Airport Case Study
Qantas Significant Bird Strike Event
30th April 2012
Brisbane Airport
Speakers
•Luke Harvey (Airside Coordination Manager, BAC)
•Dave Selby (Wildlife Coordinator, BAC)
•Matthew Hill (Qantas Engineering, Queensland Quality
Training and Advisor)
Incident Report and Investigation (Luke Harvey)
Aircraft & Birdstrikes
Event Brief
Details of Damage
How a Jet Engine Works?
Flight Safety Impacts
Injestion Risks
Catastrophic Failure
Immediate Impacts to Qantas and our Passengers
• 250 Passengers immediately disrupted
• Consequential delays – Approx 4 days
• 600+ passengers affected
• Aircraft grounded for 2.5 days
• 38 Fan Blades replaced
• Aircraft & Engine inspections + Engine balance fuel burn. (4 Tonne)
• Brand Impact
• Lost Revenue
Luke Harvey Learning’s
• Active Harassment (Access and Staffing)
• Notification – ERSA, NOTAM, ATIS
• Awareness – Senior Management
• Stakeholder Involvement
• Passive Management (habitat management)
Luke Harvey Learning’s
Airside Drainage Upgrade/Gable Road Upgrade
Questions?