Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction
Transcript
Page 1: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction.

Air Traffic Regulation Office (ATRO)April.2012

CAAC ADS-B Implementation Introduction

Page 2: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction.

Contents

1.CAAC ADS-B Implementation Preliminary Work

2.CAAC Next Phase Work

3. “ADS-B General Plan and Implementation of CAAC” release schedules

Page 3: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction.

Preliminary Work — Policy, Specification and Standards

2010,CAAC ATRO Published CAAC Surveillance Technology

Implementation Policy (AC-115-TM-2010-01),Includes ADS-B

Application Strategy.

2011,CAAC ATRO and ATMB Published ADS-B ATC Operation

Specification (AC-93-TM-2011-01)

2012,CAAC ATRO finished ADS-B 1090MHz ES Ground

Station(Receive) Technology Specification

Page 4: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction.

2008,CAAC Flight Standards Department Published ADS-B

Flight Operation(IB-FS-2008-002 )

2010,CAAC Aircraft Airworthiness and Flight Standards

Department Published Airworthiness and Operational Approval of

ADS-B Application in non-radar areas via 1090MHz

ES(AC-91-FS/AA-2010-14)

Preliminary Work — Policy, Specification and Standards

Page 5: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction.

2010, CAAC Aircraft Airworthiness Published ADS-B and TIS-B

Airborne Equipment Standards (CTSO-C166b)

2011, ATMB Began to Preparation of ADS-B Implementation

Road Map.

Preliminary Work — Policy, Specification and Standards

Page 6: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction.

Feb.2012 , CAAC ATRO Authorize TEDC.CO.LTD ADS-B Ground Station Lisence

Preliminary Work — ADS-B Equipment Certification

Page 7: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction.

Oct.2009 , ATMB ChengDu—JiuZhai Route Archive to ADS-B

surveillance coverage, including 2 ADS-B Ground Station.

Preliminary Work — ADS-B Route Surveillance Verification

Page 8: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction.

May, 2011, ChengDu—LaSha Route ADS-B began Trail

Operation , including 6 Ground Station.

Preliminary Work — ADS-B Application and Trail Operation

Page 9: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction.

July.2011,Z1 route archive to ADS-B

aurveillance coverage, ATMB is in charge of

ADS-B trail operation, CAACSRI responsble for

the whole project build.The project includes six

ADS-B ground station

Preliminary Work — ADS-B Route Surveillance Application

Page 10: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction.

Aug.2011 , ADS-B Application Seminar held in

ChengDu CAAC decides on ADS-B data link:

Transport Aviation: 1090MHz ES data link

General Aviation:1090MHz ES data link

Preliminary Work — ADS-B Application Seminar

Page 11: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction.

Contents

1.CAAC ADS-B Implementation Preliminary Work

2.CAAC Next Phase Work

3. “ADS-B General Plan and Implementation of CAAC” release schedules

Page 12: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction.

CAAC ADS-B Next Phase Work

Preparation of CAAC ADS-B Overall Planning and implementation of program

Standards, specifications and supporting polices of ADS-B application formulation and amendment.

ADS-B application problem research, includes: ADS-B anti-spoof and jamming studying ADS-B signal mixed fruit studying Compass2 integrity impacts on ADS-B Data Fusion of ads-b and other surveillance source

Page 13: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction.

Launch a series of ADS-B technology and function application verification projects, such as:

air-air surveillance application based on ADS-B IN function. includes Commercial and General Aviation

ADS-B ground station TIS-B/FIS-B function application verification.

ADS-B airborne equipment application verification based on GNSS(GPS + Compass2)  

CAAC ADS-B Next Phase Work

Page 14: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction.

Contents

1.CAAC ADS-B Implementation Preliminary Work

2.CAAC Next Phase Work

3. “ADS-B General Plan and Implementation of CAAC” release schedules

Page 15: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction.

CAAC ADS-B Implement Office & Work Group

Feb.2012,CAAC ADS-B implement office & workgroup

established. The Organization includes members of unit:

CAAC Flight Standards Department

CAAC Aircraft Airworthiness

CAAC Air Traffic Regulation Office (ATRO)

CAAC Air Traffic Management Bureau (ATMB)

The Second Research Institute of CAAC(CAACSRI)

Page 16: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction.

ADS-B Implementation Task Division of CAAC department

ATRO and CAACSRI responsible for preparation of “ADS-B

General Plan and implementation solution of CAAC”

CAAC Flight Standards Department responsible for formulating

airborne equipment updating plan and flight crew training

CAAC Aircraft Airworthiness and Flight Standards Department

responsible for ADS-B airborne equipment airworthiness certification

Page 17: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction.

ATRO responsible for the promulgation of the ADS-

B ground station standard and ADS-B ground station equipment

certification

ATMB excutes CAAC ADS-B implement program and

responsible for preparation of the specification of ATC operation,

equipment operation and staff training.

Task Division of CAAC department in ADS-B implement

Page 18: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction.

May.2012 Complement the draft of “ADS-B General Plan and

Implementation Solution of CAAC”.

June.2012 Submit to the ADS-B Implement office the

comments edition of “ADS-B General Plan and Implementation

Solution of CAAC”.

July.2012 CAAC authority release official version.

Release Schedules

Page 19: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction.