AIK-EKO RESEARCHAND DESIGN INSTITUTE
2[
AIK-EKO RESEARCH AND DESIGN INSTITUTE
3
INTERACTION STRATEGY BETWEEN AIK-EKO CORPORATION AND CUSTOMER
PRIME COSTS REDUCTION
QUALITY IMPROVEMENTECOLOGICAL VALUES
IMPROVEMENT
MAXIMUM EFFICIENT PRODUCTION
TECHOLOGY OPTIMIZATION
WORK ARRANGEMENT
AIK-EKO RESEARCH AND DESIGN
INSTITUTE
PROJECT MANAGEMENT
CENTER
FERROUS AND NON-FERROUS
METALS ORES BENEFICIATION
NON-FERROUS METALLURGY
LIME PRODUCTION
GAS CLEANING
AND ASPIRATION
POWER TECHNOLOGIES
CHEMICAL INDUSTRY
TECHNOLOGICAL PROCESSES
AUTOMATION
SCIENTIFIC AND RESEARCH DIVISION
- laboratory studies
- technology development
- pilot tests
- industrial tests
ENGINEERING DIVISION
- development of feasibility study and
technical-economic calculation
- basic engineering
- detailed engineering
- contract supervision
INSTITUTE STRUCTURE
- Scientific Surveys Departments
- Research Laboratories
- Chief Project Engineers Department
- Technological Department
- Department of Thermal Engineering
- Architectural and Building Department
- Construction Department
- General Layout and Transport
Department
- Equipment Department
- Design and Estimate Department
- Economic Planning Department
TECHNICAL SUPERVISION
- placing orders for equipment manufacture
- quality control
- plant inspection
- finished products acceptance and testing
- equipment procurement
- contract supervision, start-up and
commissioning
WORK ARRANGEMENT AND PLANNING
- drawing up of project implementation
plans and schedules
- execution control
- work arrangement for project participants
cooperation
- stepwise information collection
and analysis
DOCUMENTATION
- operation documentation development
- permission documentation for equipment
GUARANTEE AND SERVICE
MAINTENANCE
PERSONNEL TRAINING
AIK-EKO TECHNOLOGICAL
DEPARTMENTS
PROJECTDEVELOPMENT
WATER TECHNOLOGIES
AUDIT IS A BASIS FOR COMPANY DEVELOPMENT STRATEGY
FERROUS METALLURGY,
SINTER AND BLAST-FURNACE
PROCESS
AIK-EKO RESEARCH AND DESIGN
INSTITUTE
AIK-EKO Research and Design Institute is one of AIK-EKO International Company subdivisions
that works in sphere of building new industrial enterprises as well as reconstruction of the existing
ones. AIK-EKO R&D Institute activity is aimed at development and implementation of advanced
energy-saving technologies for mining, metallurgical and power industry.
Operating strategy of effective cooperation between AIK-EKO R&D Institute and specialized
departments allows developing high-technology solutions of current interest in accordance with
the Customer requirements within the shortest possible time.
Cooperation with us allows the Customer either maximally efficient applying of investments
during building of new industrial plants or optimization of existing production processes.
Results of partnership with AIK-EKO Research and Design Institute for the Customer are as follows:
- minimal payback period of investments;
- prime cost reduction;
- improving of manufactured products competitiveness.
AIK-EKO R&D INSTITUTE SPECIALIZATION
● Scientic and research activity
laboratory studies
pilot tests
technology development
● Design and survey works
production technical audit
engineering survey
bankable feasibility study,
feasibility study
basic engineering
detailed engineering
contract supervision
● Implementation of technical solutions
ferrous and non-ferrous metal ores
beneciation and pelletizing
ferrous metallurgy, sinter production
lime production
non-ferrous metallurgy
chemical production
power generation
gas cleaning and aspiration
water technologies
technological processes automation
4 5
QUALITY MANAGEMENT SYSTEM
In the process of design and estimate documentation development AIK-EKO R&D
Institute uses effective project management system conforming to international quality
management system.
Project Management System combined with application of specialized
software products enables Institute to achieve the following: to provide engineering services meeting all Customer's requirements, according to
worldwide standards and advanced technologies;
to carry out complicated complex designs including several directions as well as to
support them till their successful start up;
to perform control of design documentation development quality at all design stages;
to keep and control time terms for issuance and development of design and estimate
documentation at all stages;
to improve design and estimate documentation organizing and development methods
by means of implementation of new software products and advanced 3D design
methods.
AIK-EKO R&D INSTITUTE STRUCTURE
PROJECT MANAGEMENT SYSTEMDirector General
of AIK-EKO R&D Institute
Chief EngineerDeputy
Director General
Occupational Safety and Health
Department
Deputy Director General
for Science
Research Department
Scientific Department
Technical Department
Chief Project Engineers
Department
Sales Department
Foreign Trade Department
Auxiliary Department
Planning and Economic
Department
Human Resources Department
Recordkeeping Office
Metallurgical Department
Gas Cleaning, Heating and Ventilation Department
Water Supply and Sewerage Department
Thermal Engineering Department
Electrical Equipment and Automation Department
Architectural and Constructional Department
General Layout and Transport Department
Design Engineering Department
Patent and Invention
Department
Legal Department
Administrative Office
6 7
PROJECT STRATEGIC PLANNING
CONSULTING SERVICESCONSULTING SERVICES
Conduct of production technical audit allows
complex production optimization and equipment
operation efficiency improvement of entire
process chain.
When conducting technical audit our
specialists determine problematic factors in
management structure of enterprise as well as in
operation of equipment process chain. Finally
the recommendations for use of manufacturing
technologies with minimal labor efforts, as well as
maximal energy efficiency and capacity will be
issued.
The main tasks of production technical audit are as follows:
to improve production capacity;
to improve energy efficiency;
to reduce raw material consumption and rejected product quantity;
to improve output product quality;
to reduce labor efforts for repairs and operation.
Performance of all tasks is directed at prime cost reduction, improving competitiveness and
increasing of profits.
PRODUCTION TECHNICAL AUDIT
Before making decision for investment reasonability and effectiveness the first-priority
task is strategic planning. One of main steps of strategic planning is strategic analysis
enabling to determine and implement maximal efficient strategy for further development
of enterprise or corporation.
AIK-EKO R&D Institute in cooperation with specialized departments performs technical
audit for existing enterprises of industrial and municipal sector and based on that technical
audit makes strategic analysis that hereafter determines directions for investment projects
and programs.
Additionally, Institute performs strategic analysis for determining of new plants
construction reasonability taking into account current and predictable situation of local
and international markets, capital costs, competitiveness and payback time.
We always offer effective solutions that will be relevant to specific type and conditions
of activity.
SCIENTIFIC AND RESEARCH ACTIVITY
LABORATORY RESEARCH
Mineral raw materials composition analysis
(spectral, physical and phase, chemical,
mineralogical, granulometric and thermal
analysis).
Analysis of all kinds of solutions and
suspensions, liquid and solid phase
(spectral, physical and phase, chemical,
photometric, granulometric, atomic
adsorption analysis).
Analysis of dust and dust-gas mixtures
properties (chemical and granulometric
analysis).
Laboratory research of end product
quality according to the developed
technology.
PILOT TESTS
Pilot tests are required for prove-out and confirmation of developed technology. During
performing pilot tests several variants of process chains are tested in order to determine
optimal variant. Results obtained during pilot tests are the basis for further project
development and implementation.
TECHOLOGIES DEVELOPMENT
On the basis of laboratory and pilot tests results specialists of AIK-EKO R&D Institute
design departments develop technologies of planned production with optimal technical
and economic indicators.
SCIENTIFIC AND RESEARCH ACTIVITY
98
Ferrous metallurgy. 5 mtpa sinter plant
6.5 mtpa iron-ore crushing and beneficiation plant.2.5 mtpa pellet plant
11
ENGINEERING
For justification of project investments our specialists perform feasibility study (if necessary
feasibility study is performed in several variants). On the basis of feasibility study results our
Customers can make decision on feasibility of project implementation, the most
acceptable variants and if required they can use feasibility study for design review and
approval by third-party investors.
In case of necessity our designers can take part in design review and approval by
Customer and third-part investors.
BANKABLE FEASIBILITY STUDY
At the stage of basic engineering the main design solutions are accepted, equipment
is selected as well as environmental compatibility and safety of accepted solutions in
terms of occupational and technogenic safety are evaluated.
Our design solutions are always aimed at usage of leading, reliable, advanced
technologies with minimal costs. We do not intend to use proven, but outdated
technologies. We offer to move forward.
Documents completed at basic engineering stage are used by Customer during
undergoing any expert reviews and obtaining required permits from regulatory
authorities. Our specialists provide complete support for obtaining positive conclusion of
expert review and permits.
We have experience in undergoing expert reviews as well as obtaining permits and we
are capable to release Customer from these works taking them upon ourselves.
10
ENGINEERING
ENGINEERING SURVEYS
AIK-EKO R&D Institute performs the full range of
engineering surveys which are obligatory during
development of qualitative project and necessary
for periodical examination of production sites,
buildings and facilities.
Our specialists perform engineering and
geological, engineering and geodesic surveys,
inspection of building structures etc.
BASIC ENGINEERING
Gas cleaning units of the plant
13
DETAILED ENGINEERING
ENGINEERING
DESIGN SUPERVISION
Specialists of AIK-EKO R&D Institute
have long-term experience in supervision
of industrial plants construction and
start-up. It allows providing qualified
design supervision of construction with
strict observance of all technical solutions
accepted in the project.
TRAINING
Implementation of modern technologies requires first of all involvement of qualified
operation personnel. For this purpose institute specialists as project designers develop
manuals and conduct training of management and production personnel of Customer.
Training is conducted at industrial site of Customer, at similar reference plants and as in
training centre of Institute.
12
ENGINEERING
Performance of detailed engineering results in providing complete set of documents
required for project implementation.
SCOPE OF DETAILED ENGINEERING WORKS INCLUDES BUT IS NOT LIMITED
TO THE FOLLOWING:
development of detailed process ow sheets;
detailed technological calculations (aerodynamics, hydraulics, thermal engineering,
water balance etc.);
development of detailed technological documents;
development of purchase order specications of equipment, goods and materials;
structural elements design calculation;
development of general construction detailed
documents;
development of works scope list;
nal connection and integration of all systems;
development of power supply systems and
systems of connection to utilities networks;
development of measures for equipment
acceptance control, quality control, test
control and control of acceptance for
operation;
preparation of operation manuals, programs
of personnel training and work permit.
Titanium magnetite ores beneficiation plant with 2.5 mtpa capacity by feed ore
14
References
15
References
6 CGOK PJSC
Aspiration units revamping at pellet plant. Aspiration units. Detailed Engineering.
2012
Poltava GOK JSC7Workshop of concentrate otation upgrading. Revamping and new construction of aspiration units. Detailed Engineering.
2012
Ukraine
Ukraine
1
Cherkassy Thermal Power
Plant Organizational Unit
of Cherkassy Khimvolokno PJSC
MMT mills aspiration with cyclone lter application. Detailed Engineering.
2009
Revamping of ash collection system of boiler. Basic and Detailed Engineering.
2012
Coal supply system aspiration of conveyors. Detailed Engineering.
2013
SGOK PJSC (Northern Mining and Beneciation Complex)
2
Technical reequipment with renovation of process line with roasting machine. Mix preparation facility. Mix preparation area. Aspiration systems revamping.Main Process Solutions and Detailed Engineering.
2010
DTEK PAVLOGRADUGOL PJSC, Stepnaya mine
3
Implementation of new advanced equipment for decrease of solids emission into the atmosphere to
3max 20 mg/m of boiler mine. Detailed Engineering.
2011
DTEK PAVLOGRADUGOL PJSC, Ternovskaya mine
4Implementation of new advanced equipment for decrease of solids emission into the atmosphere of Ternovskaya boiler mine. Detailed Engineering.
2012
SEVERSTAL JSC
5
Revamping of ferroalloys central storage. Aspiration units No. 1, 2 of crusher. Basic Engineering.
2010
Revamping of roller quenching machine. 3Installation of 3400 m /h cooling tower.
Basic Engineering.
Revamping of No. 4 defrosting garage water 3recycling system. Installation of 1200 m /h cooling
tower. Basic Engineering.
2012
2012
Aspiration units of casthouse of newly built blast furnace No. 3. Basic Engineering.
2013
Sinter production. Sinter workshop No. 2. Revamping of aspiration unit. Basic Engineering.
2013
Sinter production. Sinter workshop No. 2. Aspiration units of primary mixing. Basic Engineering.
2013
Sinter production. Sinter workshop No. 2. Aspiration unit from coke crushers facility and mix preparation plant. Basic Engineering.
2013
Limestone-dolomite workshop. Revamping of No. 7 rotary kiln gas cleaning. Basic Engineering.
2013
№ CUSTOMER PERFORMED WORKS YEAR
SEVERSTAL JSC
SEVERSTAL JSC
SEVERSTAL JSC
SEVERSTAL JSC
SEVERSTAL JSC
SEVERSTAL JSC
SEVERSTAL JSC
COUNTRY
Ukraine
Ukraine
Ukraine
Ukraine
Russia
Russia
Russia
Russia
Russia
Russia
Russia
Russia
Ukraine
Ukraine
CUSTOMER PERFORMED WORKS YEAR
Cherkassy Thermal Power
Plant Organizational Unit
of Cherkassy Khimvolokno PJSC
Cherkassy Thermal Power
Plant Organizational Unit
of Cherkassy Khimvolokno PJSC
Ilyich Iron and SteelWorks PJSC, Mariupol
Limekiln workshop. Revamping of aspiration of 16 and 17 conveyors area. Detailed Engineering.
Limekiln workshop. Revamping of ue gas cleaning units No.1, No.2 of furnace. Design and survey work.
2013
2013
Ukraine
Ukraine
12Ilyich Iron and Steel Works PJSC, Mariupol
№ CUSTOMER PERFORMED WORKS YEARCOUNTRY
PershotravenskyRepairand EngineeringPlant
Implementation of new dust and gas cleaning equipment for reducing pollutants emissions into atmosphere during process of thermal electric power generation by boiler house No. 4. Detailed Engineering.
2012
9
CGN CompanyDust collecting system for ore-thermal furnace. Basic Engineering.
2012
CGN CompanyDust collecting system for rening unit. Basic Engineering.
2012
CGN CompanyDust collecting system for drier drum No. 1. Basic Engineering.
2012
Dust collecting system for No. 1 tube rotary kiln. Basic Engineering. CGN Company 2013
Dust collecting system for No. 2 tube rotary kiln. Basic Engineering.
CGN Company 2013
Zaporozhstal JSC 10
Cold rolling workshop No. 1. Revamping of pickling department with changing into salt pickling.
3Installation of 230 m /h cooling tower. Basic Engineering.
Pavlogradsk Coal Preparation Plant, branch of DTEK Pavlogradugol PJSC
Reconstruction of aspiration and dust collecting units in the building of dosing and accumulating hoppers. Detailed design.
Cosmonauts Mine Organizational Unit of DTEK Rovenkianthracite Ltd
11
Yasenovsk Mine Management Organizational Unit of DTEK Rovenkianthracite Ltd
Dust collecting system for drier drum No. 2. Basic Engineering.
CGN Company 2013
2013
2013
2013
2013
Project development for installation of modern dust and gas cleaning equipment for ue gas cleaning, reducing solids emissions into atmosphere during process of heat electric power generation by boiler house at site of Vakhrushev mine. Detailed design.
Installation of the second stage of ue gas cleaning on the basis of new advanced equipment for reducing solids emissions into the atmosphere in the process of heat power generation by boiler workshop of vertical shaft. Detailed design.
Ukraine
Guatemala
Guatemala
Guatemala
Guatemala
Guatemala
Guatemala
Ukraine
Ukraine
Ukraine
Ukraine
Implementation of new dust and gas cleaning equipment for reducing pollutants emissions into atmosphere during process of thermal electric power generation by boiler house No. 1.Detailed Engineering.
2012Ukraine
8
PershotravenskyRepairand EngineeringPlant
Construction of recycling water supply system for metal 3and slag granulation areas with a capacity of 2,300 m /h.
2013CGN Company Guatemala
16
References
17
References
№
13 Pokrovskoe Mine Management PJSC
Designing second stage of ue gas dust cleaning on boiler house of main industrial site after two operating coal boilers. Detailed design.
14 Ufaleynickel JSCFurther equipping of blow system of shaft kilns No.2, 3, 4, 5, 6 with supplied air heating devices. Detailed Engineering.
Yenakiieve Iron And Steel Works PJSC
15 Revamping of aspiration system of converter workshop mixer department. Detailed Engineering.
Further equipping of blow system of shaft kilns No. 1, 2 with air heating devices. Detailed Engineering.
Ilyich Iron and Steel Works PJSC, Mariupol
Central Water Supply System. Revamping of treatment plants of industrial efuent No. 1. Radial sedimentation tank with oil catching system.Basic and Detailed Engineering.
Central Water Supply System. Slurry system revamping. Construction of slurry dewatering facilities after Blast Furnace and Oxygen Converter Plant gas cleaning. Feasibility Study.
2015
2015
2014
2014
2014
Ukraine
Ukraine
Ukraine
Russia
Ukraine
Rezhnickel Production
16
Azovstal Iron & Steel Works PJSC
17
Beneciation plant. Workshop of slurry tailings thickening. Workshop of concentrate thickening, ltration, storing and shipping. Gas cleaning units No. 1-9. Detailed Engineering.
Eristovsk Mining and Beneciation Complex Ltd. Construction of mining and beneciation complex on the basis of the deposit of Eristovsk
2014
2015
2016
Surveying existing aspiration system of discharge area, discharge units of rotary kilns and lime storage
3ensuring max 50 mg/m cleaning from dust with providing recommendations for their improvement. Design and survey work.
Russia
Ukraine
Ukraine
18
12 Ilyich Iron and Steel Works PJSC, Mariupol
Central Water Supply System, Chemical Water Treatment Plant No. 5. Combined Heat and Power Plant, Chemical Water Treatment Plant No. 6. Construction of facility of salt water collection and pumping. Feasibility Study.
2015UkraineIlyich Iron and Steel Works PJSC, Mariupol
Crushing plant. Implementation of aspiration systems and air ducts extension along screening facility No. 1. screening facility No. 2 and transfer unit No. 1. Detailed Engineering.
Eristovsk Mining and Beneciation Complex Ltd. Construction of mining and beneciation complex on the basis of the deposit of Eristovsk
2016Ukraine
Ukraine
Ukraine
Ukraine
19
Pobuzhsky Ferronickel Plant Ltd.
Revamping of aspiration equipment of 17 m level of metallurgical workshop. Basic and detailed engineering.
rd Revamping of gas cleaning equipment of the 3gas cleaning stage of tube rotary kiln No. 1-2. Basic and Detailed Engineering.
Aspiration equipment revamping of department of coarse crushing, medium crushing, overcharging, calcination workshop stockyard. Basic and Detailed Engineering.
2015
2015
2015
COUNTRYCUSTOMER PERFORMED WORKS YEAR
Pobuzhsky Ferronickel Plant Ltd.
Pobuzhsky Ferronickel Plant Ltd.
№
Ukraine
Ukraine
Ukraine
Ukraine
19
Revamping of gas cleaning equipment of drier drums No. 1, No. 2.
Activities management plan. Repair of brick and concrete refractory of 4.5x70 rotary kiln at Pobuzhsky Ferronickel Plant Ltd.
Development of Pre-design Documentation including Feasibility Study for installation of EAF-1.5 type furnace with auxiliary equipment for ferroniobium production at metallurgical workshop of Pobuzhsky Ferronickel Plant Ltd. Feasibility Study.
2016
2017
2017
20 Rudomine LtdRevamping of hematite quartzite beneciation complex of the sixth iron ore oor of Yuzhniy open pit. Detailed Engineering.
2016обогатительная фабрика
CUSTOMER PERFORMED WORKS YEARCOUNTRY
Pobuzhsky Ferronickel Plant Ltd.
Pobuzhsky Ferronickel Plant Ltd.
Pobuzhsky Ferronickel Plant Ltd.
UkraineOliyar Private Company 2017
Ukraine 2017Casthouse. Pump-and-accumulator station. Pumping equipment replacement. Feasibility Study.
Zaporizhzhia Casting and Mechanical Plant Ltd.
Ukraine 2017
Construction of mini biofuel Combined Heat and Power Plant based on condensing turbine generator with steam bleeding for providing Hot Water Supply for Rakovka district, Kremenchuk, Ukraine. Feasibility Study.
Soft Energy Ltd.
22
23
24
ChechRepublic
2017
Modernization of slag tapping system of Tandem Furnaces by means of slag pot carriage installation. Basic Engineering.
ArcelorMittalOstrava a.s.
21
Survey study of gas cleaning systems of boiler Е-25-1.4-ВЦКС.
rdRevamping of gas cleaning equipment of the 3 gas cleaning stage of tube rotary kiln No. 1-2. Design, equipment supply, contract supervision and commissioning.
Construction of the second line of calcinating shop dryhouse at Pobuzhsky Ferronikel Plant LLC with a capacity of 100-150 dmt/h of ore raw materials. Feasibility study.
2018
2019
PRONICO Company
Implementation of gas-cleaning equipment for the ne ore area. Design, equipment supply, contract supervision and commissioning.
2018Guatemala
Filter plant for service water supply.Design, equipment supply, contract supervision and commissioning.
PRONICO Company
Guatemala
Recalculation of gas cleaning system pipelines of Tube Rotary Kiln No.1. Modernized equipment supply.
PRONICO Company
Guatemala
252019
2019
UkrainePobuzhsky Ferronickel Plant Ltd.
UkrainePobuzhsky Ferronickel Plant Ltd.
www.aik-eko.com
Reception Room:
Tel./Fax: +38 061 233 23 55 (Ua)
Tel.: +38 067 617 41 41 (Ua) 8 Sedova Str., Zaporizhzhia,
69057, Ukraine
e-mail: [email protected]
AIK-EKO RESEARCH AND DESIGN INSTITUTE
UKRAINE
Reception Room:
Tel./Fax: +38 061 233 09 99
Tel.: +38 067 617 33 83 (Ua)
Tel.: +38 067 617 42 24 (Eng)
8 Sedova Str., Zaporizhzhia,
69057, Ukraine
e-mail: [email protected]
ТС “AIK-EKO”