Date post: | 02-Nov-2014 |
Category: |
Education |
Upload: | christina-kelman |
View: | 389 times |
Download: | 3 times |
AIESEC IndonesiaoGCDP Structures
for Off-Peak & Summer
Off-Peak
Off-Peak: Structure
Off-Peak OC Team
OCP
OC TM + RA-MA OC TM + RA-MA OC Logistics + RA-MA
OC Promotions + RA-MA
Details for the team:
Duration: January - March
Commitment Required: 7-10 hours per week
Expected Development: Team Management, Project Management, Innovation
Maximum 5 in the team, Suggested structure is shown.
Special L&D Needs:1.Need to understand the product and
program: oGCDP2.Understanding of GCM for selection3.OGX Process4.OGX timeline5.Project Management6.Time Management7.Self Effectiveness
Note: It is best is the one OC team handles all parts of the pre-raise-match process.OPS, tracking and the realisation process can be handled by the IPS/Quality MB or another MB/VP.
OCP: JD
Additional Notes:
1. Please adapt the JD to your local reality2. OCP makes a good pipeline for VP oGCDP or MB oGCDP
OC Promotion + Ra-MA: JD
Additional Notes:
1. Please adapt the JD to your local reality2. Each TMP will manage 5-8 EPs as EP Managers
OC Logistics + RA-MA
=
Additional Notes:
1. Please adapt the JD to your local reality2. Each TMP will manage 5-8 EPs as EP Managers
OC TM + RA-MA
=
Additional Notes:
1. Please adapt the JD to your local reality2. Each TMP will manage 5-8 EPs as EP Managers
Since off-peak is a new concept for AIESEC Indonesia, motivate this OC team through enabling them to be pioneer for oGCDP
Indoneisa
FOR THE ACHIEVEMENT
OF...
2015
If you have any questions please email:
MCVP TM: [email protected] oGCDP: [email protected]
MCVP Operations: [email protected]