Brake repair, E93 413.32

Liebert Cassidy Whitmore Labor attorney fees, July 1,590.00

Life Assist Inc Patient medical supplies 1,814.71

Maeve Juarez M. Juarez Reimb: Whittier fire asgmt meals 183.00

Marborg Industries Refuse disposal, Sta. 1 473.49

McCormix Corporation Diesel fuel, July and August 4,092.93

Mission Uniform Service Inc Shop towels, Sta. 1 713.32

Montecito Village Hardware Bolts, washers, paint 116.78

Montecito Water District Water service, Sta. 1 720.22

O'Connor Pest Control Quarterly pest control maint., Sta. 1 178.00

Paradise Chevrolet Repair part: skid plate for BC915 124.67

Peyton Scapes Landscape maintenance 550.00

Precision Imaging Office copier usage fee, July 200.24

Precision Imaging Office copier usage fee, August 145.96

Price Postel & Parma Legal services, July 2,694.00

August 2017

MONTECITO FIRE PROTECTION DISTRICTWARRANTS AND CLAIMS DETAIL

Reg Pg. 19

October 23, 2017

Page 20: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Payee Description AmountReady Refresh By Nestle Bottled water 396.36

Ryland Mccracken R. McCracken Reimb: Paramedic renewal 200.00

Safety Kleen Corp Quarterly solvent tank maintenance 646.32

Sansum Clinic Pre-employment medical exams 4,550.00

Santa Barbara News Press Public notice: Preliminary budget 2017-18 99.84

Satcom Global Inc Satellite phone charges 152.07

SB County Auditor-Controller Additional user tax 386.88

Scott Chapman S. Chapman reimb: PPE - Wildland pack accessories 609.00

Sintra Group Pre-employment background check - 4 employees 4,425.00

SM Tire 4 tires: P920 541.74

South Coast Emergency Vehicle E91 & E92 compartment door repair parts 91.00

South Coast Emergency Vehicle Dust filters/Turbo intake hose; E92 643.50

Southern California Edison Electricity service 2,424.95

Sprinkle Tire Inc Tires and mounting, R91 897.20

Sprint E92 Sim card for MDC, July 75.98

Staples Business Advantage Office supplies 260.87

The Gas Company Gas service, Sta. 1 - 08/02/17 106.35

The UPS Store Shipping charges 98.64

The Village Service Station Gasoline charges, July 2017 498.76

Velocity Truck Center Ventura Cty E391: plugs, filter 78.59

Veritiv Operating Company Household supplies 701.56

Veritiv Operating Company Household supplies 144.81

Verizon Wireless Wireless service, August 2,185.72

Wageworks Inc FSA administrative fee, June 110.50

Wageworks Inc FSA administrative fee, July 110.50

Wageworks Inc FSA plan reimbursements, employee paid 476.03

Winema Industrial & Safety Supply Multi-gas monitor (budgeted) 2,860.76

Fund 3650 Total 94,281.74

Fund 3653 - Land & BuildingPrice Postel & Parma Legal services - Station 3, July 945.00

Fund 3653 Total 945.00

Reg Pg. 20

October 23, 2017

Page 21: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Payee Description AmountFund 3650 - GeneralAcross The Street Productions Blue Card teacher training fee: B. Hauser 4,500.00

ADP Inc ADP fees, 3 periods 737.08

Aflac Employee paid insurance, August 2017 1,781.50

AGS Rebuilders Inc Rebuild starter & stock for E91, E92, E93 398.73

Allstar Fire Equipment Inc PPE, 4 new hires 1,723.20

Allstar Fire Equipment Inc Voice Amplifier (4) 1,961.05

A-OK Mower Shop Inc Portable generator repair 63.94

Boone Printing & Graphics Mailing labels 80.82

Brandon Bennewate B. Bennewate Reimb: Trench Rescue Technician 348.00

Brandon Bennewate B. Bennewate Reimb: Rescue Systems 1 596.18

CalPERS CalPERS GASB 68 reports 1,400.00

Capture Technologies Voice logging recorder (budgeted) 25,518.47

Cox Communications - Business CAD connectivity & Internet 2,742.21

DFND Technologies PPE: Fire defend uniform shirts (budgeted) 785.50

Dino Denunzio's Paint & Body Shop 912 auto body repair 2,495.03

EAN Services LLC Rental car: L. Muller Minerva 5 fire assignment 299.00

Eco Tree Works Roadside weed abatement: various neighborhoods 6,240.00

Eco Tree Works Roadside weed abatement: various neighborhoods 6,600.00

Eric Klemowicz E. Klemowicz Reimb: Trench Rescue Technician 469.88

Firesafe Solutions Roadside weed abatement: E. Mountain Dr. 1,000.00

Firesafe Solutions Roadside weed abatement: Mountain Dr. 5,000.00

Fuel Smart Gasoline charges, September 77.34

Hugo's Auto Detailing Car wash service, August 2017 175.00

Impulse Internet Services Phone services, 9/25-10/24/17 1,884.05

Informaco Emend Billing Service IT support, September 4,600.00

Informaco Emend Billing Service IT support (billable) - MDC Project 240.00

Informaco Emend Billing Service IT support (billable) - VOIP Project 2,790.00

Informaco Emend Billing Service IT services (billable)- Dispatch upgrade project 6,480.00

John Badaracco J. Badaracco Reimb: Ruth fire asgmt meals/lodging 324.73

Johnson Equipment Co Inverter: USAR 91 368.19

Kerry Kellogg K. Kellogg Reimb: Miller fire asgmt meals 181.00

L N Curtis & Sons Thermal image camera batteries (13) 1,060.48

L N Curtis & Sons Hose maintenance 39.18

L N Curtis & Sons Nozzle and valve set, PT91 360.75

L N Curtis & Sons Level B HazMat suits - replace from Biltmore inc 481.86

L N Curtis & Sons Auto extrication tools, E91/E92 (budgeted FY17) 13,498.11

Liebert Cassidy Whitmore Labor attorney fees, August 2017 1,223.00

Life Assist Inc Patient medical supplies 21.00

Life Assist Inc Patient medical supplies 999.83

Loren Bass L. Bass Reimb: Type 3 Pre-Build trip 177.20

Marborg Industries Refuse disposal 553.07

Mission Uniform Service Inc Shop towels 377.11

Montecito Village Hardware Batteries, rubber bands 22.60

Montecito Village Hardware Paint 129.17

Montecito Water District Water service 691.93

Norm Katz Psy D Pre-employment screening 1,800.00

Peyton Scapes Landscape maintenance 550.00

Physio Control Annual Lifepak maintenance (budgeted) 5,961.96

Rayne Water Conditioning Soft water service, semi-annual 888.36

Ready Refresh By Nestle Bottled water 271.51

Robert Galbraith R. Galbraith Reimb: External hard drives (2) 130.96

MONTECITO FIRE PROTECTION DISTRICTWARRANTS AND CLAIMS DETAIL

September 2017

Reg Pg. 21

October 23, 2017

Page 22: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Payee Description AmountSansum Clinic Pre-employment medical exams 2,732.00

Santa Barbara Co Fire Chief Assoc Annual Membership dues, FY2017-18 300.00

Satcom Global Inc Satellite phone charges 150.18

SB County Auditor-Controller Additional user tax 60.83

SB County Auditor-Controller FIN quarterly billing Q1, FY 17-18 3,990.25

SB Tree Care Inc Fuel treatment network: E. Mountain Dr. 1,150.00

Scott Chapman S. Chapman Reimb: PPE - Wildland packs 1,392.06

Shaun P Davis S. Davis Reimb: Binders for Academy 126.50

Snap-On Industrial Mechanic tools 490.40

Southern California Edison Electricity service 2,419.14

Special District Risk Mgmt Authority Worker's comp premium adjustment, FY 16-17 44,124.54

Sprint E92 Sim card for MDC, 7/26-8/25/17 75.98

Staples Business Advantage Office supplies 942.23

Susan M Woolley Labor attorney fees, August 2,035.50

The Gas Company Gas service, Sta. 1 - 8/31/17 46.07

The Gas Company Gas service, Sta. 2 - 8/31/17 47.94

The UPS Store Shipping charges 222.51

The Village Service Station Gasoline charges, August 2017 1,154.73

Trace Analytics LLC Mako compressed air testing 12.00

Travis Ederer T. Ederer Reimb: Red fire asgmt meals 36.00

Travis Ederer T. Ederer Reimb: Red fire asgmt hotel 124.24

Travis Ederer T. Ederer Reimb: Miller fire asgmt meals/hotel 198.33

US Bank Corporate Card VOIP phone system: IT supplies returned (credit) (286.16)

Dispatch IT supplies and E-waste fee for phones 152.15

Dinner for red flag upstaffing personnel 185.10

Hydrant maintenance gauges returned (credit) (282.47)

Repair part for coffeemaker, Sta. 2 (accrued FY17) 43.97

Repair parts for coffeemakers, Sta. 1 and 2 308.74

Vehicle repair parts 160.35

Tires installation, 912 200.21

Cal Fire Chiefs EMS membership: K. Taylor, FY17-18 150.00

Postage for HEARO radio mailing (accrued FY17) 103.88

Calendar app, 900 and iPad keyboard, 914 111.57

Laptop for pre-plans (accrued FY17) 551.47

Annual report postage costs 441.02

Fax, back-up server and Expensify, monthly fees 23.94

Juarez/Gil: Alamo/Whittier fire asgmt meals 20.45

Business meeting re: Type 3 team (accrued FY17) 37.17

K. Taylor: Contra Costa FD site visit flight 97.95

Business meetings (2) 146.41

Gasoline charges (accrued FY17) 117.05

Gasoline charges 1,701.47

Verizon Wireless Wireless service, 8/14-9/13/17 1,882.75

Wageworks Inc FSA plan reimbursements, employee paid 2,412.69

Wageworks Inc FSA administrative fee, August 110.50

Winema Industrial & Safety Supply Calibration gas for monitors 298.60

Winema Industrial & Safety Supply Multi-gas monitors, 3 (budgeted) 7,093.79

Zworld GIS Mapping services, September 165.00

Fund 3650 Total 188,878.01

Reg Pg. 22

October 23, 2017

Page 23: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

August September

Regular Salaries 568,794.00$ 568,794.00$

Directors Fees 1,225.00 700.00

Auxiliary 2,346.00 2,788.00

FLSA Safety 6,978.90 13,989.90

FLSA Dispatch 4,351.68 2,972.16

Overtime 291,963.49 271,019.18

Dispatch Cadre Earnings 2,461.80 2,238.00

Mass Mutual 457 Contribution 8,800.00 8,800.00

Vacation Redemption Program - 956.70

Gross Wages 886,920.87 872,257.94

District Contributions to Insurance 142,556.74 143,115.06

District Contributions to Medicare/SS 12,615.58 12,439.93

District Contributions to SUI 64.28 62.78

CalPERS Employee Contribution, District paid 49,780.99 50,317.45

CalPERS Employer Contribution, Employee paid (47,819.85) (48,257.74)

CalPERS, District Contribution 112,144.94 113,406.24

Health and Dependent Care FSA Contributions (3,506.40) (3,506.40)

Due to AFLAC (2,011.55) (1,781.50)

Total Benefits 263,824.73 265,795.82

Grand Total 1,150,745.60$ 1,138,053.76$

MONTECITO FIRE PROTECTION DISTRICTPAYROLL EXPENDITURES

August and September 2017

Reg Pg. 23

October 23, 2017

Page 24: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Nam

eD

ate

Wo

rked

Co

mp

Hrs

OT

Hrs

To

tal

Am

ou

nt

Co

nst

ant

Sta

ffin

gF

ire

Rei

mb

urs

able

Ove

rtim

eD

escr

ipti

on

Bennew

ate

, B

.07/0

7/1

724.0

1,6

00.9

2

1,6

00.9

2

Badara

cco, J.

07/2

0/1

75.0

453.4

5

453.4

5

Hic

km

an, K

.07/2

4/1

724.0

1,7

87.4

0

1,7

87.4

0

Kello

gg, K

.07/2

4/1

75.0

56.0

5,8

02.7

2

5,8

02.7

2

Pow

ell,

K.

07/2

4/1

724.0

1,6

09.2

0

1,6

09.2

0

Vill

arr

eal, J

.07/2

4/1

724.0

2,1

29.7

6

2,1

29.7

6

Walk

up, R

.07/2

4/1

713.5

905.1

8

905.1

8

Bla

ke, G

.07/2

7/1

724.0

1,6

47.3

6

1,6

47.3

6

Edw

ard

s, T

.07/2

9/1

724.0

2,1

24.0

0

2,1

24.0

0

Vill

arr

eal, J

.07/3

1/1

74.5

399.3

3

399.3

3

Vill

arr

eal, J

.07/3

1/1

716.5

1,4

64.2

1

1,4

64.2

1

Skei, E

.08/0

1/1

73.0

259.4

7

259.4

7

Arn

old

, D

.08/0

2/1

717.5

935.2

9

935.2

9

Gre

gson, A

.08/0

2/1

715.0

1,3

27.5

0

1,3

27.5

0

Pow

ell,

K.

08/0

2/1

717.5

1,1

73.3

8

1,1

73.3

8

Vill

arr

eal, J

.08/0

2/1

717.5

1,5

52.9

5

1,5

52.9

5

Wre

nn, B

.08/0

2/1

717.5

1,0

68.6

4

1,0

68.6

4

Arn

old

, D

.08/0

3/1

722.5

1,2

02.5

1

1,2

02.5

1

Bla

ke, G

.08/0

3/1

724.0

1,6

47.3

6

1,6

47.3

6

Briner,

A.

08/0

3/1

724.0

2,0

54.8

8

2,0

54.8

8

Bro

um

and, A

.08/0

3/1

724.0

1,6

94.1

6

1,6

94.1

6

Edere

r, T

.08/0

3/1

724.0

2,1

24.0

0

2,1

24.0

0

Gra

nt, L

.08/0

3/1

724.0

1,4

65.5

6

1,4

65.5

6

Jenkin

s, J.

08/0

3/1

78.0

8.5

1,0

23.8

3

1,0

23.8

3

Mann, K

.08/0

3/1

724.0

1,9

44.3

6

1,9

44.3

6

Zeitsoff, J.

08/0

3/1

724.0

1,7

09.2

8

1,7

09.2

8

Davis

, S

.08/0

4/1

713.5

1,0

76.2

9

1,0

76.2

9

Rupp, A

.08/0

4/1

713.0

3,6

20.6

6

3,6

20.6

6

Walk

up, R

.08/0

4/1

713.0

871.6

5

871.6

5

Wid

ling, A

.08/0

4/1

712.0

1,0

62.0

0

1,0

62.0

0

Wre

nn, B

.08/0

4/1

713.5

824.3

8

824.3

8

MO

NT

EC

ITO

FIR

E P

RO

TE

CT

ION

DIS

TR

ICT

OV

ER

TIM

E D

ET

AIL

Au

gu

st 2

017

Reg Pg. 24

October 23, 2017

Page 25: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Nam

eD

ate

Wo

rked

Co

mp

Hrs

OT

Hrs

To

tal

Am

ou

nt

Co

nst

ant

Sta

ffin

gF

ire

Rei

mb

urs

able

Ove

rtim

eD

escr

ipti

on

Briner,

A.

08/0

5/1

722.0

1,8

83.6

4

1,8

83.6

4

Edere

r, T

.08/0

5/1

721.0

1,8

58.5

0

1,8

58.5

0

Eubank, N

.08/0

5/1

723.5

1,2

55.9

6

1,2

55.9

6

Gra

nt, L

.08/0

5/1

716.0

6.5

396.9

2

396.9

2

Laurits

on, R

.08/0

5/1

724.0

3,3

63.8

4

3,3

63.8

4

Taylo

r, J

.08/0

5/1

724.0

1,1

92.3

2

1,1

92.3

2

Jenkin

s, J.

08/0

6/1

725.0

3,0

11.2

5

3,0

11.2

5

Laurits

on, R

.08/0

6/1

74.0

560.6

4

560.6

4

Chapm

an, S

.08/0

7/1

724.0

1,9

67.4

0

1,9

67.4

0

Edw

ard

s, T

.08/0

7/1

724.0

2,1

24.0

0

2,1

24.0

0

McC

racken, R

.08/0

7/1

74.0

20.0

1,4

67.0

0

1,4

67.0

0

Poulo

s, T

.08/0

7/1

724.0

1,7

34.8

4

1,7

34.8

4

Taylo

r, J

.08/0

7/1

724.0

1,1

92.3

2

1,1

92.3

2

Vill

arr

eal, J

.08/0

7/1

724.0

2,1

29.7

6

2,1

29.7

6

Zeitsoff, J.

08/0

7/1

724.0

1,7

09.2

8

1,7

09.2

8

Jenkin

s, J.

08/0

8/1

716.0

-

-

-

Kle

mow

icz, E

.08/0

8/1

74.0

20.0

1,3

41.0

0

1,3

41.0

0

Briner,

A.

07/2

2-0

7/2

8/1

788.0

7,3

35.2

4

7,3

35.2

4

Whilt

, S

.07/2

2-0

7/2

8/1

724.0

64.0

4,1

44.3

2

4,1

44.3

2

Gra

nt, L

.07/2

3-0

7/2

8/1

784.5

5,1

60.0

0

5,1

60.0

0

Zeitsoff, J.

07/2

4-0

7/2

8/1

788.0

6,2

67.3

6

6,2

67.3

6

Gil,

A.

07/2

4-0

7/3

1/1

713.5

38.5

4,1

00.2

5

4,1

00.2

5

Juare

z, M

.07/2

4-0

8/0

4/1

743.5

62.5

6,1

48.7

1

6,1

48.7

1

Bennew

ate

, B

.07/2

6-0

7/3

1/1

798.0

6,5

37.0

9

6,5

37.0

9

Chapm

an, S

.08/0

2-0

8/0

4/1

716.0

34.5

2,8

28.1

4

2,8

28.1

4

Mulle

r, L

.08/0

3-0

8/0

8/1

7111.0

5,8

45.8

2

5,8

45.8

2

Wid

ling, A

.08/0

5-0

8/0

7/1

748.0

4,2

48.0

0

4,2

48.0

0

Holthe, D

.08/0

5-0

8/0

8/1

748.0

5,3

15.5

4

5,3

15.5

4

Pow

ell,

K.

08/0

5-0

8/0

8/1

748.0

3,2

18.4

0

3,2

18.4

0

Walk

up, R

.08/0

5-0

8/0

8/1

748.0

3,2

18.4

0

3,2

18.4

0

Pay

roll

8/16

/17

140,

117.

62

20,7

77.8

6

11

9,33

9.76

-

Fuente

s, E

.07/2

4/1

713.5

1,0

93.7

0

1,0

93.7

0

Galb

raith, R

.07/2

4/1

724.0

1,6

47.3

6

1,6

47.3

6

St. O

egger,

D.

07/2

5/1

724.0

1,8

50.4

0

1,8

50.4

0

Wre

nn, B

.07/3

1/1

716.5

1,0

07.5

7

1,0

07.5

7

Reg Pg. 25

October 23, 2017

Page 26: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Nam

eD

ate

Wo

rked

Co

mp

Hrs

OT

Hrs

To

tal

Am

ou

nt

Co

nst

ant

Sta

ffin

gF

ire

Rei

mb

urs

able

Ove

rtim

eD

escr

ipti

on

Wre

nn, B

.08/0

1/1

73.0

183.2

0

183.2

0

Badara

cco, J.

08/0

5/1

72.0

181.3

8

18

1.3

8

En

gin

e r

ep

air

Gil,

A.

08/0

6/1

75.0

-

-

-

F

ina

nce

Co

mm

itte

e r

ep

ort

s

Bennew

ate

, B

.08/0

8/1

72.0

133.4

1

13

3.4

1

Ha

zM

at

tea

m m

ee

tin

g

Bass, L.

08/0

9/1

724.0

1,8

03.2

4

1,8

03.2

4

Bennew

ate

, B

.08/0

9/1

724.0

1,6

00.9

2

1,6

00.9

2

Chapm

an, S

.08/0

9/1

724.0

1,9

67.4

0

1,9

67.4

0

Edw

ard

s, T

.08/0

9/1

724.0

2,1

24.0

0

2,1

24.0

0

Eubank, N

.08/0

9/1

724.0

1,2

82.6

8

1,2

82.6

8

Skei, E

.08/0

9/1

724.0

2,0

75.7

6

2,0

75.7

6

Taylo

r, J

.08/0

9/1

724.0

1,1

92.3

2

1,1

92.3

2

Vill

arr

eal, J

.08/0

9/1

724.0

2,1

29.7

6

2,1

29.7

6

Galb

raith, R

.08/1

0/1

724.0

1,6

47.3

6

1,6

47.3

6

Jenkin

s, J.

08/1

0/1

74.0

481.8

0

481.8

0

Poulo

s, T

.08/1

0/1

724.0

1,7

34.8

4

1,7

34.8

4

Taylo

r, J

.08/1

0/1

712.0

596.1

6

596.1

6

Edw

ard

s, T

.08/1

1/1

74.5

398.2

5

398.2

5

Rupp, A

.08/1

1/1

711.0

652.9

1

652.9

1

Bennew

ate

, B

.08/1

2/1

724.0

1,6

00.9

2

1,6

00.9

2

Taylo

r, J

.08/1

2/1

724.0

1,1

92.3

2

596.1

6

596.1

6

Hauser,

B.

08/1

3/1

718.5

1,2

26.8

3

1,2

26.8

3

Jenkin

s, J.

08/1

3/1

713.0

1,5

65.8

5

1,5

65.8

5

Bla

ke, G

.08/1

4/1

724.0

1,6

47.3

6

1,6

47.3

6

Eubank, N

.08/1

4/1

724.0

1,2

82.6

8

855.1

2

427.5

6

Gra

nt, L

.08/1

4/1

78.0

466.3

2

466.3

2

Jenkin

s, J.

08/1

4/1

73.0

361.3

5

361.3

5

Mann, K

.08/1

4/1

724.0

1,9

44.3

6

1,2

96.2

4

648.1

2

Mulle

r, L

.08/1

4/1

713.0

684.6

5

684.6

5

Skei, E

.08/1

4/1

724.0

2,0

75.7

6

1,3

83.8

4

691.9

2

Vill

arr

eal, J

.08/1

4/1

74.0

20.0

1,7

74.8

0

1,7

74.8

0

Fuente

s, E

.08/1

5/1

711.0

891.1

7

89

1.1

7

Tra

inin

g b

ackfill

Wid

ling, A

.08/1

5/1

724.0

2,1

24.0

0

2,1

24.0

0

Arn

old

, D

.08/1

6/1

724.0

1,2

82.6

8

1,2

82.6

8

Mann, K

.08/1

6/1

724.0

1,9

44.3

6

1,9

44.3

6

Mulle

r, L

.08/1

6/1

724.0

1,2

63.9

6

1,2

63.9

6

Reg Pg. 26

October 23, 2017

Page 27: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Nam

eD

ate

Wo

rked

Co

mp

Hrs

OT

Hrs

To

tal

Am

ou

nt

Co

nst

ant

Sta

ffin

gF

ire

Rei

mb

urs

able

Ove

rtim

eD

escr

ipti

on

Skei, E

.08/1

6/1

78.0

691.9

2

69

1.9

2

Active

sh

oo

ter

tra

inin

g

Whilt

, S

.08/1

6/1

77.0

453.2

9

45

3.2

9

Active

sh

oo

ter

tra

inin

g

Gre

gson, A

.08/1

7/1

715.0

1,3

27.5

0

1,3

27.5

0

Wid

ling, A

.08/1

7/1

79.0

796.5

0

796.5

0

Mann, K

.08/1

8/1

724.0

1,9

44.3

6

1,9

44.3

6

Poulo

s, T

.08/1

8/1

724.0

1,7

34.8

4

1,7

34.8

4

Laurits

on, R

.08/2

0/1

723.0

3,2

23.6

8

3,2

23.6

8

Mann, K

.08/2

0/1

724.0

1,9

44.3

6

1,9

44.3

6

Laurits

on, R

.08/2

1/1

714.0

1,9

62.2

4

1,9

62.2

4

Gre

gson, A

.08/2

2/1

716.0

1,4

16.0

0

1,4

16.0

0

Hic

km

an, K

.08/2

2/1

711.0

819.2

3

81

9.2

3

Tra

inin

g b

ackfill

Wid

ling, A

.07/0

9-0

7/2

2/1

7-

624.0

0

624.0

0

P

ayro

ll co

rre

ctio

n f

rom

8/1

Mulle

r, L

.08/0

9-0

8/1

2/1

748.0

2,5

27.9

2

2,5

27.9

2

Holthe, D

.08/0

9-0

8/1

4/1

711.0

85.0

7,9

26.6

8

7,9

26.6

8

Pow

ell,

K.

08/0

9-0

8/1

4/1

796.0

6,4

36.8

0

6,4

36.8

0

Rupp, A

.08/0

9-0

8/1

4/1

796.0

5,6

98.0

8

5,6

98.0

8

Walk

up, R

.08/0

9-0

8/1

4/1

716.0

64.5

4,3

24.7

3

4,3

24.7

3

Wid

ling, A

.08/0

9-0

8/1

4/1

796.0

8,4

96.0

0

8,4

96.0

0

Badara

cco, J.

08/1

1-0

8/2

3/1

7116.0

10,5

20.0

4

10,5

20.0

4

Edere

r, T

.08/1

3-0

8/2

6/1

7168.0

14,8

68.0

0

14,8

68.0

0

Kello

gg, K

.08/1

3-0

8/2

6/1

710.5

120.5

12,4

86.2

1

12,4

86.2

1

Whilt

, S

.08/1

9-0

8/2

3/1

792.0

5,9

57.4

6

5,9

57.4

6

Zeitsoff, J.

08/1

9-0

8/2

3/1

792.0

6,5

52.2

4

6,5

52.2

4

Pay

roll

9/1/

1715

1,84

5.87

33

,413

.53

115,

261.

94

3,

170.

40

Gra

nd

To

tal

291,

963.

49

54,1

91.3

9

23

4,60

1.70

3,17

0.40

% o

f T

ota

l10

0.0%

18.6

%80

.4%

1.1%

Reg Pg. 27

October 23, 2017

Page 28: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Nam

eD

ate

Wo

rked

Co

mp

Hrs

OT

Hrs

To

tal

Am

ou

nt

Co

nst

ant

Sta

ffin

gF

ire

Rei

mb

urs

able

Ove

rtim

eD

escr

ipti

on

Bass, L.

06/2

0/1

79.0

643.6

8

64

3.6

8

Typ

e 3

bu

ild t

rip

Davis

, S

.07/1

9/1

724.0

1,9

13.4

0

1,9

13.4

0

Davis

, S

.08/0

4/1

713.5

1,0

76.2

9

1,0

76.2

9

Fuente

s, E

.08/2

2/1

724.0

1,9

44.3

6

1,9

44.3

6

Wid

ling, A

.08/2

4/1

724.0

2,1

24.0

0

2,1

24.0

0

Gra

nt, L

.08/2

5/1

75.0

291.4

5

291.4

5

Wid

ling, A

.08/2

5/1

724.0

2,1

24.0

0

2,1

24.0

0

Gre

gson, A

.08/2

6/1

724.0

2,1

24.0

0

2,1

24.0

0

McC

racken, R

.08/2

6/1

724.0

1,7

60.4

0

1,7

60.4

0

Gra

nt, L

.08/2

7/1

724.0

1,3

98.9

6

1,3

98.9

6

Laurits

on, R

.08/2

7/1

723.0

3,2

23.6

8

3,2

23.6

8

McC

racken, R

.08/2

8/1

724.0

1,7

60.4

0

1,7

60.4

0

Vill

arr

eal, J

.08/2

8/1

74.0

15.5

1,3

75.4

7

1,3

75.4

7

Bla

ke, G

.08/2

9/1

724.0

1,6

47.3

6

1,6

47.3

6

Briner,

A.

08/2

9/1

724.0

2,0

88.0

0

2,0

88.0

0

Chapm

an, S

.08/2

9/1

715.0

1,2

29.6

3

1,2

29.6

3

Hauser,

B.

08/2

9/1

714.5

961.5

7

961.5

7

Hic

km

an, K

.08/2

9/1

714.5

1,0

79.8

9

1,0

79.8

9

Bennew

ate

, B

.08/3

0/1

724.0

1,6

67.1

6

1,6

67

.16

D

isp

atc

h c

ad

re t

rain

ing

Jenkin

s, J.

08/3

0/1

716.0

1,9

27.2

0

1,9

27.2

0

Bass, L.

08/3

1/1

724.0

-

-

-

Bennew

ate

, B

.08/3

1/1

724.0

1,6

67.1

6

1,6

67.1

6

Mann, K

.08/3

1/1

724.0

1,9

44.3

6

1,9

44.3

6

McC

racken, R

.08/3

1/1

724.0

1,7

60.4

0

1,7

60.4

0

Poulo

s, T

.08/3

1/1

724.0

1,7

34.8

4

1,7

34.8

4

Bennew

ate

, B

.09/0

1/1

724.0

1,6

67.1

6

1,6

67.1

6

Fuente

s, E

.09/0

1/1

77.0

567.1

0

567.1

0

Poulo

s, T

.09/0

1/1

77.0

506.0

0

506.0

0

Bennew

ate

, B

.09/0

2/1

724.0

1,6

67.1

6

1,6

67.1

6

OV

ER

TIM

E D

ET

AIL

Sep

tem

ber

201

7

MO

NT

EC

ITO

FIR

E P

RO

TE

CT

ION

DIS

TR

ICT

Reg Pg. 28

October 23, 2017

Page 29: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Nam

eD

ate

Wo

rked

Co

mp

Hrs

OT

Hrs

To

tal

Am

ou

nt

Co

nst

ant

Sta

ffin

gF

ire

Rei

mb

urs

able

Ove

rtim

eD

escr

ipti

on

Briner,

A.

09/0

2/1

77.0

609.0

0

609.0

0

Galb

raith, R

.09/0

2/1

77.0

480.4

8

480.4

8

Mann, K

.09/0

2/1

724.0

1,9

44.3

6

1,9

44.3

6

Poulo

s, T

.09/0

2/1

724.0

1,7

34.8

4

1,7

34.8

4

Walk

up, R

.09/0

2/1

78.0

16.0

1,0

72.8

0

1,0

72.8

0

Davis

, S

.09/0

3/1

724.0

1,9

13.4

0

1,9

13.4

0

Fuente

s, E

.09/0

3/1

724.0

-

-

-

Galb

raith, R

.09/0

3/1

724.0

1,6

47.3

6

1,6

47.3

6

Gra

nt, L

.09/0

3/1

724.0

1,3

98.9

6

1,3

98.9

6

Jenkin

s, J.

09/0

3/1

712.0

1,4

45.4

0

1,4

45.4

0

Mann, K

.09/0

3/1

724.0

1,9

44.3

6

1,9

44.3

6

Poulo

s, T

.09/0

3/1

719.0

1,3

73.4

1

1,3

73.4

1

Skei, E

.09/0

3/1

713.0

1,1

24.3

7

1,1

24.3

7

Taylo

r, J

.09/0

3/1

712.0

596.1

6

596.1

6

Bla

ke, G

.09/0

4/1

724.0

1,6

47.3

6

1,6

47.3

6

Davis

, S

.09/0

4/1

724.0

1,9

13.4

0

1,9

13.4

0

Galb

raith, R

.09/0

4/1

78.0

16.0

1,0

98.2

4

1,0

98.2

4

Bro

um

and, A

.09/0

5/1

724.0

1,6

94.1

6

1,6

94.1

6

Davis

, S

.09/0

5/1

724.0

1,9

13.4

0

1,9

13.4

0

Edw

ard

s, S

.09/0

5/1

724.0

1,2

63.9

6

1,2

63.9

6

Fuente

s, E

.09/0

5/1

724.0

1,9

44.3

6

1,9

44.3

6

Galb

raith, R

.09/0

5/1

724.0

1,6

47.3

6

1,6

47.3

6

Gra

nt, L

.09/0

5/1

724.0

1,3

98.9

6

1,3

98.9

6

Poulo

s, T

.09/0

5/1

724.0

1,7

34.8

4

1,7

34.8

4

Bla

ke, G

.09/0

6/1

74.0

274.5

6

274.5

6

Fuente

s, E

.09/0

6/1

710.5

850.6

6

850.6

6

Galb

raith, R

.09/0

6/1

78.0

16.0

1,0

98.2

4

1,0

98.2

4

Hauser,

B.

09/0

6/1

720.0

1,3

26.3

0

1,3

26.3

0

Hic

km

an, K

.09/0

6/1

78.0

16.0

1,1

91.6

0

1,1

91.6

0

Pow

ell,

K.

09/0

6/1

710.0

670.5

0

670.5

0

Bla

ke, G

.09/0

7/1

724.0

1,6

47.3

6

1,6

47.3

6

Hic

km

an, K

.09/0

7/1

78.0

16.0

1,1

91.6

0

1,1

91.6

0

Mann, K

.09/0

7/1

724.0

1,9

44.3

6

1,9

44.3

6

Reg Pg. 29

October 23, 2017

Page 30: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Nam

eD

ate

Wo

rked

Co

mp

Hrs

OT

Hrs

To

tal

Am

ou

nt

Co

nst

ant

Sta

ffin

gF

ire

Rei

mb

urs

able

Ove

rtim

eD

escr

ipti

on

Poulo

s, T

.09/0

7/1

724.0

1,7

34.8

4

1,7

34.8

4

Bla

ke, G

.09/0

8/1

78.5

583.4

4

583.4

4

Davis

, S

.09/0

8/1

724.0

1,9

13.4

0

1,9

13.4

0

Fuente

s, E

.09/0

8/1

724.0

1,9

44.3

6

1,9

44.3

6

Hic

km

an, K

.09/0

8/1

724.0

1,7

87.4

0

1,7

87.4

0

Jenkin

s, J.

09/0

8/1

75.5

662.4

8

662.4

8

McC

racken, R

.09/0

8/1

724.0

1,7

60.4

0

1,7

60.4

0

Whilt

, S

.08/2

4-0

9/0

5/1

7195.5

12,6

59.6

0

12,6

59.6

0

Zeitsoff, J.

08/2

4-0

9/0

5/1

7195.5

13,9

23.5

1

13,9

23.5

1

Eubank, N

.08/2

9-0

9/0

9/1

7189.5

10,1

27.8

3

10,1

27.8

3

Holthe, D

.08/2

9-0

9/0

9/1

7168.0

15,6

66.8

4

15,6

66.8

4

Kle

mow

icz, E

.08/2

9-0

9/0

9/1

7144.0

9,6

55.2

0

9,6

55.2

0

Rupp, A

.08/2

9-0

9/0

9/1

7168.0

9,9

71.6

4

9,9

71.6

4

Badara

cco, J.

08/3

0-0

9/0

8/1

796.0

8,7

06.2

4

8,7

06.2

4

Mulle

r, L

.08/3

0-0

9/0

8/1

7144.0

7,5

83.7

6

7,5

83.7

6

Chapm

an, S

.09/0

2-0

9/0

6/1

752.0

4,2

62.7

0

4,2

62.7

0

McC

racken, R

.09/0

2-0

9/0

6/1

751.5

3,7

77.5

3

3,7

77.5

3

Arn

old

, D

.09/0

2-0

9/0

9/1

715.0

116.5

6,2

26.3

4

6,2

26.3

4

Bass, L.

09/0

2-0

9/0

9/1

724.0

107.0

8,0

39.4

5

8,0

39.4

5

Hauser,

B.

09/0

3-0

9/0

6/1

728.0

1,8

56.8

2

1,8

56.8

2

Vill

arr

eal, J

.09/0

6-0

9/1

9/1

783.5

7,4

09.7

9

7,4

09.7

9

Bro

um

and, A

.09/0

7-0

9/0

9/1

735.0

2,4

70.6

5

2,4

70.6

5

Pay

roll

9/15

/17

220,

335.

42

35,8

56.1

4

18

2,16

8.44

2,31

0.84

Kello

gg, K

.09/0

4/1

710.0

1,0

36.2

0

1,0

36.2

0

Bennew

ate

, B

.09/0

5/1

79.0

625.1

9

62

5.1

9

Ha

zM

at

tra

inin

g

Bennew

ate

, B

.09/0

7/1

79.0

625.1

9

62

5.1

9

Ha

zM

at

tra

inin

g

Bennew

ate

, B

.09/0

9/1

77.0

486.2

5

486.2

5

Edere

r, T

.09/0

9/1

724.0

2,1

24.0

0

2,1

24.0

0

Gra

nt, L

.09/0

9/1

724.0

1,3

98.9

6

1,3

98.9

6

Hic

km

an, K

.09/0

9/1

724.0

1,7

87.4

0

1,7

87.4

0

Jenkin

s, J.

09/0

9/1

714.0

1,6

86.3

0

1,6

86.3

0

Laurits

on, R

.09/0

9/1

724.0

3,3

63.8

4

3,3

63.8

4

McC

racken, R

.09/0

9/1

710.0

733.5

0

733.5

0

Whilt

, S

.09/0

9/1

77.0

453.2

9

453.2

9

Reg Pg. 30

October 23, 2017

Page 31: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Nam

eD

ate

Wo

rked

Co

mp

Hrs

OT

Hrs

To

tal

Am

ou

nt

Co

nst

ant

Sta

ffin

gF

ire

Rei

mb

urs

able

Ove

rtim

eD

escr

ipti

on

Jenkin

s, J.

09/1

0/1

725.0

3,0

11.2

5

3,0

11.2

5

Hauser,

B.

09/1

1/1

724.0

1,5

91.5

6

1,5

91.5

6

Hic

km

an, K

.09/1

1/1

724.0

1,7

87.4

0

1,7

87.4

0

Poulo

s, T

.09/1

1/1

724.0

1,7

34.8

4

1,7

34.8

4

Taylo

r, J

.09/1

2/1

724.0

1,1

92.3

2

1,1

92.3

2

Taylo

r, J

.09/1

3/1

724.0

1,1

92.3

2

1,1

92.3

2

Taylo

r, J

.09/1

4/1

724.0

1,1

92.3

2

1,1

92.3

2

Laurits

on, R

.09/1

7/1

723.0

3,2

23.6

8

3,2

23.6

8

Mann, K

.09/2

0/1

710.0

810.1

5

810.1

5

Hauser,

B.

09/2

1/1

724.0

1,5

91.5

6

1,5

91.5

6

Edw

ard

s, T

.09/2

4/1

724.0

2,1

24.0

0

2,1

24.0

0

Bennew

ate

, B

.09/2

9/1

7839.0

4

839.0

4

P

ayro

ll co

rre

ctio

n f

rom

9/1

5

Briner,

A.

09/2

9/1

763.4

8

63.4

8

Pa

yro

ll co

rre

ctio

n f

rom

9/1

5

Juare

z, M

.09/0

1-0

9/0

7/1

728.0

25.5

2,5

65.0

5

2,5

65.0

5

Mulle

r, L

.09/0

9-0

9/1

4/1

796.0

5,0

55.8

4

5,0

55.8

4

Badara

cco, J.

09/0

9-0

9/1

7/1

792.5

8,3

88.8

3

8,3

88.8

3

Pay

roll

9/29

/17

50,6

83.7

6

30,0

02.8

2

19

,430

.56

1,25

0.38

Gra

nd

To

tal

271,

019.

18

65,8

58.9

6

20

1,59

9.00

3,56

1.22

% o

f T

ota

l10

0.0%

24.3

%74

.4%

1.3%

Reg Pg. 31

October 23, 2017

Page 32: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Month PaidConstant Staffing

Fire Assignments Overtime Total OT

JULY 46,936.95 69,707.18 9,507.39 126,151.52

AUGUST 43,966.30 436,798.35 7,470.87 488,235.52

SEPTEMBER 34,992.70 163,041.82 (4,999.72) 193,034.80

OCTOBER 65,818.98 127,655.74 6,734.15 200,208.87

NOVEMBER 45,003.12 20,434.23 14,015.22 79,452.57

DECEMBER 46,995.02 - 7,596.39 54,591.41

JANUARY 39,053.11 - 1,997.30 41,050.41

FEBRUARY 59,860.08 - 9,319.12 69,179.20

MARCH 36,472.22 - 13,369.44 49,841.66

APRIL 59,117.88 - 19,208.89 78,326.77

MAY 26,508.83 18,991.90 13,139.21 58,639.94

JUNE 68,054.18 3,201.08 27,368.30 98,623.56

TOTAL 572,779.36 839,830.30 124,726.56 1,537,336.22

Cons.Staff. Fire Asgmts Overtime Total OT

YTD Sept 2016 125,895.95 669,547.35 11,978.54 807,421.83

Month PaidConstant Staffing

Fire Assignments Overtime Total OT

JULY 58,685.91 323,098.62 4,576.30 386,360.83

AUGUST 54,191.39 234,601.70 3,170.40 291,963.49

SEPTEMBER 65,858.96 201,599.00 3,561.22 271,019.18

OCTOBER -

NOVEMBER -

DECEMBER -

JANUARY -

FEBRUARY -

MARCH -

APRIL -

MAY -

JUNE -

TOTAL 178,736.26 759,299.32 11,307.92 949,343.50

Budget 750,000.00 455,000.00 125,000.00

% of Budget 23.8% 166.9% 9.0%

MONTECITO FIRE PROTECTION DISTRICTOVERTIME SUMMARY

Fiscal Year 2016-17

Fiscal Year 2017-18

Reg Pg. 32

October 23, 2017

Page 33: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Variance ReportFinance Committee - October 16, 2017

Report Line Item Variance Explanation

1 Balance Sheet 0115 Fair market value adjustments posted by the County on a quarterly basis.

2 Balance Sheet 0211Property tax revenue impounded by the Auditor-Controller's Office due to

large assessment appeals that have not been settled.

3 Balance Sheet 0230

The Account Receivable balance includes three fire assignment

reimbursements from last fiscal year. Payment is expected by

December.

4 Balance Sheet1015 &

1210

The EFT and accounts payable account reflects expenses entered by

month-end, but disbursement payment wasn't completed until the next

month. Details are available on the Cash Reconciliation report.

5 Balance Sheet 2130

Fund Balance - Committed maintains the District's reserve balances as

of 7/1/17: Catastrophic $2,400,000 and Economic Uncertainties

$3,670,000.

6 Financial Status Taxes TotalThe District expects to receive about 2.5 million in property tax revenue

in November.

7 Financial Status 6301

The overtime reimbursable account exceeds the budgeted amount due

to a busy fire season. A budget amendment will be considered in

May/June to adjust the budgeted amount.

8 Financial Status 6450

Funds designated to use towards pension prefunding: $1,800,000

towards PARS and $860,000 towards the CalPERS Pre-2013 UAL

liabilities.

9 Financial Status6900 &

7090

The premiums for worker's compensation and general liability insurance

require full payment at the beginning of the fiscal year.

10 Financial Trend 7050Monthly expenses have increased due to the new VOIP phone system

and an increase in data lines for iPads.

11 Financial Trend 7205

Wildland Fire Specialists have engaged on some big projects earlier than

in past fiscal years. Projects include roadside clearance and dead tree

removals.

12 Expenditure Trend 6100

The payroll expense varies based on the number of payroll periods

recorded during each month. April - 1, May - 2, June - 3, July - 1, August -

2, September - 3.

13 Expenditure Trend 6400

In July, the District prepaid a significant portion of retirement

contributions to CalPERS. The prepayment results in savings of over

$20k.

Reg Pg. 33

October 23, 2017

Page 34: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 34

October 23, 2017

Page 35: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

As

se

ts &

Oth

er

De

bit

s

As

se

ts

0110

-- C

ash

in T

reas

ury

7,04

7,85

5.82

76,9

85.4

15,

373,

233.

431,

751,

607.

8001

15 --

Tre

asur

y FM

V A

djus

tmen

t-3

,750

.99

2,46

4.42

0.00

-1,2

86.5

701

20 --

Impr

est C

ash

500.

000.

000.

0050

0.00

0130

-- C

ash

with

Fis

cal A

gent

s11

,924

.98

0.00

0.00

11,9

24.9

802

11 --

Pro

p Ta

x Im

poun

ds R

ecei

vabl

e21

0,47

9.00

0.00

0.00

210,

479.

0002

30 --

Acc

ount

s R

ecei

vabl

e93

,762

.00

0.00

25,3

90.0

068

,372

.00

0240

-- In

tere

st R

ecei

vabl

e19

,740

.80

9,65

3.91

19,7

40.8

09,

653.

91

Tota

l Ass

ets

7,38

0,51

1.61

89,1

03.7

45,

418,

364.

232,

051,

251.

12

Tota

l Ass

ets

& O

ther

Deb

its7,

380,

511.

6189

,103

.74

5,41

8,36

4.23

2,05

1,25

1.12

Lia

bilit

ies

, E

qu

ity

& O

the

r C

red

its

Lia

bilit

ies

1010

-- W

arra

nts

Pay

able

0.00

1,66

4,45

9.78

1,66

4,45

9.78

0.00

1015

-- E

FT P

ayab

le7,

293.

531,

049,

100.

791,

041,

807.

260.

0010

20 --

Sal

arie

s &

Ben

efits

Pay

able

12,6

26.0

012

,626

.00

0.00

0.00

1210

-- A

ccou

nts

Pay

able

31,6

08.4

82,

706,

267.

042,

779,

931.

2510

5,27

2.69

1240

-- A

ccru

ed E

xpen

ses

22,7

94.0

022

,794

.00

0.00

0.00

1400

-- D

epos

its3,

000.

000.

000.

003,

000.

0017

30 --

Uni

dent

ified

Dep

osits

0.00

31,4

75.1

131

,475

.11

0.00

Tota

l Lia

bilit

ies

77,3

22.0

15,

486,

722.

725,

517,

673.

4010

8,27

2.69

Eq

uit

y

2110

-- F

und

Bal

ance

-Non

spen

dabl

e12

7,51

0.00

0.00

0.00

127,

510.

0021

30 --

Fun

d B

alan

ce-C

omm

itted

5,67

3,50

0.00

0.00

397,

000.

006,

070,

500.

0022

00 --

Fun

d B

alan

ce-R

esid

ual

1,50

2,17

9.60

25,8

89,4

04.5

820

,132

,193

.41

-4,2

55,0

31.5

7

Tota

l Equ

ity7,

303,

189.

6025

,889

,404

.58

20,5

29,1

93.4

11,

942,

978.

43

Ba

lan

ce

Sh

ee

tA

s o

f: 9

/30

/20

17

Ac

co

un

tin

g P

eri

od

: C

LO

SE

D

Sel

ectio

n C

riter

ia: F

und

= 36

50-3

653

Layo

ut O

ptio

ns: S

umm

ariz

ed B

y =

Fund

; Pag

e B

reak

At =

Fun

d

Be

gin

nin

g B

ala

nc

e7

/1/2

01

7Y

ea

r-T

o-D

ate

De

bit

sY

ea

r-T

o-D

ate

Cre

dit

sE

nd

ing

Ba

lan

ce

9/3

0/2

01

7

Fu

nd

36

50

--

Mo

nte

cit

o F

ire

Pro

tec

tio

n D

ist

Cou

nty

of S

anta

Bar

bara

, FIN

Last

Upd

ated

: 10

/12/

2017

5:2

2 A

MP

age

1 of

5

Reg Pg. 35

October 23, 2017

agil
Text Box
1
agil
Text Box
2
agil
Text Box
3
agil
Text Box
4
agil
Text Box
4
agil
Text Box
5
Page 36: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Tota

l Lia

bilit

ies,

Equ

ity &

Oth

er C

redi

ts7,

380,

511.

6131

,376

,127

.30

26,0

46,8

66.8

12,

051,

251.

12

Ba

lan

ce

Sh

ee

tA

s o

f: 9

/30

/20

17

Ac

co

un

tin

g P

eri

od

: C

LO

SE

D

Sel

ectio

n C

riter

ia: F

und

= 36

50-3

653

Layo

ut O

ptio

ns: S

umm

ariz

ed B

y =

Fund

; Pag

e B

reak

At =

Fun

d

Be

gin

nin

g B

ala

nc

e7

/1/2

01

7Y

ea

r-T

o-D

ate

De

bit

sY

ea

r-T

o-D

ate

Cre

dit

sE

nd

ing

Ba

lan

ce

9/3

0/2

01

7

Fu

nd

36

50

--

Mo

nte

cit

o F

ire

Pro

tec

tio

n D

ist

Cou

nty

of S

anta

Bar

bara

, FIN

Last

Upd

ated

: 10

/12/

2017

5:2

2 A

MP

age

2 of

5

Reg Pg. 36

October 23, 2017

Page 37: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

As

se

ts &

Oth

er

De

bit

s

As

se

ts

0110

-- C

ash

in T

reas

ury

208.

0815

5,00

0.45

52,2

32.4

710

2,97

6.06

0115

-- T

reas

ury

FMV

Adj

ustm

ent

-0.1

10.

0075

.53

-75.

6402

40 --

Inte

rest

Rec

eiva

ble

0.45

254.

060.

4525

4.06

Tota

l Ass

ets

208.

4215

5,25

4.51

52,3

08.4

510

3,15

4.48

Tota

l Ass

ets

& O

ther

Deb

its20

8.42

155,

254.

5152

,308

.45

103,

154.

48

Lia

bilit

ies

, E

qu

ity

& O

the

r C

red

its

Lia

bilit

ies

1010

-- W

arra

nts

Pay

able

0.00

2,96

0.00

2,96

0.00

0.00

1015

-- E

FT P

ayab

le0.

0049

,272

.47

49,2

72.4

70.

0012

10 --

Acc

ount

s P

ayab

le0.

0052

,232

.47

52,2

32.4

70.

00

Tota

l Lia

bilit

ies

0.00

104,

464.

9410

4,46

4.94

0.00

Eq

uit

y

2140

-- F

und

Bal

ance

-Ass

igne

d20

8.42

0.00

0.00

208.

4222

00 --

Fun

d B

alan

ce-R

esid

ual

0.00

207,

308.

0031

0,25

4.06

102,

946.

06

Tota

l Equ

ity20

8.42

207,

308.

0031

0,25

4.06

103,

154.

48

Tota

l Lia

bilit

ies,

Equ

ity &

Oth

er C

redi

ts20

8.42

311,

772.

9441

4,71

9.00

103,

154.

48

Ba

lan

ce

Sh

ee

tA

s o

f: 9

/30

/20

17

Ac

co

un

tin

g P

eri

od

: C

LO

SE

D

Sel

ectio

n C

riter

ia: F

und

= 36

50-3

653

Layo

ut O

ptio

ns: S

umm

ariz

ed B

y =

Fund

; Pag

e B

reak

At =

Fun

d

Be

gin

nin

g B

ala

nc

e7

/1/2

01

7Y

ea

r-T

o-D

ate

De

bit

sY

ea

r-T

o-D

ate

Cre

dit

sE

nd

ing

Ba

lan

ce

9/3

0/2

01

7

Fu

nd

36

51

--

Mo

nte

cit

o F

ire

Pe

ns

ion

Ob

lig

Cou

nty

of S

anta

Bar

bara

, FIN

Last

Upd

ated

: 10

/12/

2017

5:2

2 A

MP

age

3 of

5

Reg Pg. 37

October 23, 2017

Page 38: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

As

se

ts &

Oth

er

De

bit

s

As

se

ts

0110

-- C

ash

in T

reas

ury

2,65

4,64

1.09

5,10

4.49

0.00

2,65

9,74

5.58

0115

-- T

reas

ury

FMV

Adj

ustm

ent

-1,4

12.8

40.

0054

0.76

-1,9

53.6

002

40 --

Inte

rest

Rec

eiva

ble

5,10

4.49

6,61

1.43

5,10

4.49

6,61

1.43

Tota

l Ass

ets

2,65

8,33

2.74

11,7

15.9

25,

645.

252,

664,

403.

41

Tota

l Ass

ets

& O

ther

Deb

its2,

658,

332.

7411

,715

.92

5,64

5.25

2,66

4,40

3.41

Lia

bilit

ies

, E

qu

ity

& O

the

r C

red

its

Eq

uit

y

2140

-- F

und

Bal

ance

-Ass

igne

d2,

658,

332.

740.

000.

002,

658,

332.

7422

00 --

Fun

d B

alan

ce-R

esid

ual

0.00

512,

540.

7651

8,61

1.43

6,07

0.67

Tota

l Equ

ity2,

658,

332.

7451

2,54

0.76

518,

611.

432,

664,

403.

41

Tota

l Lia

bilit

ies,

Equ

ity &

Oth

er C

redi

ts2,

658,

332.

7451

2,54

0.76

518,

611.

432,

664,

403.

41

Ba

lan

ce

Sh

ee

tA

s o

f: 9

/30

/20

17

Ac

co

un

tin

g P

eri

od

: C

LO

SE

D

Sel

ectio

n C

riter

ia: F

und

= 36

50-3

653

Layo

ut O

ptio

ns: S

umm

ariz

ed B

y =

Fund

; Pag

e B

reak

At =

Fun

d

Be

gin

nin

g B

ala

nc

e7

/1/2

01

7Y

ea

r-T

o-D

ate

De

bit

sY

ea

r-T

o-D

ate

Cre

dit

sE

nd

ing

Ba

lan

ce

9/3

0/2

01

7

Fu

nd

36

52

--

Mo

nte

cit

o F

ire

Ca

p O

utl

ay

Re

s

Cou

nty

of S

anta

Bar

bara

, FIN

Last

Upd

ated

: 10

/12/

2017

5:2

2 A

MP

age

4 of

5

Reg Pg. 38

October 23, 2017

Page 39: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

As

se

ts &

Oth

er

De

bit

s

As

se

ts

0110

-- C

ash

in T

reas

ury

5,35

2,20

1.75

9,81

0.17

1,76

4.00

5,36

0,24

7.92

0115

-- T

reas

ury

FMV

Adj

ustm

ent

-2,8

48.5

30.

001,

088.

60-3

,937

.13

0240

-- In

tere

st R

ecei

vabl

e9,

810.

1713

,326

.56

9,81

0.17

13,3

26.5

6

Tota

l Ass

ets

5,35

9,16

3.39

23,1

36.7

312

,662

.77

5,36

9,63

7.35

Tota

l Ass

ets

& O

ther

Deb

its5,

359,

163.

3923

,136

.73

12,6

62.7

75,

369,

637.

35

Lia

bilit

ies

, E

qu

ity

& O

the

r C

red

its

Lia

bilit

ies

1015

-- E

FT P

ayab

le0.

001,

764.

001,

764.

000.

0012

10 --

Acc

ount

s P

ayab

le0.

001,

764.

001,

764.

000.

0012

40 --

Acc

rued

Exp

ense

s81

9.00

819.

000.

000.

00

Tota

l Lia

bilit

ies

819.

004,

347.

003,

528.

000.

00

Eq

uit

y

2140

-- F

und

Bal

ance

-Ass

igne

d5,

358,

343.

790.

000.

005,

358,

343.

7922

00 --

Fun

d B

alan

ce-R

esid

ual

0.60

202,

852.

6021

4,14

5.56

11,2

93.5

6

Tota

l Equ

ity5,

358,

344.

3920

2,85

2.60

214,

145.

565,

369,

637.

35

Tota

l Lia

bilit

ies,

Equ

ity &

Oth

er C

redi

ts5,

359,

163.

3920

7,19

9.60

217,

673.

565,

369,

637.

35

Ba

lan

ce

Sh

ee

tA

s o

f: 9

/30

/20

17

Ac

co

un

tin

g P

eri

od

: C

LO

SE

D

Sel

ectio

n C

riter

ia: F

und

= 36

50-3

653

Layo

ut O

ptio

ns: S

umm

ariz

ed B

y =

Fund

; Pag

e B

reak

At =

Fun

d

Be

gin

nin

g B

ala

nc

e7

/1/2

01

7Y

ea

r-T

o-D

ate

De

bit

sY

ea

r-T

o-D

ate

Cre

dit

sE

nd

ing

Ba

lan

ce

9/3

0/2

01

7

Fu

nd

36

53

--

Mo

nte

cit

o F

ire

La

nd

& B

uil

din

g

Cou

nty

of S

anta

Bar

bara

, FIN

Last

Upd

ated

: 10

/12/

2017

5:2

2 A

MP

age

5 of

5

Reg Pg. 39

October 23, 2017

Page 40: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Rev

enue

sTa

xes

3010

-- P

rope

rty T

ax-C

urre

nt S

ecur

ed15

,939

,945

.00

0.00

-15,

939,

945.

000.

00 %

3011

-- P

rope

rty T

ax-U

nita

ry14

4,70

0.00

0.00

-144

,700

.00

0.00

%30

15 --

PT

PY

Cor

r/Esc

apes

Sec

ured

83,5

00.0

00.

00-8

3,50

0.00

0.00

%30

20 --

Pro

perty

Tax

-Cur

rent

Uns

ecd

727,

065.

000.

00-7

27,0

65.0

00.

00 %

3040

-- P

rope

rty T

ax-P

rior S

ecur

ed23

,980

.00

0.00

-23,

980.

000.

00 %

3050

-- P

rope

rty T

ax-P

rior U

nsec

ured

5,85

0.00

0.00

-5,8

50.0

00.

00 %

3054

-- S

uppl

emen

tal P

ty T

ax-C

urre

nt36

7,87

0.00

0.00

-367

,870

.00

0.00

%

Taxe

s17

,292

,910

.00

0.00

-17,

292,

910.

000.

00 %

Use

of M

oney

and

Pro

perty

3380

-- In

tere

st In

com

e14

,700

.00

9,65

3.91

-5,0

46.0

965

.67

%33

81 --

Unr

ealiz

ed G

ain/

Loss

Invs

tmnt

s0.

002,

464.

422,

464.

42--

3409

-- O

ther

Ren

tal o

f Bld

gs a

nd L

and

52,2

60.0

00.

00-5

2,26

0.00

0.00

%

Use

of M

oney

and

Pro

perty

66,9

60.0

012

,118

.33

-54,

841.

6718

.10

%

Inte

rgov

ernm

enta

l Rev

enue

-Sta

te37

50 --

Sta

te-E

mer

genc

y A

ssis

tanc

e32

5,00

0.00

0.00

-325

,000

.00

0.00

%42

20 --

Hom

eow

ners

Pro

perty

Tax

Rel

ief

82,6

10.0

00.

00-8

2,61

0.00

0.00

%

Inte

rgov

ernm

enta

l Rev

enue

-Sta

te40

7,61

0.00

0.00

-407

,610

.00

0.00

%

Inte

rgov

ernm

enta

l Rev

enue

-Fed

eral

4476

-- F

eder

al E

mer

genc

y A

ssis

tanc

e13

0,00

0.00

0.00

-130

,000

.00

0.00

%

Inte

rgov

ernm

enta

l Rev

enue

-Fed

eral

130,

000.

000.

00-1

30,0

00.0

00.

00 %

Cha

rges

for S

ervi

ces

5105

-- R

eim

b fo

r Dis

trict

Ser

vice

s19

2,81

0.00

22,3

24.6

5-1

70,4

85.3

511

.58

%

Cha

rges

for S

ervi

ces

192,

810.

0022

,324

.65

-170

,485

.35

11.5

8 %

Fina

ncia

l Sta

tus

As

of: 9

/30/

2017

(25%

Ela

psed

)A

ccou

ntin

g P

erio

d: C

LOS

ED

Sel

ectio

n C

riter

ia: F

und

= 36

50-3

653

Layo

ut O

ptio

ns: S

umm

ariz

ed B

y =

Fund

, Lin

eIte

mA

ccou

nt; P

age

Bre

ak A

t = F

und

Line

Item

Acc

ount

6/30

/201

8Fi

scal

Yea

rA

djus

ted

Bud

get

9/30

/201

7Y

ear-

To-D

ate

Act

ual

6/30

/201

8Fi

scal

Yea

rV

aria

nce

6/30

/201

8Fi

scal

Yea

rP

ct o

f Bud

get

Fund

365

0 --

Mon

teci

to F

ire P

rote

ctio

n D

ist

Cou

nty

of S

anta

Bar

bara

, FIN

Last

Upd

ated

: 10

/12/

2017

5:2

2 A

MP

age

1 of

7

Reg Pg. 40

October 23, 2017

agil
Text Box
6
Page 41: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Mis

cella

neou

s R

even

ue59

09 --

Oth

er M

isce

llane

ous

Rev

enue

7,50

0.00

6,08

5.46

-1,4

14.5

481

.14

%

Mis

cella

neou

s R

even

ue7,

500.

006,

085.

46-1

,414

.54

81.1

4 %

Rev

enue

s18

,097

,790

.00

40,5

28.4

4-1

8,05

7,26

1.56

0.22

%

Exp

endi

ture

sS

alar

ies

and

Em

ploy

ee B

enef

its61

00 --

Reg

ular

Sal

arie

s7,

522,

810.

001,

806,

450.

235,

716,

359.

7724

.01

%63

00 --

Ove

rtim

e12

5,00

0.00

6,56

8.54

118,

431.

465.

25 %

6301

-- O

verti

me

- Rei

mbu

rsab

le45

5,00

0.00

734,

645.

76-2

79,6

45.7

616

1.46

%63

10 --

Ove

rtim

e - C

onst

ant S

taffi

ng75

0,00

0.00

145,

261.

4460

4,73

8.56

19.3

7 %

6400

-- R

etire

men

t Con

tribu

tion

2,23

8,01

5.00

1,12

1,45

2.61

1,11

6,56

2.39

50.1

1 %

6450

-- S

upp

Ret

irem

ent C

ontri

butio

n2,

660,

000.

000.

002,

660,

000.

000.

00 %

6550

-- F

ICA

/Med

icar

e12

6,96

5.00

39,0

91.3

487

,873

.66

30.7

9 %

6600

-- H

ealth

Insu

ranc

e C

ontri

b1,

812,

680.

0042

8,92

5.24

1,38

3,75

4.76

23.6

6 %

6700

-- U

nem

ploy

men

t Ins

Con

tribu

tion

10,8

20.0

019

4.59

10,6

25.4

11.

80 %

6900

-- W

orke

rs C

ompe

nsat

ion

575,

000.

0063

6,07

1.90

-61,

071.

9011

0.62

%

Sal

arie

s an

d E

mpl

oyee

Ben

efits

16,2

76,2

90.0

04,

918,

661.

6511

,357

,628

.35

30.2

2 %

Ser

vice

s an

d S

uppl

ies

7030

-- C

loth

ing

and

Per

sona

l52

,500

.00

8,85

5.83

43,6

44.1

716

.87

%70

50 --

Com

mun

icat

ions

99,5

00.0

028

,533

.88

70,9

66.1

228

.68

%70

60 --

Foo

d2,

500.

0018

5.10

2,31

4.90

7.40

%70

70 --

Hou

seho

ld S

uppl

ies

34,8

50.0

04,

829.

4830

,020

.52

13.8

6 %

7090

-- In

sura

nce

31,0

00.0

026

,537

.00

4,46

3.00

85.6

0 %

7120

-- E

quip

men

t Mai

nten

ance

35,0

00.0

01,

661.

4533

,338

.55

4.75

%72

00 --

Stru

ctur

e &

Gro

und

Mai

nten

ance

43,5

50.0

04,

079.

4339

,470

.57

9.37

%72

05 --

Fire

Def

ense

Zon

e23

6,00

0.00

31,5

65.0

020

4,43

5.00

13.3

8 %

Fina

ncia

l Sta

tus

As

of: 9

/30/

2017

(25%

Ela

psed

)A

ccou

ntin

g P

erio

d: C

LOS

ED

Sel

ectio

n C

riter

ia: F

und

= 36

50-3

653

Layo

ut O

ptio

ns: S

umm

ariz

ed B

y =

Fund

, Lin

eIte

mA

ccou

nt; P

age

Bre

ak A

t = F

und

Line

Item

Acc

ount

6/30

/201

8Fi

scal

Yea

rA

djus

ted

Bud

get

9/30

/201

7Y

ear-

To-D

ate

Act

ual

6/30

/201

8Fi

scal

Yea

rV

aria

nce

6/30

/201

8Fi

scal

Yea

rP

ct o

f Bud

get

Fund

365

0 --

Mon

teci

to F

ire P

rote

ctio

n D

ist

Cou

nty

of S

anta

Bar

bara

, FIN

Last

Upd

ated

: 10

/12/

2017

5:2

2 A

MP

age

2 of

7

Reg Pg. 41

October 23, 2017

agil
Text Box
7
agil
Text Box
8
agil
Text Box
9
agil
Text Box
(Liability/Property)
agil
Text Box
9
Page 42: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

7322

-- C

onsu

lting

& M

gmt F

ees

3,35

0.00

0.00

3,35

0.00

0.00

%73

24 --

Aud

it an

d A

ccou

ntin

g Fe

es25

,000

.00

3,99

0.25

21,0

09.7

515

.96

%73

48 --

Inst

rum

ents

& E

quip

. < $

5000

85,0

00.0

05,

339.

0779

,660

.93

6.28

%73

63 --

Equ

ipm

ent M

aint

enan

ce69

,500

.00

13,6

45.4

755

,854

.53

19.6

3 %

7400

-- M

edic

al, D

enta

l and

Lab

38,1

00.0

010

,304

.73

27,7

95.2

727

.05

%74

30 --

Mem

bers

hips

12,5

00.0

01,

390.

0011

,110

.00

11.1

2 %

7450

-- O

ffice

Exp

ense

27,5

00.0

04,

980.

0122

,519

.99

18.1

1 %

7460

-- P

rofe

ssio

nal &

Spe

cial

Ser

vice

359,

750.

0058

,667

.45

301,

082.

5516

.31

%75

07 --

AD

P P

ayro

ll Fe

es7,

500.

001,

550.

755,

949.

2520

.68

%75

10 --

Con

tract

ual S

ervi

ces

61,6

00.0

025

,650

.62

35,9

49.3

841

.64

%75

30 --

Pub

licat

ions

& L

egal

Not

ices

6,00

0.00

2,54

9.84

3,45

0.16

42.5

0 %

7546

-- A

dmin

istra

tive

Exp

ense

240,

000.

000.

0024

0,00

0.00

0.00

%75

80 --

Ren

ts/L

ease

s-S

truct

ure

4,50

0.00

0.00

4,50

0.00

0.00

%76

30 --

Sm

all T

ools

& In

stru

men

ts20

,100

.00

10,8

98.8

79,

201.

1354

.22

%76

50 --

Spe

cial

Dep

artm

enta

l Exp

ense

63,5

00.0

013

,915

.83

49,5

84.1

721

.91

%76

71 --

Spe

cial

Pro

ject

s38

,000

.00

0.00

38,0

00.0

00.

00 %

7730

-- T

rans

porta

tion

and

Trav

el35

,000

.00

4,31

3.34

30,6

86.6

612

.32

%77

31 --

Gas

olin

e-O

il-Fu

el55

,000

.00

8,62

5.06

46,3

74.9

415

.68

%77

32 --

Tra

inin

g87

,750

.00

6,39

9.70

81,3

50.3

07.

29 %

7760

-- U

tiliti

es48

,000

.00

9,59

1.67

38,4

08.3

319

.98

%

Ser

vice

s an

d S

uppl

ies

1,82

2,55

0.00

288,

059.

831,

534,

490.

1715

.81

%

Cap

ital A

sset

s83

00 --

Equ

ipm

ent

414,

200.

0039

,018

.13

375,

181.

879.

42 %

Cap

ital A

sset

s41

4,20

0.00

39,0

18.1

337

5,18

1.87

9.42

%

Exp

endi

ture

s18

,513

,040

.00

5,24

5,73

9.61

13,2

67,3

00.3

928

.34

%

Fina

ncia

l Sta

tus

As

of: 9

/30/

2017

(25%

Ela

psed

)A

ccou

ntin

g P

erio

d: C

LOS

ED

Sel

ectio

n C

riter

ia: F

und

= 36

50-3

653

Layo

ut O

ptio

ns: S

umm

ariz

ed B

y =

Fund

, Lin

eIte

mA

ccou

nt; P

age

Bre

ak A

t = F

und

Line

Item

Acc

ount

6/30

/201

8Fi

scal

Yea

rA

djus

ted

Bud

get

9/30

/201

7Y

ear-

To-D

ate

Act

ual

6/30

/201

8Fi

scal

Yea

rV

aria

nce

6/30

/201

8Fi

scal

Yea

rP

ct o

f Bud

get

Fund

365

0 --

Mon

teci

to F

ire P

rote

ctio

n D

ist

Cou

nty

of S

anta

Bar

bara

, FIN

Last

Upd

ated

: 10

/12/

2017

5:2

2 A

MP

age

3 of

7

Reg Pg. 42

October 23, 2017

Page 43: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Oth

er F

inan

cing

Sou

rces

& U

ses

Oth

er F

inan

cing

Use

s79

01 --

Ope

r Trf

(Out

)61

5,00

0.00

155,

000.

0046

0,00

0.00

25.2

0 %

Oth

er F

inan

cing

Use

s61

5,00

0.00

155,

000.

0046

0,00

0.00

25.2

0 %

Oth

er F

inan

cing

Sou

rces

& U

ses

-615

,000

.00

-155

,000

.00

460,

000.

0025

.20

%

Mon

teci

to F

ire P

rote

ctio

n D

ist

-1,0

30,2

50.0

0-5

,360

,211

.17

-4,3

29,9

61.1

752

0.28

%

Fina

ncia

l Sta

tus

As

of: 9

/30/

2017

(25%

Ela

psed

)A

ccou

ntin

g P

erio

d: C

LOS

ED

Sel

ectio

n C

riter

ia: F

und

= 36

50-3

653

Layo

ut O

ptio

ns: S

umm

ariz

ed B

y =

Fund

, Lin

eIte

mA

ccou

nt; P

age

Bre

ak A

t = F

und

Line

Item

Acc

ount

6/30

/201

8Fi

scal

Yea

rA

djus

ted

Bud

get

9/30

/201

7Y

ear-

To-D

ate

Act

ual

6/30

/201

8Fi

scal

Yea

rV

aria

nce

6/30

/201

8Fi

scal

Yea

rP

ct o

f Bud

get

Fund

365

0 --

Mon

teci

to F

ire P

rote

ctio

n D

ist

Cou

nty

of S

anta

Bar

bara

, FIN

Last

Upd

ated

: 10

/12/

2017

5:2

2 A

MP

age

4 of

7

Reg Pg. 43

October 23, 2017

Page 44: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Rev

enue

sU

se o

f Mon

ey a

nd P

rope

rty33

80 --

Inte

rest

Inco

me

0.00

254.

0625

4.06

--33

81 --

Unr

ealiz

ed G

ain/

Loss

Invs

tmnt

s0.

00-7

5.53

-75.

53--

Use

of M

oney

and

Pro

perty

0.00

178.

5317

8.53

--

Rev

enue

s0.

0017

8.53

178.

53--

Exp

endi

ture

sS

ervi

ces

and

Sup

plie

s74

60 --

Pro

fess

iona

l & S

peci

al S

ervi

ce3,

500.

002,

960.

0054

0.00

84.5

7 %

Ser

vice

s an

d S

uppl

ies

3,50

0.00

2,96

0.00

540.

0084

.57

%

Oth

er C

harg

es78

30 --

Inte

rest

Exp

ense

6,34

0.00

3,27

7.00

3,06

3.00

51.6

9 %

Oth

er C

harg

es6,

340.

003,

277.

003,

063.

0051

.69

%

Exp

endi

ture

s9,

840.

006,

237.

003,

603.

0063

.38

%

Oth

er F

inan

cing

Sou

rces

& U

ses

Oth

er F

inan

cing

Sou

rces

5910

-- O

per T

rf (In

)-G

ener

al F

und

155,

000.

0015

5,00

0.00

0.00

100.

00 %

Oth

er F

inan

cing

Sou

rces

155,

000.

0015

5,00

0.00

0.00

100.

00 %

Oth

er F

inan

cing

Use

s79

10 --

Lon

g Te

rm D

ebt P

rinc

Rep

aym

ent

145,

000.

0045

,995

.47

99,0

04.5

331

.72

%

Oth

er F

inan

cing

Use

s14

5,00

0.00

45,9

95.4

799

,004

.53

31.7

2 %

Oth

er F

inan

cing

Sou

rces

& U

ses

10,0

00.0

010

9,00

4.53

99,0

04.5

31,

090.

05 %

Mon

teci

to F

ire P

ensi

on O

blig

160.

0010

2,94

6.06

102,

786.

0664

,341

.29

%

Fina

ncia

l Sta

tus

As

of: 9

/30/

2017

(25%

Ela

psed

)A

ccou

ntin

g P

erio

d: C

LOS

ED

Sel

ectio

n C

riter

ia: F

und

= 36

50-3

653

Layo

ut O

ptio

ns: S

umm

ariz

ed B

y =

Fund

, Lin

eIte

mA

ccou

nt; P

age

Bre

ak A

t = F

und

Line

Item

Acc

ount

6/30

/201

8Fi

scal

Yea

rA

djus

ted

Bud

get

9/30

/201

7Y

ear-

To-D

ate

Act

ual

6/30

/201

8Fi

scal

Yea

rV

aria

nce

6/30

/201

8Fi

scal

Yea

rP

ct o

f Bud

get

Fund

365

1 --

Mon

teci

to F

ire P

ensi

on O

blig

Cou

nty

of S

anta

Bar

bara

, FIN

Last

Upd

ated

: 10

/12/

2017

5:2

2 A

MP

age

5 of

7

Reg Pg. 44

October 23, 2017

Page 45: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Rev

enue

sU

se o

f Mon

ey a

nd P

rope

rty33

80 --

Inte

rest

Inco

me

10,0

00.0

06,

611.

43-3

,388

.57

66.1

1 %

3381

-- U

nrea

lized

Gai

n/Lo

ss In

vstm

nts

0.00

-540

.76

-540

.76

--

Use

of M

oney

and

Pro

perty

10,0

00.0

06,

070.

67-3

,929

.33

60.7

1 %

Rev

enue

s10

,000

.00

6,07

0.67

-3,9

29.3

360

.71

%

Exp

endi

ture

sC

apita

l Ass

ets

8300

-- E

quip

men

t51

2,00

0.00

0.00

512,

000.

000.

00 %

Cap

ital A

sset

s51

2,00

0.00

0.00

512,

000.

000.

00 %

Exp

endi

ture

s51

2,00

0.00

0.00

512,

000.

000.

00 %

Oth

er F

inan

cing

Sou

rces

& U

ses

Oth

er F

inan

cing

Sou

rces

5910

-- O

per T

rf (In

)-G

ener

al F

und

460,

000.

000.

00-4

60,0

00.0

00.

00 %

Oth

er F

inan

cing

Sou

rces

460,

000.

000.

00-4

60,0

00.0

00.

00 %

Oth

er F

inan

cing

Sou

rces

& U

ses

460,

000.

000.

00-4

60,0

00.0

00.

00 %

Mon

teci

to F

ire C

ap O

utla

y R

es-4

2,00

0.00

6,07

0.67

48,0

70.6

7-1

4.45

%

Fina

ncia

l Sta

tus

As

of: 9

/30/

2017

(25%

Ela

psed

)A

ccou

ntin

g P

erio

d: C

LOS

ED

Sel

ectio

n C

riter

ia: F

und

= 36

50-3

653

Layo

ut O

ptio

ns: S

umm

ariz

ed B

y =

Fund

, Lin

eIte

mA

ccou

nt; P

age

Bre

ak A

t = F

und

Line

Item

Acc

ount

6/30

/201

8Fi

scal

Yea

rA

djus

ted

Bud

get

9/30

/201

7Y

ear-

To-D

ate

Act

ual

6/30

/201

8Fi

scal

Yea

rV

aria

nce

6/30

/201

8Fi

scal

Yea

rP

ct o

f Bud

get

Fund

365

2 --

Mon

teci

to F

ire C

ap O

utla

y R

es

Cou

nty

of S

anta

Bar

bara

, FIN

Last

Upd

ated

: 10

/12/

2017

5:2

2 A

MP

age

6 of

7

Reg Pg. 45

October 23, 2017

Page 46: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Rev

enue

sU

se o

f Mon

ey a

nd P

rope

rty33

80 --

Inte

rest

Inco

me

15,0

00.0

013

,326

.56

-1,6

73.4

488

.84

%33

81 --

Unr

ealiz

ed G

ain/

Loss

Invs

tmnt

s0.

00-1

,088

.60

-1,0

88.6

0--

Use

of M

oney

and

Pro

perty

15,0

00.0

012

,237

.96

-2,7

62.0

481

.59

%

Rev

enue

s15

,000

.00

12,2

37.9

6-2

,762

.04

81.5

9 %

Exp

endi

ture

sC

apita

l Ass

ets

8100

-- L

and

200,

000.

0094

5.00

199,

055.

000.

47 %

Cap

ital A

sset

s20

0,00

0.00

945.

0019

9,05

5.00

0.47

%

Exp

endi

ture

s20

0,00

0.00

945.

0019

9,05

5.00

0.47

%

Mon

teci

to F

ire L

and

& B

uild

ing

-185

,000

.00

11,2

92.9

619

6,29

2.96

-6.1

0 %

Net

Fin

anci

al Im

pact

-1,2

57,0

90.0

0-5

,239

,901

.48

-3,9

82,8

11.4

841

6.83

%

Fina

ncia

l Sta

tus

As

of: 9

/30/

2017

(25%

Ela

psed

)A

ccou

ntin

g P

erio

d: C

LOS

ED

Sel

ectio

n C

riter

ia: F

und

= 36

50-3

653

Layo

ut O

ptio

ns: S

umm

ariz

ed B

y =

Fund

, Lin

eIte

mA

ccou

nt; P

age

Bre

ak A

t = F

und

Line

Item

Acc

ount

6/30

/201

8Fi

scal

Yea

rA

djus

ted

Bud

get

9/30

/201

7Y

ear-

To-D

ate

Act

ual

6/30

/201

8Fi

scal

Yea

rV

aria

nce

6/30

/201

8Fi

scal

Yea

rP

ct o

f Bud

get

Fund

365

3 --

Mon

teci

to F

ire L

and

& B

uild

ing

Cou

nty

of S

anta

Bar

bara

, FIN

Last

Upd

ated

: 10

/12/

2017

5:2

2 A

MP

age

7 of

7

Reg Pg. 46

October 23, 2017

Page 47: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Rev

enue

sTa

xes

3010

-- P

rope

rty T

ax-C

urre

nt S

ecur

ed22

,257

.20

0.00

0.00

3011

-- P

rope

rty T

ax-U

nita

ry0.

000.

000.

0030

15 --

PT

PY

Cor

r/Esc

apes

Sec

ured

-486

.36

0.00

0.00

3020

-- P

rope

rty T

ax-C

urre

nt U

nsec

d-2

97.8

80.

000.

0030

40 --

Pro

perty

Tax

-Prio

r Sec

ured

119.

310.

000.

0030

50 --

Pro

perty

Tax

-Prio

r Uns

ecur

ed56

.05

0.00

0.00

3054

-- S

uppl

emen

tal P

ty T

ax-C

urre

nt0.

000.

000.

00

Taxe

s21

,648

.32

0.00

0.00

Use

of M

oney

and

Pro

perty

3380

-- In

tere

st In

com

e2,

146.

515,

631.

249,

653.

9133

81 --

Unr

ealiz

ed G

ain/

Loss

Invs

tmnt

s-2

,865

.52

-15,

213.

062,

464.

4234

09 --

Oth

er R

enta

l of B

ldgs

and

Lan

d0.

000.

000.

00

Use

of M

oney

and

Pro

perty

-719

.01

-9,5

81.8

212

,118

.33

Inte

rgov

ernm

enta

l Rev

enue

-Sta

te37

50 --

Sta

te-E

mer

genc

y A

ssis

tanc

e0.

000.

000.

0042

20 --

Hom

eow

ners

Pro

perty

Tax

Rel

ief

0.00

0.00

0.00

Inte

rgov

ernm

enta

l Rev

enue

-Sta

te0.

000.

000.

00

Inte

rgov

ernm

enta

l Rev

enue

-Fed

eral

4476

-- F

eder

al E

mer

genc

y A

ssis

tanc

e0.

0019

6,85

2.67

0.00

Inte

rgov

ernm

enta

l Rev

enue

-Fed

eral

0.00

196,

852.

670.

00

Cha

rges

for S

ervi

ces

5105

-- R

eim

b fo

r Dis

trict

Ser

vice

s21

,714

.39

21,9

08.7

422

,324

.65

Cha

rges

for S

ervi

ces

21,7

14.3

921

,908

.74

22,3

24.6

5

Fina

ncia

l Tre

ndA

s of

: 9/3

0/20

17A

ccou

ntin

g P

erio

d: C

LOS

ED

Sel

ectio

n C

riter

ia: F

und

= 36

50

Layo

ut O

ptio

ns: S

umm

ariz

ed B

y =

Fund

, Lin

eIte

mA

ccou

nt; P

age

Bre

ak A

t = F

und;

Col

umns

= 3

yr

Line

Item

Acc

ount

9/30

/201

5Y

ear-

To-D

ate

Act

ual

9/30

/201

6Y

ear-

To-D

ate

Act

ual

9/30

/201

7Y

ear-

To-D

ate

Act

ual

Fund

365

0 --

Mon

teci

to F

ire P

rote

ctio

n D

ist

Cou

nty

of S

anta

Bar

bara

, FIN

Last

Upd

ated

: 10

/12/

2017

5:2

2 A

MP

age

1 of

4

Reg Pg. 47

October 23, 2017

Page 48: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Mis

cella

neou

s R

even

ue59

09 --

Oth

er M

isce

llane

ous

Rev

enue

0.00

468.

556,

085.

46

Mis

cella

neou

s R

even

ue0.

0046

8.55

6,08

5.46

Rev

enue

s42

,643

.70

209,

648.

1440

,528

.44

Exp

endi

ture

sS

alar

ies

and

Em

ploy

ee B

enef

its61

00 --

Reg

ular

Sal

arie

s1,

331,

235.

811,

747,

357.

401,

806,

450.

2363

00 --

Ove

rtim

e-4

7,37

9.51

9,87

4.54

6,56

8.54

6301

-- O

verti

me

- Rei

mbu

rsab

le57

2,58

6.00

664,

796.

3473

4,64

5.76

6310

-- O

verti

me

- Con

stan

t Sta

ffing

106,

703.

3112

5,89

6.35

145,

261.

4464

00 --

Ret

irem

ent C

ontri

butio

n85

6,54

8.23

967,

926.

231,

121,

452.

6164

50 --

Sup

p R

etire

men

t Con

tribu

tion

0.00

0.00

0.00

6475

-- R

etire

e M

edic

al O

PE

B82

3,47

8.00

0.00

0.00

6550

-- F

ICA

/Med

icar

e26

,673

.48

36,5

30.8

039

,091

.34

6600

-- H

ealth

Insu

ranc

e C

ontri

b43

8,22

3.72

511,

457.

0642

8,92

5.24

6700

-- U

nem

ploy

men

t Ins

Con

tribu

tion

118.

0529

3.64

194.

5969

00 --

Wor

kers

Com

pens

atio

n51

4,79

7.43

510,

375.

4263

6,07

1.90

Sal

arie

s an

d E

mpl

oyee

Ben

efits

4,62

2,98

4.52

4,57

4,50

7.78

4,91

8,66

1.65

Ser

vice

s an

d S

uppl

ies

7030

-- C

loth

ing

and

Per

sona

l32

2.98

35,9

53.6

58,

855.

8370

50 --

Com

mun

icat

ions

19,7

05.3

617

,015

.41

28,5

33.8

870

60 --

Foo

d0.

00-2

11.9

418

5.10

7070

-- H

ouse

hold

Sup

plie

s6,

345.

806,

239.

504,

829.

4870

90 --

Insu

ranc

e27

,333

.00

25,6

61.9

326

,537

.00

7120

-- E

quip

men

t Mai

nten

ance

1,53

3.70

2,33

5.57

1,66

1.45

7200

-- S

truct

ure

& G

roun

d M

aint

enan

ce5,

595.

845,

346.

364,

079.

43

Fina

ncia

l Tre

ndA

s of

: 9/3

0/20

17A

ccou

ntin

g P

erio

d: C

LOS

ED

Sel

ectio

n C

riter

ia: F

und

= 36

50

Layo

ut O

ptio

ns: S

umm

ariz

ed B

y =

Fund

, Lin

eIte

mA

ccou

nt; P

age

Bre

ak A

t = F

und;

Col

umns

= 3

yr

Line

Item

Acc

ount

9/30

/201

5Y

ear-

To-D

ate

Act

ual

9/30

/201

6Y

ear-

To-D

ate

Act

ual

9/30

/201

7Y

ear-

To-D

ate

Act

ual

Fund

365

0 --

Mon

teci

to F

ire P

rote

ctio

n D

ist

Cou

nty

of S

anta

Bar

bara

, FIN

Last

Upd

ated

: 10

/12/

2017

5:2

2 A

MP

age

2 of

4

Reg Pg. 48

October 23, 2017

agil
Text Box
10
Page 49: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

7205

-- F

ire D

efen

se Z

one

8,87

5.00

8,70

2.05

31,5

65.0

073

22 --

Con

sulti

ng &

Mgm

t Fee

s0.

000.

000.

0073

24 --

Aud

it an

d A

ccou

ntin

g Fe

es0.

003,

400.

753,

990.

2573

48 --

Inst

rum

ents

& E

quip

. < $

5000

-115

.70

0.00

5,33

9.07

7363

-- E

quip

men

t Mai

nten

ance

12,7

76.1

413

,177

.64

13,6

45.4

774

00 --

Med

ical

, Den

tal a

nd L

ab10

,031

.94

16,2

24.6

410

,304

.73

7430

-- M

embe

rshi

ps6,

469.

961,

735.

001,

390.

0074

50 --

Offi

ce E

xpen

se2,

506.

843,

099.

044,

980.

0174

60 --

Pro

fess

iona

l & S

peci

al S

ervi

ce38

,676

.17

41,2

56.7

558

,667

.45

7507

-- A

DP

Pay

roll

Fees

1,49

9.23

1,54

8.81

1,55

0.75

7510

-- C

ontra

ctua

l Ser

vice

s21

,367

.46

24,3

58.4

525

,650

.62

7530

-- P

ublic

atio

ns &

Leg

al N

otic

es1,

277.

622,

951.

562,

549.

8475

46 --

Adm

inis

trativ

e E

xpen

se0.

000.

000.

0075

80 --

Ren

ts/L

ease

s-S

truct

ure

911.

5591

9.92

0.00

7630

-- S

mal

l Too

ls &

Inst

rum

ents

1,66

1.79

2,89

4.85

10,8

98.8

776

50 --

Spe

cial

Dep

artm

enta

l Exp

ense

10,9

43.9

311

,754

.12

13,9

15.8

376

71 --

Spe

cial

Pro

ject

s93

8.75

2,27

0.69

0.00

7730

-- T

rans

porta

tion

and

Trav

el2,

546.

043,

885.

464,

313.

3477

31 --

Gas

olin

e-O

il-Fu

el10

,209

.32

6,85

4.70

8,62

5.06

7732

-- T

rain

ing

3,52

8.84

5,46

5.97

6,39

9.70

7760

-- U

tiliti

es8,

682.

738,

902.

519,

591.

67

Ser

vice

s an

d S

uppl

ies

203,

624.

2925

1,74

3.39

288,

059.

83

Oth

er C

harg

es78

60 --

Con

trib

To O

ther

Age

ncie

s0.

000.

000.

00

Oth

er C

harg

es0.

000.

000.

00

Cap

ital A

sset

s83

00 --

Equ

ipm

ent

0.00

30,4

37.1

739

,018

.13

Fina

ncia

l Tre

ndA

s of

: 9/3

0/20

17A

ccou

ntin

g P

erio

d: C

LOS

ED

Sel

ectio

n C

riter

ia: F

und

= 36

50

Layo

ut O

ptio

ns: S

umm

ariz

ed B

y =

Fund

, Lin

eIte

mA

ccou

nt; P

age

Bre

ak A

t = F

und;

Col

umns

= 3

yr

Line

Item

Acc

ount

9/30

/201

5Y

ear-

To-D

ate

Act

ual

9/30

/201

6Y

ear-

To-D

ate

Act

ual

9/30

/201

7Y

ear-

To-D

ate

Act

ual

Fund

365

0 --

Mon

teci

to F

ire P

rote

ctio

n D

ist

Cou

nty

of S

anta

Bar

bara

, FIN

Last

Upd

ated

: 10

/12/

2017

5:2

2 A

MP

age

3 of

4

Reg Pg. 49

October 23, 2017

Page 50: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Cap

ital A

sset

s0.

0030

,437

.17

39,0

18.1

3

Exp

endi

ture

s4,

826,

608.

814,

856,

688.

345,

245,

739.

61

Oth

er F

inan

cing

Sou

rces

& U

ses

Oth

er F

inan

cing

Sou

rces

5910

-- O

per T

rf (In

)-G

ener

al F

und

0.00

0.00

0.00

Oth

er F

inan

cing

Sou

rces

0.00

0.00

0.00

Oth

er F

inan

cing

Use

s79

01 --

Ope

r Trf

(Out

)39

2,81

2.00

406,

068.

0015

5,00

0.00

Oth

er F

inan

cing

Use

s39

2,81

2.00

406,

068.

0015

5,00

0.00

Oth

er F

inan

cing

Sou

rces

& U

ses

-392

,812

.00

-406

,068

.00

-155

,000

.00

Cha

nges

to F

und

Bal

ance

sD

ecre

ase

to R

estri

cted

9797

-- U

nrea

lized

Gai

ns2,

865.

5215

,213

.06

0.00

Dec

reas

e to

Res

trict

ed2,

865.

5215

,213

.06

0.00

Incr

ease

to R

estri

cted

9797

-- U

nrea

lized

Gai

ns0.

000.

000.

00

Incr

ease

to R

estri

cted

0.00

0.00

0.00

Cha

nges

to F

und

Bal

ance

s2,

865.

5215

,213

.06

0.00

Mon

teci

to F

ire P

rote

ctio

n D

ist

-5,1

73,9

11.5

9-5

,037

,895

.14

-5,3

60,2

11.1

7

Net

Fin

anci

al Im

pact

-5,1

73,9

11.5

9-5

,037

,895

.14

-5,3

60,2

11.1

7

Fina

ncia

l Tre

ndA

s of

: 9/3

0/20

17A

ccou

ntin

g P

erio

d: C

LOS

ED

Sel

ectio

n C

riter

ia: F

und

= 36

50

Layo

ut O

ptio

ns: S

umm

ariz

ed B

y =

Fund

, Lin

eIte

mA

ccou

nt; P

age

Bre

ak A

t = F

und;

Col

umns

= 3

yr

Line

Item

Acc

ount

9/30

/201

5Y

ear-

To-D

ate

Act

ual

9/30

/201

6Y

ear-

To-D

ate

Act

ual

9/30

/201

7Y

ear-

To-D

ate

Act

ual

Fund

365

0 --

Mon

teci

to F

ire P

rote

ctio

n D

ist

Cou

nty

of S

anta

Bar

bara

, FIN

Last

Upd

ated

: 10

/12/

2017

5:2

2 A

MP

age

4 of

4

Reg Pg. 50

October 23, 2017

Page 51: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Exp

endi

ture

sS

alar

ies

and

Em

ploy

ee B

enef

its61

00 --

Reg

ular

Sal

arie

s33

5,30

7.78

627,

951.

5386

9,67

8.69

265,

057.

7062

4,73

8.63

916,

653.

9063

00 --

Ove

rtim

e26

,196

.91

8,70

5.82

14,9

73.9

761

2.46

474.

845,

481.

2463

01 --

Ove

rtim

e - R

eim

burs

able

0.00

0.00

27,4

15.9

841

,984

.70

395,

230.

6829

7,43

0.38

6310

-- O

verti

me

- Con

stan

t Sta

ffing

90,6

52.3

425

,308

.58

127,

057.

5534

,151

.60

41,8

40.1

769

,269

.67

6400

-- R

etire

men

t Con

tribu

tion

61,1

72.1

212

2,35

2.85

178,

754.

3483

5,38

8.00

171,

949.

5411

4,11

5.07

6450

-- S

upp

Ret

irem

ent C

ontri

butio

n0.

000.

001,

200,

000.

000.

000.

000.

0065

50 --

FIC

A/M

edic

are

-114

,287

.24

9,28

4.42

14,7

43.4

55,

328.

0614

,861

.01

18,9

02.2

766

00 --

Hea

lth In

sura

nce

Con

trib

143,

239.

8314

3,81

8.84

18,1

61.8

114

2,92

1.94

142,

777.

7414

3,22

5.56

6700

-- U

nem

ploy

men

t Ins

Con

tribu

tion

0.56

68.3

125

4.32

0.00

67.5

312

7.06

6900

-- W

orke

rs C

ompe

nsat

ion

0.00

-9,3

28.8

5-2

,994

.64

591,

947.

360.

0044

,124

.54

Tota

l Sal

arie

s an

d E

mpl

oyee

Ben

efits

542,

282.

3092

8,16

1.50

2,44

8,04

5.47

1,91

7,39

1.82

1,39

1,94

0.14

1,60

9,32

9.69

Ser

vice

s an

d S

uppl

ies

7030

-- C

loth

ing

and

Per

sona

l15

,871

.30

1,04

8.00

16,5

94.4

622

4.73

6,06

2.88

2,56

8.22

7050

-- C

omm

unic

atio

ns6,

271.

136,

431.

5933

,473

.79

8,07

4.14

11,0

68.5

89,

391.

1670

60 --

Foo

d74

7.62

52.7

283

.38

0.00

0.00

185.

1070

70 --

Hou

seho

ld S

uppl

ies

7,80

5.23

2,19

4.32

3,92

5.30

896.

552,

731.

241,

201.

6970

90 --

Insu

ranc

e0.

000.

000.

0026

,537

.00

0.00

0.00

7120

-- E

quip

men

t Mai

nten

ance

693.

004,

098.

312,

908.

03-3

.31

1,38

8.10

276.

6672

00 --

Stru

ctur

e &

Gro

und

Mai

nten

ance

7,90

1.25

1,37

8.00

3,48

7.60

550.

002,

091.

071,

438.

3672

05 --

Fire

Def

ense

Zon

e39

,281

.96

85,3

05.7

155

,797

.36

11,5

75.0

00.

0019

,990

.00

7322

-- C

onsu

lting

& M

gmt F

ees

798.

900.

0082

2.90

0.00

0.00

0.00

7324

-- A

udit

and

Acc

ount

ing

Fees

3,40

0.75

797.

000.

000.

000.

003,

990.

2573

48 --

Inst

rum

ents

& E

quip

. < $

5000

110.

157,

843.

3849

,113

.82

1,90

0.53

2,86

0.76

577.

7873

63 --

Equ

ipm

ent M

aint

enan

ce15

,447

.02

2,53

7.71

14,7

66.2

886

2.94

8,13

3.87

4,64

8.66

7400

-- M

edic

al, D

enta

l and

Lab

879.

892,

979.

231,

966.

441,

160.

022,

139.

327,

005.

3974

30 --

Mem

bers

hips

-100

.00

350.

000.

0084

0.00

100.

0045

0.00

Exp

endi

ture

Tre

ndA

s of

: 9/3

0/20

17A

ccou

ntin

g P

erio

d: C

LOS

ED

Sel

ectio

n C

riter

ia: F

und

= 36

50

Layo

ut O

ptio

ns: S

umm

ariz

ed B

y =

Fund

, Lin

eIte

mA

ccou

nt; P

age

Bre

ak A

t = F

und;

Col

umns

= 6

mo,

MTD

Act

ual

Line

Item

Acc

ount

4/30

/201

7M

onth

-To-

Dat

eA

ctua

l

5/31

/201

7M

onth

-To-

Dat

eA

ctua

l

6/30

/201

7M

onth

-To-

Dat

eA

ctua

l

7/31

/201

7M

onth

-To-

Dat

eA

ctua

l

8/31

/201

7M

onth

-To-

Dat

eA

ctua

l

9/30

/201

7M

onth

-To-

Dat

eA

ctua

l

Fund

365

0 --

Mon

teci

to F

ire P

rote

ctio

n D

ist

Cou

nty

of S

anta

Bar

bara

, FIN

Last

Upd

ated

: 10

/12/

2017

5:2

2 A

MP

age

1 of

3

Reg Pg. 51

October 23, 2017

agil
Text Box
12
agil
Text Box
7
agil
Text Box
13
Page 52: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

7450

-- O

ffice

Exp

ense

1,52

2.63

1,72

4.69

5,56

6.75

809.

442,

031.

592,

138.

9874

60 --

Pro

fess

iona

l & S

peci

al S

ervi

ce47

,072

.75

22,3

41.7

045

,052

.00

7,79

7.93

39,9

17.5

010

,952

.02

7507

-- A

DP

Pay

roll

Fees

473.

5150

3.21

483.

9851

4.11

299.

5673

7.08

7510

-- C

ontra

ctua

l Ser

vice

s2,

583.

9313

6.88

7,71

3.65

22,6

77.1

62,

949.

5223

.94

7530

-- P

ublic

atio

ns &

Leg

al N

otic

es68

7.50

0.00

0.00

2,45

0.00

99.8

40.

0075

46 --

Adm

inis

trativ

e E

xpen

se23

8,34

6.00

0.00

0.00

0.00

0.00

0.00

7580

-- R

ents

/Lea

ses-

Stru

ctur

e93

8.52

0.00

0.00

0.00

0.00

0.00

7630

-- S

mal

l Too

ls &

Inst

rum

ents

1,51

3.38

3,14

8.36

4,84

2.98

301.

690.

0010

,597

.18

7650

-- S

peci

al D

epar

tmen

tal E

xpen

se1,

211.

400.

0011

,046

.11

13,9

15.8

30.

000.

0076

71 --

Spe

cial

Pro

ject

s0.

000.

007,

675.

820.

000.

000.

0077

30 --

Tra

nspo

rtatio

n an

d Tr

avel

524.

3210

,398

.85

3,86

5.71

359.

0091

9.80

3,03

4.54

7731

-- G

asol

ine-

Oil-

Fuel

4,60

5.26

1,02

2.17

10,7

71.8

716

.41

5,55

8.06

3,05

0.59

7732

-- T

rain

ing

5,66

8.94

20,0

20.8

214

,903

.40

154.

6820

0.00

6,04

5.02

7760

-- U

tiliti

es2,

506.

152,

420.

342,

779.

303,

135.

073,

251.

523,

205.

08

Tota

l Ser

vice

s an

d S

uppl

ies

406,

762.

4917

6,73

2.99

297,

640.

9310

4,74

8.92

91,8

03.2

191

,507

.70

Cap

ital A

sset

s83

00 --

Equ

ipm

ent

17,6

08.5

771

,482

.42

174,

934.

58-6

,478

.45

0.00

45,4

96.5

8

Tota

l Cap

ital A

sset

s17

,608

.57

71,4

82.4

217

4,93

4.58

-6,4

78.4

50.

0045

,496

.58

Tota

l Exp

endi

ture

s96

6,65

3.36

1,17

6,37

6.91

2,92

0,62

0.98

2,01

5,66

2.29

1,48

3,74

3.35

1,74

6,33

3.97

Oth

er F

inan

cing

Sou

rces

& U

ses

Oth

er F

inan

cing

Use

s79

01 --

Ope

r Trf

(Out

)0.

000.

001,

186,

000.

0015

5,00

0.00

0.00

0.00

Tota

l Oth

er F

inan

cing

Use

s0.

000.

001,

186,

000.

0015

5,00

0.00

0.00

0.00

Tota

l Oth

er F

inan

cing

Sou

rces

& U

ses

0.00

0.00

1,18

6,00

0.00

155,

000.

000.

000.

00

Exp

endi

ture

Tre

ndA

s of

: 9/3

0/20

17A

ccou

ntin

g P

erio

d: C

LOS

ED

Sel

ectio

n C

riter

ia: F

und

= 36

50

Layo

ut O

ptio

ns: S

umm

ariz

ed B

y =

Fund

, Lin

eIte

mA

ccou

nt; P

age

Bre

ak A

t = F

und;

Col

umns

= 6

mo,

MTD

Act

ual

Line

Item

Acc

ount

4/30

/201

7M

onth

-To-

Dat

eA

ctua

l

5/31

/201

7M

onth

-To-

Dat

eA

ctua

l

6/30

/201

7M

onth

-To-

Dat

eA

ctua

l

7/31

/201

7M

onth

-To-

Dat

eA

ctua

l

8/31

/201

7M

onth

-To-

Dat

eA

ctua

l

9/30

/201

7M

onth

-To-

Dat

eA

ctua

l

Fund

365

0 --

Mon

teci

to F

ire P

rote

ctio

n D

ist

Cou

nty

of S

anta

Bar

bara

, FIN

Last

Upd

ated

: 10

/12/

2017

5:2

2 A

MP

age

2 of

3

Reg Pg. 52

October 23, 2017

Page 53: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Cha

nges

to F

und

Bal

ance

sC

hang

es to

Non

spen

dabl

e96

02 --

Rec

eiva

bles

0.00

0.00

127,

510.

000.

000.

000.

00

Tota

l Cha

nges

to N

onsp

enda

ble

0.00

0.00

127,

510.

000.

000.

000.

00

Tota

l Cha

nges

to F

und

Bal

ance

s0.

000.

0012

7,51

0.00

0.00

0.00

0.00

Tota

l Mon

teci

to F

ire P

rote

ctio

n D

ist

966,

653.

361,

176,

376.

914,

234,

130.

982,

170,

662.

291,

483,

743.

351,

746,

333.

97

Tota

l Rep

ort

966,

653.

361,

176,

376.

914,

234,

130.

982,

170,

662.

291,

483,

743.

351,

746,

333.

97

Exp

endi

ture

Tre

ndA

s of

: 9/3

0/20

17A

ccou

ntin

g P

erio

d: C

LOS

ED

Sel

ectio

n C

riter

ia: F

und

= 36

50

Layo

ut O

ptio

ns: S

umm

ariz

ed B

y =

Fund

, Lin

eIte

mA

ccou

nt; P

age

Bre

ak A

t = F

und;

Col

umns

= 6

mo,

MTD

Act

ual

Line

Item

Acc

ount

4/30

/201

7M

onth

-To-

Dat

eA

ctua

l

5/31

/201

7M

onth

-To-

Dat

eA

ctua

l

6/30

/201

7M

onth

-To-

Dat

eA

ctua

l

7/31

/201

7M

onth

-To-

Dat

eA

ctua

l

8/31

/201

7M

onth

-To-

Dat

eA

ctua

l

9/30

/201

7M

onth

-To-

Dat

eA

ctua

l

Fund

365

0 --

Mon

teci

to F

ire P

rote

ctio

n D

ist

Cou

nty

of S

anta

Bar

bara

, FIN

Last

Upd

ated

: 10

/12/

2017

5:2

2 A

MP

age

3 of

3

Reg Pg. 53

October 23, 2017

Page 54: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

MSM

August 14, 2017

142695File:

Billing Attorney:

Montecito Fire Protection District595 San Ysidro RoadSanta Barbara, CA 93108 12611

Invoice #:

TAX ID # 95-1782877

Counsellors at Law

Santa Barbara, CA 93102-0099

(805) 962-0011

P.O. Box 99

* * * * * * * * * * * * * * * * * * * *

ACCOUNT SUMMARY BALANCE

12611-00000General Matters $1,308.00RE:

Our File Number:

12611-00022Ordinances $283.50RE:

Our File Number:

12611-00059Station Three $945.00RE:

Our File Number:

12611-00061Board Mtgs $1,102.50RE:

Our File Number:

$3,639.00Total Current Fees & Costs

Current Disbursements

SUMMARY OF CURRENT BILLING

$4,843.50

Current Fees$0.00

Previous BalancePayments - Thank You

$0.00

$4,843.50

Total Current Fees & Costs $3,639.00

TOTAL PAST DUE

SUMMARY OF PAST DUE BALANCES

$3,639.00

$3,639.00TOTAL BALANCE DUE

Reg Pg. 54

October 23, 2017

agil
Text Box
- Fund 3653
agil
Text Box
- Fund 3653 - Fund 3650
agil
Text Box
- 945.00 2,694.00
Page 55: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 55

October 23, 2017

Page 56: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 56

October 23, 2017

Page 57: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 57

October 23, 2017

Page 58: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 58

October 23, 2017

Page 59: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 59

October 23, 2017

Page 60: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 60

October 23, 2017

Page 61: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 61

October 23, 2017

Page 62: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 62

October 23, 2017

Page 63: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Agenda Item #7

Reg Pg. 63

October 23, 2017

Page 64: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 64

October 23, 2017

Page 65: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

MONTECITO FIRE PROTECTION DISTRICTPARS Post-Employment Benefits Trust

OPEB Account

MonthBeginning Balance Contributions Earnings Expenses

Ending Balance 1-M %

August 2016 9,523,447.66 - 45,572.47 1,984.05 9,567,036.08 0.48%

September 2016 9,567,036.08 - 42,304.49 5,846.57 9,603,494.00 0.44%

October 2016 9,603,494.00 - (119,882.18) 2,000.73 9,481,611.09 -1.25%

November 2016 9,481,611.09 - 96,928.53 3,978.27 9,574,561.35 1.02%

December 2016 9,574,561.35 - 78,934.58 4,002.15 9,649,493.78 0.82%

January 2017 9,649,493.78 - 170,422.28 1,994.70 9,817,921.36 1.77%

February 2017 9,817,921.36 - 196,673.48 6,405.78 10,008,189.06 2.00%

March 2017 10,008,189.06 - 52,657.52 4,181.44 10,056,665.14 0.53%

April 2017 10,056,665.14 - 133,186.49 2,092.78 10,187,758.85 1.32%

May 2017 10,187,758.85 - 135,159.82 8,607.04 10,314,311.63 1.33%

June 2017 (Old) 10,314,311.63 (10,314,311.63) 62,087.81 4,354.66 57,733.15

June 2017 (New) - 10,314,311.63 239.08 - 10,314,550.71

July 2017 (Old) 57,733.15 (57,733.15) 865.84 2,262.49 (1,396.65)

July 2017 (New) 10,314,550.71 57,733.15 165,876.16 2,092.33 10,536,067.69

Total 10,372,283.86 - 1,061,026.37 49,802.99 10,534,671.04

Pension Account

MonthBeginning Balance Contributions Earnings Expenses

Ending Balance 1-M %

June 2017 - 1,200,000.00 26.44 - 1,200,026.44

July 2017 1,200,026.44 - 3,816.98 243.43 1,203,599.99 0.32%

Total 1,200,000.00 3,843.42 243.43 -

Reg Pg. 65

October 23, 2017

Page 66: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 66

October 23, 2017

Page 67: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 67

October 23, 2017

Page 68: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 68

October 23, 2017

Page 69: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 69

October 23, 2017

Page 70: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 70

October 23, 2017

Page 71: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 71

October 23, 2017

Page 72: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 72

October 23, 2017

Page 73: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Agenda Item #8

Reg Pg. 73

October 23, 2017

Page 74: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 74

October 23, 2017

Page 75: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

MINUTES OF THE REGULAR MEETING OF THE BOARD OF DIRECTORS OF THE

MONTECITO FIRE PROTECTION DISTRICT

Held at Fire District Headquarters, 595 San Ysidro Road September 25, 2017 at 2:00 p.m.

Director van Duinwyk called the meeting to order at 2:00 p.m.

Present: Director van Duinwyk, Director Easton, Director Powell, Director

Venable. Chief Hickman and District Counsel Mark Manion were also present.

Absent: Director Lee

1. Public comment: Any person may address the Board at this time on any non-agenda

matter that is within the subject matter jurisdiction of the Montecito Fire Protection

District. (30 minutes total time allotted for this discussion.)

There were no public comments at this meeting.

2. Time Certain, 2:00 p.m. – Receive presentation from Jeff Small, Managing Partner of

Capitol Public Finance Group (Capitol PFG), regarding memorandum on Funding

Pension and Other Post-Employment Benefits. (Strategic Plan Goal 9.1)

Jeff Small, Managing Partner of Capitol PFG provided a power point presentation

regarding memorandum on Funding Pension and Other Post-Employment Benefits. The

Board took a break at 3:04 p.m. The Board reconvened at 3:15 p.m.

3. Discussion item: Review initiatives 1, 2 and 3 of the Public Information and Education

Project. (Strategic Plan Goal 10.1)

Chief Hickman provided a review of the completed initiatives of the Public Information

and Education Project.

4. Consider recommendation for approval of Resolution 2017-06, Adoption of the Final

Budget for the Fiscal Year 2017-18. (Strategic Plan Goal 9.1)

5. Motion made by Director Easton , seconded by Director Powell to approve Resolution

2017-06, Adoption of the Final Budget for the Fiscal Year 2017-18. The Resolution was

amended to remove the $860,000 transfer to Fund 3653 and reallocate the amount to

additional retirement contributions. The Roll Call Vote was as follows:

Ayes: J. Venable, P. van Duinwyk, J. A. Powell, S. Easton

Nays: None

Abstain: None

Absent: M. Lee

Reg Pg. 75

October 23, 2017

Page 76: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

6. Consider recommendation for approval of the Annual Employee Reimbursement

Disclosure report. (Strategic Plan Goal 9.1)

Chief Hickman provided information regarding the Annual Employee Reimbursement

Disclosure report. Motion made by Director van Duinwyk, seconded by Director Easton

and passed unanimously to approve the Annual Employee Reimbursement Disclosure

report.

7. Discussion item: Fire Danger Signs. (Strategic Plan Goal 3.3)

Chief Hickman provided background information regarding current fire danger signs

throughout the District. After thorough discussion, the Board appointed Directors Easton

and Venable to work as an Ad-Hoc committee to further research the possibility of placing

additional signs throughout the District. The Chief recommended that the committee invite

the Montecito Association to be part of the discussion.

8. Approval of Minutes of the August 28, 2017 Regular Meeting.

9. Motion to approve the minutes of the August 28, 2017 Regular Meeting made by Director

Powell, seconded by Director Venable and unanimously passed.

10. Fire Chief’s report.

Chief Hickman responded to an inquiry made by Director Powell last meeting regarding

the impact of ADU’s and the Standards of Cover. The Chief stated that the Prevention

Bureau contacted the County regarding the number of ADU’s that are within the District.

He indicated that to date, there have been 22 approved, with one currently pending. He

noted that the Bureau is averaging two applications per week, and he did not foresee any

negative impact to the Standards of Cover.

11. Board of Director’s report.

Director Venable mentioned the MERRAG 30 year anniversary event.

12. Suggestions from Directors for items other than regular agenda items to be included

for the October 23, 2017 Regular Board meeting.

Director Easton stated that the committee would provide a report regarding the fire danger

signs. The Board also requested an agenda item to discuss the distribution of the $860,000

contribution to CalPERS as part of Capitol PFG’s recommendation.

The Meeting Adjourned at 4:15 p.m.

________________________ ________________________

President Peter van Duinwyk Secretary John Venable

Reg Pg. 76

October 23, 2017

Page 77: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Agenda Item #9

Reg Pg. 77

October 23, 2017

Page 78: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 78

October 23, 2017

Page 79: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 79

October 23, 2017

Page 80: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

Reg Pg. 80

October 23, 2017

Page 81: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

SEPTEMBER 2017 CALLS BY INCIDENT TYPE TOTAL INCIDENTS:  138 

           FIRE:  6    EMS: 62           HAZARDOUS CONDITION:   10                PUBLIC SERVICE**:  12 

                    FALSE ALARM:  12    GOOD INTENT*:  35              SEVERE WEATHER:  0    SPECIAL INCIDENT TYPES: 1                                               

     

              *Good Intent: Firefighters respond to a reported emergency, but find a different type of incident or nothing at all upon arrival to the area.  Example: A caller reports smoke on the hillside. Firefighters arrive to discover a grading operation at a construction site is creating dust mistaken for smoke. Dispatched and Cancelled Enroute falls in this category. ** Public Service: Non‐emergency requests for assistance. Examples: lock out, animal rescue, ring removal, water problem; lift assists, seized gate, stalled elevator, providing the Sheriff’s Department with a ladder to enter a building.  

 

Fire4%

EMS45%

Hazardous Condition7%

Public Service9%

Good Intent25%

False Alarm9%

Special Incident Type1%

SEPTEMBER 2017 INCIDENT TYPES

Reg Pg. 81

October 23, 2017

Page 82: AGENDA FOR THE REGULAR MEETING OF THE BOARD OF … › siteninja › multitenant › ...Sealed Bid Opening - ITB# 2017-001 Removal & Replacement of Roof Underlayment System Fire Station

 

0

20

40

60

80

100

120

140

160

Fire

Overpressure,

Explosion

EMS

Haz. Condition

Service

Good Intent

False Alarm

Severe W

eather

Special Inciden

tTo

tal

April ‐September 2017 In

cident Trend

Series1

Series2

Series3

Series4

Series5

Series6

Reg Pg. 82

October 23, 2017


Recommended