+ All Categories
Home > Documents > AIAG Core Tool Software Project...

AIAG Core Tool Software Project...

Date post: 08-May-2018
Category:
Upload: lekhuong
View: 376 times
Download: 10 times
Share this document with a friend
25
AIAG Core Tool Software Project Status John M. Cachat, AIAG Project Manager [email protected]
Transcript
Page 1: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

AIAG Core Tool Software Project Status

John M. Cachat, AIAG Project Manager [email protected]

Page 2: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

Tier 2 (T2) and Smaller Focus

The intended customer base for this project is T2 and smaller organizations that do not need, and/or cannot afford, the larger PLM or QMS applications. T2 and smaller companies may have only one or two people working on the documentation versus large, multi-site teams.

Page 3: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

IATF 16949 and the Core Tools

• Section 4.4.1.2: Product safety • Section 8.3.4.1: Monitoring • Section 8.3.4.3: Prototype program • Section 8.5.1.1: Control plan • Section 8.5.1.4: Verification after shutdown • Section 8.5.6.1: Control of changes – supplemental • Section 8.6.1: Release of products and services — supplemental • Section 8.7.1.4: Control of reworked product • Section 9.1.1.2: Identification of statistical tools • Section 9.2.2.3: Manufacturing process audit • Section 10.2.4: Error-proofing • Section 10.3.1: Continual improvement – supplemental

Page 4: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

Creation of a Core Tools Forms Software project

A Voice of the Customer Survey was sent out and the results show a strong international interest in a cloud based application to complete several very technical forms related to product and process development (DFMEA, Process Flow, PFMEA, and Control Plan), and product release (PPAP) that are part of the Advanced Product Quality Planning (APQP) process. MSA and SPC are out of scope.

Page 5: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...
Page 6: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...
Page 7: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...
Page 8: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...
Page 9: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

Common Themes from VOC

The Voice of the Customer (VOC) survey resulted in several common themes including: flexibility, customizable, project task tracker, linkages between forms, and robust security of proprietary data on a web app.

Page 10: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

Form Linkage is Critical

Linkage between the DFMEA, Process Flow, PFMEA, and Control Plan with a relational database that makes it easier to make sure that everything is tied together.

Page 11: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

Project Management / Task Tracker

The addition of a checklist, or a simple project management / task management process with flexibility to customize the task list. A simple timeline with assignments and due dates will be added.

Page 12: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

Robust Security

As a cloud based application, there will be robust security that assures no one can access the company’s information without permission.

Page 13: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

Reporting

Reporting will be added in order to make it easier for companies to manage the process.

Page 14: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

International, Multi-Lingual

Recognizing the global automotive supply chain, several languages will be supported in the application.

Page 15: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

New AIAG-VDA FMEA Manual Support

• Currently suppliers providing products to both German and N.A. OEM's are required to assess their products' failure modes and effects differently

• This causes confusion and adds complexity to the product development and product improvement activities of the suppliers.

• The new Core Tools software will include the new AIAG-VDA FMEA content

Page 16: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

Target Pricing & Timeline

The goal is to provide this cloud based app for a low dollar per user per month pricing model. The timeline has not yet be determined other than ASAP.

Page 17: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

Team Members

Steve Leggett JD Marhevko

Page 18: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

Conceptual Design Screens

Page 19: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

Conceptual Design Screens

Page 20: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

Conceptual Design Screens

Page 21: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

Conceptual Design Screens

Page 22: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

Conceptual Design Screens

Page 23: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

2nd Level of VOC Meeting

• LOCATION – AIAG Headquarters • DATE - TBD • Maximum 30 people – 1st come, 1st served • Must be an AIAG member (T2 and lower) • Must be using AIAG Core Tools XLS or equivalent • Contact John Cachat - [email protected]

Page 24: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

Q&A

Today’s Panel includes:

Page 25: AIAG Core Tool Software Project Statusadmin.aiag.org/docs/uploads/events/presentations/S17QUALITY/CTSU... · MSA and SPC are out of ... • Must be using AIAG Core Tools XLS or ...

AIAG Core Tool Software Project Status

John M. Cachat, AIAG Project Manager [email protected]


Recommended