AGENDA ITEMS FOR POM TO BE HELD ON 27th & 28th April’20121.0 Targets set for the Year 2012-13 and month-wise action plan to achieve the
same.1.1 It will be our endeavour to make the year 2012-13 accident free.
PCE, CME, COM, CSO and DRMs to prepare action plan for achieving the NIL accident target.CSO should prepare action plan for spreading social awareness amongst road users so that unmanned LC accidents are avoided. PCE and DRMs should prepare action plan for reducing/manning the LCs.
1.2 Punctuality suffers on the account of assets like Signal/Track/Loco failures, Operating reasons. COM, in consultation with PCE. CAO, CSTE and DRMs to prepare action plan for improving the average punctuality of passenger trains. Similarly action plan to be prepared for improving the average speed of goods trains which has not been satisfactory in the year 2011-12.
1.3 CCM and COM to prepare action plan for reducing the terminal detention on this Railway.
1.4 Work has been done in the area of cleanliness – both at stations and on board in originating trains. However a lot is still to be done. CMD to prepare action plan for improving cleanliness at stations as well as on board.
1.5 Due to shortage of funds, proper financial control needs to be exercised to ensure that there is no shortage of funds for targeted activities and unfruitful expenditure is avoided. FA&CAO in consultation with all PHODs, CAO and DRMs, to accordingly divide the fund allotment for the year month-wise and monitor the expenditure accordingly. FA&CAO to prepare an action plan in this regard.
1.6 Efforts have been made to keep OT, TA and NDA under control. FA&CAO to prepare action plan to further reduce the expenditure under these heads.
1.7 PCE, in consultation with COM and CAO, should prepare an action plan for ensuring maximum utilisation of track machines. The plan should also ensure provision of maximum traffic block for planned works.
1.8 CPO and CSO should prepare an action plan for filling up the Safety category vacancies.
1.9 Lot of deficiencies have been noticed during inspection of pantry cars. CME to prepare an action plan for ensuring no deficiencies in pantry cars.
1.10 CME and COM to prepare action plan for improving 10Hr performance over this Railway in the current year.
1.11 Sundry earnings need to be closely monitored. CCM to prepare action plan for improving the sundry earnings during the current year.
1.12 COS in consultation with PCE, CAO and CME to prepare action plan for scrap disposal and monitoring of the achievements on monthly basis.
1.13 FA&CAO to prepare action plan for closing the pending inspection reports, special letters, draft/audit paras, stock sheets cases etc.
1.14 All PHODs and DRMs to prepare action plan for preparing and getting sanctioned completion estimates and closing the physically completed works.
1.15 DRMs to prepare action plan to identify, dismantle the unused lines and dispose the scrap generated.
1.16 CEE to prepare action plan for energy conservation.
2.0 Achievements against the targets for the year 2011-12 indicating position of performance of COPPY (Items discussed during the last divisional review meeting should also be covered).
3.0 Safety Performance:3.1 Position of consequential train accidents as per given proforma: Category-wise
break-up of accidents:
1
3.2 Analysis of derailments for the year 2011-12, Department-wise & Cause-wise as per proforma given below:
Date/ Time
Details/ Location Cause Department
responsible
Staff responsible Status of DA&R
3.3 Time-wise analysis of accident on Unmanned LC
Time Passenger Goods Total00.00-06.00 hrs06.00-12.00 hrs12.00-18.00 hrs18.00-24.00 hrs
3.4 Position of indicative accident as per proforma below:
Items 2007-08 2008-09 2009-10 2010-11 2011-12
SPADBreach of Block Rule
Averted Collision
3.5 Position of Ambush checks on Unmanned LCs & Safety drives. Details of ambush checks done and details of safety drives conducted.
3.6 Status of Mock Drill conducted during the current year as per proforma below:3.7 Position of D&AR cases related to accidents:3.8 (i) Position of manning, closure, provision of lifting barrier & removal of
deficiencies of LCs.(ii) Progress of construction of ROBs/RUBs/Limited Height Subway.
3.9 Position of vulnerable trees on the side of track likely to affect Railway traffic on proforma below:3.10 Deep Screening arrears & Action Plan as per proforma below:
S.No
.
Divn
.
BG/M
G
Sect
ion
UP/D
N
Trac
k St
ruct
ure
Whe
ther
LW
R/SW
R Deepscreening Overdue
Last
don
e in
the
over
due
stre
tch
Avai
labl
e Balla
st
Cush
ion
(mm
)
Action Plan to wipe out the arrears
Betw
een
Stat
ions
Loca
tion
Km
From
Km
To
Tota
l Le
ngth
(Km
)
Clea
n
Cake
d
Total Km3.11 Destressing – arrears and action plan to eliminate - as per proforma below:
LWRs OVERDUE FOR DESTRESSINGAs on 31-03-2012
Divn.
BG
/MG
Sect
ion
Up/
DN
LWR
No.
Trac
k st
ruct
ure Available ballast
cushion (mm)Destressing
last done (Month/Year
Tm Td No. of fractures in the last one
year
Action Plan to
wipe out the arrearsClean Caked Rail Weld
1 2 3 4 5 6 7 8 9 10 11 12 13 14
3.12 Position of vacancy in Safety Category & Action Plan to fill up: 3.13 Updating of SWRs as per proforma below:
As on 31-03-2012
2
Div Section
No. of existin
g SWRs
No. of SWRs updated as per Rly Bd’s
format
Balance to be update
dAction plan for balance
3.14 Progress of Emergency Lights in passenger coaches as per proforma below:As on 31-03-2012
Division Base depot
Coach holding
No. of coaches provided with
emergency lights
No. of defective
ELs
No. of coaches still without ELs
Action Plan to provide the
balance coaches with
EL1 2 3 4 5 6 7
3.15 Details of Pantry Car inspection during the year 2011-12 as per proforma below:Pantry car
no.Inspections done in first quarter of
this year
Inspections done in second quarter of this
year
Inspections done in third quarter of this
year
Major deficiencies
noted and action taken thereof
Officers Supervisors
Officers
Supervisors
Officers
Supervisors
1 2 3 4 5 6 7 8
3.16 Analysis of 10 Hrs performance for the year 2011-12 Mont
hName of the
division
%age of trips
within 10 hrs. “Sign on to Sign off”
%age of
trips within
10 hrs. from wheel move
to stop
%age of trips within 10-12 hrs.
“Sign on to Sign off”
%age of trips within 12-13 hrs.
“Sign on to Sign off”
%age of trips within over 13-14 hrs.
“Sign on to Sign off”
%age of trips within over
13 hrs. “Sign on to Sign off”
Remarks
4.0 Review of punctuality performance & Action Plan to improve it further. 4.1 Analysis of punctuality performance of Mail/Exp. & passenger trains vis-à-vis
target & COPPY. (After implementation of PAM module w.e.f. 01.01.2009) as NER overall
ItemBG MG
Target – 90% Target – 90%2011-12 2010-11 2009-10 2011-12 2010-11 2009-10
Mail/Exp.Passenger
4.2 Causewise analysis for loss of punctuality of trains:Cause BG MG
3
Mail/Express Passenger Mail/Express Passenger2011-12 2011-12 2011-12 2011-12
Trains lost
% of loss Trains lost
% of loss Trains lost
% of loss
Trains lost
% of loss
AccidentAgitationACPBad WeatherC&WCommercialConstructionLocoElectric defectElectric LocoEngineeringOther RailwayIncidentLaw & OrderL/Crossing GateOthersOut of PathRe-Scheduling of trains Run OverS&TTrafficTotal trains lostTotal trains run
4.3 Position of permanent speed restrictions & plan for removal, if any. 4.4 Analysis of asset failure & comparison with COPPY as per the proforma below:
Div.
As on 31.03.2012
2011-12 2010-11 2009-10
Rail Weld
Total Rail Wel
dTota
l Rail Weld
Total
5.0 Freight loading performance of year 2011-12.
5.1 Originating loading performance vis-à-vis target & COPPY as per proforma given below and action plan to achieve the targets for the year 2012-13:
(Figures in million tonnes)
4
Year Board’s Target
Actual Variation
Loading MT %
2003 – 2004 1.602004 – 2005 2.002005-2006 2.002006-2007 2.202007-2008 2.002008-2009 3.752009-2010 2.00
2010-11 1.752011-12
Commodity-wise originating Revenue Loading (Figures in million tonnes)
Sl. No.
Commodity Actual
2010-11
Actual Loading Board’s Target
for 2011-12
%age variation over last
year
%age variation
over Target2010-11 2011- 12
MT % MT %
1 Food grain 0.60 0.51
2 Fertiliser 0.04 0.033 Container 0.08 0.074 Others 0.98 0.64
Break up of othersi Sugar
7i Sugarcane
iii Stone/Sleeper
iv Woodiv Misc.5 TOTAL
5.2 Progress of throughput enhancement works
5
Traffic facility works ( Plan Head 16) throughput enhancement works-
(Rs. in thousand)
S.No
Year of sanction
Description ValueOutlay
for 2011-
12
Expenditure incurr
ed
Throw Forwa
rd
Financial Progress
Physical
Progress
1 2009-10 Gorakhpur-Remodeling of yard 62105 6000 9207 52898
2 2008-09 Kathgodam-Yard remodeling 39100 0 18360
20740
3 2005-06 Provision of 3rd running line at- Kachwa road, Jungiganj, Saidabad, Rajatalab
90047 3000 96319
-6272
4 2007-08 Provision of 3rd running line at- Ahimanpur,Katka, Bhiti, Ramnathpur
91499 5000 75432
16067
52011-12 Provision of 3rd running line at-
Chamaraua12045 300 0 1204
56 2009-10 Conversion into 3 line crossing
stations-Paiteepur, Babupur, Shankerpur ,Ramipur, Tappa Khajuria
196756 15000
4273 192483
7 2009-10 Gautamsthan- 4th addl. running line.
49674 100 9799 39875
8 2009-10 Ballia- 5th addl. running line. 30086 7000 5039 25047
9 2010-11 Allahabad city- Addl. full length running line no. 6
44200 2500 0 44200
10 2006-07 Provision of 3rd running line at- Taron, Dhondadih, Sagarpali
51600 10000
4744 46856
11 2007-08 Provision of 3rd running line at- AnkushpurSahbajkuli, Tajpurdehma
64200 15000
22021
42179
12 2007-08 Provision of 3rd running line at- Lar road,Sadat, Dullahpur
58341 5000 19332
39009
13 2007-08 Nigatpur halt- Conversion into 3 running line crossing station.
52306 5000 18828
33478
14 2003-04 New terminal station at Gomti Nagar
683200 100 440000
243100
15 2008-09 Provision of 3rd running line at- Saraimir, Khurhat
40000 10000
8164 31836
16 2007-08 Manjhi halt- Conversion into 3 running line crossing station.
63555 5000 14078
49477
17 2003-04 Provision MEMU services at ASH,LC & BNZ
88482 3000 62894
25588
18
2000-01 Remodeling of Lucknow Jn. Yard 272590 0 248449
24141
19 2008-09 Provision of 3rd running line at Sarairani
20000 50 2450 17550
20 2006-07 Provision of 3rd running line at Sarayan
32892 100 32792 100
21 2006-07 Provision of 3rd running line at 36000 100 35000 1000
6
Tahsil fatehpur
Patch doubling works (PH-15)- Works in progress (Rs. in lakh)
S.No.
Year of
Sanc.
Name of works
Ant. Cost
Outlay 2011-12
Outlay proposed 12-13
Balance
Progress
Remarks
1 2007-08
Barabanki-Burhwal 29 Kms
15497 7092 7500 905
2 2006-07
Chawkaghat - Ghaghara ghat 5.63 Kms
9655 7558 2000 97
3 1997-98
Sahjanwa -Gorakhpur 17.7 Kms
13499 11498 2000 1
GKP-DMG(6kms).Opened on 23-11-04
4 2006-07
GorakhpurCantt-Baitalpur 34.13 Kms
15444 13443 2000 1
GKC-KHM (10 kms) Opened on 25-2-09 KHM-CC-(11.25 kms) Opened on 10.04-11
5 2006-07
Baitalpur–Bhatni 28,07 Kms
14845 6919 6000 1926
6 2006-07
Bhatni-Ziradei 38.11 Kms
10227 8178 2000 49
BTK-ZRDE (17 kms) Opened on 06-07-2010 BTK-BHTR (8.05 kms) Opened on 21-11-11
7 2007-08
Mau-Indara 8 Kms 6552 1722 2900 1930
100 %
Work completed. Opened on 11-12-2011
8 2011-12
Aunrihar-Manduadih 38 kms
16089 - 1000 15089 -
Plan and detailed estimate are under preparation.
7
5.3 Position of Terminal Detention as per details below:Terminal/ Station
Av. Detention of loading April to December Remarks if any No. of rakes ARPL PLRL RLDP ARDP
10-11 11-12
10-11
11-12
10-11
11-12
10-11
11-12
10-11 11-12
1 2 3 4 5 6 7 8 9 10 11 12NER
IR5.4 Running of Long Haul Trains : 5.5 Important Operating indices & plan to improve it further as per
proforma below:
S.No. ITEMS 2010-11 Target
2011-12 April to Mar. %age
improve- ment10-11 11-12
1 NTKMs (in million) 10753 -
2 NTKMs per wagon day 10004 10400
3Wagon Kms per wagon day 250 265
4 Wagon turn round( in days ) 1.85 1.48
5 NTKMs per engine hours 25208 -6 Diesel utilization (goods)
(FOIS figure) 431 450
7. Average Loaded Receipt ( in 8 WW/day) 1377 -
8. Average wagon Holding ( in 8 WW/day) 2944 -
9. Total Interchange ( in 8 WW) 1402411 -
5.6 Position of vacancies of ALP/Shunter/LP & Plan for filling up vacancies (promotional & DR quota).
6.0 Review of Financial Performance (Earnings & Expenditure):Originating Traffic and Earnings.
Head
Actual2010-11
Target2011-12
APRIL TO MARCH %Age Variation over
Actual2010-
11
Target2011-
12
Actual2011-
12
Target Last year
ORIGINATING TRAFFIC (In Million)Passenger (Nos.) 239.18 251.17Freight loading (In tonnes) 1.69 1.90ORIGINATING EARNINGS (In Crores of Rs.)
8
Passenger 943.04 1099.43Other Coaching 62.56 68.82Goods 130.62 146.85Sundries 40.79 44.87Total 1177.01 1359.97
PARCEL TRAFFIC AND EARNINGS:
Head
Actual2010-11
Target2011-
12
APRIL TO MARCH %Age Variation over
Actual2010-11
Target2011-12
Actual2011-12
Target Last year
Parcel Traffic(In thousand tonnes) 174.57 -Parcel Earnings (In Crores of Rs.) 30.41 35.30
CUMULATIVE POSITION OF TICKET CHECKING PERFORMANCE FROM S.
No.Particulars Target
for2011-
12
Performance during
2011-12
Performance during 2010-11
%age VariationOver last
YearOver
Target
1 No. of checks conducted
21340
2 No. of HP cases (WOT &
Irr.)
480821
3 Amount realized
198168355
4 No. of UBL 512925 Freight in Rs. 2698174
Total earning 200866529
6.1 Passenger Earning : Achievement vis-à-vis target & COPPY. Action Plan to achieve the target
6.2 Freight Earning : Achievement vis-à-vis target & COPPY. Action Plan to achieve the target.
6.3 Other Coaching Earning: Achievement vis-à-vis target & COPPY. Action Plan to achieve the target.
6.4 Sundry Earning : Achievement vis-à-vis target & COPPY. Action Plan to achieve the target.
6.5 Ordinary Working Expenses : (i) Position as per proforma below:
2010-11 2011-12Actuals B.G. Incremental
over Actual(2-1)
S.L. RE RE-BG(4-2)
Position Propor.
B.G.Approx. Variation
1 2 3 4 5 6 7 8 9
(ii) Demand-wise position in comparison to B.G. & R.E. as per proforma below & plan to keep within B.G.
9
D.N. B.G. S.L. R.E. 11-12 Position Up to Mar’12
Variation
w.r.t. B.G. w.r.t. S.L.1 2 3 4 5 6 7
(iii) Segment-wise analysis of expenditure .
(a) Position of expenditure on OT, NDA, TA, Children Education. This should be indicated with respect to B.G. & COPPY & Plan to keep within B.G.
(b) Hrs. reduction/increase in OT, Manday reduction/increase in TA w.r.t. COPPY & plan to keep within B.G.
(iv) Plan Expenditure:
(a) Source-wise progress of Plan Expenditure for PH-16 should be given on following proforma:
PH-16Allocation Budget Grant
2011-12Reassessed BG, 2011-12
Approx. exp. during the year
%age exp. w.r.t.
reassessed BG1 2 3 4 5
CAPCFDRFDFSFOLWRTotalEBRGrand Total
(b) Plan Head-wise utilization of fund as per proforma below:
Plan Heads BE 2011-12
Reassessed Budget Grant (RBG)
2011-12
Approx. exp. during the
year
%age exp w.r.t. reassessed
Budget Grant1 2 3 4 5
7.0 Action Plan to improve:
7.1 Cleanliness in trains and at Stations:
7.1.1 Status of SIG inspections, summary of deficiencies noticed and status of removal of these deficiencies.
Status of SIG inspections during the year:(a) SIG inspections carried out
Division SIG inspections Due SIG Inspections carried outIzatnagarLucknowVaranasi
(b) Summary of deficiency & status of removal of deficiency.Division Deficiency noticed in
cleanlinessRemoval of deficiency
10
IzatnagarLucknowVaranasi
7.1.2 Position on complaints related to Image Makeover items & plan to reduce it further.
Position on complaints related to Image Makeover items & plan to reduce it further (2010-11 & 2011-12)
Sl.NO.
CAUSE WISE CLASSIFICATION
LJN DIVISION
IZNDIVISION
BSBDIVISION
TOTAL % agevariation
2010 2011 % age Vari.
2010
2011
% age Variation
2010
2011
% age Vari.
2010
2011
1. IMPROPER BEHAVIOUR OF COMMERCIAL STAFF.
2. IMPROPER BEHAVIOUR OF NON COMMERCIAL STAFF
3. IMPROPER BEHAVIOUR OF NON-RAILWAY STAFF
4. PASSENGER BOOKING5. RESERVATION ISSUES6. ALLOTMENT OF SEATS
/BERTHS BY TRAINS STAFF
7. REFUND AGAINST TICKETS.
8. UNAUTHORISED PASSENGERS IN COACHES
9. BOOKING, LUGGAGE, PARCEL
10. WORKING OF INQUIRY OFFICE
11. NON AVAILABILITY OF WATER
12. CATERING AND VENDING SERVICES
13. CLEANLINESS AT STATIONS
14. MAINTENANCE OF CLEANLINESS IN COACHES
15. MAL FUNTIONING OF ELECTRICAL EQUIPMENTS
16. PUNCTUALITY OF TRAINS
17. COMPLAINTS RELATING TO SLEEPER CLASS
18. THEFT AND PILFERAGES
19. BRIBERY AND CORRUPTION
20. NON AVAILABILITY OF BED ROLLES/POOR QUALITY
21. MISCELLANEOUR22. NULL REPORTS
TOTAL
7.1.3 Position of stations not provided minimum essential amenities and plan for providing the same.
7.1.4 Position of uncleaned stations/toilets as per complaints received and plan to ensure cleanliness on such stations.
11
7.1.5 Status of Mechanised/Semi-mechanised cleaning of stations & plan to cover balance & finalization of tender, if pending any.
7.1.6 Status of intensive mechanized cleaning of coaches in Coaching Depot & plan for balance, if any.
7.1.7 Position of OBHS & plan for finalization in balance trains, if any, as per Board’s new guidelines.
7.1.8 Status of CTS on proforma below :Station Name of Agency DOC Valid up to Remarks
1 2 3 4 57.1.9 Status of setting up of Mechanised Laundries: 7.1.10 Position of availability of linens & washing contracts. 7.1.11 Progress of works related to pest & rodent control as per proforma below :
Name of Depot
Name of Agency
DOC Valid upto
1 2 3 47.1.12 Position of manpower shortfall for coach maintenance activities as per proforma
below & plan for creation of posts & filling up of vacancies:
Dep
ot
Tota
l re
quire
men
t as
per
yar
d st
ick
Equi
vale
nt
man
pow
er t
o w
orkl
oad
outs
ourc
e
Net
re
quire
men
t
Ava
ilabl
e sa
nctio
n
On
Rol
l
Net
add
ition
al
requ
irem
ent
of s
taff
Vaca
ncie
s ba
sed
on
cu
rren
t sa
nctio
n
Mor
e sa
nctio
n re
quire
d
Stat
us
of
prop
osal
s f
or
sanc
tion
of
ad
ditio
nal p
ost
%ag
e sh
orta
ge
7.2 Action Plan to improve Catering Services: 7.2.1 Status of transfer of static/mobile catering units from IRCTC. Vacancy position of
catering staff & plan for filling up the same. Status of issue of JPO for catering waste management.
7.2.2 Position of Renewal/Allotment of GMUs/SMUs. 7.2.3 Position of train side vending as per Board’s guidelines.7.2.4 Status of fixation of License Fee & recovery of arrears as per Para 18 of the
Catering Policy-2010.7.2.5 Position on catering waste management as per Board’s policy instructions vide
letter No. 2011/TG-III/800/45 dt. 13.09.11.7.2.6 Status on mechanism for monitoring catering services based upon Board’s
instructions.
8.0 Other Miscellaneous Issues: 8.1 Progress on utilization of fund under PH 29 & 30 as per proforma given below:-
Plan Head Original B.G.
R.E. Exp. For year 2011-12 (Up to
Dec)
Action Plan for
remaining F.Y.
Remrks, if any
1 2 3 4 5 68.2 Status of compliance of Joint Note prepared between Open Line and Construction
regarding commissioning of projects as per proforma below:Name of project
Section Date of taking over
Total no. of items
No. of items yet to be complied
Remarks, if any (department- wise
break-up)1 2 3 4 5 6
8.3 Utilisation of Track Machines, adherence to MOU singed jointly between Sr. DEN & Sr. DOM, position of availability of block vis-à-vis blocks agreed as per MOU.
12
8.4 Drawing of completion estimates/reports for completed works as per provision of Engineering Code.
8.5 Status on signing the land agreement vis-à-vis pending as on 01.04.2011 and plan for balance.
8.6 Demand recoverable – Outsiders’ dues – Progress made in Court Cases, Under estate officers & other cases.
8.7 Disposal of scrap : Achievement vis-à-vis target. 8.8 Progress on commissioning of JTBS vis-à-vis target. 8.9 Status of working of in-motion weighbridges & position of overloading reports
during the year 2011-12.8.10 Analysis of section-wise average speed of Goods Trains & Plan to improve it further. 8.11 Analysis of time taken in placement of damaged coaches in sick lines of
Coaching Depot, Plan to reduce it further (especially for GKP Depot). 8.12 Progress of fitment of VCDs on diesel locos as proforma below & Action Plan
for balance, if any: Type of
locoTotal loco holding
Loco provided with VCD
Balance to be provided
1 2 3 48.13 Year-wise & Department-wise pending Audit Objection Report (Part I & Part II),
Special letter, Draft & provisional para, Stock Sheets and Accounts Inspection Reports.
814 Energy Conservation of year 2011-12 vis-à-vis target & COPPY.8.15 Filling up of vacancies of promotional quota of Safety and Non-safety categories. 8.16 Progress on DPG, MP/MLA references & Star marked letters. 8.17 Position of appointments on Compassionate Ground. 8.18 Review of pending Court Cases 8.19 Mandays lost on account of IOD/HOD & RMC. 8.20 Finalisation of ONR (Other than Normal Retirement) cases.8.21 Open Adalat.8.22 Pension Revision items – Pre-2006 & Post-2006.8.23 Budgetary provisions for Group ‘D’ recruitments against Employment Notice
dated 15.12.2010.8.24 Work Study :8.24.1 Proposed work area for future Work Study.8.24.2 Surrender against identified balance 474 nos. posts of various divisions/HQ as per Work
Study Reports, Plan for surrender of these posts. 8.25 Progress of ongoing works & balance fund required for commissioning:-(i) Status of ongoing works & requirement of fund to complete such works for
proforma below:- (Those works stopped due to shortage of fund)
S. No. Brief description of works
Year & sanction
Approx. cost of works
Exp. Upto Mar/11
Expenditure year 2011-12
Balance liability to complete the works
Remarks if any
1 2 3 4 5 6 7 8(ii) Status of ongoing works & requirement of fund to complete the works as per proforma below :- ( work continuing but constraint of fund)S. No. Brief
description of works
Year & sanction
Approx. cost of works
Exp. Upto March/11
Expenditure year 2011-12
Works stopped due to
shortage of fund since :
Balance liabilities
to complete
the works
Remarks if any
1 2 3 4 5 6 7 8
8.25 Compliance on items of POM held on 30th & 31st Jan’2012.
13
*******
14