Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

Date post: 08-Jul-2018
Category:
Upload: ahmed-adel-abdellatif
View: 223 times
Download: 0 times
Share this document with a friend

of 15

Transcript
  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    1/33

    Project Management ProfessionalPMP Exam Preparation Course

    Prepared By: Eng. Ahmed El Antary, PPM, MSPMEngineering & Management Technologies LLC

    Delaware, USA

    [email protected] – www.enmatecs.com

    Project Risk Management

    Chapter 11PMBOK 5th Ed.

    “Ahmed El Antary”

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    2/33

    The Course Leader

    Ahmed El Antary, PPM, MSPM Engineering and Management Consultant

    Certified Professional Project Manager (PPM), WCU, USA PhD Learner with concentration on Project Management - PhD-BA

    program. NorthCenteral University, AZ, USA Master of Science in Project Management, Colorado Technical University,

    Colorado Springs, CO, USA

    B. Sc. Civil Engineering, Al Azhar University, Cairo, Egypt Project Management Certificate & PMP Preparation Course, WCU, USA Business Management Certificate GL, CTU, CO, USA Change Management Certificate GL, CTU, CO, USA Project Management Certificate GL, CTU, CO, USA

    Team Member of the Construction Extension Project for the PMBOK 3rdEd. By (PMI) and (ANSI) Certified Green Buildings Expert (GBE) Certified LEED Expert (CLE) Certified Sustainable Development Expert (SDE)

    Certified Building Information Modeling Expert (BIME)

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    3/33

    Project Risk Management

    Project Risk Management includes the processes of conducting risk

    management planning, identification, response planning, andmonitoring and control on a project.

    The objectives of Project Risk Management are to increase theprobability and impact of positive events, and decrease the probabilityand impact of negative events in the project.

    Projects are launched to take advantage of opportunities

    Opportunities carry with them associated (adverse) risks

    The greater the opportunity, the greater the degree of uncertainty and

    the associated risk Project risk management should be seen as advanced preparation for

    possible adverse future events, rather than responding as theyhappen.

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    4/33

    Organization’s Risk Attitude

    Organizations perceive risk as the effect of uncertainty onprojects and organizational objectives. Organizations andstakeholders are willing to accept varying degrees of riskdepending on their risk attitude. The risk attitudes of both theorganization and the stakeholders may be influenced by anumber of factors, which are broadly classified into three

    themes: Risk appetite, which is the degree of uncertainty an entity is willing

    to take on in anticipation of a reward.

    Risk tolerance, which is the degree, amount, or volume of risk that

    an organization or individual will withstand. Risk threshold, which refers to measures along the level of

    uncertainty or the level of impact at which a stakeholder may have aspecific interest. Below that risk threshold, the organization will

    accept the risk. Above that risk threshold, the organization will nottolerate the risk.

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    5/33

    Project Risk Management

    The knowledge area of Project Risk Management consists of thefollowing processes:

    Risk Management Processes

    Process Project Phase Key Deliverables

    Plan Risk Management Planning Risk Management Plan

    Identify Risks Planning Risk register

    Perform Qualitative Risk

    AnalysisPlanning Risk register updates

    Perform Quantitative Risk

    Analysis Planning Risk register updates

    Plan Risk Responses PlanningRisk related contract

    decisions

    Control Risks Monitoring and Controlling Risk register updates

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    6/33

    Plan Risk Management

    Plan Risk Management is the process of defining how to conduct riskmanagement activities for a project.

    Inputs Tools and Techniques Outputs

    Project management plan

    Project charter

    Stakeholder register

    Enterprise environmentalFactors

    Organizational process assets

    Analytical techniques:

    Analytical techniques areused to understand anddefine the overall riskmanagement context ofthe project.

    Expert judgment

    Meetings

    Risk management plan

    Plan Risk Management Process

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    7/33

    Risk Management Plan

    The risk management plan is a component of the project management plan anddescribes how risk management activities will be structured and performed. The

    risk management plan includes the following: Methodology. Defines the approaches, tools, and data sources.

    Roles and responsibilities.

    Budgeting.

    Timing.

    Risk categories. Provide a means for grouping potential causes of risk. A riskbreakdown structure (RBS) helps the project team to look at many sources from whichproject risk may arise in a risk identification exercise. The RBS is a hierarchicalrepresentation of risks according to their risk categories.

    Definitions of risk probability and impact. The example table definitions negative

    impacts that could be used in evaluating risk impacts related to four project objectives.(Similar tables may be established with a positive impact perspective). The exampleillustrates both relative and numerical (in this case, nonlinear) approaches.

    Probability and impact matrix.

    Revised stakeholders’ tolerances.

    Reporting formats.

    Tracking.

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    8/33

    Example of a Risk Breakdown Structure (RBS)

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    9/33

    Definition of Impact Scales for Four Project Objectives

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    10/33

    Identify Risks Identify Risks is the process of determining which risks may affect the

    project and documenting their characteristics.

    Inputs Tools and Techniques Outputs

    Risk management plan

    Cost management plan

    Schedule management plan

    Quality management plan

    Human resource

    management plan

    Scope baseline

    Activity cost estimates

    Activity duration estimates

    Stakeholder register

    Project documents

    Procurement documents

    Enterprise environmental Factors

    Organizational process assets

    Documentation reviews

    Information gathering techniques:

    Brainstorming Delphi technique Interviewing Root cause analysis

    Checklist analysis

    Assumptions analysis

    Diagramming techniques: Cause and effect diagrams System or process flow charts Influence diagrams

    SWOT analysis

    Expert judgment

    Risk register: List of identified risks

    List of potential responses

    Identify Risks Process

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    11/33

    Brainstorming

    Think of all thepossible risks thatproject may face

    Note risks down andbe careful to define

    them clearly

    Monitor risksthrough all projectphase and their

    impact possibilities

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    12/33

    Influence Diagram

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    13/33

    SWOT Analysis

    Strengths: (Organizational Internal) Build on these strengths

    Weaknesses: (Organizational Internal) Eliminate or reduces these weaknesses

    Opportunities: (Organizational External) Exploit all possible opportunities

    Threats: (Organizational External) Mitigate all potential threats

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    14/33

    Perform Qualitative Risk Analysis Perform Qualitative Risk Analysis is the process of prioritizing risks for

    further analysis or action by assessing and combining their probability

    of occurrence and impact.

    Inputs Tools and Techniques Outputs

    Risk management plan

    Scope baseline

    Risk registerEnterprise environmental factors

    Organizational process assets

    Risk probability and impactassessment

    Probability and impact matrix

    Risk data quality assessment

    Risk categorizationRisk urgency assessment

    Expert judgment

    Project documentsupdates:

    Risk register updates

    Assumptions log

    updates

    Perform Qualitative Risk Analysis Process

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    15/33

    Probability and Impact Matrix

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    16/33

    Probability and Impact Matrix “Cont.”

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    17/33

    Perform Quantitative Risk Analysis

    Perform Quantitative Risk Analysis is the process of numericallyanalyzing the effect of identified risks on overall project objectives.

    Inputs Tools and Techniques Outputs

    Risk management plan

    Cost management plan

    Schedule management plan

    Risk register

    Enterprise environmental factors

    Organizational process assets

    Data gathering and representation

    techniques: Interviewing Probability distributionsQuantitative risk analysis andmodeling techniques:Sensitivity analysis: The Tornadodiagram Expected monetary value analysis:Decision tree analysis Modeling and simulation

    Expert judgment

    Project documents

    updates: Probabilistic analysisof the project Probability ofachieving cost and timeobjectives Prioritized list ofquantified risks Trends in quantitativerisk analysis results

    Perform Quantitative Risk Analysis Process

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    18/33

    Range of Project Cost Estimates by Risk Interviewing

    Interviewing relevant stakeholders helps determine the three-point estimatesfor each WBS element for triangular, beta or other distributions.

    In this example, the likelihood of completing the project at or below the mostlikely estimate of $41 million is relatively small as shown in the simulationresults.

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    19/33

    Perform Quantitative Risk Analysis

    Quantitative risk analysis and modeling

    techniques Sensitivity Analysis: Tornado Diagram – 

    determines which risks have the most potential

    impact on the project Expected monetary value analysis – a statistical

    concept that calculates the average outcome

    when the future includes scenarios that may ormay not happen

    Modeling and Simulation

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    20/33

    Example of Tornado Diagram

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    21/33

    Decision Tree Diagram

    A decision is being made whether to invest $120M US to build a new plant or to instead invest only $50M USto upgrade the existing plant. For each decision, the demand (which is uncertain, and therefore represents a“chance node”) must be accounted for. For example, strong demand leads to $200M revenue with the new plant but only $120M US for the upgradedplant, perhaps due to capacity limitations of the upgraded plant. The end of each branch shows the net effect ofthe payoffs minus costs. For each decision branch, all effects are added (see shaded areas) to determine theoverall Expected Monetary Value (EMV) of the decision.

    Remember to account for the investment costs. From the calculations in the shaded areas, the upgradedplant has a higher EMV of $46M – also the EMV of the overall decision. (This choice also represents the lowestrisk, avoiding the worst case possible outcome of a loss of $30M).

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    22/33

    Cost Risk Simulation Results

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    23/33

    Plan Risk Responses Plan Risk Responses is the process of developing options and actions

    to enhance opportunities and to reduce threats to project objectives.

    The key benefit of this process is that it addresses the risks by theirpriority, inserting resources and activities into the budget, scheduleand project management plan as needed.

    Inputs Tools and Techniques Outputs

    Risk managementplan

    Risk register

    Strategies for negative risks orthreats

    Strategies for positive risks oropportunities

    Contingent response strategies

    Expert judgment

    Project management planupdates

    Project documents updates

    Plan Risk Responses Process

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    24/33

    Plan Risk Response T&T

    Strategies for Negative Risks or Threats

    Avoidance – Change PMP to eliminate thethreat by eliminating the cause

    Transference - Make another party responsible

    for the risk through allocation, purchasing ofinsurance, or outsourcing the work

    Mitigation – Reduction in the probability or

    impact the risk Accept – This strategy is adopted because it is

    seldom possible to eliminate all threats from a

    project

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    25/33

    Plan Risk Response T&T

    Strategies for Positive Risks or Opportunities

    Exploit – Ensures the opportunity is realized

    Share – allocating ownership to a third partywho is best able to capture the opportunity

    Enhance – Modifies the size of anopportunity by increasing the probability orpositive impacts

    Accept

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    26/33

    Control Risks Control Risks is the process of implementing risk response plans,

    tracking identified risks, monitoring residual risks, identifying new

    risks, and evaluating risk process effectiveness throughout the project.The key benefit of this process is that it improves efficiency of the riskapproach throughout the project life cycle to continuously optimizerisk responses.

    Inputs Tools and Techniques Outputs

    Project management plan

    Risk register

    Work performance dataWork performance reports

    Risk reassessment

    Risk audits

    Variance and trend analysis

    Technical performance measurement

    Reserve analysis

    Meetings

    Work performanceinformation

    Change requests:

    Project management planupdates

    Project documents updates

    Organizational processassets updates

    Control Risks Process

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    27/33

    Q U E S T I O N S

    A N S W E R S

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    28/33

    Resources Project Management Institute. (2013). A guide to the project management body of

    knowledge ( 5th ed.). Newtown Square, PA: Project Management Institute.

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    29/33

    Q & A on Project Risk Management1. Andrew has joined as the Project Manager of a project. One of the project documentsavailable to Andrew lists down all the risks in a hierarchical fashion. What is this document

    called?1.Risk Management Plan.2.List of risks.3.Monte Carlo diagram.4.Risk Breakdown Structure.

    2. Which of the following statements is true about risks?1.When evaluating risks their impact should be considered, however probability ofoccurrence is not important.2.Risks if they happen always have negative impact and not positive.3.Risk register documents all the risks in detail.4.Risk response plan is another name for Risk Management Plan.

    3. Beta is the Project Manager of a Road construction project. During a project review, Betarealizes that one particular risk has occurred. To take appropriate action against risk thathas happened, Beta needs to refer to which document?

    1.Risk response plan2.Risk management plan

    3.Risk breakdown structure4.Risk register

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    30/33

    Q & A on Project Risk Management4. During which stage of Risk planning are risks prioritized based on probability and impact?

    Identify RisksPlan Risk responses

    Perform Qualitative risk analysisPerform Quantitative risk analysis

    5. During which stage of Risk planning are modeling techniques used to determine overall

    effects of risks on project objectives for high probability, high impact risks?Identify RisksPlan Risk responsesPerform Qualitative risk analysisPerform Quantitative risk analysis

    6. Andrew is a Project Manager for Green Valley project. A risk management plan has beenprepared for the project. Which of the following should Andrew do next?

    Perform Qualitative risk analysisPerform Quantitative risk analysis

    Identify RisksPlan Risk responses

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    31/33

    Q & A on Project Risk Management7. Which of the following processes has risk register as the primary output?

    Plan Risk ManagementIdentify Risks

    Monitoring and Control RisksPerform Qualitative Risk Analysis

    8. Five of the processes in Project Risk Management are from which process group?

    InitiatingPlanningExecutingMonitoring and Control

    9. John Strauss is a Project Manager for a reforestation project. To identify the risksinvolved, John sends a questionnaire to gather inputs from experts. Which technique isJohn using?

    Delphi techniqueInterviews

    Brain stormingDocumentation review

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    32/33

    Q & A on Project Risk Management

    10. Mathew is a Project Manager for software migration at a bank. A majorrisk that has been identified is attrition of resources. As a strategy torespond to this risk, Mathew, with support from Senior Management,provides good increments to his team members. What type of risk responseis Mathew following?

    AcceptAvoid

    TransferMitigate

    11. Which of these is a valid response to positive risks?

    ExploitMitigateEnhanceShare

  • 8/19/2019 Ahmed El Antary - PMP Part 11- Risk 5th Ed - General

    33/33

    Q & A on Project Risk Management

    Answers1. d. Hierarchical description of risks is called Risk Breakdown structure.

    2. c. Risk register documents the risks in detail.3. a. Beta needs to refer to the Risk response plan that documentsresponses to identified risks.4. c. Risk probability and impact are defined during Qualitative risk analysis.5. d.6. c. Risk identification is performed after performing the risk managementplan.7. b. Process of Identify Risks has Risk register as the major output.8. b. Five of the six processes in Project Risk Management are part of thePlanning process group.9. a. John is using the Delphi technique to identify risks.