26
Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015
Transcript
Page 1: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Aggregation Issues

Jesse Lovegren, Ph.D.

Air Permits Division

Texas Commission on Environmental Quality

Advanced Air Permitting Seminar 2015

Page 2: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Presentation Sections

• Overview

• Site Aggregation

• Examples

• Project Aggregation

• Examples

Page 3: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Overview

• Clean Air Act programs applying to "major" sites/sources:

Site Aggregation: “common sense notion of a plant”

Project Aggregation: keeps applicants from improperly avoiding major NSR review

Page 4: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Site AggregationAffected Programs

• Major NSR: Modification to existing major source vs. new source;

• Title V: Applicability of program; and

• NESHAPs for source categories: Major source vs. Area source

Page 5: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Site AggregationSite Criteria

• Same industrial grouping;

• Located in one or more contiguous or adjacent properties; and

• Under common control

Page 6: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Site AggregationSame Industrial Grouping

• Grouping is 2-digit SIC code

• “Support Facility” concept

• Groupings not considered for NESHAP program

Page 7: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Site AggregationContiguous/Adjacent Properties

• Adjoining except for an intervening road, railroad, right-of-way, waterway, etc.;

• Properties located < ¼ mile apart; and

• Interdependent (can be > ¼ mile apart)

Page 8: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Site AggregationContiguous/Adjacent Properties

Oil and Gas Rules

• SB 1134 applies

• Proposed EPA rules:

Proposal 1: Defines “adjacent”; and

Proposal 2: Revises regional consistency regulations

Site Aggregation Contiguous/Adjacent Properties

Oil and Gas Rules

Page 9: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Site AggregationUnder Common Control

• Generally, operations under the same company;

• Evaluated at the highest point of the organization’s structure; and

• More complex business relationships require case-by-case determination

Page 10: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Example 1

Property A:

Crude oil & refined products storage

Property B:

For-hire storage; includes a boiler

Page 11: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Example 1Can They be Aggregated?

Properties A & B:

• Owned by the same company

• On opposite banks of a waterway and < ¼ mile apart at their closest point

< ¼ mile

Page 12: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Example 1Answer

• Common control

• Adjacent properties

• Property A belongs to: Group 5171 Property B belongs to: Group 5169

• Boiler is a support facility

Yes: Sites can be aggregated.

Page 13: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Example 2

Property A:

Soil/groundwater remediation facility

Property B:

Bulk fuels terminal

Page 14: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Example 2Can They be Aggregated?

• On contiguous properties

• Company B owns a share of both

• Shared electricity supply

Partly Owned by Companies A & B

Operated by Company B

Page 15: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Example 2Answer

• Not under common control

• Contiguous properties

• Property A belongs to: Group 4959 Property B belongs to: Group 5171

• Neither is a support facility

No: Sites cannot be aggregated.

Page 16: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Project AggregationApplicability

• Major NSR;

• Major modifications to stationary sources; a physical change with an emissions increase; and

• Projects sufficiently related or treated as a single physical change

Page 17: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Project AggregationOther Applicability

• Applies to evaluation of project increase only

• Source-wide netting comprises all contemporaneous changes at the source, related or not

Page 18: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Project AggregationProject Criteria

• Timing of applications

• Documentation: Funding applications; Consumer demand and projected

production reports; and Statements on plans of operation

• TCEQ analysis

Page 19: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Project AggregationWhen Is Evaluation Required?

• Two or more filed within a short time period; and

• Major NSR requirement avoided by separate treatment of projects

Page 20: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Example 3

Project 1:

PSD application for construction of marine loading dock & storage

Project 2:

PSD application for additional throughput

Page 21: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Example 3Is Further Evaluation Needed?

Project 1 & 2:

• Subject to PSD review for VOC (O3 precursor); and

• Increases for other pollutants insignificant even when projects considered together

Page 22: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Example 3Answer

• Can be considered part of the same physical change

• No major NSR requirements avoided

• Analysis for Project 2 may include emissions from Project 1

No further evaluation is needed.

Page 23: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Example 4

Project 1:

Permit for changes at 3 units at an aluminum reduction plant

Permit

3 Units Controls

Project 2:

Request to split into 3 separate reviews/permits

Permit

1 Unit

Permit

1 Unit

Permit

1 Unit

Page 24: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Example 4Should the Permit Be Split?

Considerations:

• Splitting permit = removal of control device

• Owner: “Projects were separate business decisions and economic justifications.”

Permit

3 Units Controls

Permit

1 Unit

Permit

1 Unit

Permit

1 Unit

Page 25: Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Example 4Answer

• Previous owner statements treat the changes as one project

• Owner should not agree to emission reduction measures to avoid PSD review and then apply to discontinue reduction measures

Permit should not be split.